Contract Subject Clause(s) 1.1(a) Agreement objection to assignment by the Employer 2.

2 Request for written notification of the delegated powers of the Engineer 2.3(b) Dissatisfaction with an instruction of the Engineers Representative 4 Request for consent to sublet 5.2 Request for clarification of ambiguity or discrepancy in the documentation and possible additional cost 6.3 Request for additional information, disruption of progress 6.4 Notice of delay in the issue of any drawing or instruction 7.2 Submission of design work for approval 10.1 Performance Security 10.1 Advice that Performance Security has been provided 12.2/44 Notice of Not Foreseeable Physical Obstructions or conditions on site 13.1/55.1 Notice of legally or physically impossible work 14.1 Submission of Programme 14.3 Cash Flow Estimate to be submitted 17.1 Request for reimbursement of costs in correction inaccurate setting out data 18.1 Reimbursement for Exploratory Works 20.1 Letter advising of Employers liability to insure the works after issue of Taking-Over Certificate 20.43 Claims loss or damage in respect of Employers Risks 25.1 Evidence and Terms of Insurance 27.1 Notice of fossils, geological or archaeological interest 27.1 Claims for reimbursement of additional costs and extension of time 28 Request for the reimbursement of costs associated with Patent Rights 30.3 Notification of damage to a road or bridge on the route to site 31.2 Letter to Engineer requesting payment for services provided 35.1 Return of Labour and Contractors equipment 36.2 Application for cost of samples 36.5 Request for extensions of time and cost reimbursement where tests not provided for 38.2 Examination of work before covering up 38.2 Reimbursement of costs for opening up the works for inspection 39.1 Disagreement with Engineers instruction to remove improper work 40.1 Notice of Delay and Additional Cost arising from suspension of work 40.3 Request for permission to proceed with suspended work 40.3 Notice to treat suspended work as omitted from Contract 41.1 Confirmation of commencement of work 42.1 Proposals for commencement 44.2(a) Application for Extension of Time

44.2(b) 44.3 45.1 48.1 48.2 49.2 50.1 51.2 52.2 52.3 52.4 52.4 53.1 53.3 53.3 54.3 54.4 54.1 56.1 59.2 59.3 59.5 59.5 60.1 60.1 60.3 60.5 60.6 60.7 60.3 62.1 65.3 65.5 67.1 68.1 68.3 69.1 69.4 71.1

Detailed Particulars of Claim Interim, final Particulars of Claim Request for permission to work night/weekend shifts Taking-Over Certificate Taking Over of Sections or Parts Clarification of Works of Repair Request for reimbursement of costs associated with the Engineers instruction to search for the cause of a defect Confirmation of Instruction Notification Notification of Variations Exceeding 15% Daywork Record Monthly Daywork Statement Notice of Claim Substantiation of Claim Substantiation of Claim Continuing Event Assistance with Customs Clearance Assistance with Re-Export of Constructional Equipment Consent for the removal of equipment from site Notice of Disagreement/Agreement with measurement records and drawings Objection to the Nomination of a Nominated Subcontractor Design Liability under a Nominated Sub Contract Proof of payment to a Nominated Subcontractor Notice of Withholding Payment to a Nominated Subcontractor Monthly Statement Notification of Non Payment Release of Retention Money Statement at Completion Draft Final Statement Discharge pursuant to Clause 60.7 of the Conditions Release of Second Half of Retention Money Defects Liability Certificate Damage to Works by Special Risks Increased Costs arising from the Consequence of a Special Risk Request for an Engineers Decision Notices to Contractor Change of Address Notice of Termination of Contract Entitlement to Suspend Work Currency Restrictions

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Request for an Engineers Decision

We are writing to advise you that a dispute has arisen between the parties to the Contract to Clause 67.1 of the Conditions we are referring this to you for a decision. The nature of the dispute is as follows:

This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Notice of Disagreement with Measurement Records Clause 56.1

We refer to the measurement records and drawings issued to us under your reference No.. and dated .. and regret that we have been unable to agree these considering them to be incorrect in the following respects:(a) (b) . .

This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alternatively should the M&R agree the records and drawings he should confirm his agreement to the records and drawings as issued and as signed by him.

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Substantiation of Claim Ref No

Further to our letter dated giving notice of our intention to submit a claim, we now enclose pursuant to Clause 53.3 of the Conditions our account giving full and detailed particulars of the amount claimed together with full details of the reasons and grounds upon which our claim is based. As the event is of a continuing nature this account is submitted as an interim account and further accounts will be forwarded to you in due course. In accordance with Clause 53.3 we shall send to you a Final Account within 28 days of the end of the effects resulting from this event. May we ask that you advise us as to the intervals at which you require further interim accounts and whether the attached and any further accounts are to be copied to the Employer. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative Encl:

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Substantiation of the Claim Ref No .

Further to our letter dated.. giving notice of our intention to submit a claim, we now enclose pursuant to Clause 53.3 of the Conditions our account giving full and detailed particulars of the amount claimed together with full details of the reasons and grounds upon which our claim is based. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Enc: The above or the following notice is to be given with 28 days or such other time as may be agreed with the Engineer for the giving of such notice under Clause 53.1 of the Conditions.

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Notice of Claim

In accordance with the requirement set down in Clause 53.1 of the Conditions we are writing to give you notice of our intention to claim additional payments pursuant to Clause. The event which is as follows.. occurred on the . and we are keeping such contemporary records as we feel necessary to substantiate our claim. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Notification of a Varied Rate

In accordance with the requirements of Clause 52 we write to give notice pursuant to Clause 52.2(a) of the Conditions of our intention to claim a varied rate for since the nature of the work arising from your Variation Instruction is such as to render the Contract rate inapplicable for the following reason.. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Request for Reimbursement of the Costs Associated with Instruction to

Search for the Cause of a Defect Further to your instruction dated requiring us to provide the appropriate facilities to determine the cause of the defect noted we are writing to confirm that this has now been done and we must advise you as follows:The search and investigation have shown that the defect reported to us cannot be attributed to any neglect or failure on our part under the Contract nor to the use of materials or workmanship not in accordance with the Contract and accordingly we request that the costs which we have incurred be added to the Contract Sum pursuant to Clause 50.1 of the Conditions. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Clarification of Works of Repair

We refer to the Schedule of Defects issued pursuant to Clause 49.2 and write to advise you that in our opinion the following items. (a) . (b) . are defects which are not attributable to any neglect or failure on our part to comply with any obligation expressed or implied under the Contract. As we regard these items of defects to have arisen from other causes we request that the value in making good be therefore assessed and paid for as additional work in accordance with Clause 52 pursuant to Clause 49.3 of the Conditions. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International Duncan Meredith Project Director CC: Mr. Sami Mukhtar SSC Mr. Livingston Taylor Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Interim/Final Particulars of Claim

In accordance with the requirements of Clause 44.3 we enclose interim/final particulars in respect of the event referred to in our letter dated.. The event referred to has had a continuing effect such that it has not been practicable for us to submit detailed particulars within the period of 28 days referred to in Clause 44.2(b). This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Enc:

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Detailed Particulars of Claim

Further to our letter dated.. giving notice of an event which fairly entitles us to an extension of time we now write in accordance with Clause 44.2(b) to enclose detailed particulars of the extension of time to which we consider ourselves entitled in relation to (give details of the nature of the event referred to in the notice given under Clause 44.2(a)). This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Enc:

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Application for Extension of Time

In accordance with the provisions of Clause 44.2(a) we write to give notice that an event has occurred within the last 28 days which is such as fairly to entitle us to an extension of the time for completion of the works or a section thereof. The event was.. and item(a) (e) of Clause 44.2 applied. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Notice to Treat Suspended Work as Omitted from Contract

We refer to our letter dated seeking your agreement to proceed with the contract works/part of the works and note that the period of 28 days have now elapsed since our request to proceed. We write therefore to give notice pursuant to Clause 40.3 that we elect to treat the suspension as an event of default by the Employer and terminate our employment under the Contract in accordance with the provisions of Clause 69.1 of the Conditions/an omission of the suspended part of the Contract under Clause 51. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Request for Permission to Proceed with Suspended Works

We refer to your instruction..to suspend the progress of the contract works/that part of the works and note that 84 days have now elapsed from the date of your instruction. We write therefore to give notice pursuant to Clause 40.3 of the Conditions requiring permission within 28 days to proceed with the suspended work. This notice is given without prejudice to any other rights or remedies that we may possess. Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works Subject: Notice of Delay and Additional Costs Arising from Suspension of Work

We refer to your instruction to suspend the progress of the contract works/that part of the works and write to give notice of delay and extra cost arising from your instruction pursuant to Clause 40.1 of the Conditions. The suspension is not to be the best of our knowledge attributable to items (a)-(d) of Clause 40.1. We shall maintain such contemporary records as may be required by you to substantiate our additional costs and to support our request for an extension of time pursuant to Clause 44. This notice is given without prejudice to any other rights or remedies that we may possess. Yours faithfully, For and on behalf of Murray & Roberts International
Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Removal of Improper Work We refer to your Instruction No requiring us to remove . on the basis that we have improperly constructed this by using materials which do not comply with the Specification. We have now looked at this matter carefully and it is our opinion that the materials used comply fully with the Contract Conditions and that as such their removal should not be required pursuant to Clause 39.1 of the Conditions but should be the subject of a Variation order issued under Clause 51.1 of the Conditions. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Request for determination pursuant to Clause 36.5 of the Conditions Further to your Instruction dated .. testing has been carried out on . and you have confirmed that these tests have been completed to your satisfaction and that the materials/plant/workmanship were found to be in accordance with the Contract requirements. As these tests were not provided for in the Contract and as a result delay to our programme and additional costs have been incurred, we are writing to request that pursuant to Clause 36.5 of the Conditions you determine the extension of time to which we are entitled and also the amount of the costs to be added to the Contract Price. We attach our record of the delay incurred and the total costs which were involved. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully, For and on behalf of Murray & Roberts International
Duncan Meredith Project Director CC: Mr. Sami Mukhtar SSC

Mr. Livingston Taylor

Client RepresentativeEnc:

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Boreholes and Exploratory Excavation Further to your Representatives recent request we are writing to confirm that we have completed the exploratory excavation work. This work is not covered by either a Bill of Quantities item or included therein as a provisional sum. May we therefore request an instruction under the provisions of Clause 51, pursuant to Clause 18.1 of the Conditions. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Request for reimbursement of costs in correcting inaccurate setting out data We refer to your drawing No . which gives details of setting out points, lines and levels of reference for all parts of the Works. It has now become apparent that the drawing is inaccurate in so much that . and that we have as a direct result of working to the information given incurred expense in correcting the setting out and correcting faulty construction work. May we therefore request that additional costs that we have incurred be reimbursed to us pursuant to Clause 17.1 of the Conditions. To enable you to determine an addition to the Contract Price in accordance with Clause 52 we are maintaining contemporary records and these are available to you to assist your determination. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully, For and on behalf of Murray & Roberts International
Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor

SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Legally/Physically Impossible Work Pursuant to Clause 13.1 of the Conditions we write to give notice that having examined your Drawings it is apparent that the work as designed cannot be constructed because it fails to . /or is physically impossible to construct because Since this is a matter for which we are not liable under Clause 13.1 may we request an instruction to vary the works pursuant to Clause 51.1. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Notice of Not Foreseeable Physical Obstruction or Conditions In accordance with the requirements of Clause 12.2 of the Conditions we write to give notice that we have encountered physical obstructions on site which in our opinion were not foreseeable by an experienced contractor. The physical obstruction is and located.. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Notice of Delay in the issue of Information Further to our letter reference . dated .. and to our programme issued on the it has become apparent that the non receipt of the information requested is now delaying our work and we therefore give notice of delay and additional cost pursuant to Clause 6.3 of the Conditions. It is considered that an extension of time may also be required and we therefore give notice of our request for this pursuant to Clause 44 of the Conditions. We shall in support of the above keep contemporary records as may reasonably be necessary to support our claims pursuant to Clause 53.1 of the Conditions. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully, For and on behalf of Murray & Roberts International
Duncan Meredith Project Director CC: Mr. Sami Mukhtar SSC

Mr. Livingston Taylor

Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Request for Additional Information Disruption of Progress Further to our discussion with your Representative and pursuant to Clause 6.3 of the Conditions we now write to confirm that the execution of the works is likely to be delayed or disrupted unless details . are issued by you within a reasonable time. Such delay or disruption will incur additional consequential costs. Our requirements were indicated on the Programme issued to you on and to avoid delay the details requested should be made available to us not later than. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor

SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Request for clarification of Ambiguity (and for reimbursement of extra cost) May we draw your attention to an apparent ambiguity between the description given in Bill of Quantity Item and the contradictory specification item page number . (or say between figured and scaled dimensions for .). We therefore request clarification of this discrepancy pursuant to Clause 5.2 of the Conditions and if you deem necessary the issue of an instruction. Should any such instruction cause extra cost that could not have been reasonably foreseen we assume that you will be certifying an additional sum to cover the amount involved. This notice is given without prejudice to any other rights or remedies that we may possess Yours faithfully,
For and on behalf of Murray & Roberts International Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative

Alexandria Office 10 Ahmed Afifi St. Fathala Market Bldg. San Stefano Alex- Egypt Tel: +20 3 5846014/16/18 Fax: +20 3 5845858 e-mail: murrobsanstef@link.net June, 2003 M&R700/ Laing/ THE ENGINEER JOHN LAING INTERNATIONAL OFFICE Attention: Mr. Tom B. Young Ground & First Floor No. 2 Anessah Mai Street, Alexandria EGYPT Dear Sirs, Project : SAN STEFANO COMPLEX : Main Building TP-2a Works

Subject: Dissatisfaction with an Instruction of the Engineers Representative We write to acknowledge receipt of Instruction No relating to . issued by your Representative. We have considered this instruction carefully and believe this to be contrary to the spirit and intention of the Contract and therefore question this pursuant to Clause 2.3(b) of the Conditions and request that this be confirmed/reversed/varied accordingly. This notice is given without prejudice to any other rights or remedies that we may possess. Yours faithfully,
For and on behalf of Murray & Roberts International

Duncan Meredith Project Director CC: Mr. Sami Mukhtar Mr. Livingston Taylor SSC Client Representative