Sunteți pe pagina 1din 2

Project report BScIT a) cover page (format) b) Declaration c) Certificate of the college (2 per students) d) Certificate from Company

e) Acknowledgment f) Index g) Main report [Table of content] i) Objective and scope of the project (Objective : Aim of the project , How is it useful to the organization and the user. Scope : Project Feasibility or limitation of the project ii) Theoretical background Organization Logo Company Name : Address Contact No: E-mail id: Organisation Features: History and Company Description iii) Definition of problem Limitation of the existing System Proposed System How Project helps the organization or the firm. Kind of problem the project solves. Advantages of the proposed software or project. iv) System analysis and design vis--vis users requirements Problem Analysis: Analysis of the companys problem. Discussion with the External Guide How the students found a solution to the companys problem. Modules of the project. System Requirements: Organisations demands about the project software and their requirements. v) System Planning (Explain in few words about gantt chart ) And draw vi) Detailed life cycle of the project ER diagram Entity relation Ship diagram Event Table- Event/Trigger/Source/Activity /Response/ Destination Project Type : Structural Approach ( VB,ASP) DFD-Data Flow Diagram Context Level DFD, DFD Fragments Project Type : Object Oriented Approach ( JAVA, C#) UML Diagrams: Class Diagram, Usecase Diagrams, Sequence Diagram, Activity Diagrams vii) Process involved Software Process Model Used: Incremental , Spiral , Waterfall Model. Specify the diagram and describe why this model was chosen for the project. viii) Methodology adopted, system implementation and details of hardware and software used.

Description about the software languages used and the key features System Requirements: Software and Hardware Requirements Software: Front End and Backend Hardware: Processor, RAM, CPU Speed, Hard disk, Monitor ix) System maintenance and evaluation Corrective maintenance, Adaptive, Perfective, Preventive (See Nishas Book) (40) x) Methodology used for testing Unit testing, Module test, Function Test, Acceptance test, Integration Test, Black box test, White Box Test , System Test xi) Layout of the screen and code (1 to 1) (use Tab) Annexure: 1. Data Dictionary: List of database Tables Table Name : Field Name / Data Type/ Size or Format / Description 2. List of Figures and Tables with Page No 3. Bibliography Books and Websites Referred i) Data dictionary This should give a catalogue of the data elements used in the system / sub system. Data name, aliases if any, length (size), type numeric, alpha, binary, etc. Note: 1. Minor variation in the above format as per the project requirements may be permitted. 2. the report should be presented in the bound form (hard bound)

S-ar putea să vă placă și