Sunteți pe pagina 1din 25

Date: August 16, 2011

To
The Cluster Coordination Unit - Hetauda



Subject: For the Vacant Position of MF and DF

Dear Sir;

I wish to apply for the Vacant Position of MF and DF in various Local
Bodies, which was published in The Kantipur, Nepali national daily on
2068/04/17.
As for my educational qualification, I have passed BE in civil engineering
from Nepal Engineering College in A Grade in 2008. I had complete ECHO
project at rural villages of Humla and Mugu District by KIRDARC Nepal and
Mission East; I had working on the DF for the Manang District. Now I am in
search of more challenging job for the proper utilization of my knowledge. During
my job, I had participated in different Projects, with the help of my qualification
and experience; I assure you that if I am selected. I have attached my Cv and
Certificate with this application, which inform you more about me. I have for the
positive response from you soon.




Yours Truly,

Hem Raj Shahi
Contact No: 9851016051


CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
Curriculum vitae

Name : Hem Raj Shahi
Sex : Male
Date of Birth : 1
st
August, 1983
Permanent Address : Shree kot 2, Mugu, Karanali
Citizenship No : 5277
Passport NO : 3442431, Valid Until 2018/11/19
Contact No : cell +977-9851016051
+977-9741137840
Resi. +977-01-4780378
Personal E-mail : hemraj109@yahoo.com , hemraj109@gmail.com
Marital Status : Married
Nationality : Nepali

Award and Medals:

FCAN Gold Medal for securing Highest Marks in Bachelor in Civil Engineering Given by
Federation of Contractors Associations of Nepal (FCAN)

Structure Award for Securing Highest Marks in Structure Analysis I and II

Water Award for Securing Highest Marks in Fluid Mechanics and Hydraulics

Geo-tech Award for Securing Highest Marks in Engineering Geology, Engineering properties
of Soil and Foundation

Mathematics Award for Securing Highest Marks in Engineering Math I, II and III

Academic Qualification:

Degree in Civil Engineering from Nepal Engineering College, Bhaktapur, Pokhara University, Nepal in
2008
Diploma in Civil Engineering from Baijnath Engineering College, Mahendranagar, CTEVT, Nepal in 2003
S.L.C from Lokpriya Ma Vi Gamtha, Mugu, HMG Board, Nepal in 2000

Nepal Engineering Council Reg. No: 5648 Civil A

Nepal Engineers Association Membership No: 10647 (Civil)


Language Efficiency:
Speaking Reading Writing
Nepali - Mother Tongue
English- Good Good Good
Hindi - Good Good Good

Computer skills:
- Windows Applications, MS-Word, Excel and Power Point

Professional Experiences:

1. From : 27 July 2009
To : Till Date
Employer : RIDARC Nepal Pvt. Ltd. (Rural Infrastructure Development and Research Consultant
Nepal)
Designation : Executive Director / Bridge Designer

CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
Project Name:
1. Detail Engineering Survey, Soil investigation, Hydrological Study and Design, Estimation of
Marsyngdi River Bridge at Bhraka VDC, Chame Khansar Road, Manang
2. Detailed Engineering Survey, Design and Cost Estimate of RCC Bridge at Satasi Khola, Jhapa
3. Detail Engineering Survey, Soil investigation, Hydrological Study, Datailed Design and Cost Estimatie
of Saradi Khola Motorable Bridge at Phulbari Syangja
4. Detail Engineering Survey and Design of following Suspension/Suspended Bridge:
Chipchipe-Devghat (Risti Khola), Tanahu
Chipchipe-Dharmpani (Nablung), Seti Nadi, Tanahu

5. Detail Engineering Survey and Design of Gairi Jangar Suspended Bridge, 145 m. Span
Major Responsibilities:
- Assisting Field Survey team to conduct well Survey
- Prepare Preliminary Design Reports and Discussion with Clint
- Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation
- Final Defense and Correct the over al

2. From : 1
st
May 2009
To : Till Date (As a part Time)
Employer : BDA Nepal Pvt. Ltd. / GIDA Pvt Ltd. / GOEC Nepal Pvt Ltd
Position : Bridge Designer / Structural Engineer
Clint : Department of Roads, Bridge Project, Babarmahal, Kathmandu, Nepal

Project Name:
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed
Design of Bridge (s) of Consultant

GIDA Nepal P. Ltd. Contact No: BU-DSD-26/065/66
1. Badighad Bridge at Kharbang Paudineta Hawangi Arkhabad Motor Road , Gulmi
2. Bhalubahi Nadi Bridge at Roopanni Rajbiraj Kunauli Sadak , Saptari
3. Mainawati Khola Rural Road Bridge Mainawati Khola, Oshapur-Balkahawa, Siraha
4. Marlaiya Bridge Parsa
5. Bangari Bridge Bara
6. Gangajali Nadi Bridge, Kamalpur VDC, Saptari
7. Phusre Khola Bridge at Kaski
8. Sapa Khola Bridge at Sarlahi
9. Sursar Khola Bridge at Kakdhuwa chhapaki Jodne Sadak at Saptari
BDA Nepal Pvt Ltd and GOEC Nepal Pvt. Ltd. Jv Contact No: BU-DSD-22/065/66
1. Bhingri Bridge over Jari Khola at Chakhake Bhingri Rolpa Road at Bhingri, Pyuthan
2. Churagad Bridge over Churagad Khola at Ghartighau on Sahid Marga, Rolpa
3. Jimrukh Khola Bridge at SirungKholagau, Rajwara VDC-3, Pyuthan
4. Katuwa Khola Bridge at Ghorahi-Bhalubang Road at Chaughera, Dang
5. Chhape Khola Bridge over Chhape Khola ( Rapti Bridge) at Khalanga Dharampani
Arghakhachi Road at Rahakholagau, Pyuthan
6. Sisne (Katuwa) Khola Bridge over Sisne Khola at Ghorahi-pyuthan Road at Asare, Dang
7. Sulichaur Phagam (Gajur) Khola Bridge at Chakchake Gumchal - Gam Road at Runibang,
Rolpa
8. Uwa Khola at Kamphu -Besi at Rolpa

Major Responsibilities:
- Assisting Field Survey team to conduct well Survey
- Prepare Preliminary Design Reports and Discussion with Clint
- Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation
- Final Defense and Correct the over all

3. From : 1
st
May 2009
To : Till Date (As a part Time)
Employer : Everest Engineering Consultant, ktm
Position : Bridge Designer / Structural Engineer
Clint : Department of Roads, Bridge Project, Babarmahal, Kathmandu, Nepal

Project Name:
CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed
Design of Bridge (s)
1. Dokar Biruwaguthi Bridge at Janata Road Parsa
2. Gade Nadi Bridge at Near Ragpur Tandi, Parsa
3. Dhudai (Dhongahi) Nadi Bridge at Birgung Aura Thori Sadak, Parsa
4. Kholsi Nadi Bridge at Birgung Aura Thori Sadak, Parsa
5. Naurangiya Nadi Bridge at Birgung Aura Thori Sadak, Parsa
6. Sikta (Bhaluwahi) Nadi Bridge at Birgung Aura Thori Sadak, Parsa
7. Hamahi Nadi Bridge at Birgung Aura Thori Sadak, Parsa

Major Responsibilities:
- Assisting Field Survey team to conduct well Survey
- Prepare Preliminary Design Reports and Discussion with Clint
- Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation
- Final Defense and Correct the over all

4. From : 15 December 2010
To : Till Date (As a part Time)
Employer : Gaurav Integrated Development Associate Nepal (P) Ltd. (GIDA Nepal P. Ltd.)
:
Position : Bridge Designer / Structural Engineer
Clint : Department of Roads, Bridge Project, Babarmahal, Kathmandu, Nepal

Project Name:
Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed
Design of Bridge (s)
1. Bangari Khola Bridge at Bara
2. Marlaiya Khola Bridge at Parsa

Major Responsibilities:
- Assisting Field Survey team to conduct well Survey
- Prepare Preliminary Design Reports and Discussion with Clint
- Prepare Detail Design, Drawing, BOQ and Assisting to Report preparation
- Final Defense and Correct the over all

5. From : 23 December 2009
To : 1
st
May 2010
Employer : District Development Office Manang, (LGCDP)
Duty station : District Facilitator
Project Name : Local Governance ad community Development Programme(LGCDP)

Major Responsibilities:
- Assisting office of District Development Committee to carry out participatory
planning process in consultation concerned programme officers, Sections and Line
Agencies
- Provide technical support to DDC board in prioritization of project proposal at
different level of plan approval and prioritization process.
- Under the overall guideline of Local Development Officer and Planning
Monitoring and Administrative officer, and District technical office, DF will
support to organize meeting and workshop involving users committees, Line
agencies community Organizations, and local NGOs directly involved in DDCs
supported activities
- Assisting DDC to prepare Annual Work Plan, prepare project funding matrix, for
the funded through LGCDP and Implemented by DDCs
- Assisting DDCs and VDCs to prepare monitoring and evaluation plan timely
inform concerned authorities to correct the misappropriations, Mistakes and
weaknesses if found.
- Provide technical Support wherever possible for Designing, costing of
infrastructure projects funded through LGCDP
- Support DDCs to conduct IEE, EIA and Other environment and safeguard
required under LGCDP
- Assisting DDCs in Managing the Local Governance and Accountability Facility
CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.

6. From : 1 August 2009
To : 20 December 2009
Employer : Everest Engineering Consultants, Baneshwor, Kathmandu and Inclusive consultant (P)
Ltd. Kalimati, Kathmandu J/V
Designation : Deputy Team Leader, Civil Engineer
Duty station : District Implementation Support Team (DIST), Jhapa
Project Name :
Rural Reconstruction and Rehabilitation Sector Development Program
(RRRSDP), District Project Office (DPO), Jhapa

Funded By :
Government of Nepal (GON), Asian Development Bank (ADB) and OPEC Fund
for International Development (OFID)

Major Responsibilities:
To provide technical input and guidance in engineering survey, design, construction
supervision, monitoring and reporting; and will work closely with the social, resettlement, and
environment team members in overall implementation of the project in the district. Deputy
Team Leader will works work under the guidance of the DIST Team Leader and undertake the
following tasks, among others;
- Assist DPO in planning, identification, short-listing, prioritization and selection of
sub-project and supplementary investment projects;
- Train DTO staff in the use of laboratory equipments for material testing and
quality control of civil works;
- Assist in arranging on- site monitoring of project works by local stakeholders
- Support DTO to establish and manage the quality control labs.
- Ensure implementation of standard specifications, norms, design guidelines etc.
complying with the DOLIDAR'S Approach Manual, work norms, specifications,
guidelines etc.
- Provide technical input and guidance for engineering design, construction
supervision, monitoring and reporting of all sub-projects.
- Organize and conduct orientation and awareness trainings to different stakeholders
including VIUG, VICCC, BGs; Savings and credit groups about the process and
procedures of the project implementation.
- Assist DPO for procurement and contract management.
- Assist team leader in the coordination of the team members.
- Undertake additional tasks as required by the DIST Team Leader and DPO


7. From : 31 May 2009
To : Till date as part time
Employer : Group of Engineers for Appropriate Technology Nepal
(GREAT - Nepal)
Designation : Civil Engineer / Team Leader
Project Name :

Chame Khangsar Rural Road Inventory ( Ch- 0+000 to 32+ 240 ), Manag, DDC / DTO Manag ( 10
June 2009 to 1 July 2009)
Detail survey, Design and Soil Investigation of Motarable Bridge over Marshyangdi River at Tal,
Manag, DDC / DTO Manag(1July- Till Date)
Preparation of Master Plan of Timang Airport, Manang, DDC / DTO Manag(1July- Till Date)
Major Responsibilities:
- Carry out survey and design
- Report Preparation
- Project Presentation
8. From : 10 November 2008
To : 31 May 2009
Employer : Karnali Integrated Rural Development and Research Center
(KIRDARC - Nepal)
Designation : Project Manager/Engineer
Duty station : Humla and Mugu
CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
Job Purpose : To manage the overall WATSAN programme.
Project Name :

Clean water, Improved Sanitation and Hygiene knowledge in rural villages of Humla and Mugu, Mid
West Nepal

Supported INGO : Mission East
Funded By : European Union Humanitarian Aid department (ECHO)
Major Responsibilities:
- Carry out survey, design and implementation of the infrastructure development
activities in the field like irrigation, water, health and sanitation etc. including
social mobilization and social development activities as necessary.
- Based on the community needs and rights, prepare plan, budget and action plan on
annual, quarterly and half yearly basis in consultation with the project team,
community and local government agencies.
- Coordinate, collaborate and network between local, district and regional levels.
- Prepare proposals, project reports of infrastructure development works including
social mobilization and social development activities where necessary.
- Develop the skill of technical supervisors for feasibility survey and design;
prepare estimate of quantity and cost, detailed drawings and other necessary
documents of irrigation, safe drinking water, sanitation schemes and other social
parts.
- Ensure timely procurement process with quality materials and quality work
standard.
- Furnish technical and social information regarding projects to the supervisor,
Regional Coordinator, Programme Manager and Executive Director as and when
required.
- Ensure that project implementation guidelines and agreement are fully followed
- Follow the organisational guidelines, code of conduct, staff administration policy,
financial procedures and others rule and regulations.
- Carry out work as instructed by Project Coordinator, Regional Coordinator,
Programme Manager and Executive Director.
- Prepare water, health and sanitation guideline and modify them as per the
organisational development and play key role for the implementation of such
guideline/policies in the field.
- Ensure that project is being planned and implemented from caste and gender
perspectives.

9. From : April 2007
To : October 2008 (As part time)
Employer : Inclusive consultent, ktm
Designation : Sub Engineer
Project Name:
Detail survey, Design and Soil Investigation of RCC Bridge, Mohana River, Kailali, DDC / DTO
Kailali (April - May 2007)
Detail Survey, Design and Planning of Far Western Medical Collage, Mehendranagar, Kanchanpur
(24 Jan 2008 - 2 Feb 2008)
Tribeni Shankhamul suspension Bridge, Daman and Palung V. D. C., Makawanpur, DDC / DTO
Makawanpur, (2 Jun 2008 - 8 Jun 2008)
Rapti Khola suspended Bridge,Bhaise,Makawanpur, DDC / DTO Makawanpur, (8 Jun 2008 - 12
Jun 2008)
Major Responsibilities:
- Detail Survey, Design and Report Preparation
- Project Presentation


10. From : June 2007
To : July 2008 (As part time)
Employer : Nepal Consult Jv Everest Enginering consultent, lalitpur
Designation : Sub-Engineer / Surveyor
Project Name:
CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
Daltar Irrigation Subproject Galchi, Dhadhing, CMIASP, Bhanimandal, lalitpur ( 8 Jun 2008 17
Jun 2008)
Jaipuri Jogimara Irrigation Subproject, Jaypuri-Jogimara, Dhadhing, CMIASP, Bhanimandal,
lalitpur ( 8 Jun 2008 17 Jun 2008)
Detail Engineering Survey of 33kV Dipyal-Jumla Transmission Line (157 kM) Nepal Electricity
Authority, SHP and Rural Electrification Department, Jamal, KTM. ( 22 Jun 2007 - 25 July
2007)
Major Responsibilities:
- Detail Survey, Design and Report Preparation
- Project Presentation
11. From : 1 April 2005
To : 20 November 2008 (As a part Time)
Employer : Everest Engineering Consultant, ktm
Position : Sub-Engineer / Surveyor
Project Name:
Feasibility Study of Bagmati River Bridge at kavrepalanchowk, kavrepalanchowk & Makawanpur
District Border, DoLIDAR, Jawalakhel, Lalitpur (20 March 2007- 25 March 2007)
Feasibility Study of Darchula - Tinkar Road, Darchula, 90 km. Dipartment of Roads, Babarmahal,
Kathmandu (28 May 2007 - 29 Oct. 2007)
Preparation of Master Plan of Manang Airport, Manang, CAAN, Babarmahal, Kathmandu (Jan. 21,
2007 to Jun 20, 2007)
Lamsal Ghat Suspension Bridge, Bhojpur, DoLIDAR, Jawalakhel, Lalitpur (May 2007-July 2007)
Sakela Siran Suspension Bridge, Udayapur, DoLIDAR, Jawalakhel, Lalitpur (May 2007-July 2007)

Feasibility Study of Kiran Nala Bridge, Banke, DoLIDAR, Jawalakhel, Lalitpur (July 2007-Nov.
2007)
Okharpauwa Kumari kolpu Road, Detail Survey, Design and Eastimate (Ch 3+000 to 33+000 Km),
Nuwakot, District Development Committee Nuwakot ( 27 Nov 23 Dec, 2007)
Field Verification of GIS Based Desk Identified Mini-Grid Schemes - Dolakha District, AEPC/ESAP,
Khumaltar, Lalitpur (14 January 2008 - 15 February 2008).
Field Verification of GIS Based Desk Identified Mini-Grid Schemes - Salyan District, AEPC/ESAP,
Khumaltar, Lalitpur (15 May 2008 - 22 Jun 2008).
Detail Feasibility Study of KORASI KHOLA MHP (7 kW) Chaulakhark VDC, Rangda,Solukhumbu,
AEPC/ESAP, Khumaltar, Lalitpur ( 22 April 2008 - 28 th April 2008)

Major Responsibilities:
- Feasibility Study, Detail Survey, Design and Estimate, Report preparation
- Project briefing and Presentation

12. From : 5 April 2007
To : 10 November 2008 (As a part time)
Employer : Eastren Engineering Consultant, ktm
Designation : Sub-Engineer / Surveyor
Project Name:
Detail survey, Design and Soil Investigation of RCC Bridge, Chhyasal, Koteshower, Ktm (April -
May 2007)
Panauti- Khopasi Road, Detail Survey, Design and Eastimate (Ch 0+000 to 13+000 Km), Kavre,
District Development Committee Kavre ( 20 June 15 July, 2007)

Major Responsibilities:
- Detail Survey, Design and Report Preparation
- Project Presentation


13. From : 02 January 2004
To : 31 December 2004
Employer : DFID-CSP Nepal (Department for international development, British Embassy,
Kathmandu, Nepal)
Designation : Consultants
Duty Station : Mugu District
Project Name:
Chimat Micro-Hydropower, Shree Nagar, Mugu (Jan. 2004 - Apr. 2004)
CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
Hapikharka Drinking Water Supply Project, Shree Nagar - 5, Mugu (Jan. 2004 -
May 2004)
Health Post Office Building Construction Work, Sheri VDC, Mugu (Feb. 2004 -
may 2004)
Major responsibilities:
- Technical feasibility study, design, estimate and implementation of projects
(Drinking water supply system , irrigation canal , rural roads , pletic set(small
hydro power system), Building)
- Reporting and Support to CSO to make planning
- Super vision of Construction work

14. From : 20 June 2004
To : 30 November 2004
Employer : Mahila Uapakar Munch, Kohalpur, Banke
Designation : Site Supervisor
Duty station : kohalpur, Banke
Major responsibilities:
- To Design, Estimate and Implementation of office Building
- Site Supervision of Building
- Final Evaluation and Report Prepared

15. From : 1 January 2005
To : 30 February 2006
Employer : Rural Community Development Center (RCDC, Mugu)
Designation : Sub Engineer / Surveyor
Duty station : Mugu District
Project Name:
Talcha Drinking Water Supply Project, Talcha Airport, Mugu,Fund Board(Jan.
2005 - Mar. 2005)
Ghoira Drinking Water Supply Project, Pina, Mugu, Fund Board (Feb. 2005 - Mar.
2005)
Mathi Tuma Water Supply Project, Shree Nagar, Mugu, Fund Board (May 2005 -
Aug. 2005)
Major Responsibilities:
- Technical Feasibility and Detail Survey, Design, Estimate and Implementation of
projects (Water Supply Schemes, Irrigation Canal, Rural Roads)
- Reporting and Supporting to programme Coordinator


Trainings

S.N. Description Duration Date Organized by Venue
1 SW_ ROAD / SW_DTM (
Road Design / Digital
Terrain Modeling Software)
15 days 1- 15 July, 2005 Softwel (P) Ltd.
Kathmandu, Nepal
Softwel (P) Ltd.
Kathmandu, Nepal
2 Computer Aided Design
(CAD 2D & 3D)
1 month 1- 30 Dec, 2005 Nepal Engineering
College ,
Changunarayan,
Bhaktapur
Nepal Engineering
College ,
Changunarayan,
Bhaktapur
3 Land Development (LD)/
Civil Design
3 months 15 Dec, 2006
to
15 Mar, 2007
Eureka Global
Academy, Bagbazar,
Kathmandu
Bagbazar, Kathmandu


Conference/Seminar Attended

S.N. Description Duration Date Organized by Venue
1 Soil Liquefaction
Mr Mitsu Okamura
Graduate school of science and
engineering, Ehime university
1 days 23 Nov, 2006 Center for Disaster Risk
Service (CDRS), nec
Nec, Bhaktapur
2 Prefeasibility of w/s orientation 3 days 16-18 Fund Board/Udaya Nepalgunj
CV: H. R. Shahi

RIDARC Nepal Pvt Ltd.
S.N. Description Duration Date Organized by Venue
Training Aprial,2004 consultancy
3 International conference on:
Disaster
Management:Achievements and
Challenges
3 days 18-20 Nov,
2005
Nepal Engineering Collage
(nec) with Ehime
University,Japan,NSET,UN
DP,Nepal
Hyatt Regency
Hotel, Bouddha
4 Hydrological Extremes of 2006
in Nepalgunj Area
1 days 17 Nov 2006 Department of Hydrology &
Meteriology, Babarmahal,
Kathmandu
DHM, Babarmahal,
Ktm
5 Rain water Harvesting

1 days 18 May 2007 Nepal Engineering
Association, lalitpur
NEA, Building
pulchok, lalitpur
6 Earthquake vulnerability of
Kathmandu valley
1 days 5 June 2007 Center for Disaster Risk
Service (CDRS), nec
Nepal Engineering
Collage,
Changunarayan,
Bhaktapur

7
Hydra Nepal 1 days 25th Dec, 2007 Nepal Engineering Collage,
Changunarayan, Bhaktapur
Nepal Engineering
Collage,
Changunarayan,
Bhaktapur
8 National seminar on:
Hydropower for National
Development in Nepal:
Prospects, Challenges and
Strategies
1 days 5th Jan, 2007 Nepal Engineering
Association (NEA) & AIT
Alumni Association Nepal
(AITAAN)
Shankhar Hotal Ktm
9
Second National Seminar on
Rural Bridges " Connecting
Rural Nepal"
1 day's 2nd Nov 2007 Nepal Engineering College
and Ehime University,Japan
,UNDP
Yak Place
Pulchowk, Lalitpur
10
National Structural Engineering
Seminar on Towards Quality
Structures
1 days 12th Sep 2008 Structural Engineers
Association Nepal
(SEANep) & Panchkanya
Group
Shankhar Hotal Ktm


CERTIFICATION:


I, the undersigned, certify to the best of my knowledge and belief that
(i) this CV correctly describes my qualifications and my experience;
(ii) I am not employed by the Executing/Implementing Agency;
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of
the inputs specified for me in the Personnel Schedule in Form provided team mobilization takes
place within the validity of this proposal or any agreed extension thereof;
(iv) I am committed to undertake the assignment within the validity of Proposal;
(v) I am not part of the team who wrote the terms of reference for this consulting services assignment;


I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if
engaged.



______________________________________________________
[Signature of expert]
Date: 31/04/2068
Day/Month /Year

Full Name of authorised representative: Hem Raj Shahi














































































































































January 15, 2005

To Whom It May Concern

This is to certify that Mr. Hem Raj Shahi residence of Shree Kot VDC- 2, Rol,
Mugu District, Karnaki Zone, was Working as a Consultants in this Organization
for the Services of Technical Feasibility, technical backstopping of hardware
projects of Mugu District from January 2004 to December 2004. Mr Shahi
contributes handsomely in the fruitful outcomes of the many of the issues related
with Technical Feasibility Study, technical backstopping of hardware different
Projects like Hill Irrigation, Rural Road, Micro Hydropower, Water Supply, Hospital
and School Building project, Agriculture Program in Most of location of the Mugu
District. He had support CSO Mugu to over all planning of the project as well as
screening and implementing. He always did his assignment in time with sound
academic and practical knowledge while working in this Organization. We are
confident that if he gets further opportunity in any field (Work for Infrastructure
Development) related to him, he would credibly accomplish his assignment in
time. We strongly recommend him for further opportunity to work or study and
wish bright future with successful career.




________________
Keshav Prasad Shrestha
(Contract Officer)
DFID-CSP Nepal




































=- --

= = ==== =+- c



=+a =+= +=-, == -- : -== - = --=
=- - ===+ -+= +=+= =-=- == =-== ===-
+=+=-= =-=+- =- ==+ == =-= =-=+- += =-
---= -- - =- === += = == =-=+ +=
-=-+ +== =-=-= = =- - ~|+= =-+ =aa +=-+
+=- =c



+-+= +-=
--= -+= =++
=-= -+= ==-+ +===, =-z

S-ar putea să vă placă și