Contract No:GTC 144 Contract Title:Qatar Power Transmission System Expansion Phase VIII
SUBSTATION /
CIRCUIT :
RAYYAN WEST
No
Related Section
Defects Description
Remarks
Signature
a) 13 14 Protection
UPS Minor Hyundai scope Statron will be done Hyundai will be done.
The correct rating to be displayed in the UPS Start / Stop procedure to be pasted on the door (inside) of the UPS b) BATTERIES
22 23 24
The Battery room and all the battery room equipments are to be cleaned completely. The battery cell topping up to be done (wherever required). Boost charging of batteries is to be done as per the procedure (in presence of KM rep. from A & I).
ET-P20/F5
Issue: 0
01-01-2008
Page 1of 3
25
Minor
ET-P20/F5
Issue: 0
01-01-2008
Page 1of 3
Boost procedure fixed temporarily to be replaced with boost procedure in stainless steel plate. Charger -2 : Sound from txr to be rectified Charger -1: Firing card LED not glowing. DVR panel: Diode dropper for charger 1 & 2 to be separately mounted. Battery commissioning date to be entered in data menu of battery charger.
White patch formation of LED display to be rectified. NO contact of DVR fault parallel with Earth fault NO contact shall be re terminated at NO contact of charger fault. All the three NO contact of DVR fault shall be made parallel with charger NO contact. Battery fuse rating to be changed suitable for battery charging of 240Amps instead of 220Amps as it was changed at Site. Charger -1&2 sides plates and Charger -2 rear side to be cleaned Charger -2: One bolt not fixed at rear side Charger -2: Rear bolt not fixed in full length Charger -1: RH side bolt not fixed in full length
ET-P20/F5 Issue: 0 01-01-2008 Page 1of 3
Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal Minor/Normal
Ready for inspection. Ready for .inspection Ready for .inspection Ready for .inspection Ready for .inspection Statron will be done Statron will be done Statron will be done Ready for .inspection Ready for .inspection Ready for .inspection Ready for .inspection Ready for inspection.
Permanent component labels not fixed. Label for fixing battery charger and fuse box opening handle not fixed in panel key box. Alarm details not fixed in charger 1, 2 and DVR panel Fuse box -1 operating instruction not fixed in door of fuse box-1: Change the selector switch to charger 2 feed to isolate the fuses Fuse box -2 operating instruction not fixed in door of fuse box 2 :Change the selector switch to charger 1 feed to isolate the fuses Rating plate to be fixed in stainless steel in charger 1 &2, DVR Details of revised charger change over logic to be fixed.
Permanent instruction details to RESET battery charger to be fixed. Charger, diode dropper and fuse box door keys not positioned.
Minor/Normal
Statron will be done. km under discussion Ready for inspection. Statron will be done. km under discussion Ready for .inspection
40
Protection
Minor/Normal
41
Protection
Minor/Normal
42
Protection
Minor/Normal
43
Protection
Minor/Normal
44
Protection
Minor/Normal
45 46 47 48
Statron will be done. Ready for .inspection Ready for .inspection Ready for .inspection Ready for inspection.
Charger and diode dropper opening handle not positioned in LVDC room.
ET-P20/F5 Issue: 0 01-01-2008 Page 1of 3
Ready for inspection. km under discussion km under discussion Ready for inspection. km under discussion Statron provide updated scheme. Statron provide updated scheme. km under discussion km under discussion Statron will be done. Ready for inspection.
Lock not provided for battery charger change over switch. Fuse box isolator safety lock key to be kept in key box. Auto change over switch with Auto/Manual mode similar to Phase IX substations to be fixed. Revised schematic diagram with out change over for fuse fail to be positioned. Revised schematic diagram with relay contacts for fuse fail and fuse isolator open paralleled to be positioned. Over load alarm not configured to DGCC/SCS Material for mimic shall as per KM standard practice. Connector conduits are not clamped in charger 1 & 2 Charger -1 & charger -2: DC output cable to be clamped instead of ties. Sponge filters provided on front and rear top of the battery charger and DVR panel to be replaced with 1mm filter instead of sponge filter for proper air circulation similar to UPS.
ET-P20/F5 Issue: 0 01-01-2008 Page 1of 3
54
Protection
Minor/Normal
55
Protection
Minor/Normal
56 57 58 59
60
Protection
Earth fault pick up less than 19v drop not possible to be rectified. Fuse failure alarm relay 3 contacts to be paralleled with fuse isolator open relay.
Digital values of DVR card 1&2. setting to be submitted in CD Software for configuring DVR card with digital values to be submitted Manual for configuring DVR card to be submitted DVR panel: Door Fan control fuses to be replaced with MCB similar to Phase V to Phase VII STATRON chargers.
Minor/Normal
Statron will be done.km under .discussion Ready for inspection. Ready for .inspection Ready for .inspection Ready for .inspection Km under .discussion Km under .discussion Statron will be done Km under discussion Km under discussion .
62
Protection
Minor/Normal
63 64 65 66 67 68 69 70
Note : The comments of consultant / KM rep (during S.A.T) shall also be included in this for preparing the complete pending list after TOC