Sunteți pe pagina 1din 10

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

1 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

Electrical Transient Analyzer Program ETAP PowerStation

Short Circuit Analysis

ANSI Standard 3-Phase, LG, LL, & LLG Fault Currents 1/2 Cycle Network

Swing Number of Buses: 1

Generator 1

Load 7

Total 9

XFMR2 Number of Branches: 4

XFMR3 1

Reactor 0

Line/Cable 3

Impedance 0

Tie PD 0

Total 8

Synchronous Generator Number of Machines: 1

Power Grid 1

Synchronous Motor 1

Induction Machines 4

Lumped Load 0

Total 7

System Frequency: Unit System: Project Filename: Output Filename:

60 Hz Metric cccc C:\Users\Maryori\Desktop\tarea de CORTO\CASO PREVIO\SIN perfiles de tension\BARRA 2\Untitled.SA2

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

2 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

BUS Input Data

Bus
ID Bus 1 Bus 2 Bus 3 Bus 4 Bus 5 Bus 6 Bus 7 Bus 8 Bus 9 Type SWNG Load Load Load Load Load Load Load Gen. 9 Buses Total Nom. kV 34.500 230.000 230.000 138.000 13.800 63.250 63.250 138.000 13.800 Base kV 34.500 230.000 230.000 138.000 13.800 63.250 63.250 138.000 13.800

Initial Voltage
%Mag. 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 104.3 Ang. 0.0 0.0 0.0 0.0 -30.0 -30.0 -30.0 0.0 -30.0

Generation
MW Mvar

Motor Load
MW Mvar

17.368

7.425

9.227 0.000 26.595

3.855 11.280

All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

3 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

LINE / CABLE Input Data

Line/Cable
ID L23 L48 L67 Library Size

Ohms or Mohs / 1000 m per Conductor (Cable) or per Phase (Line)


Length(m) 95000.0 100000.0 90.0 #/Phase 1 1 1 T ( C) 75 75 75 R1 0.080000 0.110000 0.150000 X1 0.350000 0.420000 0.330000 Y1 0.0000011 0.0000085 0.0000090 R0 0.192000 0.264000 0.360000 X0 0.840000 1.008000 0.792000 Y0 0.0000025 0.0000204 0.0000021

Line / Cable resistances are listed at the specified temperatures.

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

4 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

2-WINDING TRANSFORMER Input Data

Transformer
ID Tx2 Tx4 Tx5 Tx3 1 MVA 25.000 15.000 15.000 30.000 Prim. kV 230.000 138.000 138.000 66.000

Rating
Sec. kV 138.000 13.800 13.800 14.400 %Z 8.500 7.250 6.350 6.150 X/R 12.0 11.0 7.0 8.0 + 5% 0 0 0 0

Z Variation
- 5% 0 0 0 0 % Tol. 0 0 0 0

% Tap Setting
Prim. 0 0 0 0 Sec. 0 0 0 0

Adjusted
%Z 8.5000 7.2500 6.3500 6.1500

Phase Shift
Type Std Pos. Seq. Std Pos. Seq. Std Pos. Seq. Std Pos. Seq. Angle 0.0 -30.0 -30.0 0.0

2-WINDING TRANSFORMER Grounding Input Data


Grounding Transformer
ID Tx2 Tx4 Tx5 Tx3 1 MVA 25.000 15.000 15.000 30.000

Rating
Prim. kV 230.000 138.000 138.000 66.000 Sec. kV 138.000 13.800 13.800 14.400

Conn.
Type Y/Y Y/D Y/D Y/Y

Prinary
Type Solid Solid Solid Solid Solid Amp

Secondary
Type Solid Amp

3-WINDING TRANSFORMER Input Data

Transformer
ID Tx1 Winding Primary: Secondary: Tertiary:

Rating
MVA 40.000 25.000 15.000 kV 230.000 63.250 34.500

Tap
% 0 0 0 Zps = Zpt = Zst = %Z 5.000 7.000 8.000

Impedance
X/R 30.0 30.0 30.0 MVAb 40.000 40.000 40.000 % Tol. 0 0 0

Z Variation
+ 5% 0 - 5% 0

Phase Shift
Type Angle

Std Pos. Seq. Std Pos. Seq.

0.0 -30.0

3-WINDING TRANSFORMER Grounding Input Data


Transformer
ID Tx1 Winding Primary: Secondary: Tertiary:

Rating
MVA 40.000 25.000 15.000 kV 230.000 63.250 34.500 Conn. Wye Wye Delta

Grounding
Type Solid Solid Amp

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

5 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

BRANCH CONNECTIONS
CKT/Branch
ID Tx2 Tx4 Tx5 Tx3 1 Tx1 Type 2W XFMR 2W XFMR 2W XFMR 2W XFMR 3W XFMR 3W XFMR 3W XFMR L23 L48 L67 Cable Cable Cable Bus 3 Bus 8 Bus 4 Bus 7 Bus 2 Bus 2 Bus 6 Bus 3 Bus 4 Bus 7 From Bus Bus 4 Bus 9 Bus 5 Bus 9 Bus 6 Bus 1 Bus 1 Bus 2 Bus 8 Bus 6

Connected Bus ID
To Bus

% Impedance, Pos. Seq., 100 MVAb


R 2.82 4.38 5.99 2.77 0.52 0.86 1.29 1.44 5.78 0.03 X 33.88 48.13 41.91 22.15 15.49 25.82 38.73 6.29 22.05 0.07 Z 34.00 48.33 42.33 22.32 15.50 25.83 38.75 6.45 22.80 0.08 Y 0.0032405 0.0032405 0.0032405 0.0032405 0.0032405 0.0032405 0.0032405 5.5280499 16.1874008 0.0032405

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

6 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

POWER GRID Input Data

Power Grid
ID U1 Total Power Grids (= 1 ) Bus 1 320.000 MVA

Connected Bus
ID

Rating
MVASC 320.000 kV 34.500 X/R 30.00

Positive Seq. Imp


%R 1.04109 %X 31.23270

Grounding
Type Wye - Solid X/R 30.00

Zero Seq. Imp.


% R0 0.296220 % X0 8.88651

SYNCHRONOUS GENERATOR Input Data

Synchronous Generator
ID G2 Type Turbo MVA 20.000

Rating
kV 14.400 RPM 3600 X"/R 30.00

Positive Seq. Imp.


%R 0.006 % X" 0.17 % X' 0.28 Conn. Wye

Grounding
Type Solid Amp

Zero Seq. Imp.


X/R 30.00 % R0 0.003 % X0 0.10

Total Connected Synchronous Generators ( = 1 ): 20.000 MVA

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

7 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

INDUCTION MACHINES Input Data

Induction Machine
ID MI 1 MI 2 MI 3 MI 4 Type Motor Motor Motor Motor Qty 1 1 1 1 kVA 4722.0 4722.0 4722.0 4722.0

Rating (Base)
kV 13.800 13.800 13.800 13.800 RPM 900 900 900 900 X"/R 35.00 35.00 35.00 35.00

Positive Seq. Imp.


%R 0.440 0.440 0.440 0.440 % X" 15.38 15.38 15.38 15.38 % X' 23.08 23.08 23.08 23.08 Conn. Wye Wye Wye Wye

Grounding
Type Open Open Open Open Amp X/R 35.00 35.00 35.00 35.00

Zero Seq. Imp.


% R0 0.440 0.440 0.440 0.440 % X0 15.38 15.38 15.38 15.38

Total Connected Induction Machines ( = 4 ): 18888.1 kVA

SYNCHRONOUS MOTOR Input Data

Synchronous Motor
ID MS Type Motor Qty 1 kVA 10000.3

Rating (Base)
kV 13.200 RPM 900 X"/R 35.00

Positive Seq. Imp.


%R 0.440 % X" 15.385 % X' 23.077 Conn. Wye

Grounding
Type Solid Amp X/R

Zero Seq. Imp.


% R0 0.440 % X0 15.38

35.00

Total Connected Synchronous Motors ( = 1 ): 10000.3 kVA

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

8 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

SHORT- CIRCUIT REPORT


Fault at bus: Nominal kV Base kV Bus 2 = = 230.000 230.000 Prefault Voltage = 100.00 % of nominal bus kV = 100.00 % of base kV Positive & Zero Sequence Impedances Looking into "From Bus"
R1 % Impedance on 100 MVA base X1 R0 1.82E+001 8.65E+001 3.81E+001 5.87E+001 1.62E+000 1.93E+001 4.35E+000 2.07E+000 X0 2.75E+001 1.59E+002 7.14E+001 6.20E+001

Contribution
From Bus ID Bus 2 Bus 3 # Bus 6 # Bus 1 Total Bus 2 Bus 2 Bus 2 To Bus ID

3-Phase Fault
%V From Bus 0.00 7.42 40.54 43.99 kA Symm. rms 1.372 0.289 0.657 0.427

Line-To-Ground Fault
% Voltage at From Bus Va Vb Vc 0.00 8.37 45.47 77.03 108.36 107.30 101.97 77.53 107.51 106.18 101.77 100.01 kA Symm. rms Ia 3I0 1.175 0.232 0.525 0.418 1.175 0.201 0.452 0.521 *

1.34E+000 8.84E+000 3.03E+000 2.62E+000

# Indicates fault current contribution is from three-winding transformers * Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

9 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

Short-Circuit Summary Report


1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus
ID Bus 2 kV 230.00 Real 0.100

3-Phase Fault
Imag. -1.369 Mag. 1.372

Line-to-Ground Fault
Real 0.079 Imag. -1.172 Mag. 1.175

Line-to-Line Fault
Real 1.185 Imag. 0.087 Mag. 1.188

*Line-to-Line-to-Ground
Real 1.153 Imag. 0.599 Mag. 1.300

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA * LLG fault current is the larger of the two faulted line currents

Project: Location: Contract: Engineer: Filename: cccc

ETAP PowerStation
4.0.0C

Page: Date: SN:

10 12-02-2011 KLGCONSULT Base Normal

Study Case: SC

Revision: Config.:

Short-Circuit Summary Report

Bus
ID Bus 2 kV 230.000

Positive Sequence Imp. (ohm)


Resistance 7.08369 Reactance 96.49307 Impedance 96.75274

Negative Sequence Imp. (ohm)


Resistance 7.08111 Reactance 96.54057 Impedance 96.79991

Zero Sequence Imp. (ohm)


Resistance 8.56437 Reactance 145.36723 Impedance 145.61931