SYNCHRONOUS COMPENSATORS

FOR MINI-GRIDS AND ISLANDING

Final Report

CONTRACT NUMBER: K/EL/00267/00/00

URN NUMBER: 04/1444


The DTI drives our ambition of
‘prosperity for all’ by working to
create the best environment for
business success in the UK.
We help people and companies
become more productive by
promoting enterprise, innovation
and creativity.

We champion UK business at home and


abroad. We invest heavily in
world-class science and technology.
We protect the rights of working
people and consumers. And we
stand up for fair and open markets
in the UK, Europe and the world.

ii
SYNCHRONOUS COMPENSATORS
FOR MINI-GRIDS AND ISLANDING

K/EL/00267/00/00
URN04/1444

Contractor

Econnect Ltd

The work described in this report was carried out under contract
as part of the DTI Technology Programme: New and Renewable
Energy, which is managed by Future Energy Solutions. The
views and judgements expressed in this report are those of the
contractor and do not necessarily reflect those of the DTI or
Future Energy Solutions.

First published 2004


 Econnect 2004

iii
EXECUTIVE SUMMARY
Objective
The objective of the project was to demonstrate the viability of operating a stand-
alone power system with 100% wind power using standard (grid-connected design)
induction generator wind turbines, with synchronous compensators and Distributed
Intelligent Load Controllers providing voltage control and frequency regulation
respectively.
Background
There is a large global requirement for rural electrification as 2 billion people are
without electricity. To supply these by extending existing grid systems would
require massive investments in transmission and distribution plant in addition to the
power stations to feed them. An alternative is to use local mini-grids to provide
electricity using local indigenous renewable resources. The use of non-dispatchable
renewable resources requires management of the balance between the available
power and the system loads to ensure that the system's voltage and frequency
remain within acceptable limits.
Econnect has developed a new generation of Distributed Intelligent Load Controllers
to enable mini-grids (island grids, wind-diesel systems or autonomous systems) to
use one or many standard (grid-connected design) wind turbines. The controllers
use highly innovative software algorithms to control system frequency within the
statutory limits, based on measurements of the frequency and rate of change of
frequency of the supply. This information is processed using a fuzzy control
algorithm, embedded in each controller, which informs load-switching decisions.
There is no central controller and no communications link between the controllers.
The global effect of the independent devices is to maintain power system stability
for autonomous power systems powered solely from wind power. The controllers
have undergone extensive modelling as well as successful site and laboratory tests
on wind turbines.
In conjunction with the use of robust and well-established synchronous
compensator technology to manage system voltage, the controllers offer a flexible,
low-cost and efficient means of incorporating large amounts of renewable energy in
electrical power systems.
The main purpose of the project was to develop equipment suitable for use in
remote locations which would permit islanded operation of wind turbine systems
equipped with induction generators. The project aimed to demonstrate methods by
which induction wind turbine generators can operate in islanded mode, receiving
voltage control from synchronous compensators and frequency control from
distributed intelligent load controllers. This was to be achieved by developing a
design methodology and applying it to the construction of two test systems,
incorporating a 20kW stall-regulated wind turbine and a 300kW pitch-regulated wind
turbine respectively. Each wind turbine was to be islanded from the electricity grid,
fitted with the synchronous compensator and distributed load control technology,
and tested.

iv
Work carried out
The project incorporated the following activities:
• Selection of appropriate test sites and agreement with wind turbine operators
The 20kW, stall-regulated Gazelle, and the 300kW, pitch-regulated Windmaster
were identified as suitable test vehicles. The Gazelle had a simple control
system. The Windmaster was more complex than the Gazelle and provided a
natural progression in the development of the system.
• Data collection for wind turbines, and discussion with manufacturers / operators
• System design
Suitable synchronous compensators were selected in conjunction with Newage
AVK-SEG, and appropriate load control configurations were specified.
• Dynamic computer modelling of the system
A computer model of each intended autonomous power system was developed
using MATLAB / Simulink. Variable wind speed inputs and consumer loads were
applied to investigate power quality and system stability.
• Specification and procurement of load control hardware, load banks, protection
equipment, pony motors, variable speed drives, cabling, and datalogging
equipment
• Load control software development
• System assembly and installation
• Development of a modular, PC-based, instrumentation and datalogging system
• Production of risk assessment and method statement documents
• Transport of equipment to the wind turbine site
• Synchronous compensator equipment commissioning
• Wind turbine modification
The objective during testing was to avoid any modification of the wind turbine
system. However, in order to incorporate the synchronous compensator
equipment, some changes had to be made. These were minor in the case of the
Gazelle but more complex in the case of the Windmaster.
• Wind turbine testing
Following satisfactory commissioning tests, the wind turbines were
disconnected from the grid and connected into the mini-grid system. A variety
of tests were carried out, including optimisation of the wind turbine start
procedures, simulated wind-diesel operation, and wind-only operation under a
range of wind conditions.
• Decommissioning of test equipment
• Results analysis
• Dissemination of the results

v
Results from computer simulation
The results from the computer models predicted successful operation of the stand-
alone systems. The simulated control loads were seen to contribute the difference
between the varying wind turbine input power and the varying base load power
requirement. The random nature of the control load switching was clearly
demonstrated. Predicted system frequency was maintained between approximately
48 and 52Hz, slightly outside the BS EN 50160 recommendation. Predicted voltage
control was good, well within the required +/-10% of 230V stated in BS EN 50160.
The models achieved this with different amounts of base load applied, different
ratings of power factor correction capacitors, and different wind speeds. Some
voltage imbalance between the phases was predicted and would be expected, since
the loads were single-phase loads. On the Gazelle model this imbalance was well
within limits; the Windmaster model indicated a potential area of concern.
The Windmaster model was employed to investigate the observed starting
performance of the wind turbine in more detail, and was used to estimate the effects
of modifying the starting strategy. It indicated that most of the power drain on the
system during the start was due to the starting resistors rather than the motoring
requirement of the wind turbine.
Results from wind turbine testing
Effective wind-only operation was achieved with both wind turbines. Under these
conditions, the only power input into the system was from the wind turbine, and the
only frequency (speed) control was provided by the load controllers. No adjustment
to the load controller firmware was necessary to achieve stable frequency control in
wind-only mode, and no additional adjustment was necessary to the AVR to achieve
stable voltage control. Wind-only mode could be maintained stably for as long as
there was enough wind to overcome the losses in the system, mainly the
synchronous compensator's rotating losses.
Periods of wind-only operation were analysed to evaluate each system's
performance.
Frequency control was good, within the BS EN 50160 requirement of +/-1Hz. With
the Gazelle, there was a definite offset, however, with a low mean value of 48.6Hz,
which put the system as configured outside acceptable limits. The load controller
frequency setpoints were modified for the Windmaster tests and successfully
removed this offset. On both systems, a slow oscillation in frequency was observed.
The frequency of this oscillation, around 0.4Hz, was well outside the region where
flicker would be a problem (8-10Hz).
Voltage control was good. The voltages on all three phases remained well within the
BS EN 50160 voltage requirements during wind-only operation on both wind
turbines. As the load control employed single-phase loads, with no restriction on the
relative loading on each phase, this result was particularly encouraging. The values
of negative sequence voltage achieved were well within the nominal 2% limit in BS
EN 50160.
It was an aim of the work to be able to start the wind turbine without adversely
affecting the power quality of the system. Starting the Gazelle was achieved with the

vi
frequency and voltages remaining within required limits. This was not the case with
the Windmaster and would be an area for further development of the system.
The rotating losses within each system were evaluated. Observed system losses of
10% of the Gazelle's rated power and 5% of the Windmaster's rated power were in
line with the Newage synchronous compensator design data.
Conclusions
Successful operation of the stand-alone system was achieved with both wind
turbines. In areas where operability was limited, straightforward improvements have
been identified. Neither machine was felt to be fundamentally unsuitable for stand-
alone operation. Adaptation to stand-alone operation would ideally be carried out in
conjunction with the manufacturer, which makes the Windmaster less suitable for
further development.
The experience gained within this project has allowed a practical design
methodology for stand-alone wind turbine systems to be developed.
The use of Newage's generators as a synchronous compensator with the stand-
alone wind turbine system was relatively novel use of the equipment in comparison
with Newage's standard diesel genset experience. Discussion with Newage's
technical support department proved invaluable in assessing the technical
implications of the proposed application and selecting appropriate machines. In both
test situations the synchronous compensators and AVRs selected performed well
with minimal adjustment to AVR settings, justifying the selection of well-established
and robust technology. These generators compare well with power electronics
alternatives in terms of cost.
The load control system demonstrated its ability to regulate system frequency within
statutory limits for stand-alone wind turbine systems. No reprogramming of load
controller firmware was necessary during testing. Frequency-sensitive controllable
load up to the full rating of the wind turbine was felt to be essential, even if only to
accommodate the large power swings during starting.
As intended during the design stage, minimal modifications were made to the wind
turbine systems to allow them to operate in stand-alone mode. For both wind
turbines it was necessary to widen out the frequency and voltage limits imposed by
their protection systems.
The experience with starting the wind turbines suggested that a power electronic
soft starter to limit the inrush current is essential in a stand-alone system if the back-
up power system and synchronous compensator are not to be grossly oversized to
cope with the starting requirements. Most modern induction generator wind
turbines have soft starters, but older machines would need one installed in place of
the starting resistors.
The experience gained with the Gazelle and the Windmaster provides confidence
that most wind turbines with induction generators could be adapted to use in a
stand-alone mode, using a synchronous compensator and distributed load control.
The concept is applicable for any size of wind turbine. Wind turbines with power
electronic grid interfaces might not require synchronous compensator technology to
maintain stand-alone grid voltages (depending on their design), but could employ

vii
distributed load control to manage system frequency and make most efficient use of
any surplus wind power.
The system developed here could also be used to allow existing diesel-generator-
based systems to incorporate one or more wind turbines with ratings comparable to,
or even significantly larger than, the diesel set's nominal kVA rating.

viii
Recommendations
This project has clearly demonstrated the suitability of distributed load control for
controlling system frequency in stand-alone wind turbine systems. It is
recommended that the technologies employed here are developed for full
commercial application.
The methodology developed from this work will produce robust system designs
with a high chance of successful operation with minimal development work or
modifications on site. The next step would be to demonstrate long-term operation of
such a system, successfully integrated into an existing stand-alone diesel-based
mini-grid. This will require further development of the back-up power supply and the
accompanying supervisory system. A diesel generator with a clutch to allow its
alternator to act as the synchronous compensator or a pony motor powered by an
existing mini-grid are both viable alternatives.
Although the fundamental governing operation of the load controllers does not
require any communication between the load controllers, integration into a system
which uses more than one type of generation source might require some
communications ability for supervisory control purposes. This aspect of the load
controllers is currently under development and has been successfully demonstrated
with hydropower and photovoltaic systems. A full system demonstration would
consolidate this work.
The system concept has potential for use on offshore wind turbines in the event of
an outage due to a fault on the electrical network connecting the wind farm to the
shore. A system which enables one or more offshore wind turbines to operate
without a mains grid connection could maintain a wind-powered supply to an array
of wind turbines, and therefore safeguard them from damage (for example, due to
loss of auxiliary equipment, or collisions with vessels or aircraft). This solution
would also permit charging of any back-up batteries, reduce the size of any diesel
genset required for back-up and minimise the amount of diesel fuel required to be
stored at the turbine.

ix
CONTENTS

Executive Summary......................................................................................................... iv
1 INTRODUCTION ......................................................................................................... 1
1.1 Background ......................................................................................................... 1
1.2 Aims and objectives of the project.................................................................... 1
1.3 Benefits................................................................................................................ 2
1.4 Previous work ..................................................................................................... 3
1.5 Collaborators....................................................................................................... 3
1.6 Project overview ................................................................................................. 3
2 DESIGN CONSIDERATIONS...................................................................................... 5
2.1 Requirements...................................................................................................... 5
2.2 System design philosophy................................................................................. 5
2.3 Frequency and voltage control .......................................................................... 5
2.4 Load management.............................................................................................. 6
2.5 Reactive power compensation and voltage control......................................... 6
3 SYSTEM SIMULATION.............................................................................................. 9
3.1 Wind Turbine ...................................................................................................... 9
3.2 Synchronous Compensator and Automatic Voltage Regulator (AVR) ........... 9
3.3 Control Loads and Distributed Intelligent Load Controllers............................ 9
3.4 Simulations carried out.................................................................................... 10
3.5 Gazelle simulation results................................................................................ 10
3.6 Windmaster simulation results........................................................................ 10
4 DATALOGGING SYSTEM........................................................................................ 13
4.1 Requirements and specification ...................................................................... 13
4.2 Instrumentation and data recording ............................................................... 13
5 20KW DEMONSTRATION USING GAZELLE WIND TURBINE AT SUNDERLAND,
TYNE AND WEAR ........................................................................................................... 15
5.1 Gazelle wind turbine......................................................................................... 15
Wind turbine and generator........................................................................................... 15
Existing Gazelle control, sequencing and protection................................................... 15
Soft starter....................................................................................................................... 16
Auxiliary equipment ....................................................................................................... 16
5.2 System design and development.................................................................... 16

x
Synchronous generator selection.................................................................................. 16
AVR selection .................................................................................................................. 16
Pony motor...................................................................................................................... 17
Auxiliary equipment ....................................................................................................... 17
5.3 Test results ........................................................................................................ 17
Wind-only operation ....................................................................................................... 17
Simulated wind-diesel mode ......................................................................................... 17
Starting ............................................................................................................................ 17
5.4 Discussion of Gazelle results ........................................................................... 18
Power quality .................................................................................................................. 18
Wind turbine starting...................................................................................................... 19
Reactive power compensation and rotating losses ..................................................... 19
6 300KW DEMONSTRATION USING WINDMASTER WIND TURBINE AT BLYTH,
NORTHUMBERLAND ...................................................................................................... 21
6.1 Windmaster wind turbine ................................................................................ 21
Wind turbine details ....................................................................................................... 21
Starting resistors............................................................................................................. 21
Blade pitch control .......................................................................................................... 21
Existing Windmaster control and protection ................................................................ 22
Windmaster auxiliary equipment .................................................................................. 22
6.2 System design and development.................................................................... 22
Synchronous generator selection.................................................................................. 22
AVR .................................................................................................................................. 22
Governing load controllers and control loads .............................................................. 23
Pony motor...................................................................................................................... 23
6.3 Test results ........................................................................................................ 23
Wind-only operation ....................................................................................................... 23
Simulated wind-diesel mode ......................................................................................... 23
Wind turbine starting...................................................................................................... 23
Rotating losses................................................................................................................ 24
6.4 Discussion of Windmaster results................................................................... 24
Power quality .................................................................................................................. 24
Analysis of starting performance - updated modelling results ................................... 25
Potential for improving system performance during wind turbine starting .............. 26

xi
Windmaster protection settings .................................................................................... 27
Load control .................................................................................................................... 27
Design assumptions and requirements ........................................................................ 27
7 FINAL DESIGN METHODOLOGY ............................................................................ 28
8 DISCUSSION AND CONCLUSIONS........................................................................ 30
8.1 Synchronous compensator technology .......................................................... 31
8.2 Load controller technology .............................................................................. 31
8.3 Suitability of the Gazelle and Windmaster wind turbines ............................. 31
8.4 Applicability to other wind turbines................................................................ 32
8.5 Recommendations and Further Work ............................................................. 32
9 REFERENCES............................................................................................................ 34
10 APPENDIX A - FIGURES .......................................................................................... 35

xii
LIST OF FIGURES
1. System configuration
2. Predicted frequency and active power flows from Gazelle computer
simulation
3. Predicted voltages and reactive power flows from Gazelle computer
simulation
4. Predicted frequency and active power flows from Windmaster computer
simulation
5. Predicted voltages and reactive power flows from Windmaster computer
simulation
6. Instrumentation requirements
7. Transducers installed
8. Measured frequency and active power flows from wind-only Gazelle
operation
9. Examples of control load switching from wind-only Gazelle operation
10. Measured voltages and reactive power flows from wind-only Gazelle
operation
11. Measured frequency and active power flows from wind-only Windmaster
operation
12. Measured voltage and reactive power flows from wind-only Windmaster
operation
13. Measured frequency and active power flows during Windmaster start
14. Measured voltage and reactive power flows during Windmaster start

LIST OF TABLES
1. Frequency and voltage results - wind-only Gazelle operation
2. Frequency and voltage results - wind-only Windmaster operation

xiii
1 INTRODUCTION
1.1 Background
There is a large global requirement for rural electrification as 2 billion people are
without electricity. To supply these by extending existing grid systems would require
massive investments in transmission and distribution plant in addition to the power
stations to feed them. An alternative is to use mini-grids to provide electricity using
local indigenous renewable resources.
The UK has pioneered island renewable energy systems, eg Fair Isle and Foula, with
distributed load management to enable these grids to operate with 100% wind
energy penetration. These projects have been individually successful, but have not
been replicated in the global market. It is believed that there are two key reasons why
this is so:
• the systems have employed purpose-built wind turbines with synchronous
generators rather than standard (grid-connected design) induction generator
machines
• the grids cannot successfully accommodate more than one or two turbines.
Recognising this opportunity, Econnect has developed a new generation of
Distributed Intelligent Load Controllers to enable mini-grids (island grids, wind diesel
systems or autonomous systems) to use one or many standard (grid connected
design) wind turbines. Econnect received a SMART award in 1995 and SPUR award
in 1997 to undertake this development. The development was supported by two
Econnect Eng. D. Studentships at UMIST. The controllers used highly innovative
software algorithms to control system frequency within the statutory limits. They
underwent extensive modelling as well as successful preliminary site and laboratory
tests on wind turbines with induction and synchronous generators.
In order to develop Econnect's role as system integrators for a number of
demonstration systems, and hence expand the market for the load controllers, the
need to demonstrate the technology with in-service wind turbines was identified.
When developed, this load controller technology also has the potential to provide
safe and stable operation of grid-connected embedded generation in islanded mode
under network fault conditions. This could offer significant benefits in improving
security of supply to customers, particularly in remote rural areas where islanding
may be more beneficial.
1.2 Aims and objectives of the project
The main aim of the project was to develop equipment suitable for use in remote
locations which would permit islanded operation of wind turbine systems equipped
with induction generators. A structured set of objectives was produced as follows:
• demonstrate methods by which induction wind turbine generators can operate in
islanded mode, receiving voltage control from synchronous compensators and
frequency control from distributed intelligent load controllers
• develop a design methodology for synchronous compensators and apply it to the
construction of such units for two test systems

1
• site test a 20kw stall regulated wind turbine, to be islanded from the electricity
grid and fitted with the above technology
• site test a 300kw pitch regulated wind turbine, to be islanded from the electricity
grid and fitted with the above technology
• publish the results and test data to inform relevant parties as to the benefits of
mini-grid technology which incorporates these technologies
1.3 Benefits
The main beneficiaries of this project were identified as Econnect, mini-grid
developers, distribution network operators, embedded generator owners and remote
rural communities. It was envisaged that the project would:
• provide test results to demonstrate the capability of DILCs in providing safe,
stable and sustained operation of mini-grids or islanded sections of the
interconnected grid with 100% wind energy penetration with high power quality
• provide a design methodology for synchronous compensators, a key component
in mini-grid systems using standard grid connected wind turbines and DILCs to
achieve sustained and stable 100% wind penetration
• establish Distributed Intelligent Load Control as the preferred option for the
developers and operators of mini-grids world-wide to integrate wind energy at
high penetration
• raise awareness of the possibilities for operating embedded generation in
islanded mode by offering proven technology and test results with wind turbines
designed for grid connection
• offer a possible method of island operation, thereby improving security of supply,
reducing customer minutes lost (CML) and customer interruptions (CI), improving
voltage support and protection discrimination for customers and networks
particularly in remote rural areas
• develop collaborations between Econnect and UK companies to bid successfully
for development and operation of mini-grid systems using renewable energy
• open up new export markets for UK business
• provide opportunities for reducing lost generation time from embedded
generation plant due to network faults
• establish and promote UK expertise in the world-wide mini-grid market and for
islanded operation
The use of Distributed Intelligent Load Control technology to control system
frequency:
• is cheaper than using wind turbines with inverters and cheaper than energy
storage
• breaks the maximum wind penetration threshold considered acceptable by many
utilities
• enables cheaper electricity supply in mini-grids due to saving of wear and tear on
gensets

2
1.4 Previous work
This project was a development of work carried out by Econnect in conjunction with
UMIST in December 1999 [1,2]. The aim of these tests was to investigate whether an
adequate level of control could be achieved using distributed intelligent load
controllers to manipulate a series of resistive loads in order to function as an
electronic governor for a wind-diesel system, while running in wind-only mode. The
system was located at the Rutherford Appleton Laboratories Energy Research Unit
(RAL) in Oxfordshire. The experimental wind-diesel system consisted of a 45kW stall-
regulated 3-bladed wind turbine, with rotor diameter 17m, and a 48kW turbocharged
diesel generator set coupled to a 68kW/85kVA synchronous alternator via an
electromagnetic clutch. The performance was good although some stability problems
were encountered. The site tests at RAL provided useful information and
demonstrated that the system could operate satisfactorily in the wind-only mode of
operation using the load controllers and a synchronous compensator.
The next steps were to demonstrate that this could be achieved on a commercially-
available wind turbine, designed for grid-connected operation, and then to show that
the system would also work successfully on a larger, pitch-regulated commercially-
available wind turbine.
1.5 Collaborators
Support for, and interest in, the project was obtained from a synchronous generator
manufacturer (Newage AVK-SEG) and a wind turbine manufacturer (Gazelle Wind
Turbines Ltd). Two wind turbine operators kindly permitted their wind turbines to be
disconnected from the grid and tested on stand-alone systems (the Business and
Innovation Centre, Sunderland, and Blyth Harbour Wind Farm Company).
Windcluster had originally agreed to make a wind turbine available for testing, but
project timescales did not fit in with repowering of the wind farm in question.
Significant technical and logistical assistance was provided by NaREC and by AMEC
Wind.
1.6 Project overview
The project incorporated the following activities:
• Selection of appropriate test sites and agreement with wind turbine operators
• Data collection for wind turbines, and discussion with manufacturers
• System design, including
- selection of suitable synchronous compensators
- specification of load control configuration, protection equipment and
back-up power equipment
• Dynamic computer modelling of the system
• Specification and procurement of
- load control hardware
- load banks
- protection equipment

3
- pony motors and variable speed drives
- cabling
- instrumentation and datalogging equipment
• Load control software development
• System assembly and installation
• Development of datalogging systems
• Production of risk assessment and method statement documents
• Equipment commissioning
• Wind turbine modification
• Wind turbine testing
• Decommissioning of test equipment
• Results analysis
• Dissemination of the results [10,11,12]

4
2 DESIGN CONSIDERATIONS
2.1 Requirements
The main technical operating requirements for a wind turbine-based stand-alone
electrical power system are to:
• maintain a continuous supply with voltage and frequency within required
limits [3]
• operate generating equipment safely and within its limitations, to maximise its
operating life
• ensure adequate protection against failures within the system
• maximise use of the available wind power
The solution developed needed to be a low cost, robust and reliable design, with
minimal, and straightforward, maintenance requirements.
2.2 System design philosophy
Research into electrical systems has often concentrated on "high-tech" solutions
appropriate for use in well-funded, grid-connected applications, and much current
development is focussed on static solutions and techniques based on power
electronics, such as StatCom [4]. These solutions are less appropriate for a remote
location where technical skills are limited, such high-tech equipment is unfamiliar,
and technical support and spares from the manufacturer are difficult and time-
consuming to access. In this type of environment, where it is envisaged stand-alone
wind turbine technology would be of most benefit, experience has shown that
straightforward, low-cost and "low-tech" solutions are often most appropriate. It was
therefore decided within this project to aim to produce a solution with low-cost,
robust, well-established, off-the-shelf equipment, and to preserve as much
commonality with the grid-connected wind turbine system as possible, in order to:
• minimise bespoke engineering design and manufacturing work, and hence
minimise cost and delivery times
• maximise system reliability
• allow straightforward maintenance and product support from equipment
manufacturers
2.3 Frequency and voltage control
In any autonomous power system which employs a rotating generator, the system's
electrical frequency is directly proportional to the generator's rotational speed.
Constant frequency is maintained by matching the active power supply into the
system with the active power drawn from the system by the loads. If this is not
achieved, either surplus energy in the system is absorbed in accelerating all the
rotating machines, increasing the frequency, or any excess load is supplied from the
kinetic energy of the rotating machines, causing a drop in frequency.
A “conventional” autonomous power system, with a dispatchable energy source
such as a diesel generator, achieves this balance by controlling the power output
using the diesel governor [1]. In a system which relies purely on a non-dispatchable

5
renewable energy source like a wind turbine, this balance is achieved by matching
the load demand to the variable power input. Although frequency is fundamentally
dependent on active power, variation in reactive power flows around the network will
modify component losses and hence cause changes in active power.
Voltage stability is dependent on the active and reactive power flows within a
system. In a large system, where the line inductive impedance is considerably greater
than its resistance, reactive power tends to be the dominant component; in a smaller
system like those under consideration here, the line resistance is more comparable
with the inductive impedance and both active and reactive power flows affect voltage
levels. Voltage, unlike frequency, can also vary at different points around the
network, depending on the power flows at each point and the line characteristics
between points.
The strategy employed in this project was to use the DILCs and control loads to
balance the flow of active power in the system, and hence regulate the system
frequency. Reactive power, and hence voltage control, was supplied by a
synchronous compensator. The system configuration is shown in figure 1.
2.4 Load management
The load management strategy employed a number of small, individually-controlled
deferrable loads, distributed around the mini-grid. This approach is scalable to any
size of system. These loads would typically be water or space heaters, switched on
and off by individual governing load controllers, developed by Econnect. Each
controller sampled the supply voltage waveform and calculated the frequency and
rate of change of frequency of the supply. This information was then processed using
a “fuzzy logic” algorithm, to produce an appropriate switching decision. Load
switching was achieved using a solid state TRIAC device that switched at zero
crossing points, ensuring negligible supply distortion.
The global combination of the independent switching decisions from all the load
controllers formed a decentralised, dynamic load management system. The fuzzy
logic algorithm had an adjustable time delay plus a self-tuning facility, which enabled
each individual controller to tailor its decision-making process to improve system
stability. The use of multiple small loads produced a controllable load with good
resolution. The resulting system was flexible and had high redundancy; it would also
permit easy expansion to cope with increased supply capacity. In a typical stand-
alone application, deferrable loads around the network would make effective use of
the excess wind power.
2.5 Reactive power compensation and voltage control
The test systems retained the existing power factor correction capacitors, and used a
synchronous compensator to meet the fluctuating system requirements above the
base reactive power provided by the capacitors. Capacitors offered a low cost and
efficient way of providing a proportion of the required reactive power, whilst the
synchronous compensator exhibited great advantages, such as flexibility of
operation under all load conditions, and an essentially inductive source impedance
that could not cause harmonic resonances with the network.
It was decided to limit the capacitor rating within both demonstration systems to
those already installed for power factor correction. Significant increases in capacitor

6
rating would have introduced additional capacitor switching requirements, with
additional control equipment requirements and potential reliability concerns. High
levels of capacitance connected could also increase the risk of self-exciting the wind
turbine and/or reaching the underexcitation limit on the synchronous compensator in
the event of some system failures, with associated risks of resonance, overvoltage
and component damage.

7
This page has been deliberately left blank

8
3 SYSTEM SIMULATION
The first step in the design process was to develop a computer model of each
intended autonomous power system. The models were developed using MATLAB /
Simulink, and incorporated all the components in the proposed test system by
employing Simulink's Power Systems Blockset and Fuzzy Logic Toolbox.
For each system, a mini-grid containing a wind turbine, a Newage synchronous
compensator with a backup power source, variable consumer loads, and control
loads under the control of Distributed Intelligent Load Controllers (DILCs), was
simulated. Variable wind speed inputs and variable consumer loads were applied to
investigate the power quality and stability of the system.
3.1 Wind Turbine
The wind turbine was modelled in two sections, the aerodynamic performance and
the generator. The windspeed was input from a data file in the form of windspeed v
time data. Various sets of windspeed data were used, to investigate the effects of
varying mean windspeed and turbulence levels.
A simplified approach to calculating the relationship between windspeed and
aerodynamic torque was adopted, which significantly reduced the level of complexity
of the model, and permitted valid results to be obtained provided the rotor speed of
the wind turbine remained close to its design value.
The aerodynamic torque was applied to a predefined asynchronous machine block,
available from the Power Systems Blockset library. The parameters used in the
model of the asynchronous machine were obtained from the generator data sheet for
each wind turbine [5,6].
3.2 Synchronous Compensator and Automatic Voltage Regulator (AVR)
The synchronous compensator subsystem comprised two major components, the
synchronous machine and the AVR.
The models initially employed a simplified synchronous machine block from the
Power Systems Blockset library. The simplified synchronous machine block modelled
both the electrical and mechanical characteristics of a synchronous machine [7],
using parameters from the datasheet for each machine selected.
A simple model of the AVR was developed. The AVR model sensed all three voltage
phases and used a mean root-mean-square (rms) value as its input voltage,
outputting a field voltage which was applied to the synchronous machine model
block.
3.3 Control Loads and Distributed Intelligent Load Controllers
Single-phase control loads were simulated in line with the system design. Each
phase had a number of switchable resistive loads, each with its own Distributed
Intelligent Load Controller (DILC). The controllers were implemented using the
MATLAB Fuzzy Logic Toolbox library [8]. This permitted easy integration of the
controllers into the SIMULINK simulations. A more detailed description of the fuzzy
control algorithm can be found in [1].

9
3.4 Simulations carried out
Simulations were carried out over a wide range of operating conditions. Results for
the Gazelle and Windmaster wind turbine systems are described below. Overall the
simulations results were encouraging, and gave confidence that the system design
would perform satisfactorily when implemented. The results also highlighted areas
for investigation during wind turbine testing.
3.5 Gazelle simulation results
Results for the base Gazelle computer model (post-start up) are shown in figures 2
and 3.
The graph of active power in figure 2 shows the predicted control load profile making
up the difference between the varying wind turbine input power and the varying base
load power requirement. The random nature of the control load switching is clearly
demonstrated. This is due both to the variable time delays built into each DILC, and
to the fuzzy logic and the random component within the algorithms they use. It is an
essential aspect of the use of distributed load control that the controllers act
independently and at different times to ensure stable and smooth operation.
Predicted system frequency was maintained between approximately 48 and 52Hz.
This was slightly outside the BS EN 50160 recommendation. Previous experimental
work [1] had demonstrated better frequency control, but at the expense of rapid
controller switching which can result in flicker.
Predicted voltage control (figure 3) was good, well within the required +/-10% of 230V
stated in BS EN 50160. The AVR model achieved this with variations in active power
input between 7kW and 20kW, and total reactive power requirements fluctuating
between 12kVAr and 18kVAr, of which 3-9kVAr was supplied by the synchronous
machine. The worst predicted imbalance between two-phase voltages was 7V, or 3%
of nominal. Some imbalance would be expected, since all the consumer loads and
control loads were independent single-phase loads.
Figure 3 shows the approximately constant reactive power contribution from the
capacitors at around 9kVAr, varying slightly as the voltage and frequency varied. The
reactive power from the synchronous compensator made up the shortfall between
the contribution from the power factor correction capacitors and the reactive power
required by the wind turbine and the base loads.
Variations were modelled, with different amounts of base load applied, different
ratings of power factor correction capacitors, and different wind speeds. None of the
results obtained indicted any cause for concern.
A separate investigation of wind turbine starting, using a model which incorporated a
simplified representation of the soft starter, was carried out. This provided some
useful pointers regarding the processes that take place during starting, but the
approximate nature of the soft starter model meant that its results were not directly
comparable with the test results.
3.6 Windmaster simulation results
Results for the base Windmaster computer model (post-grid connection) are shown
in figures 4 and 5.

10
Predicted system frequency remained between approximately 48Hz and 52Hz. This
was slightly outside the BS EN 50160 recommendation. The model showed a much
slower response to windspeed fluctuations than the Gazelle model. This was due to
the much greater system inertia, and resulted in less frequent controller switching
operations.
Figure 4 shows the predicted control load profile making up the difference between
the varying wind turbine input power and the varying base load power requirement.
Predicted voltage control was good, within the required ±10% of 230V stated in BS
EN 50160. The AVR model achieved this with variations in active power input
between 180kW and 300kW, and total reactive power requirements (from the wind
turbine and the base load) fluctuating between 100kVAr and 350kVAr. The largest
predicted imbalance between two-phase voltages was 20V, or 8.7% of nominal.
Some imbalance would be expected, since the control loads were independent
single-phase loads.
Figure 5 shows the predicted (approximately constant) reactive power contribution
from the capacitors at around 100kVAr, varying slightly as the voltage and frequency
varied. The reactive power from the synchronous compensator made up the shortfall
between the contribution from the power factor correction capacitors and the
reactive power required by the wind turbine and the base loads.

11
This page has been deliberately left blank

12
4 DATALOGGING SYSTEM
4.1 Requirements and specification
A datalogging system was developed to allow the performance of the system to be
evaluated. The parameters that were considered to be necessary were system
frequency, system voltages, line currents, real power flows and reactive power flows,
for all three phases for the synchronous compensator, the wind turbine and the
loads, plus wind turbine rotor speed (shown in figure 6). Although proprietary
devices existed to measure and log all these parameters, the cost of a sufficiently
comprehensive off-the-shelf system was prohibitive. The same information could be
obtained from a smaller set of measurements which then allowed the remaining
parameters to be calculated. Consequently a modular PC-based system, measuring
the minimum number of parameters possible, was specified, to give maximum
flexibility at low cost.
4.2 Instrumentation and data recording
Transducers were installed around the system as shown in figure 7. These all
produced a galvanically-isolated low voltage signal, suitable for connection to a PC-
based data acquisition card, and proportional to instantaneous values of voltage or
current as appropriate. It was assumed that a single voltage measurement on each
phase would suffice for the entire system. As the voltages were measured close to
the current measurements, this would give accurate calculated power flows.
The transducer output signals were fed into a National Instruments DAQ-6024E data
acquisition card installed in a Dell Latitude laptop. A National Instruments Labview
software application was developed to sample the inputs, carry out some signal
analysis, and log frequency, amplitude and phase information for each signal. The
data files were post-processed to calculate the required parameters.
On the Gazelle system, digital signals indicating the switching status of the load
controllers were also optically isolated and recorded via a National Instruments DAQ-
1200 data acquisition card installed in the same laptop.
For the Windmaster testing, an Areva M871 fast transient datalogger was also used
to record currents, voltages and calculated parameters.

13
This page has been deliberately left blank

14
5 20KW DEMONSTRATION USING GAZELLE WIND TURBINE AT
SUNDERLAND, TYNE AND WEAR
5.1 Gazelle wind turbine
Wind turbine and generator
The Gazelle was a three-bladed, stall-regulated downwind wind turbine rated at
20kW. Its rotor ran at 106rpm, driving the generator via a 2-stage planetary 14:1
gearbox. It was usually connected to a three-phase 400V / 50Hz mains supply. The
Gazelle's wind turbine generator was a 4-pole asynchronous Brook Crompton W-
DA180LJ motor. Calculations predicted that the Gazelle would have a reactive power
requirement of 14.6kVAR at its rated power output of 20kW. Of this, approximately
10kVAR (90% of its no-load requirement) was provided by the power factor correction
capacitors after startup.
The Gazelle operated between average windspeeds of 4 m/s and 20 m/s. Estimates
suggested that the stall regulation of the Gazelle would be successful in limiting
instantaneous power to around 20kW at gust windspeeds below about 35m/s, and
this value was used to size the system loads.
Existing Gazelle control, sequencing and protection
Sequencing control and protection for the Gazelle was carried out by a Mitsubishi
FX2N-FX32MR PLC.
During its start up the grid-connected Gazelle drew power from the network to motor
itself up to its operational speed. Due to its aerodynamic characteristics, it did not
receive much aerodynamic assistance until near its operating speed and hence would
not usually self-start. Thus in a stand-alone configuration a backup power supply was
required to assist the Gazelle. The power factor correction capacitors were connected
after reaching synchronous speed and therefore the inrush current of the induction
generator was required to be supplied by the grid, or in this case, by the synchronous
machine.
The Gazelle's PLC was set up to shut it down under the following conditions:
• low windspeed (identified by motoring of the generator)
• rotor overspeed above 10% (nominal 106rpm)
• supply voltage outside -10%/+6% limits
• excessive vibration
• winding overtemperature
• loss of hydraulic pressure (for the brake supply)
• over-voltage
• under-voltage
• over-frequency
• under-frequency

15
Soft starter
The Gazelle was fitted with a thyristor soft-starter, which allowed the voltage applied
to the stator to build up gradually when first connecting the turbine to the grid.
Typical direct-on-line starting of the Brook Crompton motor would otherwise result in
inrush currents of the order of 7.5 times the rated motor current. The voltage ramp
applied by the soft starter reduced this stator inrush current and hence the local
voltage dip. When the generator terminal voltage reached its full value, the soft
starter was bypassed to minimise power dissipation in its power electronic switches.
The soft starter generated a poor quality voltage waveform while it ramped up the
voltage.
Auxiliary equipment
The Gazelle was equipped with a variety of auxiliary devices requiring power,
including a hydraulic pump.
5.2 System design and development
Synchronous generator selection
Discussions were held with Newage about a suitable synchronous machine to use.
They advised the use of a slightly oversized machine initially. Consequently a two-
bearing 42.5kVA UCI224C machine was selected. The UCI224C weighed 281kg and
had dimensions of 792 x 690 x 552 mm.
Efficiency data was provided by Newage, in the form of power dissipated by the
machine for varying amounts of reactive power supplied. This suggested that there
would be a standing loss of around 700W even when the machine was generating no
reactive power at all. During normal operation the synchronous compensator would
be providing an average of 4.6kVAr plus consumer reactive power requirements,
which would result in the order of 1kW dissipated.
AVR selection
The performance of the AVR was critical to the control, stability, and hence
availability, of the entire network. The fact that it controlled the system voltages
means that it had the potential to permit equipment damage through overvoltage,
and also lose speed control of the wind turbine through undervoltage. Different types
of AVR were available, and the AVR selection is outlined below.
A separately-excited permanent magnet (PMG) MX321 AVR was selected for the
synchronous machine. The PMG provides a constant supply of excitation power
which is not contaminated by the load or influenced by the magnetic field of the
generator. This type of AVR is less vulnerable to non-linear loads on the system (in
this case, the Gazelle's soft starter) and will maintain a short-circuit current in the
event of a short circuit fault, presenting circuit breakers with enough current to effect
a trip. The MX321 AVR chosen senses voltages from all three phases to determine
the excitation level of the generator, which is advantageous on a system with
unbalanced loads present. The quoted voltage control accuracy for the MX321, 0.5%,
is well within the EN50160 requirements.

16
Pony motor
As the motoring requirements of the Gazelle's generator during start-up were
unknown, it was decided to size the pony motor slightly larger than the Gazelle's
generator, at 30kW. The pony motor employed was a 30kW ABB induction motor,
connected to the shaft of the synchronous machine using a flexible coupling. A 30kW
variable speed drive powered from the mains supply was used to control the speed
and torque of the pony motor.
Auxiliary equipment
All auxiliary devices on the Gazelle were powered from the synchronous
compensator supply.
5.3 Test results
Wind-only operation
Wind-only operation was achieved as shown in figures 8 - 10. The variable speed
drive powering the pony motor was shut down, and on some occasions,
disconnected, while the system continued to operate powered only by the wind
turbine. At this point, the only frequency (speed) control was provided by the load
controllers.
No adjustment to the load controller firmware was necessary to achieve stable
frequency control in wind-only mode, and no additional adjustment was necessary to
the AVR to achieve stable voltage control.
Wind-only mode could be maintained stably for as long as there was enough wind to
overcome the losses in the system, mainly the synchronous compensator's rotating
losses, but with some losses due to the auxiliary wind turbine equipment (PLC, Pilz
protection relay, G59 relay, etc).
Simulated wind-diesel mode
Before wind-only operation was achieved, the system was operated in simulated
wind-diesel mode. The variable speed drive would automatically power the pony
motor to maintain system frequency if the wind alone was insufficient to maintain
the frequency. Once there was enough wind to accelerate the pony motor /
synchronous compensator assembly above this setpoint, the drive stopped providing
active power to the pony motor, and merely provided excitation current. The pony
motor was therefore acting like an infinitely-variable diesel generator.
Starting
Some starting investigations were carried out on the grid-connected wind turbine, to
optimise the soft starter settings before trying a stand-alone start. Settings were
identified which reduced the current drawn by the wind turbine to reasonable levels.
A wind turbine start-up strategy was then developed using the pony motor. The aim
was to ensure that starting of the Gazelle could be carried out without compromising
system power quality, ie the synchronous compensator had to provide acceptable
power quality before, during and after the start. This was important because the
Gazelle needed to be motored up to synchronous speed due to its fixed-pitch rotor
blades.

17
Starting tests were first carried out with no wind. This was a worst case situation - in
normal operation, if there was no wind, the wind turbine wouldn't be started.
However it did provide a consistent set of conditions under which to investigate the
power requirements of the wind turbine during starting.
In order to ensure that no loads were switched on during wind turbine starting, the
motor speed setpoint was set to 1450rpm (48.3Hz).
Start failures due to undervoltage were remedied by increasing the no-load voltage
setpoint on the AVR to 240V rather than 220V, still well within statutory requirements.
Start failures due to underfrequency most often occurred as the soft starter was
bypassed - this presumably indicated that the switching generated a sudden step
change, which caused a demand for too much power. This was alleviated by slowing
down the rate at which the turbine was motored up to speed. There may be scope for
further adjustments to the soft starter settings to reduce the power requirements
further, which would allow a smaller pony motor to be incorporated in a future
system design.
5.4 Discussion of Gazelle results
Power quality
An 800-second period of wind-only operation was analysed to evaluate the system's
performance. During this period the mean wind turbine power generated was 6.3kW.
Table 1 shows mean, maximum, minimum and standard deviation values for
frequency and voltage, as these are the main parameters specified in BS EN 50160.
The requirements stated in BS EN 50160 are also shown.
Frequency, Hz Phase-to-neutral voltage, V,
rms
BS EN 50160 red yellow blue BS EN
50160
Mean 48.59 50 237.1 237.5 237.9 230
Maximum 49.71 51* 244.0 243.51 244.9 253
Minimum 46.98 49* 227.3 227.8 227.9 207
Standard deviation 0.41 - 2.8 2.7 2.8 -
* for 95% of week
Table 1 - Frequency and voltage results - wind-only Gazelle operation
Frequency control was good. Assuming a normal distribution, a standard deviation of
0.41Hz would suggest a variation of +/-0.82Hz for 95% of the time, within the BS EN
50160 requirement of +/-1Hz. There was a definite offset in the control, however, with
a low mean value of 48.6Hz, which puts the system as configured outside acceptable
limits. However it should be straightforward to modify the load controller firmware to
remove this offset.
A slow oscillation in frequency was observed. This is a feature inherent in the use of
the distributed load control technique. However the frequency of this oscillation,
around 0.4Hz, was well outside the region where flicker would be a problem (8-10Hz).

18
A lightbulb was connected to the red phase voltage, to evaluate visually whether
there was any flicker generated by the load controller switching. None was evident.
Voltage control was good. The AVR was adjusted to give a phase voltage of 240Vrms
with no load on the synchronous machine - this was to provide some margin above
the G59 relay's minimum during starting. The BS EN 50160 voltage requirements are
fairly wide and the voltage on all three phases remained well within them. As the
load control employed single-phase loads, with no restriction on the relative loading
on each phase, this was particularly encouraging.
Excessive negative sequence voltages could cause concern about machine winding
overcurrent / overheating; however the values achieved, (mean 1.06% of positive
sequence voltage, standard deviation 0.1%) were well within the nominal 2% limit in
BS EN 50160.
Wind turbine starting
It was an aim of the work to be able to start the wind turbine without adversely
affecting the power quality of the system. Although starting the wind turbine did
have an effect on frequency and voltage, these effects were within reasonable limits,
with a 6.3% voltage drop and a frequency variation between 47.6Hz and 50Hz during
the start sequence.
Reactive power compensation and rotating losses
Tests were carried out with three levels of static reactive power compensation: the
original 37uF capacitors, no capacitors, and 61.6uF capacitors. The capacitors were
switched in after starting and hence provided none of the starting reactive power
requirement. The following comments therefore refer only to the "steady-state", post-
starting, reactive power requirements.
The original configuration, with 37uF capacitors, resulted in a reactive power
requirement from the synchronous compensator between 6kVAr and 10kVAr. The
uncompensated wind turbine required between 12kVAr and 16kVAr reactive power
from the synchronous compensator. Introducing the larger 61.6uF capacitors reduced
the additional reactive power component to between 0kVAr and 7kVAr.
In wind-only mode, with the original capacitors fitted, the synchronous compensator
/ pony motor assembly absorbed an average of 1.9kW from the system, with a wide
variation around this mean. The Newage design data [9] suggested that real power
losses, from the synchronous machine only, at around 8kVA would be approximately
1.3kW; the remaining 0.6kW could be accounted for by the additional rotating losses
of the pony motor.
The measurements made with different power factor correction capacitors indicated
a slight general increase in the synchronous compensator assembly's real power
requirement as more apparent power was drawn from the synchronous
compensator, in line with the design data provided by Newage.

19
This page has been deliberately left blank

20
6 300KW DEMONSTRATION USING WINDMASTER WIND TURBINE
AT BLYTH, NORTHUMBERLAND
6.1 Windmaster wind turbine
Wind turbine details
The Windmaster was a three-bladed, pitch-regulated upwind wind turbine rated at
300kW. Its rotor ran at 50.9rpm, driving the generator via a 3-stage parallel axis
gearbox. The generator was connected to the local 11kV / 50Hz mains via a three-
phase 11 / 0.380 transformer. The Windmaster's generator was a 4-pole
asynchronous ABB machine (wQU 315 L4 DA). It was calculated that the generator
would have a reactive power requirement of almost 200kVAr at its rated power
output of 300kW - this could approach 230kVAr in gust conditions. Of this,
approximately 100kVAr would be provided by the power factor correction capacitors
at all times and hence the synchronous compensator would need to provide the
remaining 100-130kVAr. Approximately 70% of the no-load reactive power was
provided on the low voltage side by power factor correction capacitors.
The Windmaster operated when average windspeed was between 4 m/s and 25 m/s,
achieving rated power of 300kW at 13m/s. Local turbulence could result in highly
variable instantaneous windspeed and hence highly variable instantaneous power.
Above rated windspeed, the wind turbine's power output could easily exceed the
rated power for short periods without causing the wind turbine to cut out. This gust
power was estimated at 370kW at the Blyth site, based on observations by site
engineers, and this defined the total capacity required for the load banks.
Starting resistors
The Windmaster was not fitted with a power electronic soft-starter. Inrush currents
were reduced by the use of starting resistors when the generator was first connected
to the grid, when its speed reached approximately 1498rpm. At approximately
1500rpm, the resistors were bypassed to avoid overheating and fire, and to minimise
power dissipation. In an off-grid system, this facility should reduce the current
demand from the wind turbine generator, and hence assist the AVR and synchronous
machine to maintain system voltage during wind turbine connection, although this
approach is considerably less flexible than employing a power-electronics-based soft
starter.
Blade pitch control
The Windmaster, like most wind turbines at this rating and above, had variable-pitch
rotor blades, which were adjusted to allow the rotor to self-start, and to regulate the
power output above the rated wind speed. This is in contrast with the stall-regulated
Gazelle. The pitch-control mechanism introduced a new control mechanism, with
potential for interaction with the frequency management strategy of the load
controllers. The pitch angles of the three rotor blades were controlled hydraulically.
The linear motion of a two-directional hydraulic cylinder, with a stroke of 350mm,
was transformed into a rotational motion of up to 90 degrees, by the pitch
mechanism.

21
Existing Windmaster control and protection
Sequencing control and protection for the Windmaster was carried out by an HMZ
Data communications system.
During its start up the Windmaster's generator was not connected to the grid. Its
variable pitch blades were angled to provide aerodynamic torque to accelerate the
rotor up to its operational speed. When the generator reached approximately
1455rpm, the power factor correction capacitors were connected to the grid. When
the generator speed reached approximately 1498rpm, the generator was connected
to the grid. The initial connection was made through starting resistors in series with
the generator, to reduce the inrush current, and then the resistors were bypassed and
the generator was connected directly to the grid.
This sequence meant that the synchronous machine was not required to motor the
generator up to its operational speed, and was assisted in exciting the generator
because the power factor correction capacitors were connected before the wind
turbine generator was connected.
The Windmaster's controller was set up to carry out a shut down on any of the
following events (among others):
• rotor overspeed / rotor underspeed
• excessive vibration
• winding overtemperature
• over-voltage / under-voltage
• over-frequency / under-frequency
Windmaster auxiliary equipment
The Windmaster was equipped with a variety of auxiliary devices with various
voltage supply requirements. This included a 250bar hydraulic pump supplying the
motor for the blade pitch control and the yaw motor.
6.2 System design and development
Synchronous generator selection
In relation to the Gazelle system, a smaller synchronous machine was specified for
the Windmaster system (250kVA in comparison with a wind turbine of 300kW), in
agreement with Newage. A two-bearing 250kVA HCI434C was selected, with a weight
of 885kg and a moment of inertia of 3.35kgm2. Typical efficiency was quoted by the
manufacturer as 93% at rated output. This gave a predicted full load loss of 17.5kW,
providing an order of magnitude estimate of system losses at around 5% of wind
turbine rating.
AVR
As a result of the successful experience gained with the Gazelle system, the same
MX321 AVR was selected for the Windmaster testing.

22
Governing load controllers and control loads
The increased rating of the Windmaster compared with the Gazelle introduced some
extra considerations to be taken into account when designing the control load
configuration. It was not possible simply to scale up the Gazelle configuration, due to
the limit on the size of load that could be switched by each load controller.
A 250kW variable base load was specified, in addition to a total control load sized at
150kW, which employed seventeen load controllers per phase, switching a range of
1kW, 2kW and 4kW single-phase loads. The 250kW base load fulfilled the role of a
consumer load. In addition, two three-phase inductor banks, of 100kVAr and 25kVAr
respectively, were employed.
Pony motor
The motoring requirements of the Windmaster's generator during the grid
connection process were unknown, but not expected to be significantly larger than
the rating of the wind turbine's generator. Therefore the pony motor was sized at
200kW, smaller than the generator but with the ability to deliver higher power for
short timescales. The pony motor employed was an ABB induction motor, connected
to the shaft of the synchronous machine using a flexible coupling. A 400kW variable
speed drive powered from the mains supply was used to control the speed and
torque of the pony motor. This high rating was used for availability reasons rather
than technical ones.
6.3 Test results
Wind-only operation
Effective wind-only operation was achieved as shown in figures 11 and 12. At this
point, the only power input into the system was from the wind turbine, and the only
frequency (speed) control was provided by the load controllers.
No adjustment to the load controller firmware was necessary to achieve stable
frequency control in wind-only mode, and no additional adjustment was necessary to
the AVR to achieve stable voltage control.
Wind-only mode could be maintained stably for as long as there was enough wind to
overcome the losses in the system, mainly the synchronous compensator's rotating
losses.
Simulated wind-diesel mode
The fact that the frequency setpoint on the variable-speed drive was below the DILC
frequency target meant that the motor drive would only power the pony motor if the
wind was insufficient to maintain this lower frequency. Once there was enough wind
to accelerate the pony motor / synchronous compensator assembly above this speed,
the drive stopped providing active power to the pony motor, and merely provided
excitation current. If the wind dropped again, the drive provided active power to
maintain its speed setpoint. It was therefore acting like an infinitely-variable diesel
generator.
Wind turbine starting
Starting the wind turbine on the stand-alone system proved difficult. A successful
start required all the components of the system (ie variable speed drive, AVR and

23
load controllers) to operate successfully immediately to prevent the wind turbine
exceeding any of its protection limits.
A successful start is shown in figures 13 and 14. In order to ensure that no loads were
switched on during wind turbine starting, the pony motor speed setpoint was set
below the load controller setpoint. The PFC capacitors were switched in at 249.5
seconds; the starting resistors were switched in at 269.5 seconds, and the bypass
contactor K1 was closed at 262 seconds.
The events that occurred during the start had almost contradictory requirements. For
example, the moment at which the wind turbine was first connected required a large
flow of real and reactive power into the wind turbine system to avoid under-
frequency and under-voltage. As soon as that first inrush was overcome and the
turbine's rotor became supersynchronous, the turbine started to generate. The power
input from the variable speed drive then had to be removed, and large amounts of
load had to be applied instantly to prevent an overspeed.
Initially the G59 frequency and voltage protection prevented any progress being
made past the initial connection of the starting resistors. Temporarily bypassing
these limits by employing an alternative G59 relay allowed the bypass contactor K1
to be closed and some successful starts to be achieved. Figures 13 and 14 show the
momentary frequency and voltage dips that occurred when connecting the
generator. Many starts were terminated just after K1 was closed, due to excessive
rotor speed excursions, the limits for which effectively mirrored the frequency
settings which had been successfully bypassed. Unfortunately it was not possible to
access the control software to modify these limits, which would have been originally
set up to accommodate grid-connected operation.
Rotating losses
In wind-only mode, the synchronous compensator / pony motor assembly absorbed
an average of 15.6 kW from the system.
6.4 Discussion of Windmaster results
Power quality
Only a short period of wind-only operation was achieved with the Windmaster due to
the restrictive rotor speed limits within the controller. This period of operation has
been analysed to evaluate the system's performance. During this period the mean
wind turbine power generated was 41.3 kW. Table 2 shows mean, maximum,
minimum and standard deviation values for frequency and voltage, as these are the
main parameters specified in BS EN 50160. The requirements stated in BS EN 50160
are also shown.

24
Frequency, Hz Phase-to-neutral voltage, V, rms
measured BS EN red yellow blue BS EN
50160 50160
Mean 50.32 50 219.0 217.9 217.1 230
Maximum 50.82 51* 219.9 218.8 218.2 253
Minimum 49.58 49* 218.0 216.7 215.5 207
Standard deviation 0.23 - 0.397 0.295 0.517 -
* for 95% of week
Table 2 - Frequency and voltage results - wind-only Windmaster operation
Frequency control was good. Assuming a normal distribution, a standard deviation of
0.23Hz would suggest a variation of +/-0.46Hz for 95% of the time, within the BS EN
50160 requirement of +/- 1Hz. The mean value of 50.32Hz means that the overall
frequency level was within statutory limits.
A slow oscillation in frequency was observed. This is a feature inherent in the use of
the distributed load control technique. However the frequency of this oscillation,
around 0.4Hz, was well outside the region where flicker would be a problem (8-10Hz).
Voltage control was good. The AVR was adjusted to give a phase voltage of 220Vrms
with no load on the synchronous machine, to meet the requirements of the wind
turbine. The BS EN 50160 voltage requirements are fairly wide and the voltages on all
three phases remained well within them. As the load control employed single-phase
loads, with no restriction on the relative loading on each phase, this was particularly
encouraging, particularly in view of the predictions regarding voltage imbalance
obtained from the computer model. Negative sequence voltages were well within the
nominal 2% limit in BS EN 50160 (mean 1.1% of positive sequence voltage, standard
deviation 0.32%).
Analysis of starting performance - updated modelling results
The Simulink model was updated so that its behaviour reflected the observed results
more closely, in order to investigate the observed starting performance of the wind
turbine in more detail.
• It was found that the original version of the model predicted a system voltage
collapse at the moment of connection of the wind turbine. This was not reflected
in the observed performance of the system, and so the simplified synchronous
machine model was replaced with a full synchronous machine model, and the
AVR model was replaced with the Power Systems Blockset Excitation block.
Where specific machine parameters were not available for the HCI434C, the
default per-unit values were employed.
• A delay was added into the diesel model to allow for its response time in reacting
to a frequency dip.
• Additional measurements were incorporated to allow the power consumption of
the starting resistors to be evaluated.

25
The updated model's behaviour during starting was qualitatively correct, however it
did not replicate quantitatively the exact frequency and voltage response of the
system, most likely due to the simplifications in the AVR and pony motor controller
models. The frequency dip and the overall voltage drop during the start were
underpredicted; in contrast, the model suggested that application of out-of-balance
single-phase loads would result in larger voltage imbalances between the phases
than were seen in practice. The updated model was therefore used to provide an
overall indication of the processes involved during wind turbine starting, and to
estimate the effects of modifying the starting strategy.
The model indicated that the majority of the power drain on the system during the
start was due to the starting resistors, which absorbed a peak of around 200kW,
whereas the maximum motoring power required by the generator was only around
50kW. The peak current flow seen in the model was 480A. These values would vary
depending on the assistance provided by aerodynamic torque at the moment of
connection. Running the model with the starting resistors bypassed gave a predicted
maximum current flow of 512A, a peak power drawn by the wind turbine generator
of 80kW, and a 50% reduction in the predicted frequency excursion.
The immediate conclusion from these observations is that the resistors appeared to
be generating as large a problem as they solved for the stand-alone system - they
reduced the instantaneous current demand of the system, but greatly increased the
real power demand placed on the backup power source.
The model suggested that complete removal of the starting resistors would be likely
to result in a smaller underfrequency but a larger voltage drop (though this would
depend on how much the observed voltage drop was a consequence of the under-
frequency roll-off protection in the AVR). The risk associated with such a starting
strategy might be that in high winds there would be insufficient voltage at the
moment of wind turbine generator connection to "pull in" the wind turbine rotor and
prevent an overspeed.
Potential for improving system performance during wind turbine starting
A number of options exist for improving starting performance.
• Replacement of the starting resistors with a soft-starter (as was used in the
Gazelle testing and is employed in all modern induction-generator wind turbines).
This would limit the voltage applied to the generator terminals without affecting
the mini-grid system voltage, and hence reduce the inrush current requirement,
without increasing the real power demand on the system. Sequencing of the
power factor correction capacitors would probably need to be modified in order to
avoid interaction with the soft starter.
• Increasing the inertia, and hence the amount of stored rotational energy, within
the system. The simplest way to do this would be by connecting a flywheel onto
the synchronous compensator's shaft.
• Improving the speed and magnitude of the response of the backup power source.
This is likely to be a more expensive and risky method than the previous two
suggestions, as it deals with the symptoms rather than the cause of the problem.
It might necessitate an upgrade of the synchronous compensator.

26
Windmaster protection settings
The Windmaster controller's speed, frequency and voltage limits proved restrictive in
operating the stand-alone system. Adapting a grid-connected wind turbine to operate
within a stand-alone system is likely to require some modification of protection
limits. This is difficult in the case of the Windmaster, as the controller is old and the
manufacturer does not exist in their original form.
Load control
The original design of the Windmaster system allowed for a combination of control
load plus base load. It became apparent during testing that the transient events
during starting, in conjunction with large and rapid variations in wind speed, required
a larger proportion of controllable load to be available in order to regulate system
frequency during connection of the wind turbine. In an improved design, some of the
control load could be of larger magnitude than the load-controller-managed loads,
and employ relays to carry out overfrequency load adding and underfrequency load
shedding in a slower manner than the dynamic control provided by the load
controllers.
Design assumptions and requirements
The satisfactory performance of the system vindicates the design assumptions made.
Assuming that the system modifications discussed above would be successful in
reducing the starting power requirements, then it should be possible to derate the
backup power source (diesel) to a suitable size for the essential system loads.
The configuration tested here had the backup power source directly coupled to the
synchronous compensator. An alternative, probably preferable, solution is to operate
a separate diesel genset (with its own synchronous generator) on the system, and
use it to power a small electric pony motor to accelerate the synchronous
compensator to synchronous speed when the wind turbine is to be started. This
allows both synchronous machines to operate in parallel in wind-diesel mode if
necessary, and the diesel to be shut down in wind-only mode, to minimise losses
without using a clutch.
The synchronous compensator appeared to be sized adequately for steady-state wind
turbine operation. The synchronous compensator maintained satisfactory system
voltage when the wind turbine was running. A larger machine might have been
preferable in view of the temporary reactive power absorption requirement, and the
current inrush, observed on starting. However these requirements are both specific
to the Windmaster turbine. They would probably be surmountable if developing the
Windmaster design, and may not apply in the case of alternative wind turbines. It is
not obvious that the HCI434C synchronous compensator would be undersized in a
fully-optimised Windmaster system, but it can probably be concluded that it would
not be advisable to select a smaller machine.

27
This page has been deliberately left blank

28
7 FINAL DESIGN METHODOLOGY
Design of a given synchronous compensator system will be very specific to the
situation under consideration, depending heavily on whether a system is being
designed from scratch, or a wind turbine is being retrofitted into an existing mini-
grid. It is however possible to generalise about the processes involved. The following
activities are likely to be required in all cases.
1. Obtain wind turbine information including:
• power output and method of regulation (stall or pitch)
• generator rating and mechanical and electrical machine parameters, including
operating voltage
• power factor correction capacitor rating and sequencing
• type of soft-starter installed, and start sequencing
• shutdown sequencing and protection limits
(Close collaboration with the wind turbine manufacturer at all stages of the project
will be extremely helpful in evaluating the implications of operating the proposed
wind turbine in stand-alone mode and carrying out any modifications required.)
2. Evaluate wind turbine reactive power requirements and motoring requirements
during starting (if possible, measure on a grid-connected machine). Specify suitable
soft-starter if not already included in wind turbine package.
3. Obtain mini-grid system information including:
• details of existing and planned back-up power supplies (diesels / batteries etc)
and control systems
• type and size of available control loads
• type, size and priority of existing and planned consumer loads
• operating voltage
4. Select appropriate synchronous compensator type(s) in line with active and
reactive power requirements (both absorbing and generating) and complementary
power supplies. A permanent magnet AVR with three-phase sensing was employed
successfully here.
5. Identify a suitable control load configuration. A good starting point would be 50%
of wind turbine rating on each phase, comprising between five and ten small
resistive loads, each with its own load controller. The load sizes would be dictated by
the load controllers' switching capacity and the wind turbine rating.
6. Carry out computer modelling to assess the performance of the proposed system,
paying particular attention to system moments of inertia and frequency stability.
Confirm synchronous compensator selection.
7. Integrate synchronous compensator equipment and wind turbine into mini-grid
design.

29
This page has been deliberately left blank

30
8 DISCUSSION AND CONCLUSIONS
8.1 Synchronous compensator technology
The use of Newage's generators as a synchronous compensator with the stand-alone
wind turbine system was a relatively novel use of the equipment in comparison with
Newage's standard diesel genset experience. Discussion with Newage's technical
support department proved invaluable in assessing the technical implications of the
proposed application and selecting appropriate machines. In both test situations the
synchronous compensators and AVRs selected performed well with minimal
adjustment to AVR settings, justifying the selection of this well-established and
robust technology. These generators compare well with power electronics
alternatives in terms of cost.
8.2 Load controller technology
The load control system demonstrated its ability to regulate system frequency within
statutory limits for stand-alone wind turbine systems. No reprogramming of load
controller firmware was necessary during testing, as the flexibility provided by the
dip switches on each load controller board permitted easy adjustment of the
necessary parameters.
Frequency-sensitive controllable load up to the full rating of the wind turbine was felt
to be essential, even if only to accommodate the large power swings during starting.
8.3 Suitability of the Gazelle and Windmaster wind turbines
In both cases the system design was carried out and implemented with a large
amount of assistance from people who were extremely familiar with the wind turbine
in question. The detailed information provided was essential to achieving successful
operation of the stand-alone system for both machines.
As intended during the design stage, minimal modifications were made to the wind
turbine systems to allow them to operate in stand-alone mode. The Windmaster's
requirement for a 24-hour power supply to the controller and protection systems, to
ensure its safety when shut down, complicated its conversion into a stand-alone
machine. The Gazelle did not have this requirement as its rotor was held stationary
by its brakes when not connected to a voltage supply.
For both wind turbines it was necessary to widen out the frequency and voltage
limits imposed by their protection systems. These limits are imposed to allow an
islanded condition (or effectively, grid failure) to be identified so that the wind turbine
can be disconnected. This protection is part of the connection requirements defined
by the network operator, and therefore is not strictly part of the wind turbine's
intrinsic protection. Widening these limits was straightforward with the Gazelle, as it
employed a frequency and voltage measurement relay with adjustable settings,
separate from its controller. For the Windmaster, the frequency, voltage, and rotor
speed limits were hard-coded in its controller, and so a less temporary stand-alone
system would require modifications to the controller software, agreed in conjunction
with the manufacturer.
The experience with starting the wind turbines suggested that a power electronic soft
starter to limit the inrush current is essential in a stand-alone system if the back-up
power system and synchronous compensator are not to be grossly oversized to cope

31
with the starting requirements. Most modern induction generator wind turbines have
soft starters, but older machines like the Windmaster would need one to be installed
in place of the starting resistors.
Successful operation of the stand-alone system was achieved with both wind
turbines. In areas where operability was limited, straightforward improvements have
been identified. Neither machine was felt to be fundamentally unsuitable for stand-
alone operation. Adaptation to stand-alone operation would ideally be carried out in
conjunction with the manufacturer, which makes the Windmaster less suitable for
further development.
8.4 Applicability to other wind turbines
The experience gained with the Gazelle and the Windmaster provides confidence that
most wind turbines with induction generators could be adapted for use in a stand-
alone mode, using a synchronous compensator and distributed load control. The
concept is applicable for any size of wind turbine.
Wind turbines with power electronic grid interfaces might not require synchronous
compensator technology to maintain stand-alone grid voltages (depending on their
design), but could employ distributed load control to manage system frequency and
make most efficient use of any surplus wind power.
The system developed here could also be used to allow existing diesel-generator-
based systems to incorporate one or more wind turbines with ratings comparable to,
or even significantly larger than, the diesel set's nominal kVA rating.
8.5 Recommendations and Further Work
This project has clearly demonstrated the suitability of distributed load control for
controlling system frequency in stand-alone wind turbine systems. It is
recommended that the technologies employed here are developed for full
commercial application.
The methodology developed from this work will produce robust system designs with
a high probability of successful operation with minimal development work or
modifications on site. The next step would be to demonstrate long-term operation of
such a system, successfully integrated into an existing stand-alone diesel-based mini-
grid. This will require further development of the back-up power supply and the
accompanying supervisory system. A diesel generator with a clutch to allow its
alternator to act as the synchronous compensator or a pony motor powered by an
existing mini-grid are both viable alternatives.
Although the fundamental governing operation of the load controllers does not
require any communication between the load controllers, integration into a system
which uses more than one type of generation source might require some
communications ability for supervisory control purposes. This aspect of the load
controllers is currently under development and has been successfully demonstrated
with hydropower and photovoltaic systems. A full system demonstration would
consolidate this work.
The system concept has potential for use on offshore wind turbines in the event of an
outage due to a fault on the electrical network connecting the wind farm to the shore.
A system which could allow one or more offshore wind turbines to operate without a

32
mains grid connection could maintain a wind-powered supply to an array of wind
turbines, and therefore safeguard them from damage (for example, due to loss of
auxiliary equipment, or collisions with vessels or aircraft). This solution would enable
the charging of any back-up batteries, reduce the size of any diesel genset required
for back up and minimise the amount of diesel fuel required to be stored at the
turbine.

33
9 REFERENCES
1 P.Taylor, N Jenkins, “The Development and Application of Distributed Fuzzy
Load Control to an Autonomous Wind Diesel System”. Proceedings of EWEA
Special Topic Conference “Wind Power for the 21st Century”, Kassel,
Germany, September 2000, pp290-293
2 P. Taylor, "Distributed Intelligent Load Control of Autonomous Renewable
Energy Systems", EngD thesis, UMIST / Econnect
3 BS EN 50160 : European Standard, EN50160, “Voltage Characteristics of
electricity supplied by public distribution systems.” CENELEC, November
1994
4 A. Collinson, F. Dai, A. Beddoes, J Crabtree (EA Technology Ltd), "Solutions
for the connection and operation of distributed generation", DTI New &
Renewable Energy Programme, July 2003
5 Data sheet provided by Brooke Crompton, 4 July 2002
6 Asea Brown Boveri ABB Elektromotoren GmbH, Asynchronous Generator
Specification, Type wQU 315 L4DA, EMO/ME 14th January 1992.
7 Mathworks Matlab SimPowerSystems User Guide
8 Mathworks Matlab Fuzzy Logic Toolbox User Guide
9 Newage International “Technical Reference Manual”. Edition 4 / 2000.
10 R. Kemsley, "Voltage and Frequency Control for High-Penetration Stand-Alone
Wind Power Systems" (poster), European Wind Energy Conference and
Exhibition, Madrid, Spain, 16-19 June 2003
11 R. Kemsley, "Control solutions for stand-alone wind systems", BWEA25 -
Wind Connections, Glasgow, UK, 28-30 October 2003
12 R. Kemsley, A. Maloyd, P. Taylor, "Islanded operation as a means of
safeguarding offshore wind turbines under fault conditions", MAREC 2004:
3rd International Conference on Marine Renewable Energy, Blyth, UK, 7–9
July 2004

34
10 APPENDIX A - FIGURES

distributed intelligent
induction generator load controllers

load
~

load
wind turbine
Power factor
correction load control loads
distributed
capacitors between phases

AVR
load
excitation
measured

~
voltage load
synchronous compensator
load
Key : consumer
active power loads
load
reactive power bus bar

Figure 1 - System configuration

35
60

50

40

30

20
Frequency, H z
10

0
0 2 4 6 8 10 12 14 16 18 20

Wind turbine power


Synch. comp. power
20
Control load power
Base load power
10

0
kW

-10

-20
0 2 4 6 8 10 12 14 16 18 20
time, seconds

Figure 2 - Predicted frequency and active power flows from Gazelle computer simulation

36
300

250

200

150
V
100
Vblue
50 Vyellow
Vred
0
0 2 4 6 8 10 12 14 16 18 20

15

10 Wind turbine reactive power


Synch. comp. reactive power
5 Control load reactive power
Base load reactive power
kVAr

PFC caps. reactive power


0

-5

-10
0 2 4 6 8 10 12 14 16 18 20
time, seconds

Figure 3 - Predicted voltages and reactive power flows from Gazelle computer simulation

37
60

50

40

Frequency, Hz
30

20

10

0
0 2 4 6 8 10 12 14 16 18 20

200

100

0
kW

-100
Wind turbine power
Synch. comp. power
-200 Control load power
Base load power
-300
0 2 4 6 8 10 12 14 16 18 20
time, seconds

Figure 4- Predicted frequency and active power flows from Windmaster computer simulation

38
300

250

200

150
V
100
Vblue
50 Vyellow
Vred
0
0 2 4 6 8 10 12 14 16 18 20

Wind turbine reactive power


150 Synch. comp. reactive power
Control load reactive power
Base load reactive power
100
PFC caps. reactive power
50
kVAr

-50

-100

-150
0 2 4 6 8 10 12 14 16 18 20
time, seconds

Figure 5 - Predicted voltages and reactive power flows from Windmaster computer simulation

39
SYNCHRONOUS COMPENSATOR LOAD
CURRENTS CURRENTS
VOLTAGES VOLTAGES
POWER POWER
REACTIVE POWER REACTIVE POWER
stand alone Generator
mini-grid 3ph circuit breaker
N
E

WIND TURBINE
CURRENTS
VOLTAGES Wind turbine Load 1 Load 2 Load 3
POWER circuit breaker circuit breaker circuit breaker circuit breaker
AVR
REACTIVE POWER
synchronous
compensator Manual
switch
pony motor
to wind to load banks
turbine
WIND TURBINE
variable ROTOR RPM
speed
drive
VSD fuse switch

Auxiliary supply
fuse switch

fused mains supply


from transformer

Figure 6 - Instrumentation requirements

40
INSTANTANEOUS INSTANTANEOUS INSTANTANEOUS
CURRENTS VOLTAGES CURRENTS
stand alone
Generator
mini-grid 3ph
circuit breaker
N
E

INSTANTANEOUS
CURRENTS
Wind turbine Load 1 Load 2 Load 3
AVR circuit breaker circuit breaker circuit breaker circuit breaker

synchronous
compensator Manual
switch
pony motor
to wind
to load banks
turbine
ROTOR RPM
variable
speed
drive
VSD fuse switch

Auxiliary supply
fuse switch

fused mains supply


from transformer

Figure 7 - Transducers installed

41
20 50
frequency 45
15
40
10
35
5

frequency, Hz
30
power, kW

0 25

20
-5
15
-10
10
-15
5

-20 0
440 450 460 470 480 490 500
time, seconds

wind turbine power load power synch. comp. power system frequency

Figure 8 - Measured frequency and active power flows from wind-only Gazelle operation

42
load 5, blue phase

load 1, blue phase

load 5, yellow phase

load 1, yellow phase

load 5, red phase

load 1, red phase

300 310 320 330 340 350 360


time, seconds

Figure 9 - Examples of control load switching from wind-only Gazelle operation

43
15 250

10
200

phase-neutral voltage, Vrms


reactive power, kVAr 5
150

100
-5

50
-10

-15 0
440 450 460 470 480 490 500
time, seconds

wind turbine reactive power load reactive power synch. comp. reactive power
Vred Vyellow Vblue

Figure 10 - Measured voltages and reactive power flows from wind-only Gazelle operation

44
150 55

frequency, Hz
50

100 45
motoring 40

50 35

30
generating Power, kW

0 25

20

-50 15

10

-100 5
560 570 580 590 600 610 620
time, seconds

wind turbine power total load power synch. comp. power system frequency

Figure 11 - Measured frequency and active power flows from wind-only Windmaster operation

45
300 270

phase-neutral voltage, V
250 240
voltages
200 210
absorbing
150 180

100 150
voltage, Vrms

50 120

0 90

-50 60
generating

-100 30

-150 0
550 560 570 580 590 600 610 620
time, seconds
wind turbine system reactive power load reactive power synch. comp. reactive power
V d V ll Vbl

Figure 12 - Measured voltage and reactive power flows from wind-only Windmaster operation

46
700 52

frequency, Hz
650 50
600 48
550 46
500 44
450 42
400 40
350 38
motoring

300 36
250 34
200 32
150 30
100 28
kW / kVAr

50 26
0 24
-50 22
-100 20
-150 18
generating

-200 16
-250 14
-300 12
-350 10
249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269
time, seconds

wind turbine system power load power synch. comp. power frequency

Figure 13 - Measured frequency and active power flows during Windmaster start

47
phase-neutral voltage, Vrms
700 250
650 200
600 150
550 100
500 50
450 0
400 -50
350 -100
300 -150
absorbing

250 -200
200 -250
150 -300
100 -350
50 -400
kVAr

0 -450
-50 -500
-100 -550
-150 -600
generating

-200 -650
-250 -700
-300 -750
-350 -800
249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269
time, seconds
wind turbine system reactive power load reactive power synch. comp. reactive power
Vred LEM rms Vyellow LEM rms Vblue LEM rms

Figure 14 - Measured voltage and reactive power flows during Windmaster start

48

S-ar putea să vă placă și