(Al 30/04/05)
PROYECTO
CONTRATO DE OBRA
ENTIDAD
VALOR REFERENCIAL
CONTRATISTA
VALOR OFERTADO
SUPERVISIN
UBICACIN
PLAZO DE EJECUCIN
FECHA PRESUPUESTO
: JUNIO DE 2006
REINTEGRO
VALORIZACION N
PERIODO
MONTO BRUTO
VALORIZADO (a)
01
AL 30/04/05
0.00
ACTUAL
(b)
ACTUALIZACIN VAL.
ANTERIOR
(C)
VALORIZACIN
BRUTA
(d)=(a+b+c)
AMORTIZACIN
ADEL. EFECTIVO
(e)
VALORIZACIN
NETA
(f)=(d-e)
I.G.V.
19%
(g)=19% (f)
MULTA
(h)
NETO A PAGAR
(k)=(i)-(j)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
OBRA
FP - 01
FP - 01
FP - 02
: 04 TRIBUNA OCCIDENTE
FP - 02
: 05 TRIBUNA NORTE
FP - 02
FP - 03
FP - 03
FP - 04
ENTIDAD
CONTRATISTA
: SERCCONS S.R.L.
SUPERVISIN
UBICACIN
FP - 01
VALOR
01
PERIODO
AL 30/04/05
01
FP - 02
02
03
04
FP - 03
05
06
VALORIZADO
FP - 04
07
08
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PARCIAL
(S/.)
ACUMULADO
(S/.)
0.00
#DIV/0!
0.00
VALORIZADO
%
#DIV/0!
Pgina
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
ENTIDAD
VALOR OFERTADO
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Descripcin.
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
UND
555.08
555.08
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
555.08
100.00%
01.02.00
M2
137.98
0.3
41.39
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
137.98
41.39
100.00%
01.03.00
M2
137.98
0.61
84.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
137.98
84.17
100.00%
01.05.00
KG
51285.59
0.09
4,615.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
51285.59
4615.70
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
135.87
2.95
400.82
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
135.87
400.82
100.00%
02.02.00
M3
30.92
7.67
237.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
30.92
237.16
100.00%
02.03.00
M3
1.02
12.27
12.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.02
12.52
100.00%
02.04.00
M3
0.7
25.25
17.68
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.70
17.68
100.00%
02.05.00
M3
208.86
3.43
716.39
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
208.86
716.39
100.00%
02.06.00
M2
78.99
6.21
490.53
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
78.99
490.53
100.00%
02.07.00
M2
88.07
6.14
540.75
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
88.07
540.75
100.00%
03.00.00
03.01.00
M2
0.64
12.12
7.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.64
7.76
100.00%
03.02.00
CIMIENTOS
03.02.01
M3
30.92
137.57
4,253.66
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
30.92
4253.66
100.00%
03.03.00
SOBRECIMIENTOS
03.03.01
M3
3.26
173.91
566.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.26
566.95
100.00%
03.03.02
M2
33.12
19.44
643.85
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
33.12
643.85
100.00%
03.04.00
FALSO PISO
03.04.01
M2
78.99
21.61
1,706.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
78.99
1706.97
100.00%
04.00.00
04.01.00
SOBRECIMIENTO REFORZADO
04.01.01
M3
1.19
173.23
206.14
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.19
206.14
100.00%
04.01.02
M2
15.9
26.21
416.74
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.90
416.74
100.00%
04.01.03
KG
46.38
3.27
151.66
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
46.38
151.66
100.00%
04.02.00
ZAPATAS
04.02.01
M3
0.32
228.65
73.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.32
73.17
100.00%
04.02.02
KG
7.14
3.27
23.35
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.14
23.35
100.00%
04.03.00
COLUMNAS
04.03.01
M3
3.38
272.03
919.46
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.38
919.46
100.00%
04.03.02
M2
50.27
22.44
1,128.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
50.27
1128.06
100.00%
04.03.03
KG
322.81
3.27
1,055.59
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
322.81
1055.59
100.00%
Pgina
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
ENTIDAD
VALOR OFERTADO
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Descripcin.
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
04.04.00
VIGAS
04.04.01
M3
4.58
242.87
1,112.34
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.58
1112.34
100.00%
04.04.02
M2
49.25
27.53
1,355.85
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
49.25
1355.85
100.00%
04.04.03
KG
353.75
3.27
1,156.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
353.75
1156.76
100.00%
04.05.00
LOSA MACISA
04.05.01
M3
1.02
254.23
259.31
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.02
259.31
100.00%
04.05.02
M2
13.68
20.05
274.28
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.68
274.28
100.00%
04.05.03
KG
122.15
3.33
406.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
122.15
406.76
100.00%
04.06.00
04.06.01
M3
0.28
240.18
67.25
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.28
67.25
100.00%
04.06.02
M2
4.37
27.53
120.31
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.37
120.31
100.00%
04.06.03
KG
19.2
3.27
62.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
19.20
62.78
100.00%
05.00.00
05.01.00
ESTRUCTURAS DE MADERA
05.01.01
P2
78.3
2.81
220.02
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
78.30
220.02
100.00%
05.01.02
18.83
13.81
260.04
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.83
260.04
100.00%
05.02.00
COBERTURAS
05.02.01
M2
116.04
15.93
1,848.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
116.04
1848.52
100.00%
06.00.00
MUROS DE ALBAILERIA
06.01.00
M2
209.52
24.26
5,082.96
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
209.52
5082.96
100.00%
07.00.00
REVOQUES Y ENLUCIDOS
07.01.00
M2
66.49
9.22
613.04
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
66.49
613.04
100.00%
07.02.00
M2
207.17
8.14
1,686.36
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
207.17
1686.36
100.00%
07.03.00
M2
70.88
9.93
703.84
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
70.88
703.84
100.00%
07.04.00
M2
46.09
11.85
546.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
46.09
546.17
100.00%
07.05.00
M2
44.31
17.36
769.22
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
44.31
769.22
100.00%
07.06.00
VESTIDURA DE DERRAMES
102.32
9.05
926.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
102.32
926.00
100.00%
07.07.00
BRUAS E= 1x 1 CM.
226.4
1.28
289.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
226.40
289.79
100.00%
08.00.00
CIELORRASOS
08.01.00
M2
13.68
21.05
287.96
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.68
287.96
100.00%
08.02.00
M2
101.83
14.32
1,458.21
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
101.83
1458.21
100.00%
08.03.00
141.85
3.01
426.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
141.85
426.97
100.00%
Pgina
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
ENTIDAD
VALOR OFERTADO
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Descripcin.
09.00.00
09.01.00
PISOS
09.01.01
09.02.00
VEREDAS
09.02.01
09.02.02
Und.
Metrado
Precio S/.
M2
79.26
M2
M3
09.02.03
09.03.00
GRADAS
09.03.01
09.03.02
09.03.03
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
15.68
1,242.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
79.26
1242.80
100.00%
38.54
31.88
1,228.66
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
38.54
1228.66
100.00%
2.13
214.15
456.14
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.13
456.14
100.00%
6.74
20.22
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
20.22
100.00%
M3
1.39
214.17
297.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.39
297.70
100.00%
M2
3.72
22.06
82.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.72
82.06
100.00%
REVESTIMIENTO DE GRADAS
M2
9.22
9.96
91.83
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.22
91.83
100.00%
09.03.04
KG
16.01
3.27
52.35
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
16.01
52.35
100.00%
10.00.00
10.01.00
46.9
3.57
167.43
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
46.90
167.43
100.00%
10.02.00
36.35
2.67
97.05
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
36.35
97.05
100.00%
10.03.00
M2
66.49
42.46
2,823.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
66.49
2823.17
100.00%
11.00.00
CARPINTERIA DE MADERA
11.01.00
PUERTAS
11.01.01
M2
10.08
151.26
1,524.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10.08
1524.70
100.00%
11.01.02
M2
10.08
84.03
847.02
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10.08
847.02
100.00%
11.01.03
COLOCACION DE PUERTAS
PZA
13
16.03
208.39
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.00
208.39
100.00%
12.00.00
CARPINTERIA METALICA
12.01.00
PUERTAS
12.01.01
M2
8.03
84.08
675.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.03
675.16
100.00%
12.01.02
PZA
16.03
16.03
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
16.03
100.00%
12.02.00
VENTANAS
12.02.01
M2
8.64
75.63
653.44
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.64
653.44
100.00%
12.02.02
COLOCACION DE VENTANAS
PZA
16.03
112.21
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.00
112.21
100.00%
12.03.00
BARANDA METALICA
12.03.01
96.57
869.13
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.00
869.13
100.00%
13.00.00
CERRAJERIA
13.01.00
UND
56.81
340.86
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
340.86
100.00%
13.02.00
UND
3.03
12.12
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
12.12
100.00%
13.03.00
UND
50.08
200.32
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
200.32
100.00%
Pgina
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
ENTIDAD
VALOR OFERTADO
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Descripcin.
14.00.00
14.01.00
15.00.00
15.01.00
PINTURA EN INTERIORES
15.01.01
15.01.02
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
P2
68.78
2.74
188.46
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
68.78
188.46
100.00%
M2
153.45
3.76
576.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
153.45
576.97
100.00%
M2
85.74
3.76
322.38
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
85.74
322.38
100.00%
15.01.03
46.5
1.05
48.83
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
46.50
48.83
100.00%
15.02.00
PINTURA EN EXTERIORES
15.02.01
M2
106.53
4.87
518.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
106.53
518.80
100.00%
15.02.02
42.64
6.01
256.27
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
42.64
256.27
100.00%
15.02.03
43.25
1.57
67.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
43.25
67.90
100.00%
15.03.00
PINTURA EN CIELORRASO
15.03.01
M2
13.68
5.28
72.23
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.68
72.23
100.00%
15.03.02
M2
103.33
4.88
504.25
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
103.33
504.25
100.00%
15.04.00
15.04.01
17.5
2.29
40.08
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.50
40.08
100.00%
15.04.02
M2
8.64
4.01
34.65
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.64
34.65
100.00%
15.04.03
M2
8.03
6.15
49.38
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.03
49.38
100.00%
15.04.04
6.05
54.45
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.00
54.45
100.00%
16.00.00
16.01.00
PZA
155.88
623.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
623.52
100.00%
16.02.00
PZA
13.45
53.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
53.80
100.00%
16.03.00
COLOCACION DE APARATOS
PZA
16.03
64.12
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
64.12
100.00%
16.04.00
COLOCACION DE ACCESORIOS
PZA
6.39
25.56
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
25.56
100.00%
17.00.00
INSTALACIONES SANITARIAS
17.01.00
SALIDA DE DESAGE
17.01.01
PTO
34.9
139.60
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
139.60
100.00%
17.02.00
REDES DE DISTRIBUCION
17.02.01
30
9.31
279.30
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
30.00
279.30
100.00%
17.02.02
24
7.86
188.64
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
24.00
188.64
100.00%
17.03.00
ACCESORIOS DE REDES
17.03.01
UND
30
7.39
221.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
30.00
221.70
100.00%
17.03.02
UND
8.65
51.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
51.90
100.00%
Pgina
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
ENTIDAD
VALOR OFERTADO
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Descripcin.
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
17.03.03
UND
10.66
74.62
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.00
74.62
100.00%
17.03.04
UND
8.39
16.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
16.78
100.00%
17.03.05
UND
7.46
7.46
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
7.46
100.00%
17.03.06
UND
8.29
16.58
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
16.58
100.00%
17.04.00
ADITAMENTOS VARIOS
17.04.01
UND
32.05
64.10
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
64.10
100.00%
17.04.02
UND
30.37
30.37
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
30.37
100.00%
17.04.03
UND
27.86
111.44
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
111.44
100.00%
17.04.04
UND
32.42
64.84
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
64.84
100.00%
17.05.00
CAMARAS DE INSPECCION
17.05.01
PZA
57.13
114.26
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
114.26
100.00%
18.00.00
18.01.00
18.01.01
PTO
15
26.53
397.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.00
397.95
100.00%
18.02.00
REDES DE DISTRIBUCION
18.02.01
18
5.82
104.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.00
104.76
100.00%
18.02.02
26
4.27
111.02
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
26.00
111.02
100.00%
18.03.00
ACCESORIOS DE REDES
18.03.01
PZA
2.76
2.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
2.76
100.00%
18.03.02
PZA
15
2.34
35.10
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.00
35.10
100.00%
18.03.03
PZA
10
2.6
26.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10.00
26.00
100.00%
18.03.04
PZA
10
3.96
39.60
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10.00
39.60
100.00%
18.03.05
PZA
3.62
21.72
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
21.72
100.00%
18.03.06
PZA
40
1.03
41.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
40.00
41.20
100.00%
18.03.07
PZA
15
2.52
37.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.00
37.80
100.00%
18.04.00
LLAVES Y VALVULAS
18.04.01
PZA
25.15
75.45
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
75.45
100.00%
18.04.02
PZA
18
18.55
333.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.00
333.90
100.00%
18.05.00
PIEZAS VARIOS
18.05.01
PZA
35.26
35.26
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
35.26
100.00%
18.05.02
1.8
35.69
64.24
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.80
64.24
100.00%
19.00.00
19.01.00
17.5
33.14
579.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.50
579.95
100.00%
19.02.00
11.79
106.11
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.00
106.11
100.00%
19.03.00
PZA
8.26
49.56
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
49.56
100.00%
Pgina
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
ENTIDAD
VALOR OFERTADO
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Descripcin.
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
20.00.00
INSTALACIONES ELECTRICAS
20.01.00
20.01.01
PTO
14
21.43
300.02
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
14.00
300.02
100.00%
20.01.02
PTO
17.06
119.42
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.00
119.42
100.00%
20.02.00
TABLEROS Y CUCHILLAS
20.02.01
TABLEROS GENERAL
PZA
104.47
104.47
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
104.47
100.00%
20.02.02
PZA
68.39
68.39
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
68.39
100.00%
20.03.00
CANALIZACIONES Y CONEXIONES
20.03.01
92
10.5
966.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
92.00
966.00
100.00%
20.03.02
36
10.5
378.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
36.00
378.00
100.00%
20.03.03
GLB
139.4
139.40
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
139.40
100.00%
20.03.04
GLB
13.97
13.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
13.97
100.00%
20.03.05
190
1.31
248.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
190.00
248.90
100.00%
20.03.06
80
1.75
140.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
80.00
140.00
100.00%
20.03.07
CURVAS 3/4"
UND
75
3.42
256.50
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
75.00
256.50
100.00%
21.00.00
ARTEFACTOS
21.01.00
PZA
29.71
237.68
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.00
237.68
100.00%
21.02.00
PZA
15.7
62.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.00
62.80
100.00%
21.03.00
PZA
61.32
122.64
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
122.64
100.00%
21.04.00
INTERRUPTOR SIMPLE
PZA
7.21
14.42
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
14.42
100.00%
21.05.00
INTERRUPTOR DOBLE
PZA
7.21
36.05
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.00
36.05
100.00%
21.06.00
TOMACORRIENTE DOBLE
PZA
13.84
96.88
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.00
96.88
100.00%
21.07.00
POZO ATIERRA
GLB
555.28
555.28
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
555.28
100.00%
61,625.52
0.00
0.00
0.00
61,625.52
8.00%
4,930.04
0.00
0.00
0.00
4,930.04
UTILIDAD (5%)
5.00%
3,081.28
0.00
0.00
0.00
3,081.28
69,636.84
0.00
0.00
0.00
69,636.84
13,231.00
0.00
0.00
0.00
13,231.00
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
82,867.84
0.00
0.00
0.00
82,867.84
0.00%
0.00%
0.00%
100.00%
Pgina
10
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
M2
17.5
0.3
5.25
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.50
5.25
100.00%
01.02.00
M2
17.5
0.61
10.68
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.50
10.68
100.00%
01.03.00
KG
9215.52
0.09
829.40
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9215.52
829.40
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
29.93
2.95
88.29
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
29.93
88.29
100.00%
02.02.00
M3
7.76
7.67
59.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.76
59.52
100.00%
02.03.00
M3
47.11
3.43
161.59
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
47.11
161.59
100.00%
02.04.00
M2
8.86
6.21
55.02
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.86
55.02
100.00%
02.05.00
M2
5.96
6.14
36.59
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.96
36.59
100.00%
03.00.00
03.01.00
CIMIENTOS
03.01.01
M3
5.76
137.57
792.40
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.76
792.40
100.00%
03.02.00
SOBRECIMIENTOS
03.02.01
M3
0.48
173.91
83.48
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.48
83.48
100.00%
03.02.02
M2
8.01
19.44
155.71
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.01
155.71
100.00%
03.03.00
FALSO PISO
03.03.01
M2
8.86
21.61
191.46
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.86
191.46
100.00%
04.00.00
04.01.00
COLUMNAS
04.01.01
M3
0.49
272.03
133.29
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.49
133.29
100.00%
04.01.02
M2
6.6
22.44
148.10
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.60
148.10
100.00%
04.01.03
KG
54.12
3.27
176.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
54.12
176.97
100.00%
04.02.00
VIGAS
04.02.01
M3
0.54
242.87
131.15
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.54
131.15
100.00%
04.02.02
M2
4.8
27.53
132.14
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.80
132.14
100.00%
04.02.03
KG
44.89
3.27
146.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
44.89
146.79
100.00%
04.03.00
04.03.01
M3
0.13
240.18
31.22
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.13
31.22
100.00%
04.03.02
M2
4.19
27.53
115.35
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.19
115.35
100.00%
04.03.03
KG
12.3
3.27
40.22
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
12.30
40.22
100.00%
05.00.00
05.01.00
ESTRUCTURAS DE MADERA
05.01.01
P2
5.74
2.81
16.13
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.74
16.13
100.00%
Pgina
11
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
COSTO
9.57
13.81
132.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.57
132.16
100.00%
M2
17.15
15.93
273.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.15
273.20
100.00%
M2
33.71
24.26
817.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
33.71
817.80
100.00%
M2
23.68
9.22
218.33
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
23.68
218.33
100.00%
M2
17.69
8.14
144.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.69
144.00
100.00%
07.03.00
M2
27.11
9.93
269.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.11
269.20
100.00%
07.04.00
M2
3.7
11.85
43.85
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.70
43.85
100.00%
07.05.00
M2
7.2
17.36
124.99
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.20
124.99
100.00%
07.06.00
VESTIDURA DE DERRAMES
7.15
4.08
29.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.15
29.17
100.00%
07.07.00
BRUAS E= 1x 1 CM.
42.9
1.28
54.91
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
42.90
54.91
100.00%
08.00.00
CIELORRASOS
08.01.00
M2
13.73
14.32
196.61
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.73
196.61
100.00%
08.02.00
15.7
3.01
47.26
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.70
47.26
100.00%
09.00.00
PISOS Y VEREDAS
09.01.00
PISOS
09.01.01
M2
8.85
15.68
138.77
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.85
138.77
100.00%
09.02.00
VEREDAS
09.02.01
M2
3.96
31.88
126.24
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.96
126.24
100.00%
09.02.02
M3
0.15
214.15
32.12
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.15
32.12
100.00%
09.02.03
1.2
6.74
8.09
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.20
8.09
100.00%
10.00.00
ZOCALOS Y CONTRAZOCALOS
10.01.00
1.34
3.57
4.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.34
4.78
100.00%
10.02.00
M2
23.68
42.46
1,005.45
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
23.68
1005.45
100.00%
11.00.00
11.01.00
PUERTAS
11.01.01
M2
3.23
151.26
488.57
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.23
488.57
100.00%
11.01.02
M2
1.26
84.03
105.88
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.26
105.88
100.00%
11.01.03
COLOCACION DE PUERTAS
PZA
16.03
48.09
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
48.09
100.00%
11.02.00
VENTANAS
05.01.02
05.02.00
COBERTURAS
05.02.01
06.00.00
MUROS DE ALBAILERIA
06.01.00
07.00.00
REVOQUES Y ENLUCIDOS
07.01.00
07.02.00
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
Pgina
12
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
COSTO
0.86
75.63
65.04
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.86
65.04
100.00%
PZA
16.03
32.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
32.06
100.00%
UND
56.81
113.62
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
113.62
100.00%
UND
50.08
50.08
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
50.08
100.00%
12.03.00
UND
3.03
9.09
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
9.09
100.00%
13.00.00
13.01.00
P2
9.2
2.74
25.21
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.20
25.21
100.00%
14.00.00
14.01.00
PINTURA EN INTERIORES
14.01.01
M2
17.7
3.76
66.55
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.70
66.55
100.00%
14.02.00
PINTURA EN EXTERIORES
14.02.01
M2
27.11
4.87
132.03
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.11
132.03
100.00%
14.02.02
M2
10.9
6.01
65.51
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10.90
65.51
100.00%
14.02.03
6.7
1.57
10.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.70
10.52
100.00%
14.03.00
PINTURA EN CIELORRASO
14.03.01
M2
13.8
4.88
67.34
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.80
67.34
100.00%
14.04.00
14.04.01
M2
0.86
4.01
3.45
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.86
3.45
100.00%
14.04.02
3.4
2.29
7.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.40
7.79
100.00%
15.00.00
15.01.00
PZA
155.88
311.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
311.76
100.00%
15.02.00
PZA
13.45
26.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
26.90
100.00%
15.03.00
COLOCACION DE APARATOS
PZA
16.03
32.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
32.06
100.00%
15.04.00
COLOCACION DE ACCESORIOS
PZA
6.39
12.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
12.78
100.00%
16.00.00
INSTALACIONES SANITARIAS
16.01.00
SALIDA DE DESAGE
16.01.01
PTO
34.9
69.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
69.80
100.00%
16.02.00
REDES DE DISTRIBUCION
16.02.01
74
9.31
688.94
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
74.00
688.94
100.00%
16.02.02
12
7.86
94.32
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
12.00
94.32
100.00%
16.03.00
ACCESORIOS DE REDES
16.03.01
UND
8.65
25.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
25.95
100.00%
16.03.02
UND
10.66
10.66
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
10.66
100.00%
11.02.01
M2
11.02.02
COLOCACION DE VENTANAS
12.00.00
CERRAJERIA
12.01.00
12.02.00
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
Pgina
13
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
16.03.03
UND
8.39
16.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
16.78
100.00%
16.03.04
UND
7.39
22.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
22.17
100.00%
16.03.05
UND
8.29
8.29
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
8.29
100.00%
16.04.00
ADITAMENTOS VARIOS
16.04.01
UND
32.05
32.05
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
32.05
100.00%
16.04.02
UND
30.37
30.37
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
30.37
100.00%
16.04.03
UND
32.42
32.42
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
32.42
100.00%
16.05.00
CAMARAS DE INSPECCION
16.05.01
PZA
57.13
342.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
342.78
100.00%
17.00.00
17.01.00
17.01.01
PTO
26.53
159.18
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
159.18
100.00%
17.02.00
REDES DE DISTRIBUCION
17.02.01
70
5.82
407.40
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
70.00
407.40
100.00%
17.02.02
12
4.27
51.24
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
12.00
51.24
100.00%
17.03.00
ACCESORIOS DE REDES
17.03.01
PZA
2.76
2.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
2.76
100.00%
17.03.02
PZA
2.34
18.72
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.00
18.72
100.00%
17.03.03
PZA
2.6
13.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.00
13.00
100.00%
17.03.04
PZA
3.96
7.92
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
7.92
100.00%
17.03.05
PZA
3.62
21.72
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
21.72
100.00%
17.03.06
PZA
1.03
8.24
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
8.00
8.24
100.00%
17.03.07
PZA
2.52
15.12
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.00
15.12
100.00%
17.04.00
LLAVES Y VALVULAS
17.04.01
PZA
25.15
176.05
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.00
176.05
100.00%
17.05.00
PIEZAS VARIOS
17.05.01
PZA
35.26
35.26
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
35.26
100.00%
17.05.02
1.9
35.69
67.81
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.90
67.81
100.00%
18.00.00
18.01.00
3.4
33.14
112.68
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.40
112.68
100.00%
18.02.00
3.6
11.79
42.44
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.60
42.44
100.00%
18.03.00
PZA
8.26
24.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
24.78
100.00%
19.00.00
INSTALACIONES ELECTRICAS
19.01.00
19.01.01
PTO
21.43
64.29
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
64.29
100.00%
Pgina
14
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
19.02.00
TABLEROS Y CUCHILLAS
19.02.01
19.03.00
CANALIZACION Y TUBERIA
19.03.01
19.03.02
CURVAS 3/4"
UND
19.04.00
CONEXIONES
19.04.01
GLB
19.04.02
21.00.00
ARTEFACTOS
21.01.00
21.02.00
INTERRUPTOR DOBLE
21.03.00
INTERRUPTOR SIMPLE
Metrado
PZA
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
60.83
60.83
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
60.83
100.00%
18
10.5
189.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.00
189.00
100.00%
3.42
30.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.00
30.78
100.00%
181.27
181.27
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
181.27
100.00%
36
1.31
47.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
36.00
47.16
100.00%
PZA
29.71
89.13
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
89.13
100.00%
PZA
7.21
7.21
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
7.21
100.00%
PZA
7.21
7.21
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
7.21
100.00%
12,097.74
0.00
0.00
0.00
12,097.74
8.00%
967.82
0.00
0.00
0.00
967.82
UTILIDAD (5%)
5.00%
604.89
0.00
0.00
0.00
604.89
13,670.45
0.00
0.00
0.00
13,670.45
2,597.39
0.00
0.00
0.00
2,597.39
16,267.84
0.00
0.00
0.00
16,267.84
0.00%
0.00%
0.00%
100.00%
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
Pgina
15
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
M2
362.9
1.32
479.03
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
362.90
479.03
100.00%
01.03.00
KG
83089.83
0.09
7,478.08
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
83089.83
7478.08
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
419.43
3.08
1,291.84
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
419.43
1291.84
100.00%
02.02.00
M3
141.06
7.67
1,081.93
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
141.06
1081.93
100.00%
02.03.00
M3
323.34
25.25
8,164.34
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
323.34
8164.34
100.00%
02.04.00
M3
296.44
3.43
1,016.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
296.44
1016.79
100.00%
03.00.00
03.01.00
ZAPATAS
03.01.01
M3
47.71
249
11,879.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
47.71
11879.79
100.00%
03.01.02
KG
1026.79
3.27
3,357.60
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1026.79
3357.60
100.00%
03.02.00
PANTALLA
03.02.01
M3
55.48
271.07
15,038.96
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
55.48
15038.96
100.00%
03.02.02
M2
443.8
17.98
7,979.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
443.80
7979.52
100.00%
03.02.03
KG
2821.7
3.27
9,226.96
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2821.70
9226.96
100.00%
03.03.00
03.03.01
M3
24.45
173.25
4,235.96
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
24.45
4235.96
100.00%
03.03.02
M3
6.3
173.25
1,091.48
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.30
1091.48
100.00%
03.03.03
M2
84
19.44
1,632.96
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
84.00
1632.96
100.00%
03.03.04
KG
200.1
3.27
654.33
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
200.10
654.33
100.00%
03.04.00
COLUMNETAS DE AMARRE
03.04.01
M3
2.61
272.03
710.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.61
710.00
100.00%
03.04.02
M2
52.2
24.97
1,303.43
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
52.20
1303.43
100.00%
03.04.03
KG
285.72
3.27
934.30
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
285.72
934.30
100.00%
03.05.00
VIGUETAS DE AMARRE
03.05.01
M3
2.07
242.87
502.74
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.07
502.74
100.00%
03.05.02
M2
27.6
29.47
813.37
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.60
813.37
100.00%
03.05.03
KG
180
3.27
588.60
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
180.00
588.60
100.00%
03.06.00
03.06.01
M3
3.95
173.25
684.34
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.95
684.34
100.00%
03.06.02
M3
7.5
182.96
1,372.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.50
1372.20
100.00%
03.06.03
M3
41.08
182.96
7,516.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
41.08
7516.00
100.00%
03.06.04
M2
167.18
22.06
3,687.99
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
167.18
3687.99
100.00%
Pgina
16
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
COSTO
KG
1429.27
3.27
4,673.71
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1429.27
4673.71
100.00%
M2
118.8
24.26
2,882.09
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
118.80
2882.09
100.00%
M2
334.2
6.31
2,108.80
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
334.20
2108.80
100.00%
M2
118.8
9.93
1,179.68
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
118.80
1179.68
100.00%
M2
13.2
11.85
156.42
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.20
156.42
100.00%
05.04.00
M2
24
17.36
416.64
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
24.00
416.64
100.00%
05.05.00
M2
36
8.56
308.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
36.00
308.16
100.00%
05.06.00
BRUAS E= 1x 1 CM.
179.2
1.28
229.38
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
179.20
229.38
100.00%
06.00.00
DRENAJE
06.01.00
27
5.39
145.53
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.00
145.53
100.00%
06.02.00
120
8.72
1,046.40
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
120.00
1046.40
100.00%
07.00.00
CARPINTERIA METALICA
07.03.00
68.05
68.46
4,658.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
68.05
4658.70
100.00%
07.04.00
PZA
105.23
315.69
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
315.69
100.00%
08.00.00
PINTURA
08.01.00
M2
08.02.00
08.04.00
08.05.00
08.06.00
PZA
09.00.00
INSTALACIONES ELECTRICAS
09.01.00
09.01.01
M3
09.01.02
09.01.03
09.02.00
ARTEFACTOS ELECTRICOS
09.02.01
03.06.05
04.00.00
04.01.00
05.00.00
05.01.00
05.02.00
05.03.00
PZA
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
309
4.87
1,504.83
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
309.00
1504.83
100.00%
68.05
6.05
411.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
68.05
411.70
100.00%
73.2
3.91
286.21
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
73.20
286.21
100.00%
68.15
6.05
412.31
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
68.15
412.31
100.00%
9.65
28.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
28.95
100.00%
18.72
7.67
143.58
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.72
143.58
100.00%
150
2.02
303.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
150.00
303.00
100.00%
300
5.13
1,539.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
300.00
1539.00
100.00%
36.99
110.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
110.97
100.00%
115,584.29
0.00
0.00
0.00
115,584.29
8.00%
9,246.74
0.00
0.00
0.00
9,246.74
UTILIDAD (5%)
5.00%
5,779.21
0.00
0.00
0.00
5,779.21
Pgina
17
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
METRADO
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
COSTO
ACTUAL
%
METRADO
SALDOS
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
130,610.24
0.00
0.00
0.00
130,610.24
24,815.95
0.00
0.00
0.00
24,815.95
155,426.19
0.00
0.00
0.00
155,426.19
0.00%
0.00%
0.00%
100.00%
Pgina
18
CONTRATO DE OBRA
OBRA
: 04 TRIBUNA OCCIDENTE
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
M2
125
1.32
165.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
125.00
165.00
100.00%
01.03.00
KG
18137.57
0.09
1,632.38
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18137.57
1632.38
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
17.62
7.67
135.15
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.62
135.15
100.00%
02.02.00
M3
78.5
25.25
1,982.13
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
78.50
1982.13
100.00%
03.00.00
03.01.00
CIMIENTO REFORZADO
03.01.01
M3
12.4
249
3,087.60
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
12.40
3087.60
100.00%
03.02.00
PLACA
03.02.01
M3
6.38
173.25
1,105.34
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.38
1105.34
100.00%
03.02.02
M2
85.14
19.44
1,655.12
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
85.14
1655.12
100.00%
03.03.00
GRADERIAS
03.03.01
M3
15
173.25
2,598.75
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.00
2598.75
100.00%
03.03.02
M3
6.29
182.96
1,150.82
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.29
1150.82
100.00%
03.03.03
M2
81.68
22.06
1,801.86
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
81.68
1801.86
100.00%
03.03.04
KG
1027.45
3.27
3,359.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1027.45
3359.76
100.00%
03.04.00
COLUMNETAS DE AMARRE
03.04.01
M3
1.58
272.03
429.81
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.58
429.81
100.00%
03.04.02
M2
23.7
24.97
591.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
23.70
591.79
100.00%
03.04.03
KG
181.83
3.27
594.58
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
181.83
594.58
100.00%
03.05.00
VIGUETAS DE AMARRE
03.05.01
M3
1.5
242.87
364.31
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.50
364.31
100.00%
03.05.02
M2
17.5
29.47
515.73
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.50
515.73
100.00%
03.05.03
KG
71.87
3.27
235.01
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
71.87
235.01
100.00%
04.00.00
04.01.00
M2
26.88
24.26
652.11
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
26.88
652.11
100.00%
05.00.00
05.01.00
M2
60
6.31
378.60
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
60.00
378.60
100.00%
05.02.00
M2
26.88
9.93
266.92
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
26.88
266.92
100.00%
05.03.00
M2
3.75
11.85
44.44
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.75
44.44
100.00%
05.04.00
M2
7.5
17.36
130.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.50
130.20
100.00%
05.05.00
BRUAS E= 1x 1 CM.
114
1.28
145.92
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
114.00
145.92
100.00%
Pgina
19
CONTRATO DE OBRA
OBRA
: 04 TRIBUNA OCCIDENTE
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
07.00.00
CARPINTERIA METALICA
07.01.00
07.02.00
PZA
08.00.00
PINTURA
08.01.00
08.02.00
08.03.00
08.04.00
08.05.00
PZA
09.00.00
INSTALACIONES ELECTRICAS
09.01.00
09.01.01
M3
09.01.02
09.01.03
09.02.00
ARTEFACTOS ELECTRICOS
09.02.01
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
52.6
160.68
8,451.77
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
52.60
8451.77
100.00%
83.17
249.51
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
249.51
100.00%
M2
26.88
4.87
130.91
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
26.88
130.91
100.00%
M2
11.25
3.91
43.99
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
11.25
43.99
100.00%
M2
60
6.05
363.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
60.00
363.00
100.00%
52.6
6.05
318.23
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
52.60
318.23
100.00%
9.65
28.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
28.95
100.00%
15.36
7.67
117.81
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.36
117.81
100.00%
120
2.06
247.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
120.00
247.20
100.00%
240
5.13
1,231.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
240.00
1231.20
100.00%
36.99
110.97
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.00
110.97
100.00%
PZA
34,316.87
0.00
0.00
0.00
34,316.87
8.00%
2,745.35
0.00
0.00
0.00
2,745.35
UTILIDAD (5%)
5.00%
1,715.84
0.00
0.00
0.00
1,715.84
38,778.06
0.00
0.00
0.00
38,778.06
7,367.83
0.00
0.00
0.00
7,367.83
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
46,145.89
0.00
0.00
0.00
46,145.89
0.00%
0.00%
0.00%
100.00%
Pgina
20
CONTRATO DE OBRA
OBRA
: 05 TRIBUNA NORTE
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
M2
102.41
1.32
135.18
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
102.41
135.18
100.00%
01.03.00
KG
23576.67
0.09
2,121.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
23576.67
2121.90
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
27.2
7.67
208.62
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.20
208.62
100.00%
02.02.00
M3
42.8
25.25
1,080.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
42.80
1080.70
100.00%
03.00.00
03.01.00
CIMIENTO REFORZADO
03.01.01
M3
12.8
249
3,187.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
12.80
3187.20
100.00%
03.02.00
PLACA
03.02.01
M3
5.67
173.25
982.33
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.67
982.33
100.00%
03.02.02
M2
70.2
19.44
1,364.69
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
70.20
1364.69
100.00%
03.03.00
GRADERIAS
03.03.01
M3
10.8
173.25
1,871.10
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10.80
1871.10
100.00%
03.03.02
M3
19.58
182.96
3,582.36
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
19.58
3582.36
100.00%
03.03.03
M2
66.24
22.06
1,461.25
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
66.24
1461.25
100.00%
03.03.04
KG
844.25
3.27
2,760.70
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
844.25
2760.70
100.00%
03.04.00
COLUMNETAS DE AMARRE
03.04.01
M3
1.69
272.03
459.73
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.69
459.73
100.00%
03.04.02
M2
22.5
24.97
561.83
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
22.50
561.83
100.00%
03.04.03
KG
194.44
3.27
635.82
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
194.44
635.82
100.00%
03.05.00
VIGUETAS DE AMARRE
03.05.01
M3
1.34
242.87
325.45
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.34
325.45
100.00%
03.05.02
M2
17.84
29.47
525.74
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
17.84
525.74
100.00%
03.05.03
KG
124.79
3.27
408.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
124.79
408.06
100.00%
04.00.00
04.01.00
M2
58.76
24.26
1,425.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
58.76
1425.52
100.00%
05.00.00
05.01.00
M2
48
6.31
302.88
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
48.00
302.88
100.00%
05.02.00
M2
58.76
9.93
583.49
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
58.76
583.49
100.00%
05.03.00
M2
9.16
11.85
108.55
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.16
108.55
100.00%
05.04.00
M2
15.61
17.36
270.99
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.61
270.99
100.00%
05.05.00
BRUAS E= 1x 1 CM.
118
1.28
151.04
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
118.00
151.04
100.00%
Pgina
21
CONTRATO DE OBRA
OBRA
: 05 TRIBUNA NORTE
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
06.00.00
CARPINTERIA METALICA
06.01.00
07.00.00
CERRAJERIA
07.01.00
08.00.00
PINTURA
08.01.00
08.02.00
08.03.00
08.04.00
Und.
M2
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
5.04
84.08
423.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.04
423.76
100.00%
63.2
63.20
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
63.20
100.00%
M2
58.76
4.87
286.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
58.76
286.16
100.00%
M2
24.77
3.91
96.85
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
24.77
96.85
100.00%
M2
48
6.05
290.40
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
48.00
290.40
100.00%
5.04
6.05
30.49
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
5.04
30.49
100.00%
PZA
25,705.99
0.00
0.00
0.00
25,705.99
8.00%
2,056.48
0.00
0.00
0.00
2,056.48
UTILIDAD (5%)
5.00%
1,285.30
0.00
0.00
0.00
1,285.30
29,047.77
0.00
0.00
0.00
29,047.77
5,519.08
0.00
0.00
0.00
5,519.08
34,566.85
0.00
0.00
0.00
34,566.85
0.00%
0.00%
0.00%
100.00%
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
Pgina
22
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
M2
84.38
1.32
111.38
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
84.38
111.38
100.00%
01.03.00
KG
34275.99
0.09
3,084.84
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
34275.99
3084.84
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
154.29
8.65
1,334.61
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
154.29
1334.61
100.00%
02.02.00
M3
79.47
7.67
609.53
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
79.47
609.53
100.00%
02.03.00
M3
237.94
25.25
6,007.99
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
237.94
6007.99
100.00%
03.00.00
03.01.00
ZAPATAS
03.01.01
M3
36.01
249
8,966.49
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
36.01
8966.49
100.00%
03.01.02
KG
1187.62
3.27
3,883.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1187.62
3883.52
100.00%
03.02.00
PANTALLA
03.02.01
M3
39.76
271.07
10,777.74
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
39.76
10777.74
100.00%
03.02.02
M2
443.37
17.98
7,971.79
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
443.37
7971.79
100.00%
03.02.03
KG
2004.25
3.27
6,553.90
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2004.25
6553.90
100.00%
04.00.00
CARPINTERIA METALICA
04.01.00
33.1
238.89
7,907.26
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
33.10
7907.26
100.00%
05.00.00
PINTURA
05.01.00
33.1
7.16
237.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
33.10
237.00
100.00%
06.00.00
DRENAJE
06.01.00
15
5.39
80.85
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15.00
80.85
100.00%
06.02.00
66
8.72
575.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
66.00
575.52
100.00%
58,102.42
0.00
0.00
0.00
58,102.42
8.00%
4,648.19
0.00
0.00
0.00
4,648.19
UTILIDAD (5%)
5.00%
2,905.12
0.00
0.00
0.00
2,905.12
65,655.73
0.00
0.00
0.00
65,655.73
12,474.59
0.00
0.00
0.00
12,474.59
78,130.32
0.00
0.00
0.00
78,130.32
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
19.00%
Pgina
23
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
METRADO
AVANCE
COSTO
0.00%
ACTUAL
%
METRADO
COSTO
0.00%
SALDOS
ACUMULADO
%
METRADO
COSTO
0.00%
METRADO
COSTO
100.00%
Pgina
24
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
M2
27.15
1.32
35.84
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.15
35.84
100.00%
01.03.00
KG
15697.44
0.09
1,412.77
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
15697.44
1412.77
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
148.24
437.31
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
148.24
437.31
100.00%
02.02.00
M3
27.15
7.67
208.24
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.15
208.24
100.00%
02.03.00
M3
129.23
25.25
3,263.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
129.23
3263.06
100.00%
02.04.00
M3
57.7
3.43
197.91
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
57.70
197.91
100.00%
03.00.00
03.01.00
ZAPATAS
03.01.01
M3
13.58
249
3,381.42
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
13.58
3381.42
100.00%
03.01.02
KG
239.81
3.27
784.18
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
239.81
784.18
100.00%
03.02.00
PANTALLA
03.02.01
M3
18.09
271.07
4,903.66
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.09
4903.66
100.00%
03.02.02
M2
115.9
17.98
2,083.88
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
115.90
2083.88
100.00%
03.02.03
KG
635.8
3.27
2,079.07
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
635.80
2079.07
100.00%
03.03.00
CONTRAFUERTES
03.03.01
M3
3.9
271.07
1,057.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.90
1057.17
100.00%
03.03.02
M2
31.2
17.98
560.98
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
31.20
560.98
100.00%
03.03.03
KG
344.36
3.27
1,126.06
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
344.36
1126.06
100.00%
04.00.00
REVOQUES Y ENLUCIDOS
04.01.00
M2
55.68
6.31
351.34
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
55.68
351.34
100.00%
05.00.00
PINTURA
05.01.00
M2
55.68
4.87
271.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
55.68
271.16
100.00%
06.00.00
DRENAJE
06.01.00
4.8
5.39
25.87
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.80
25.87
100.00%
06.02.00
27
8.72
235.44
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
27.00
235.44
100.00%
2.95
22,415.36
0.00
0.00
0.00
22,415.36
8.00%
1,793.23
0.00
0.00
0.00
1,793.23
UTILIDAD (5%)
5.00%
1,120.77
0.00
0.00
0.00
1,120.77
Pgina
25
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
METRADO
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
COSTO
ACTUAL
%
METRADO
SALDOS
ACUMULADO
COSTO
METRADO
COSTO
METRADO
COSTO
25,329.36
0.00
0.00
0.00
25,329.36
4,812.58
0.00
0.00
0.00
4,812.58
30,141.94
0.00
0.00
0.00
30,141.94
0.00%
0.00%
0.00%
100.00%
Pgina
26
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
01.00.00
TRABAJOS PREELIMINARES
01.01.00
TRAZO Y REPLANTEO
M2
6300
0.23
1,449.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6300.00
1449.00
100.00%
01.02.00
M2
96.89
1.23
119.17
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
96.89
119.17
100.00%
01.03.00
KG
10092.81
0.09
908.35
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
10092.81
908.35
100.00%
01.04.00
EST
6000
6,000.00
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
1.00
6000.00
100.00%
02.00.00
MOVIMIENTO DE TIERRAS
02.01.00
M3
2433.66
2.95
7,179.30
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2433.66
7179.30
100.00%
02.02.00
M3
32.53
66.07
2,149.26
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
32.53
2149.26
100.00%
02.04.00
M3
3082.54
3.43
10,573.11
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3082.54
10573.11
100.00%
03.00.00
03.01.00
SARDINELES
03.01.01
M3
26.99
145.8
3,935.14
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
26.99
3935.14
100.00%
03.01.02
M3
7.5
201.91
1,514.33
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.50
1514.33
100.00%
03.01.03
M2
74.97
15.84
1,187.52
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
74.97
1187.52
100.00%
03.02.00
CIMIENTOS
03.02.01
M3
4.9
137.99
676.15
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
4.90
676.15
100.00%
03.03.00
SOBRECIMIENTOS
03.03.01
M3
0.69
164.84
113.74
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.69
113.74
100.00%
03.03.02
M2
9.18
19.44
178.46
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
9.18
178.46
100.00%
04.00.00
04.01.00
04.01.01
M3
0.68
173.25
117.81
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.68
117.81
100.00%
04.01.02
M2
0.8
24.97
19.98
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.80
19.98
100.00%
04.01.03
KG
18.92
3.01
56.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
18.92
56.95
100.00%
04.02.00
COLUMNETAS DE AMARRE
04.02.01
M3
0.56
250.29
140.16
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.56
140.16
100.00%
04.02.02
M2
7.5
24.97
187.28
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
7.50
187.28
100.00%
04.02.03
KG
59.53
3.01
179.19
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
59.53
179.19
100.00%
04.03.00
VIGUETAS DE AMARRE
04.03.01
M3
0.46
250.29
115.13
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
0.46
115.13
100.00%
04.03.02
M2
6.12
29.47
180.36
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
6.12
180.36
100.00%
04.03.03
KG
46
3.01
138.46
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
46.00
138.46
100.00%
05.00.00
MUROS DE ALBAILERIA
05.01.00
M2
35.13
24.26
852.25
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
35.13
852.25
100.00%
Pgina
27
CONTRATO DE OBRA
OBRA
VALOR REFERENCIAL
: S/. 122,142.15
ENTIDAD
VALOR OFERTADO
: S/. 118,500.00
CONTRATISTA
PLAZO DE EJECUCIN
SUPERVISIN
FECHA PRESUPUESTO
: JUNIO DE 2005
UBICACIN
Item
Und.
Metrado
Precio S/.
Parcial
ANTERIOR
S/.
ACTUAL
SALDOS
ACUMULADO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
METRADO
COSTO
06.00.00
06.01.00
M2
3.75
12.76
47.85
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.75
47.85
100.00%
06.02.00
M2
3.83
15.25
58.41
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
3.83
58.41
100.00%
06.03.00
SOLAQUEADO DE SARDINELES
M2
189.73
3.51
665.95
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
189.73
665.95
100.00%
07.00.00
ARCOS DE FUTBOL
07.01.00
PZA
823.88
1,647.76
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
1647.76
100.00%
08.00.00
PINTURA
08.01.00
PZA
10.89
21.78
0.00
0.00
0.00%
0.00
0.00
0.00%
0.00
0.00
0.00%
2.00
21.78
100.00%
40,412.85
0.00
0.00
0.00
40,412.85
8.00%
3,233.03
0.00
0.00
0.00
3,233.03
UTILIDAD (5%)
5.00%
2,020.64
0.00
0.00
0.00
2,020.64
45,666.52
0.00
0.00
0.00
45,666.52
8,676.64
0.00
0.00
0.00
8,676.64
MONTO VALORIZADO
IGV
MONTO TOTAL CONTRATADO
AVANCE
19.00%
54,343.16
0.00
0.00
0.00
54,343.16
0.00%
0.00%
0.00%
100.00%
ENTIDAD
CONTRATISTA
SUPERVISIN
UBICACIN
MES
FECHA
INICIO
JUNIO
JULIO
AGOSTO
SETIEMBRE
1-Jun-06
15-Jun-06
15-Jul-06
15-Aug-06
15-Sep-06
REAL
0.00%
19.12%
49.11%
79.03%
100.00%
0.00%
20.00%
60.00%
80.00%
100.00%
120.00%
% DE AVANCE ACUMULADO
100.00%
80.00%
EJECUTADO
60.00%
PROGRAMADO
40.00%
20.00%
0.00%
23-May-06
12-Jun-06
2-Jul-06
22-Jul-06
FECHA
10-Oct-06
FECHA
VALOR.
PERIODO
N
01
AL 31.05.04
02
AL 30.06.04
03
AL 31.07.04
04
AL 31.08.04
(*)
ABRIL
MAYO
MAYO
JUNIO
JUNIO
JULIO
JULIO
AGOSTO
FP - 01
01
02
(S/.)
(S/.)
298.11
62.35
03
(S/.)
0.00
FP - 02
04
(S/.)
FP - 03
05
(S/.)
06
(S/.)
07
(S/.)
FP - 04
08
(S/.)
265.01
REAJUSTE
TOTAL
REAJUSTE
TOTAL
ACUMULADO
(S/.)
(S/.)
625.47
625.47
PROYECTO
FRMULA POLINMICA
OBRA
: 01
: CONSTRUCCION MODULO DE 04 AULAS Y ESCALERAS
VALOR.
N
01
PERIODO
5/31/2004
02
6/30/2004
03
7/31/2004
04
8/31/2004
(*)
- Abril 2004
FRMULA POLINMICA
OBRA
ABRIL
MAYO
MAYO
JUNIO
JUNIO
JULIO
JULIO
AGOSTO
K=
AVANCE PROGRAMADO
PARCIAL
ACUMULADO
(1)
5845.28
5845.28
71589.17
77434.45
73498.71
150933.16
38546.26
189479.42
AVANCE REAL
PARCIAL
ACUMULADO
(2)
11400.31
11400.31
Pg. N 01
K-1
(*)
(3)
0.051
REAJUSTE PROGRAMADO
PARCIAL
ACUMULADO
(4) = (1)x(3)
298.11
298.11
REAJUSTE REAL
PARCIAL
ACUMULADO
(5) = (2)x(3)
581.42
581.42
REAJUSTE RECONOCIDO
PARCIAL
ACUMULADO
(6)
298.11
298.11
K-1
(*)
(3)
0.039
REAJUSTE PROGRAMADO
PARCIAL
ACUMULADO
(4) = (1)x(3)
82.05
82.05
REAJUSTE REAL
PARCIAL
ACUMULADO
(5) = (2)x(3)
62.35
62.35
REAJUSTE RECONOCIDO
PARCIAL
ACUMULADO
(6)
62.35
62.35
1.051
: 02
: CONSTRUCCIN MODULO DE SERVICIOS HIGINICOS
VALOR.
N
01
PERIODO
5/31/2004
02
6/30/2004
03
7/31/2004
04
8/31/2004
(*)
- Abril 2004
ABRIL
MAYO
MAYO
JUNIO
JUNIO
JULIO
JULIO
AGOSTO
K=
AVANCE PROGRAMADO
PARCIAL
ACUMULADO
(1)
2103.73
2103.73
1.039
16094.82
18198.55
18054.32
36252.88
20070.02
56322.90
AVANCE REAL
PARCIAL
ACUMULADO
(2)
1598.67
1598.67
PROYECTO
FRMULA POLINMICA
OBRA
: 03
: CONSTRUCCION PATIO DE HONOR
VALOR.
N
01
PERIODO
5/31/2004
02
6/30/2004
03
7/31/2004
04
8/31/2004
(*)
- Abril 2004
FRMULA POLINMICA
OBRA
ABRIL
MAYO
MAYO
JUNIO
JUNIO
JULIO
JULIO
AGOSTO
K=
Pg. N 02
AVANCE PROGRAMADO
PARCIAL
ACUMULADO
(1)
0.00
0.00
0.00
0.00
13046.01
13046.01
15738.97
28784.98
AVANCE REAL
PARCIAL
ACUMULADO
(2)
0.00
0.00
K-1
(*)
(3)
0.007
REAJUSTE PROGRAMADO
PARCIAL
ACUMULADO
(4) = (1)x(3)
0.00
0.00
REAJUSTE REAL
PARCIAL
ACUMULADO
(5) = (2)x(3)
0.00
0.00
REAJUSTE RECONOCIDO
PARCIAL
ACUMULADO
(6)
0.00
0.00
K-1
(*)
(3)
0.064
REAJUSTE PROGRAMADO
PARCIAL
ACUMULADO
(4) = (1)x(3)
0.00
0.00
REAJUSTE REAL
PARCIAL
ACUMULADO
(5) = (2)x(3)
265.01
265.01
REAJUSTE RECONOCIDO
PARCIAL
ACUMULADO
(6)
265.01
265.01
1.007
: 04
: CONSTRUCCION MURO DE CONTENCION DE CONCRETO ARMADO
VALOR.
N
01
PERIODO
5/31/2004
02
6/30/2004
03
7/31/2004
04
8/31/2004
(*)
- Abril 2004
ABRIL
MAYO
MAYO
JUNIO
JUNIO
JULIO
JULIO
AGOSTO
K=
AVANCE PROGRAMADO
PARCIAL
ACUMULADO
(1)
0.00
0.00
1.064
17338.73
17338.73
3494.49
20833.22
0.00
20833.22
AVANCE REAL
PARCIAL
ACUMULADO
(2)
4140.74
4140.74