Sunteți pe pagina 1din 5

Mohammad Irfan Khan

ENGINEER NETWORK CONSULTING Phone: 09967867473 , 07676749323 Email: - mirfan_0072003@yahoo.co.in, khanis2005@gmail.com

OBJECTIVE:

Use of my experience in the areas of RF Engineering to achieve a Challenging and Progressive position in Telecom Industry. I would like to place myself in an organization where I gain an experience that would offer me greater roles in decision making and enhancing the company's reputation.

Total Work Experience: 3.7-Years

CURRENT EMPLOYER:-

Technical Achiev
11 months of experience in WCDMA i.e. 3G/HSPA Good Understanding of LTE Technology

2.8 Years of experience in GSM telecommunication industry

Presently working for Aster Pvt Ltd. Since FEB, 08 to till date. Job Profile:Drive tests & Optimization of GSM Air interface for New Site, Site swapping, Site Migrations, Benchmarking and for any up gradations using TEMS Drive Test Software. Site Optimization and its throughout performance testing and improvement of its KPI. Frequency planning including full SFH parameters (MA list, MAIO, HSN, etc.) CGI, LAC, Neighbors for cell of new sites so as to make optimum use of frequency and avoid interference using TEMS Investigation and M-COM. Analysis and Post processing of RF drive test log Files on tools like TEMS, MapInfo, MCOM ,RNO Macros etc. to determine Network problems like Poor Coverage Patches, Interference, call drops, hand over Issues. Post processing of Log files and analysis of drive test data on regular basis to identify QOS affecting issues and identification of optimization steps. Analysis of Network performance statistics (KPIs) e.g., Drop Statistics, Hand over statistics and their reasons on day-to-day basis and resolving the problems by taking necessary actions on it.

Confidential

Feedback to the VoC (Voice of Customer) complaints related to the network coverage and Quality. Planning coverage and capacity sites according to TA. Optimization of network KPIs parameter like SD Drop, TCH Drop, SD Blocking, TCH Blocking, SD Congestion, TCH Congestion, Random access success rate, HOSR, TCH Assignment etc. Responsible for coverage optimization - Level and quality optimization to ensure satisfaction of customer. Optimization of the network by changing Cell Parameters, Orientation & tilting of GSM Antennas for optimum coverage. Planning of Frequency, Neighbors, MAL, MAIO, HSN, and BSIC of existing and new sites.

Job Profile In 3G:

Responsible for Drive Test (Pre Drive, Post Drive, Optimization and Cluster). Responsible for Antenna Azimuth, Height & Tilt Planning, Cable Routing etc. Analyzing in 3G(WCDMA) Interference, Call Drops, Handoff failures, IRAT Handover failures, Common Pilot Channel Received Signal Code Power , Common Pilot Channel Interference Ec / No, Scrambling Code and defining Neighbors(3G AND 2G BOTH), Check relation b/w 3G and 2G etc. Testing Carried out under PRODUCT AT on Mobiles and HSPA Dongles as per Customer Requirement Responsible for Call Test (Voice and Video), Data (R99/HSDPA) Test and Submitting the coverage plot report. Changes in the RF database parameters with help of MSC teams for resolving network issues. Finalizing the BTS sites and search ring for optimum coverage. Verifying clutter type (urban, suburban, rural, quasi open etc.). Finalizing the Tower height, antenna orientations. Troubleshooting of the network based on Customer Complaints.

Project Experience :

Project Name
Profile Duration

ERICSSON AIRTEL, GULBARGA, KERNATAKA

DT AND OPTIMISATION 1.5 YEARS

Confidential

Project Name
Profile Duration

IDEA MUMBAI ERICSSON, MAHARASHTRA

DT AND OPTIMISATION 5 MONTH

Project Name
Profile Duration

ERICSSON UNINOR PROJECT, MEERUT, UPWEST

DT AND OPTIMISATION 3 MONTH


ERICSSON UNINOR PROJECT, LUCKNOW, UPEAST

Project Name
Profile Duration

DT AND OPTIMISATION 3 MONTH


ERICSSON AIRTEL PROJECT, VIJAYWADA, ANDHRA PRADESH

Project Name
Profile Duration

DT AND OPTIMISATION 5 MONTH

Project Name
Profile Duration

ERICSSON BSNL 3G PROJECT,ALLAHABAD , UPEAST

3G DT 3 MONTH

Project Name
Profile Duration

ERICSSON UNINOR PROJECT KPI TEAM ,AGRA DIVISION, UPWEST

OPTIMISATION 3 MONTH

Project Name
Profile Duration

ERICSSON 3G IDEA, PUNA (MAHARASHTRA)

3G DT AND OPTIMISATION ON PROJECT

Confidential

I HAD WORKED IN METRIC TELECOM NETWORK PVT LTD FOR THESE PROJECT

Project: AIRCELL IN UP EAST


LOCATION: UTTER PRADESH-EAST Operator: AIRCEL Vendor : AIRCOM Responsibility: R F Survey and LOS Survey

Project: AIRTEL IN KARNATAKA


Operator: AIRTEL Vendor: ERICSSON Responsibility: R F Survey and LOS Survey RF SURVEY & TRANSMISSION

RESPONSIBILITY :

Planning capacity and converge site by using MapInfo 7.0 Deciding Antenna height and Antenna Azimuth according to cluster situation. Deciding nominal by using Map Source for new town Survey. Completely done Clutter surveys and Hot spots collection. Deciding nominal by using Map Grid for new town Survey. Back Bone LOS Survey.

Technical Skills Mobile Communication Technology:

Technology Known: GSM WCDMA LTE

Tools used: TEMS Investigation Standard 12.0 ,12.1, TEMS Investigation ( 8.1.3, 9.1, 10.0.5) , Ascom
Scanner

ERICSSON INTERNAL MACRO WCDMA RNO TOOLS

Confidential

MapInfo Professional 8.5,10.5 , MIPT-3G


Professional & academic Qualification: High School passed from Aligarh Muslim University ,ALIGARH, UP, India 10+2 passed from Aligarh Muslim University ,ALIGARH, UP, India B.E in Electronics & Telecommunication Engineering from AMIETE (Institutions of Electronics and Telecommunication),, Lodhi Road, New Delhi, INDIA . Post Diploma in Embedded System programming .

ACADEMIC TRANING: Attending a week seminar on GSM and NANO Technology at IETE, Delhi.

Personal Profile:

Personal Details: Fathers Name Mothers Name Nationality Marital Status Sex Permanent Address : : : : : : Late Mr. Tajammul Husain Khan Mrs. Khushbun Nisha Indian Married Male Village - Mohammad Pur P.O. - Gaga Pur Distt. - Siddharth Nagar , UP F 2179577

Passport No.

(Er. Mohd. Irfan Khan)

Confidential

S-ar putea să vă placă și