Sunteți pe pagina 1din 5

Abu Dhabi UAE Mobile: 00971 507412354, Email: danish_petro@yahoo.

com

Name:
Objective:

Mohammad Danish

To join a team oriented, results driven, energetic group, interested in collectively driving an organization to new performance levels in pipeline project engneering, construction, pipeline operations, and technical services in Oil & Gas sector.

Introduction to Work:
Plan, execute, control and supervise engineering work activities and perform project execution activities from contracting
strategy, technical & commercial evaluation, contract execution and budget observation through out conceptual and detail design, fabrication, installation, testing and commissioning of surface facilities in areas of Pipeline Engineering for all development projects undertaken in line with company policy / objectives to ensure reliable and successful implementation which is critical to operational needs. Monitoring project status during the course of periodic project review meetings Coordinating with Main Contractors, monitoring their performance in view of project schedule & settling all techno commercial disputes / clarifications during execution of project. Preparation of proposals/offers for upcoming projects based on enquiry document of clients. Preparation of pipeline engineering design basis for the project and getting the same duly approved from senior management & client. Preparation of the necessary documents for the early issuance of the Design Enquiries. Carry out design for in-house engineered work including drawings, specifications/ data sheets and bills of quantities for EPC contractors. Pipeline engineering design and construction advice per ASME B 31.4 ,ASME B 31.8 & ASME B31.3 including Engineering calculations, analysis covers pipeline/piping wall thickness calculation for CS / DSS / SS/ GRE, strain based calculation, elastic bend radius calculation, road/rail/water body crossing design calculations, Barred Tee calculation, Flange calculations, Re-enforcing pad calculation ,buoyancy calculations, virtual anchor point calculation, expansion on above ground pipeline ends, upheaval buckling, Flange Leakage Calculation, expansion loop calculation, hydro-test calculation, pipe span calculation, pipe support ,stress analysis using CAESAR-II, Hot Tap calculation, Stud Bolt length calculation, Zick analysis for Pig trap saddle supports, soil stiffness calculation & induction bend thinning calculation. Pig Traps design calculations (wall thickness, branch reinforcement, flange rating, saddle support, wind load, seismic load and hydro testing pressure) & Fabrication drawings. External and internal corrosion mitigation measures including selection and design of external and internal coating/lining (FBE/PP/PE) for the pipelines. Preparation of material requisitions and specifications for all pipeline related materials including line pipes (CS/DSS/SS/GRE), Flanges, valves, pig traps, pig signalers, pipeline fittings, PE Liner, Barred Tee, Fittings, isolation joints, heat shrink sleeve, corrosion monitoring fittings & gaskets. Review & approval of Material test certificates, inspection and test plans & vendor drawings for Flanges, valves, pig traps, pig signalers, pipeline fittings, Barred Tee, isolation joints, heat shrink sleeve, corrosion monitoring fittings. Technical Bid Evaluation for major items, line pipes (CS/DSS/SS/GRE), Flanges, valves, pig traps, pig signalers, pipeline fittings, PE Liner, Barred Tee, isolation joints, heat shrink sleeve, corrosion monitoring fittings & gaskets. Study & report writing for commissioning/decommissioning procedures. Preliminary and detailed analysis of pipeline routing, plan profile generation, Block Valve stations and Launching / receiving station layouts, P&IDs, Tie-in, Isometric sketches, Preparation of material requisitions and specifications for all pipeline related materials including line pipes, valves, pig traps, pig signalers and fittings. Checking drawing verses equipment layout, piping layout, piping isometric, piping supports, bulk and final material takeoff & preparation of requisition for procurement. Study & reports for commissioning & decommissioning of pipeline. Attend Design review, Hazop & weekly progress review meetings with consultants and contractors to identify and resolve areas of concerns. Prepare, Coordinate and Conduct and/or participate in necessary technical meeting and prepares correspondence, report writing and minutes to various internal and external offices in order to ensure the realization of the proposed projects as schedule. Present & interface with clients. Plan workload and type of work for other team members efficiently and ensure timely completion of the job. Controls more than one task of a project or multiple projects at one time Participate in the commissioning/shutdown job and preparing the time scheduling plan for the project under execution. Organize the preparation of As-built drawings and documentation. 2001

Education:

B.Tech - Petro-Chemical Engineering, Aligarh Muslim University, Aligarh, India Certificate in Piping Engineering, Indian Institute of Technology (I.I.T.), Bombay, 2001 Caesar-II pipe stress analysis, Coade-ImageGrafix, 2008 7 CEU Certificate, ASME Section VII Div. 1, ASME (Pursuing) Industrial Safety, IIMAT, India, 2007 Project Execution/Project Management, T&P 2008.

Computer Skills:
Design softwares: Caesar II, CAEPIPE, AUTOPIPE, PV Elite, Auto plant isometric. PDO road cross, AutoCAD 2006,
Microstation, SAP. Developed spreadsheet based calculation models for pipeline calculations, hydro test, expansion loop, virtual anchor location, Flange leakage calculation, Limit state, strain based design, pipeline stresses, soil stiffness etc.

Design Standard / Code Familiarisation


Familiar with various applicable international standard and design code like ASME B.31.8, B31.3, B31.4, B 16.5, B 16.9, B 16.11, B 16.34, B 16.47, B 36.10,B36.19, API 5L, API- 6D,API 520, API 521,API 1110,API 1102,API 650, NACE MRO175, ASME VIII, Shell Groups DEP, Saudi Aramco desktop standard and other industry applicable ANSI, MS-SSP, ISO std.

Work Experience: 2010-Present, Senior Pipeline Engineer, Litwin PEL , Abu Dhabi
FED & DD for gas lift system pilot projects (ADCO 2010)
As a Sr Pipeline Er involved in pipeline network (20 kms) & design for providing facilities for gas injection in order to overcome oil production decline and reduce the number of inactive wells by introducing an artificial lift system in the BAB field.

FEED FOR BAB NORTH 3 NEW WATER INJECTION CLUSTERS (ADCO 2010)
As a Sr Pipeline Er involved in pipeline network for surface laid distribution header which feeds the surface flow lines to the Water Injection wells. For peripheral Water Injection clusters (3Nos) consisting of 23 wells & pipeline (32kms)

2005-2010, Lead Pipeline Engineer, Tebodin & Partner LLC, Oman


T&P is an engineering consultancy company based in Muscat and are the main engineering consultants for all Petroleum Development Oman (PDO) pipeline projects, Oman Gas Company (OGC), Galfar, Occidental(OXY), Punj Lloyd (PLL), AlHassan , Al-Turki Enterprises LLC and other Primary clients in Oman.

Job Responsibility

This position reports to pipeline engineering department head, & had an additional responsibility of Stress specialists, responsible for resolving stress issues for all projects. As the lead, plans, budgets, organises, coordinates and controls the project and is responsible for coaching and developing Omani professionals. Prepare pipeline specifications and drawings, interpret soil/route survey data, prepare /review alignment drawings. Engineering for scraper trap systems including design, preparation of specifications, general arrangement drawings for the pig launchers and receivers. Review/ approve drawings, specifications and other technical documents for pipeline engineering Providing technical input and direction into the Contractors pipeline construction and installation activities in order to facilitate progress and to achieve a fit for purpose design. Plan, co-ordinate with various other engineering departments for project activities, meet with Heads of Technical Services, representatives/senior management from client and other concerned to discuss subjects such as coordinations, progress, schedule and arrive at the best and most economical and efficient solutions. Trouble shooting, attending to site queries and other site related problems.

DD for Infrastructure facilities for Nimr water treatment plant (PDO/AlTurki-2009-2010)


As a lead/senior pipeline engineer involved in detail design of EPC for 18 GRE Buried, 12 Km (Approx) long Produced Water Pipeline from DWD Site-3 to NWTP Plot A and Two Nos.18 GRE, Buried, 10 Km (Approx) long Produced Water Pipeline from DWD Site-4 to NWTP Plot A pipelines respectively.

Front End Engineering Design (FEED)-Nimr A/B & Amin bulk header replacement (PDO 2009)
As a lead/senior pipeline engineer involved in the Replacement of corroded CS header in Nimr A (12, 5.5km) , Amin (12, 3Km) & Nimr B (16, 2.1 km) with a new GRE header, Tie ins for 16 nos MSV connections, Tie in to 30 Nimr A pipeline, Tie in to 16 Piping, Tie in to 12 GRE from Nimr G.

FED & DD for Harmal Pipeline

(Al Hassan engineering Co. SAOG / PDO 2009)

Detail Design (DD) calculations ,developing the construction philosophy, route for HT/HP Pipeline (130 oC buried & 120 Bar(g)) for Harmal field gathering system consisting of pipeline & flowline network for 8 Pipeline tie back from Harmal field to KGP Bulk Header and test header , 4 Flowline and hook-Up for Harmal-1 vertical well, 6 Flowline and hook-up for Harmal-2 horizontal well , 6 Flowline and hook-up for Harmal-3 horizontal well, Remote manifold station RMS Modifications and tie-in activities at kauther Gas Plant (KGP)

OGC - South Oman Pipelines Expansion Project (OGC/GPS, 2009)


Design and detailed engineering for the Expansion of OGC South Oman Gas Transportation System at Salalah Free Zone Area. As a pipeline engineer involved in the detail design calculations & fabrication drawings of Pig Traps- 2 Sets (i.e. pig launchers and pig receivers) 20 x 18 -300# and 1 set 28x26 300#

De-commissioning procedure for 18 Main Oil Line (MOL) (PDO, 2008)


As a lead/senior pipeline engineer involved in the study & procedure / report writing for the de-commission & mothballing 18 MOL between Marmul & Nimr.

Mabrouk Gathering System (PDO/Galfar, 2008) Page 2 of 5

As a pipeline engineer involved in the detail design calculations & Fabrication drawings of Pig Traps- 4 Sets (i.e. pig launchers and pig receivers) 12 x 16 -600# and 1 set 12x16 900# for 12 Bulk Line. Stress analysis & interface resolution for new Bulk lines (12-6 Nos), test lines (6- 7 nos) and gas export pipeline (12-6 Nos) Achievement : Received the company best project award for 2008-2009.

Permanent Pigging Facilities on MPS/CPF Crossover Pipelines (Occidental Mukhaizna LLC (OXY 2008)
As Lead /Senior pipeline engineer involved in: Installation of permanent pigging facility on 14 crossover line, to carry out pigging on monthly basis. Preparation of pig trap specification, Design calculations (wall thickness, branch reinforcement, flange rating, saddle support, and hydro testing pressure), Technical Bid Evaluation for pig trap, GA Drawings including nozzle orientation.

2 to 24- 250 km Qarn Alam off Plot Steam Project (PDO/Galfar, 2008)
As a pipeline engineer involved in detailed Design for Pipeline & flow line networks, Well sites, and associated off plot infrastructure. For production, Aquifier pump off system, interconnecting pipelines & Deep water disposal system.

32 Carbon Steel Pipeline, Saih Rawl to Mukhaizna, 253 Kms, EPC job. ( Punj Lloyd Ltd. / Oman Gas Company (OGC) jobs, 2007)
As Lead pipeline engineer involved in Detailed Design & Engineering of the 32" dia pipeline & associated facilities from Saih Rawl to BVS -09 as part of the EPC contract awarded to Punj Lloyd. Associated facilities include new BVSs & associated piping work (7 nos.) and mobile flare stack.

Barik Lift Gas flowline (PDO, 2006)


Concept engineering for Barik field flowlines, to use gas at 110-133 bar (g) pressure to lift crude oil from 8 wells. Involved in concept for MOC selection SS / DSS, above ground/Belowground, Wall thickness calculation and line pipe specification.

Kauther Field Gathering System (PDO, 2005-2006)


This is a gas gathering network involving detail-engineering design of High Temperature High pressure (HT/HP) pipelines on conventional stress based design with loops, Limit state and Strain-based pipeline design calculations. The Kauther field consists of 23 new well sites and piping for six remote manifold stations. As Lead pipeline engineer involved in: Limit state and strain based pipeline calculations, analysis, running software, report writing, interfacing with client, review drawings, supervise contractor during installation, review and approve vendor drawings, documents and calculations. Achievement: Received the Petroleum Development Oman appreciation letter, on successful commissioning of High temperature/High pressure buried pipeline.

Stress Analysis Jobs


As a stress specialist responsible for review/ carry out stress analysis of pipeline jobs. Responsible for problem solving of stress related issues for all projects. In addition to the projects handled as a lead engineer, selected list of stress related jobs are as follows: FED for Lekhwair C to LPS GRE Pipeline (Review/ Approval of GRE pipeline stresses done by Vendor.) FED & DD Fahud Steam Project Phase1- Pipelines ( Stress Analysis & report for 150o C Steam Pipeline ) Stress analysis for high pressure (120 bars) and high temperature (130C) above ground and buried pipelines for pipe size ranging from 6 to 22 diameter for kauther field gathering system. Stress analysis for high pressure (120 bars) and high temperature (130C) buried pipelines for Harmal field gathering system. HP Gas flowline SN 18 & SN 21 ( Stress Analysis & report for high temperature 120oC buried flowlines) Engineering for diversion of SRS wells ( 3 f/l stress Analysis & report for high temperature 110oC buried flowlines) WL Inlet Header Stress analysis Oxy ( Resolving the vibration of existing 16in LP inlet header) Stress analysis BAPCO-Bahrain ( Review & resolve the existing BAPCO fired heaters inlet & outlet heater piping replacement with higher alloy & within limited space) Stress analysis for 15 nos above ground and buried pipelines & Scraper trap station pipe work using CAESAR-II V 5.10 mabrouk field gathering system. 36/X65 Hubara-Sahmah Oil Pipeline FEED & detailed design for 102 km ( Stress Analysis & report ) 12/X60 Lekhwair Water Injection Pipeline for 8 km including Pig L/R facilities ( Stress Analysis & report ) Raw Water Tie-ins to HMPS ( Review/ Approval of pipeline stress reports for harweel area done by Petrofac.) 2x14" crossover pipelines Oxy Mukh. ( Stress Analysis & report ) Stress Anal. For DSS F/L Barik-62 Galfar (Review/ Approval of pipeline stresses)

Page 3 of 5

2003- 2005, Pipeline Design Engineer, Radicon Gulf Consult, Saudi Arabia
General Engineering Service project design contractor for Saudi Aramco southern area Oil & Gas projects in Al Khobar Saudi Arabia.

Job Responsibility

This position reports to Project Manager, responsible for planning and scheduling piping projects from front-end engineering through to conceptual and detail design, As built and demolition projects. The job responsibility includes day to day planning, scheduling and monitoring project activities, including co ordination between Project Manager and site, documentation control, Supervising drafting staff and QA/QC. Provide detailed engineering of plant modification and capital projects which involve P&ID preparation, cost estimation, description and justification, scheduling, mechanical scope of work, design calculation, preparation of specification, piping layout and isometric drawings. Interface with other discipline engineers during the development and subsequent review of engineering deliverables. When required, serve as single-point contact with SAUDI ARAMCO PROJECT ENGINEERS. Search and retrieve existing available drawings from Saudi Aramco drawing libraries (Web QVP). Verification (at site) of existing facilities, existing drawings, dimensional and system survey for preparing detailed survey reports & documents required to be used as input data for completing design involved in the project. Consistency checking of the drawings verses equipment layout, piping layout, piping isometric, piping supports, bulk and final material take-off. Compilation of project docs such as design packages, Construction packages, project design specifications. Provide guidance, technical backup & direction to design team Draughtsman/ Designers. Timely and accurate estimation of Mech. quantities for Projects from specifications and drawings. Inviting quotations from vendors and submitting the cost estimates to the client to facilitate bidding. Working in close co-operation with all disciplines associated with the project estimate.

Saudi Aramco Projects


Detail Engineering of Khursaniyah Oil Field, Saudi Aramco Saudi Arabia
The project involves detail-engineering design for new oil well sites and oil manifold. The job involves preparation of oil gathering network,, flow line route alignments, piping plans, isometrics, pipe support design and detail calculations for well head, pig launcher & receiver, corrosion inhibitor and monitoring system and drain pit. Verification & up gradation of P&ID Uthmaniyah Gas Plant, Gharwa Oilfield The job involves working in the Gharwa Oilfield field Engineering and preparation of as built Gharwa field pipeline/flow line network, P&IDs of gas well head, gas well corrosion and air systems, Scraper launcher and receiver, gas compression and processing, whole of Uthmaniyah Gas Plants producing NGL from sour gas. Conceptual Design for pipeline scraper water treatment plant The project involves design of Filtration system for pipeline scraper water treatment plant, improving the backwash piping design, addition of Vertical pumps& Multimedia Gravity filter tank. Design PTFE/PFA lined pipe at Shed gum Gas Plant, The objective of the project is to provide a complete detail design package for design of piping with PTFE/PFA lined pipe. Fire Water Pipeline network at GOSPs The job involved design of underground RTR firewater pipeline and installation of fire monitors, Hydrants, post indicator valves and Hose reels as per Saudi Aramco standard and latest edition of NFPA. Develop and digitize OSI sketches for Sulphur Loading Plant, EAST-WEST Pipeline and Rastanura Refinery The responsibility was to develop OSI Isometric sketches, field verifying the existing isometric drawings, develop and digitize OSI drawings to reflect the field conditions & identify thickness measurement locations.

2001- 2003, Piping Engineer, Jobby Engineers Pvt. Ltd, Mumbai.


EPC company specialist in design and fabrication of pipes, tank, vessels etc.

Projects: Elf Gas Expansion Project, Mangalore, India /Novartis Chemicals Ltd, Khopoli, Mumbai, India

This position involves interfacing between engineering specialists, project engineers, planners, and construction personnel of design consultant Kaverner Power Gas India Ltd. It involves P&ID and general arrangement drawing interpretation, developing isometrics from 2D GA assemblies, drawing the line wise isometric for the construction purpose, monitor fabrication and welding procedure (SMAW, GTAW), maintaining QC documents, maintaining record of the extra and modification work, technical queries and solving fabrication difficulties, site surveying, documenting line wise consumption of pipes, valves, piping elements calculations

Page 4 of 5

of necessary details like shop joints, field joints ,inch diameter ,Inch meter ,MTO,QC documentation and in depth knowledge of detailed engineering based on major engineering standards and international codes. A sound knowledge of the safety aspects of the project safe work practices, work permit and experience in carrying out jobs in running plant.

PERSONAL DETAILS
Fathers Name: Nationality : Marital Status : Maseehuzzaman Indian Married To be agreed Sex Salary Date of Birth: 24 th June 1980 : Male : Negotiable

Availability:

Permanent Address: Maripur, Powerhouse chowk, Muzaffarpur, Bihar-842001, India. Phone: 91- 621 2220225 References: Available upon request

(Md Danish)