Safety and Naval architecture

1) what types have u sailed on ?

2) State the marpol annexes that apply to your ship?

3) What are the certificates that come under Marpol annex 1 ?

4) How many chapters are there in ISM code ? What are the certificates under ISM ?

5) What is the validity of these certificates ? what is anniversary date ? why is mentioned from expiry date ?

6) why not calculate anniversary date from issue date ? can issue date be different ?

7) What is difference between intermediate survey and annual survey ? if it is clubbed with 2nd annual or 3rd annual why is it then seperately called an intermediate survey ?

What are the obligations of a ship approaching a port under ISPS ? Who decides the security level of a ship and a port?

9) what are the fire fighting systems on your ship explain in detail

10) explain the working of the fixed co2 system in detail

11) what are the certificates a PSC would look for in a fixed co2 system of a 12 year old indian ship, explain with regards to pressure testing involved in co2 systems.

12) Explain the complete working of a dry powder extinguishing system fitted on the deck of a LNG tanker

Engineering Knowledge - motor and general

1) How will you prepare a boiler for the second day of survey after the internal inspection is compeleted.

2) what is safety valve setting pressure ? high pressure cut out pressure ? working pressure ?

3) what type of engine did u sail on in your last ship ? what is the power of the engine ?

4) how is the balancing of the engine carried out ?

5) How does a peak pressure gauge work ? importance of pmax balancing ?

Electrical

1) details on the alternator name plate

2) what is the maintance carried out on the alternator as per PMS , where to check air gap and how ?

3) where , how and importance of disconnecting diodes , earthing connection during insulation testing.

4) how to find out which light in engine room is for emergency supply ?

5) explain how these emergency lights get there supply, is it from d\c source or emergency batteries?

6) how to order a battery ? what is the amp - hour rating of a battery ? typical values for lighting battery, emergency generator starting battery?

MEP

1) overhauling of a centrifugal pump

2) Preparation for survey of bottom end bearing complete procedure

Other questions asked to other class 2 students

1) where does a container ship carry more containers ? top or inside hold ? how gm is adjusted in container ship ?

2) all the safeties in a cargo pump room of a tanker

3) how will u as a second engineer ensure annex 6 is complied with ?

4) how will u as a second engineer ensure that your alternator is fit for use all the time ?

6) what bearing is used in a centrifugal pump ? what is the cross section of a wear ring look like ? clearance value ? how and where to check the same ?

7) what are the certificates associated with co2 system of a ship ?

How many bottles of co2 will a paint room have ?

9) Present Nox and Sox requirements in force ?

10) How will you find GM of a ship ?

11) What are the fire fighting systems provided on a tanker deck ? Explain low expansion foam system in detail.

12) What are the different voltages present on the ship ? give example of few equipments under each voltage.

13) who determines the testing pressures for the various sections in a co2 fixed fire fighting system

14) Why is co2 line tested to high pressure when pressure of co2 in bottle is much lower ? IS relief valve test pr lower than or higher than line test pressure ?

15) When pressure testing co2 line , One part is at the end of the valve where does the other part end in ?

16) List all the precautions you would take before turning an engine using turning gear ?

17) what are the surveys carried out by class ? what is the difference between survey and audit ? who can do an audit ? fun 3 qustions ism clauses-operative and administrative...if anybody know pls post isps chapters,fas,mlc,safety certificates how stern tube attached to hull in detail fun 4b diff bet thin & thick shell brg in detail diff bet sulzer rnd &rnd-m critical spares of m/e thrust pad clearance how to measure fun 5 induction moter types and how roter rotate self syncronous how start &example-governer & window wiper motor pole changing method emg gen safety,motor safety fun 6 types of rudder & how to measure pintle clearance of spade rudder checks in drydock before flooding welding of thick plate preparation and gauging how hull is painted in details

frds pls post que as many as possible 1. WHAT ARE THE ADVANTAGES OF SUPER LONG STROKE.

2.HOW TO FIND WHICH STARTING AIR V/V IN THE MAIN ENGINE IS LEAKING. HOW WILL U TEST THIS DURING CONTROL TEST.

3. WHAT CHECKS TO BE DONE WHILE PUTTING BACK NEW LINER IN THE ENGINE.

4. WHY ME PERFORMANCE IS TAKEN IN ONE CYCLE.

5. SAY SOMETHING ON THE USE OF NOMOGRAM IN POWER CALCULAION.

6. WHAT IS THE IMPORTANCE OF MCR.

7.HOW TO CALCULATE SFOC.

8. WHY WE CANT TAKE POWER CARD IN 4S ENGINE.

9. WHAT IS THE SPECIALITY OF SMC ENGINE.

10. WHAT IS STRUCTURAL DIFF BETWEEN CRUDE OIL TANKER, PRODUCT CARRIER AND CHEMICAL CARRIER.

11.HOW SACRIFIICIAL ANODES ARE FITTED TO THE SHIPS HULL.

12. WHAT ALL SURVEYS ARE DONE BY CLASS.

13. WHAT IS NEW IN OIL SAMPLING.

14. WHY ON SHIP LIGHTING VOLTAGE IS DIFFERENT FROM MAIN SUPPLY.

15. WHY TRANSFORMER USED ON BOARD. IS THERE ANY OTHER WAY OF PRODUCING VARIABLE VOLTAGE FROM FIXED SUPPLY.

16. HOW WILL U SIMULATE DIFF TRIPS FROM MSB.

17. VOLT METER OF INCOMMING GENERATOR SHOWING 0. WAT WILL BE UR ACTION.

18. WHERE WILL U CONNECT EXTERNAL VOLTMETER TO CHECK INCOMING GENERATOR VOLT METER IS FAULTY OR NOT.

19. WAT ARE SAFETIES IN MSB.

20. HOW TRANSFORMERS ARE CONNECTED IN SHIP.

21. ONE UNIT EXHAUST GAS TEMPERATURE GOING UP DURING SEA PASSAGE AND YOUR ACTIONS.

22. OMD ALARM AND YOUR ACTION.

23 CO2 REGULATIONS

24 FOAM REGULATIONS (BOTH HIGH AND LOW)

25 FIXED FIRE FIGHTING SYSTEMS ON YOUR SHIP.

26 BOILER SURVEY.

27 ONE GAUGE GLASS BROKEN OTHER CHOKED ,CARGO DISHARGING ON , WHATS YOUR ACTION.

28 .2ND DAY OF BOILER SURVEY WHAT IS TO BE DONE AND SHOWN TO THE SURVEYOR

14th december 2011 - Mr. Mathews chennai mmd

Safety and Naval architecture

1) what types have u sailed on ?

2) State the marpol annexes that apply to your ship?

3) What are the certificates that come under Marpol annex 1 ?

4) How many chapters are there in ISM code ? What are the certificates under ISM ?

5) What is the validity of these certificates ? what is anniversary date ? why is mentioned from expiry date ?

6) why not calculate anniversary date from issue date ? can issue date be different ?

7) What is difference between intermediate survey and annual survey ? if it is clubbed with 2nd annual or 3rd annual

why is it then seperately called an intermediate survey ?

8) What are the obligations of a ship approaching a port under ISPS ? Who decides the security level of a ship and a port?

9) what are the fire fighting systems on your ship explain in detail

10) explain the working of the fixed co2 system in detail

11) what are the certificates a PSC would look for in a fixed co2 system of a 12 year old indian ship, explain with regards

to pressure testing involved in co2 systems.

12) Explain the complete working of a dry powder extinguishing system fitted on the deck of a LNG tanker

Engineering Knowledge - motor and general

1) How will you prepare a boiler for the second day of survey after the internal inspection is compeleted.

2) what is safety valve setting pressure ? high pressure cut out pressure ? working pressure ?

3) what type of engine did u sail on in your last ship ? what is the power of the engine ?

4) how is the balancing of the engine carried out ?

5) How does a peak pressure gauge work ? importance of pmax balancing ?

Electrical

1) details on the alternator name plate

2) what is the maintance carried out on the alternator as per PMS , where to check air gap and how ?

3) where , how and importance of disconnecting diodes , earthing connection during insulation testing.

4) how to find out which light in engine room is for emergency supply ?

5) explain how these emergency lights get there supply, is it from d\c source or emergency batteries?

6) how to order a battery ? what is the amp - hour rating of a battery ? typical values for lighting battery,

emergency generator starting battery?

MEP

1) overhauling of a centrifugal pump

2) Preparation for survey of bottom end bearing complete procedure

Other questions asked to other class 2 students

1) where does a container ship carry more containers ? top or inside hold ? how gm is adjusted in container ship ?

2) all the safeties in a cargo pump room of a tanker

3) how will u as a second engineer ensure annex 6 is complied with ?

4) how will u as a second engineer ensure that your alternator is fit for use all the time ?

6) what bearing is used in a centrifugal pump ? what is the cross section of a wear ring look like ? clearance value ?

how and where to check the same ?

7) what are the certificates associated with co2 system of a ship ?

8) How many bottles of co2 will a paint room have ?

9) Present Nox and Sox requirements in force ?

10) How will you find GM of a ship ?

11) What are the fire fighting systems provided on a tanker deck ? Explain low expansion foam system in detail.

12) What are the different voltages present on the ship ? give example of few equipments under each voltage.

13) who determines the testing pressures for the various sections in a co2 fixed fire fighting system

14) Why is co2 line tested to high pressure when pressure of co2 in bottle is much lower ? IS relief valve test pr

lower than or higher than line test pressure ?

15) When pressure testing co2 line , One part is at the end of the valve where does the other part end in ?

16) List all the precautions you would take before turning an engine using turning gear ?

17) what are the surveys carried out by class ? what is the difference between survey and audit ? who can do an audit ? 1st attempt 8/11/2010....mr trassi and mr dutta firts asked me types of ship sailed...lpg fun 3 1) hazards of chemical cargo??....hes only accepting flammability and electrostatic hazard...remaining he is saying they are subhazards. 2) which type os ships does BLEVE occur?....i told him pressurised gas carrier..he accepted 3) what type of lpg ship as per IGC code...i dont know 4) how to find GM?..i dont know

fun 4) types of engines sailed on..i told him man b& w, and mitsubishi 1) latest engine by man b&w...i said GMEC series engine....ok advantages?...low sfoc...reduced nox emission...ultra long stroke...ok..what is s/b ratio..i said 4.65..sfoc? i said 167gms/kwhr...cyl cons...0.6 to 0.8gms/kwhr..ok 2) what is wasted bolt....i told him used for main bearing keep:)..no 3) what is provision for expansion in fuel oil heater straight tube??...i dont know 4)what is brinelling..i said its the phenomenom wher inner surface of outer race and ballget damaged...he asked where u got it from????..i told him group discuusion

fun 5 1) esb safeties with regulation.....answered....ok 2) mcb safeties....accepting overcurrent relay and reverse power...not accepting short circuit trips...undervoltage relay... 3) types of fuses on board...first i said HRC....wher used...msb...what abt pumps panels..do not say semi open type...u wil fail..they are not used anywhere in er.

fun 6

1) air comp safeties??? 2) during manoeuvering 4e tells u aircomp bd bursts..and they dont nedd air comp whay will u do???....this question was answered by him....so i got this one free..he then asked me what answer do u know???...i kept quiet...he then asked me drydock specs...i started by saying preparing list of hobs..he then told me to wait outside..

mr dutta declared result..cleared fun 6...only 3 remaining thanx guys for ur help...pl help me wit the answers to this questions.. Karthik Reddiar

MAIN CHANGES IN SOLAS FROM 1ST DEC,2011

SOLAS II-2/7 Detection and Alarm Regulation 7.7 When corridors have two exits to open deck, one manually operated call point is required at each of the exits. Additional manually operated call point at the internal exit to e.g stairway is not required as long as the 20 m distance requirement is not exceeded. Regulation 9.4.2.2 Hold back arrangements with remote release are not accepted in engine room boundaries.

Regulation 10.5.2.1 45 l foam extinguisher and foam applicator shall be provided in machinery spaces containing internal combustion machinery, the subject requirement applies only to machinery spaces containing internal combustion machinery

used for main propulsion and machinery spaces of category A having more than one platform level.

Regulation 10.6.4 Deep fat cooking equipment to be any type of fixed cooking appliance that is capable of, and intended to, being filled up with cooking oil. Tilting frying pans, small portable deep fat fryers (home use type) or traditional electrical galley ranges with flat cooking surfaces are not required to comply with SOLAS Ch. II-2 Regulation 10.6.4. If small portable deep fat fryers are used, they shall be of a type with lid, with max. capacity 2.5 l and max. power 2.0 kW. These units are only to be used inside the galley boundaries.

Regulation 13.3.2.1.1 This regulation shall also apply to the means of escape from spaces above the bulkhead deck. At least one means of escape shall be arranged as independent of watertight doors which are assumed closed in order to maintain the weathertight and watertight integrity in the damage stability calculations.

Regulation 13.3.2.4.1 A means of escape required to provide continuous fire shelter shall comply with all the requirements applicable for stairways, not only insulation requirements. It applies for all vertical stairways as well as horizontal parts (horizontal stairways) of the escape route all the way to the muster/assembly station, being it an indoor or outdoor muster/assembly station.

Regulation 13.3.2.4.2 protected internal routes to be understood to be the route from the muster/assembly station to the embarkation area/station deck when the passengers/crew are guided in controlled groups.

Regulation 13.4.2.1.1 A space is considered a safe position outside the machinery space of category A if it is not contiguous to the boundaries of the machinery space of category A or if the common bulkhead between the two spaces is insulated to class A-60.

Navigational systems Regulation 21.4.3 In case of fire casualty affecting the navigating bridge, the following navigation equipment (portable or fixed) should be available in another location: a) Compass (magnetic) b) GPS c) X-Band radar display with electronic charts d) Whistle e) Navigation lights f) Internal communications with engine control room and steering gear

1. WHY THE GENERATOR RATING IN KVA & MOTOR RATING IN KW? (class ll oral question) ANS-1.it gives a electrical output for any Load(may Capacitor,Inductor &

resistor),so it is consider as Procuct of Voltage & Current excluding powerfactor. 2. Generator is a source of power. It includes active as well as reactive power. It deliver only active power while working on unity power factor. It deliver reactive power only while connected to a purely reactive load. It can deliver both of these powers while connected to a composite load. This signifies that the current limit is the main factor here. You can draw a purely rective current of rated value or purly active current of rate value. combination of output depends upon the load but the maximum limit is prescibed. When you are drawing both of the currencts active and reactive, in such condition how much the alternator can deliver? it can be descibed by KVA only not by KW. That is why alternators are rated in KVA 3. Generator is producer of Voltage and Current, we can connect load as such draining full load current or half load, even noload,but voltage remain moreover same.So it willl rated in terms of product of V*I, secondly it gives a electrical output for any Load(may Capacitor,Inductor & resistor),so it is consider as Procuct of Voltage & Current excluding powerfactor. 2ND PART.

Motors are rated in KW only because for motors the load is

mechanical and thus only active power which is converted to mech. is significant. 2. motor has its own fixed Power Factor for ratd kw design by manufacturer.