Sunteți pe pagina 1din 25

Taylor Road Resurfacing Project

General Information:
Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles
Taylor Road Resurfacing 2

General Information:
Project Limits: Euclid Heights Blvd. and Bayreuth Road Project Administration: ODOT District 12 ODOT Project Engineer: Al Yost ODOT Area Engineer: Patrick McCafferty
Taylor Road Resurfacing 3

Work Schedule
Scheduled Start Date: April 2012 Scheduled Completion Date: September 30, 2012

Taylor Road Resurfacing

Work Schedule
Work will generally be from 7 a.m. - 3:30 p.m. No night work Weekend work only if needed to keep the project on schedule

Taylor Road Resurfacing

Work Description
Repair the concrete base and resurface with asphalt from Euclid Heights Blvd to Bayreuth Road All of the existing asphalt will be removed Extensive concrete slab repair and replacement from Euclid Heights Blvd to Mayfield Road

Taylor Road Resurfacing

Work Description
Additional concrete base repairs as needed from Mayfield Road to Bayreuth Road Resurface with approximately 5 inches of asphalt

Taylor Road Resurfacing

Work Description
Eastern most lane (the lane nearest to the shopping center) from Euclid Heights Blvd to Mayfield Road will be removed
Road will be 5 lanes wide in this area when work is complete New curbs and drainage inlets will be installed
Taylor Road Resurfacing 8

Work Description
Replace damaged portions of curb throughout the project Approximately 40 driveway aprons will be replaced (at locations marked for curb replacement) Upgrade curb ramps to ADA requirements

Taylor Road Resurfacing

Work Description
Traffic signals at Severance Center Access and Hollister Road will be removed permanently

Taylor Road Resurfacing

10

Phase 1
Shift all traffic to the East half of the road and make repairs to the West half Maintain both Northbound and Southbound traffic

Taylor Road Resurfacing

11

Phase 1
On Taylor Road between Euclid Heights Blvd and Mayfield Road
1 Southbound lane 2 Northbound lanes

Taylor Road Resurfacing

12

Phase 1
On Taylor Road between Mayfield Road and Monticello Blvd
1 Southbound lane 1 Northbound lane 1 Center turn lane

Taylor Road Resurfacing

13

Phase 1
On Taylor Road between Monticello Blvd and Bayreuth Road
1 Southbound lane 1 Northbound lane

Taylor Road Resurfacing

14

Phase 1 - Intersections
Euclid Heights Blvd / Taylor Road
Left turn lane for Northbound traffic Left turn lane for Southbound traffic

Taylor Road Resurfacing

15

Phase 1 - Intersections
Mayfield Road / Taylor Road
Right turn lane for Northbound traffic Left turn lane for Southbound traffic Lanes on Mayfield Road not changed

Taylor Road Resurfacing

16

Phase 1 - Intersections
Monticello Blvd. / Taylor Road
Left turn lane for Northbound traffic

Taylor Road Resurfacing

17

Phase 2
Shift all traffic to the West half of the road and make repairs to the East half Maintain both Northbound and Southbound traffic

Taylor Road Resurfacing

18

Phase 2
On Taylor Road between Euclid Heights Blvd and Mayfield Road
1 Northbound lane 1 Southbound lane 1 Center turn lane

Taylor Road Resurfacing

19

Phase 2
On Taylor Road between Mayfield Road and Bayreuth Road
1 Northbound lane 1 Southbound lane

Taylor Road Resurfacing

20

Phase 2 - Intersections
Euclid Heights Blvd / Taylor Road
Right turn lane for Northbound traffic Left turn lane for Southbound traffic

Taylor Road Resurfacing

21

Phase 2 - Intersections
Mayfield Road / Taylor Road
Left turn lane for Northbound traffic Lanes on Mayfield Road not changed

Taylor Road Resurfacing

22

Project Notes
Please watch for construction personnel and equipment while travelling through the work zones. ODOT and City staff will work with you to mitigate any concerns which will arise during the reconstruction.

Taylor Road Resurfacing

23

Contact Us
City of Cleveland Heights: (216) 691-7311 ODOT Public Information Office: (216) 584-2005 ODOT Construction Office: (216) 584-2152 Al Yost & Pat McCafferty

Taylor Road Resurfacing

24

Thank You

Taylor Road Resurfacing

25

S-ar putea să vă placă și