DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
Remarks
Boiler
(1) Pressure Parts (2) Air and flue ducts (3) Safety valves (4) Blow-down tank (5) Support structure (6) Platforms (7) Enclosure side cladding (8) Insulation, Lagging (9) Soot blowers (10) Air preheated (11) Selective Catalytic Reactor (SCR) (i) NH3 Storage, distribution and control system (12) Auxiliary Steam System (Auxiliary Boiler & Accessories) (13)' SWGR for Boiler system (including MV/LV Tr) (13)" DC Distribution Panel for Boiler System (14) Fire Fighting System for Boiler Package
B B B B B B B B B B B B B B B B
B B B B B B B B B B B B B B B B
B B B B B E E E B B B B B B B B
B B B B B E E E B B B B B B B B
E E E E E E E E E E E E B B B E
B B B B B E E E B B B B B B B B
Wet-type FGD using limestone (1)Equipment (2)Aeration Basin (3)Discharge Channel (4)Instrumentation and control valve (5)Control System (PLC) B B B B B B B B B B B B B B B
1 / 34
B B B B B
E E E E E
B B B B B
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
B B
Remarks
(5`) Sampler (6) Weighting scale (7) Structures (8) Rail (9) Coal handling vehicles (10) Switchgear and Motor (including MV/LV Tr) (10)' DC Distribution Panel (11) Instrumentation (12) Control System (13) CCTV 4 Coal Preparation and Burning Equipment (1) Coal Silos (1.1) Coal Silos CO2 Fire Protection System (2) Coal feeders (3) Coal pulverizes (4) Coal burners (5) Primary air fans
B, E B, E B, E B, E B, E B, E B, E B, E B, E B, E
E E E E E E E E E E
E E E E E E E E E E
E E E E E E E E E E
E E E E E E E E E E
E E E E E E E E E E
E E
E E
E E
E E
E E
E E
B B B B
B B B B
B B B B
2 / 34
B B B B
E E E E
B B B B
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
B B B B B B
Remarks
(1) Light oil pumps for Boiler (1)' Valve Rack (2) Fuel oil burners (3) Strainers (4) Igniters (5) Light oil tank (6) Light oil unloading system (6.1) Fire Fighting system (6.1)' Switchgear (including MV/LV Tr) for Oil pumping equipment (6.1)' Switchgear (including MV/LV Tr) for iginition equipment (6.1)'' DC Distribution Panel 6 Air Flue Gas System (1) Forced draft fans (2) Flame Scanner Fans (3) Induced Draft fans (4) Switchgear (including MV/LV Tr) (4)' DC Distribution Panel 7 Electrostatic Precipitator (1) Electrostatic Precipitator
E E E E E E E E B B E
E E E E E E E E B B E
E E E E E E E E B B E
E E E E E E E E B B E
E E E E E E E E E E E
E E E E E E E E B B E
B B B B E
B B B B E
B B B B E
B B B B E
E E E E E
B
3 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
B B B B B
Remarks
B, C
Sampling piping from boiler area shall be provided by boiler supplier up to sampling system
B, C B, C B, C C C
C C C C C
C C C C C
C C C C C
C C C C C
C C C C C
B, E B, E B, E B, E B, E B, E B, E B, E B, E
E E E E E E E E E
E E E E E E E E E
E E E E E E E E E
E E E E E E E E E
E E E E E E E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
E E
Remarks
(2) Mill Pyrites Discharge Chute (3) Ejector & Piping Fly Ash Handling System (1) Fly Ash Silo Cyclone Bag Filter Vent Filter (2) Vacuum Blower (3) Dust conditioner (4) Discharge Chute (5) Fly Ash Silo Aeration Blower and Heater (6) Blower House Others (1) Mobile equip. for Ash handling (2) Switchgear & Motor & Control Panel (including MV/LV Tr) (2)'' DC Distribution Panel (3) Drainage (Waste water) system for AHS 10' 11 Station vacuum cleaning system for coal/particulate removal from junction houses, coal bunkers Compressed Air Plant Instrument and Station Service Air Plant (1) Compressor (2) Intercooler (3) After cooler (4) Air dryer (5) Prefilter (6) Double
B, E B, E B, E B, E B, E B, E B, E B, E B, E
E E E E E E E E E
E E E E E E E E E
E E E E E E E E E
E E E E E E E E E
E E E E E E E E E
B, E B, E B, E B, E B B, E, C
E E E E B
E E E E B
E E E E B
E E E E E
E E E E E E
E E E E E E
E E E E E E
5 / 34
E E E E E E
E E E E E E
E E E E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E E E E E E
Remarks
(11)''' DC Distribution Panel 12 13 Nitrogen Supply System Water Treatment Equipment (1) Raw Water & Demineralization Plant Desalination System Demineralised water treatment system Cation tower Degasfier Anion tower MB polisher Regeneration system Chemical dosing and neutralization system Bulk chemical storage tank Concrete tanks with lining Instrument and control valve Demineralized water tank Condensate Storage Tank Neutralization tank basin Power panel (Switchgear) (including MV/LV Tr) . DC Distribution Panel Control panel . Cable and Raceway Control System (PLC)
E E E, C, B
E E
E E
E E
E E
E E E E E E E E E E E E
E E E E E E E E E E E E
E E E E E E E E E E E E
E E E E E E E E E E E E
E E E E E E E E E E E E
E E E E E E E E E E E E
E E E E E E
E E E E E E
E E E E E E
E E E E E E
E E E E E E
E E E E E E
E, C, B E E E
6 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E E E E E E E E E E E E E E E E E E E E
Remarks
(3) Others Pre-retention basin E E E E E E Each sump pump and piping upto 1 m outside of each battery limit shall be provided by each own contractor. Outdoor piping upto WWT system will be provided by PTSC.
C, B, E
B B, C
B B
B B
7 / 34
B B
E E
B B
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
Remarks
15
Condensate System (1) Condenser(including dump tube) (2) NA (3) Air extraction equipment (for steam side) (4) Condensate Extraction pump (5) C.W. leakage detector(including analyzer) (6) Condensate polishing Plant (CPP) & Re-generation system (7) Condenser Make-up Pump except make-up water tank (8) Condenser tube cleaning equipment (on load) (9) Condensate storage tank (10) Gland Steam Condenser & Gland Steam Exhauster (11)' Power supply system (12) Instrumentation and Control valve (13) Control System (DCS) C C C C C C C C C C C C
C C C C C E C C C C
C C C C C E C C C C
C C C C C E C C C C
C C C C C E C C C C
C C C C C E C C C C
C C C C C E C C C C
16
Feed Water Heating Equipment (1) H,P & L,P. feedwater heaters (2) Deaerator with inside storage tank (3)' Power supply system (4) Instrumentation and Control valve (5) Control System (DCS) C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
17
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
C C C C
Remarks
(7)'''' DC Distribution Panel (8) Control System (DCS) 19 Generator a. Generator b. Seal oil unit c. Stator cooling water unit d. Generator auxiliary control panel e. Hydrogen gas measuring rack f. Stator cooling water measuring rack (2) Excitation equipment a. Excitation Transformer
C C
C C
C C
C C
C C
C C
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C C C C C C
C
9 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
C C C C C
Remarks
22
Protection Relay Panel (1) For Generator (2) Transformer (3) MV, LV SWGR
C C C E, C E, C C E, C E, C
C C C E C C E, C E, C
C C C C C C C C
C C C C C C C C
C C C C C C C C
C C C C C C C C
22` Protection Relay Panel except swithch yard area Syncronization system 22`` Generator Circuit Breaker 22``` Pilot Wire Intercommunication System, if exist Electrical & C&I interconnection between power plant and EVN grid 23 Switchgears & Aux. Transformers Supply (1) Turbine ( MV SWGR (11kV)) (2) Turbine (LV SWGR) (3) Turbine (Aux Transformer) (4) Turbine BOP (MV SWGR (11kV)) (5) Turbine BOP (LV SWGR) (6) Turbine BOP (Aux Transformer) (7) Boiler island(MV SWGR (11kV))
C C C C C C C
C C C C C C C
C C C C C C C
C C C C C C C
C C C C C C C
10 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
E E E E
Remarks
26
Emergency Diesel Generator Set (1) Diesel engine & generator together with its auxiliary (2) Fuel oil service tank (3) Cooling water supply up to diesel engine C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
27
27' Carbon Dioxide System for generator Piping (including hanger & support,valves, fittings, insulation, lagging and paint) All piping design scope of work for Boiler area should be terminated at one(1) meter from the outermost borderline of the TG House. (1) Steam Piping a. Main steam piping
28
b. Cold reheat steam piping with non return valve c. Hot reheat steam piping
B B
B B
B B
11 / 34
B B
E E
B B
MS, CRH, HRH piping inside of TBN building shall be closely coordinated with Sojitz/Daelim consotium. Boiler supplier shall provide ISO dwg. of MS, CRH&HRH in advance for avoid interference with other piping in TBN buiding and floor opening design. The piping stress analysis and proper support design also BWBC & GEDI scope of work.
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
B C E C C B
Remarks
C C C C
C C C C
C C C C
C C C C
C C C C
C C C C
b. Final HP feedwater heater outlet FCV-boiler c. Feedwater control valve for motor driver BFP d. Attemperator spray piping for SH/RH
B C
B C
B C
B C
E C
B C
(4) Make up piping a. Make up piping to condenser and deaerator b. Make up piping to auxiliary cooling water system c. Make up piping to generator stator cooling water system d. Make up piping to boiler filing (5) Equipment Drain piping & Overflow Piping(Turbine island) a. Equipment to Drain Valve b. Drain Valve to equipment Funnel c. Embedded Piping From funnel to (Pre) Retention Basin d. Piping From funnel to (Pre) Retention Basin e. (Pre) Retention Basin to Waste Water Plant (6) Circulating Water Piping
12 / 34
C B, C C B
C B, C C B
C B, C C B
C B, C C B
C E, C C E
C B, C C B
C E, C E, C, B E, C, B E
C E, C E E E
C E, C E E E
C E, C E E E
C E, C E E E
C E, C E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
E E E C, E
Remarks
a. Circulating Water Piping b. R.C. Protection of CW piping under the road (7) Circulating Water Intake & Discharge Concrete Culver Canal (8) Seal Water Piping for pumps, valves and etc. (for CCCW) (9) Water Piping for Ash Handling System Plant (10) Water Piping for Air Conditioning Unit (if required) (11) CCCW Piping - Header inside T/G power house - Boiler Island branch piping (12) Sampling Piping (13) Chemical Injection Piping (14) Fuel Oil Piping a. for Boiler b. for EDG c. for aux. boiler (15) Control Air / Service Air Piping
B, E E
E E
E E
E E
E E
E E
C B B, C B, C B,C B C C E, B, C
C B B, C B, C E E E E E, B, C
C B B, C B, C E E E E E,B, C
C B B, C B, C E E E E E,B, C
C E E, C E, C E E E E E, C
C B B, C B, C E E E E E,B, C
(16) NA (17) Floor Sump Piping - Underground (Embeded) - Above ground B, E, C B, E, C B, E, C B, E, C B, E, C B, E, C B, E, C B, E, C E, C E, C B, E, C B, E, C Total system, except inside TBN island detail engineering, shall be designed by E as per local regulation.
E, C
E, C
E, C
E, C
E, C
E, C
(19) Potable Water Piping (Plumbing System) - Potable water distribution piping in of Turbine Island - Boiler island & other buildings C B C E, B C E
13 / 34
C E
C E
C E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
Remarks
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C
(21') Waste Drainage Piping (Above Ground) (22) Storm water open ditch/piping including TBN island (23) NA (24) Chemical Cleaning Piping a. Chemical Cleaning Piping for Boiler b. Chemical Cleaning material for Boiler (25) Piping from Hydrogen generation plant to Turbine building (26) Pipe Support 29 Instrumentation and Control System (1) Common a. DCS b. Instrumentation cabling and piping (2) Boiler a. Boiler control system (ABC) Included in DCS
E, C E
E, C E
E, C E
E, C E
E, C E
E, C E
B B C E, C
B B C E, C
B B C E, C
B B C E, C
E E C E, C
B B C E, C
E, B, C E, B, C
C E, B, C
C E, B, C
C E, B, C
C E, C
C E, B, C
b. Burner management system (BMS) and Boiler Protection System (BPS) c. Boiler instrument d. Furnace supervisory T.V. System e. Precipitator control system f. Ash handling equipment control system g. Other instruments and detectors h. Local panels for instruments (If required)
B B B B B B
B B B B B B
B B B B B B
14 / 34
B B B B B B
E E E E E E
B B B B B B
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
B B B B
Remarks
29' CCTV 30 Cabling (1) Power Cable (2) Control Cable (3) Instrumentation Cable (4) Cable Support System (Cable rack, hanger, tray, pit,) (a) Cable Pit & Channel made of concrete including pit cover etc. (b) Cable support system inside Turbine house
E, B, C
E, B, C
E, B, C
E, B, C
E, C
E, B, C
E, B, C E, B, C E, B, C E, B, C
E, B, C E, B, C E, B, C E, B, C
E, B, C E, B, C E, B, C E, B, C
E, B, C E, B, C E, B, C E, B, C
E, C E, C E, B, C E, B, C
E, B, C E, B, C E, B, C E, B, C
E, B, C C
E, B, C C
E, B, C C
15 / 34
E, B, C C
E, B, C C
E, B, C C
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
E E E, B, C
Remarks
(c) Cable support system in & around boiler area (d) Cable support system other than (b), (c) above & (e) below (e) Conduit wiring system, if any
31
Seawater Screening Plant (1) Stop Log (a) Dam boards (b) Guide rails (2) Bar Screens (a) Screens (b) Guide rails (c) Trash rake and control system (3) Travelling Band Screen (a) Screens (b) Guide rails (c) Spray water Pumps and piping for Screen washing (d) Level sensor and control system (4)' LV Power dist board E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
31` Electrochlorination System (1) Chlorination piping to CWP pit (2) Chlorine storage and injection system (3)' LV Power dist board (4) Instrumentation and Control valve (5) Control System 31'' Circulating Water Pump Circulating Water Pump House SWGR (MV SWGR (11kV), LV SWGR, MV/LV Tr) DC Distribution Panel E E E E E E, C E E E E E E E E E E E E E E E C E E
16 / 34
E E E E E C E E
E E E E E E E E
E E E E E C E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E
Remarks
C B E
C B E
C B E
C B E
C E E
C B E
E E E C B B, E E
E E E C B E E
E E E C B E E
E E E C B E E
E E E C E E E
E E E C B E E
E E E E E E
E E E E E E
E E E E E E
E E E E E E
E E E E E E
E E E E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
Remarks
E Cables for DCS to Clock system will be provided by C, Cables between Clock system & local PLC by E&C.
E, B, C
E, C
E, C
E, C
E, C
E, C
a. Lighting distribution panels after MCC Power House's switchgear b. All sockets (power outlets) to be provided in indoor for portable electrical equipment, for example, bolt heater, inspection light etc. c. All outdoor sockets together with local control boxes for outdoor use electrical equipment such as, portable oil purifier, d. Power source box for Boiler & Turbine maintenance use (indoor and outdoor) 34 Others
E, B, C
E, C
E, C
E, C
E, C
E, C
E, B, C
E, C
E, C
E, C
E, C
E, C
E, B, C E, B, C
E, C E, C
E, C E, C
E, C E, C
E, C E, C
E, C E, C
a. for TG House
B,C
B,C
B, C
B, C
E, C
B, C
Piping support for main steam, cold reheat & hot reheat piping shall be designed and supplied by B and installed by E.
B E,B, C
B E,B, C
B E,B, C
18 / 34
B E,B, C
E E, C
B E,B, C
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
E,B, C
E,B, C
E,B, C
E,B, C
E, C
E,B, C
E,B, C
E,B, C
E,B, C
E,B, C
E, C
E,B, C
(5) Holding on Grating Floor (6) Concrete Ducts, Trenches and Pits (a) Boiler area (b) TG House (c) Transformer Yard (d) Outside of above (a), (b) & (c) (7) Conduits (a) Embedded (b) Above Ground (8) Earthing
E,B, C
E,B, C
E,B, C
E,B, C
E, C
E,B, C
E, B C E,B, C E
B C E,B, C E
E E E,B, C E
E E E,B, C E
E E E, C E
E E E,B, C E
E, B, C E, B, C
E, B, C E, B, C
E, B, C E, B, C
E, B, C E, B, C
E, C E, C
E, B, C E, B, C
(a) Earthing mesh (a)' Earthing grid interconnection between power plant and ENV grid (a)''Pig tail up to 1m above ground level
E, B, C E, C E, B, C
E, B, C E, C E, B, C
B, C E, C E, B, C
B, C E, C E, B, C
E, C E, C E, C
B, C E, C E, B, C
E, B, C
E, B, C
E, B, C
E, B, C
E, C
E, B, C
(c) Earthing Connection above Ground Level including Connection Material (9) Not Applicable
E, B, C
E, B, C
E, B, C
E, B, C
E, C
E, B, C
E, B
E, B
E, B
E, B
E, B
E, B
E, B, C
E, B, C
E, B, C
19 / 34
E, B, C
E, B, C
E, B, C
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E, B, C E, B, C
Remarks
B, C
B, C
E, C
E, C
E, C
E, C
35
Civil-Plant Interface
(1) T/G Pedestal (a) Template (b) Steel plate, conduit, pipe sleeve, anchor bolt, anchor frame, jacking post C C C C C C C C C C C C
(d) Chipping and grout pad (e) Grout (f) Floor finishing (2) Power Transformers (Gene Tr, Unit Tr) (a) Hook for pulling (b) Oil catch pit (c) Fire wall (2A) Aux, transformers except above Item (2) (a) Hook for pulling (b) Oil catch pit (3) IPB Support (a) IPB support structure
C C C
C C C
C C C
C C C
C C C
C C C
C C C
C C C
C C C
C C C
C C C
C C C
C C
E E
C C
C C
C C
C C
C
20 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
C
Remarks
(b) Foundation of IPB support (4) Indoor Equipment Foundation (a) Anchor bolt, sleeve, conduit (5) Outdoor Equipment Foundation (a) Anchor bolt, sleeve, conduit (6) Floor and Wall (a) Pipe and duct sleeve (b) Weather hood (c) Hook for pulling generator rotor (d) Wall and Floor penetration (7) Box out a. box out b. Grouting (8) Operating Platform (if necessary) (Steel structure and grating) (9) Floor Grating in T/G House (10) Channel base for Panels a. Box-out type b. Embedded type (11) Funnel for Equipment Drain (12) Pipe Protection Under Road (13) Handrail and Ladders for Concrete Basin, Concrete Tank Pit, and silos 36 Building Facility for Indoor & Outdoor Unless otherwise specified hereof, excavation works, backfill works, concrete works and other Civil / Architectural works which are required for the completion of Building Facilities shall be as a part of Civil contractor`s work (1) Lighting
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C
E, C E, C C E, C
E, C E, C C E, C
E, C E, C C E, C
E, C E, C C E, C
E, C E, C C E, C
E, C E, C C E, C
E, C E, C E, C
E, C E, C E, C
E, C E, C E, C
E, C E, C E, C
E, C E, C E, C
E, C E, C E, C
E, C E, C E, C E,C E, C
E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C
Each own scope Each own scope Each own scope Each own scope Each own scope
21 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
Remarks
(a) Outdoor and Yard lighting including lighting pole if necessary (b) Administration Buildings lighting (c) TG House/CCB lighting (c)' Misc. Building (d) Boiler and boiler BOP Building Lighting (e) Lighting for plant equipment
E E C E,C E E, C
E E C E,B,C B B, C
(f) Yard and road lighting (g) Air Craft Warning Light for Boiler / Chimney (2) Air Conditioning (a) Air conditioning & Ventilation for TG House and central control building.
E E, B
E E, B
E E, B
E E, B
E E
E E, B
(b) Air conditioning & ventilation for Administration Buildings (c) Air conditioning & Ventilation for Misc Buildings (d) Louver
E E,B, C E,B, C
E E,B, C E,B, C
E E,B, C E,B, C
E E,B, C E,B, C
E E, C E, C
E E,B, C E,B, C
(3) Fire fighting for plant (a) Pump (b) Yard F/F System and Piping (c) Inside Building & Equipment alarm & spray (d) Fire alarm system for plant (e) Special FF alram & spray for TBN island
E E E E E C
E E E E E C
E E E E E C
E E E E E C
E E E E E C
E E E E E C
(5) Plumbing (a) Piping, valve etc. (b) Drinking water supply (c) Service water supply (d) Hot water supply E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C
22 / 34
E, B, C E, B, C E, B, C E, B, C
E, C E, C E, C E, C
E, B, C E, B, C E, B, C E, B, C
Each own scope Each own scope Each own scope Each own scope
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E, B, C E E, B, C E E, B, C Each own scope Each own scope
Remarks
37 38 39 40 41 42
Billing Metering facilities SCADA Equipment Interface DCS & SCADA Terminal Boards (within power plant) Protection & controls between the Power Station and the EVN SWYD Overhead line between high voltage terminal of step-up TR and Sub-station(EVN SWYD) Potable Water Treatment System Sewage Treatment System
E, C E, C E,C E, C E E
E, C C E,C E, C E E
C C C C E E
C C C C E E
C C C C E E
C C C C E E C's design role is limited supporting E C's design role is limited supporting E
SWITCHYARD CIVIL & ARCHITECTURAL WORKS Site Grading (1) Soil investigation (2) Site grading (3) Breakwaters & shore protection (if any) (4) Dredging (if any)
E, B, C E E E
E, B, C E E E
E, B, C E E E
23 / 34
E, B, C E E E
E, B, C E E E
E, B, C E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
Remarks
Jetties (1) Coal Jetty (2) Not Applicable (3) Rail, Stopper and Embedded base of unloaded (Coal Jetty) (4) Mooring bitt (5) Rubber fender (6) Conveyor foundation (7) Navigation aids (8) Access way to Jetty E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
Coal Storage Yard (1) Coal storage Yard (2) Rail, Stopper and Embedded base of Stacker & Reclaimer (3) Conveyor foundation (4) Trash screen & Crusher R.C. Structure E E E E E E E E E E E E
24 / 34
E E E E
E E E E
E E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E E E
Remarks
Switchyard
25 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
Remarks
(1) Pipe rack foundation (2) Piping Pit with cover (3) Concrete pipe sleeper (4) Steel pipe sleeper 9' 10 Pipe Rack Trench, Tunnel, culvert etc. (indoor & outdoor) (1) Cable & Pipe culver or tunnel with manhole (2) Cable trench with cover (3) Pipe trench with cover (4) Concrete duct (5) Cable pit with cover (6) Manhole (7) Drainage 11 Water Treatment System (1) Equipment foundation (2) Filtered water tank (3) Neutralization pond (4) Backwash waste water tank (5) Lining of tank and floor (6) Embedded piping (Process) (7) Embedded piping (Drain) 12 Waste Water Treatment System (1) Equipment foundation (2) Retention basin (3) Lining of basin and floor
E E E E E
E E E E E
E E E E E
E E E E E
E E E E E
E E E E E
E, C E, C E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C E, C E, C
E, C E, C E, C E, C E, C E, C E, C
Each own scope Each own scope Each own scope Each own scope Each own scope Each own scope Each own scope
E E E E E E E
E E E E E E E
E E E E E E E
E E E E E E E
E E E E E E E
E E E E E E E
E E E
E E E
E E E
26 / 34
E E E
E E E
E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
E E
Remarks
(4) Embedded piping (Process) (5) Embedded piping (Drain) 13 Coal Bunker (0) Piling (1) Steel structure (2) Foundation 14 Chlorination System (1) Equipment & pipe foundation 15 16 Conveyor Steel Structure Boiler Foundation and Structure (0) Piling (1) Boiler foundation (2) Boiler support steel structure (3) Elevator structure (4) Elevator Pit & Foundation (5) Elevator drainage embedded piping (6) Pulverizer foundation (7) PAF foundation (8) FDF foundation (9) IDF foundation (10) Blow down tank foundation (11) Flame scanner cooling air fan foundation (12) Pyrite trench with cover (13) Submerged scraper conveyor foundation (14) Water pump for make-up foundation (15) Waste water pump for dust conditioner foundation (if required)
E, B E, B E, B
E, B E, B E, B
E, B E, B E, B
E, B E, B E, B
E, B E, B E, B
E, B E, B E, B
E E
E E
E E
E E
E E
E E
B B B B B B B B B B B B B B B B
B, E E B, E E E E E E E E B, E B, E B, E B, E B, E B, C
E E E E E E E E E E E E E E E E
27 / 34
E E E E E E E E E E E E E E E E
E E E E E E E E E E E E E E E E
E E E E E E E E E E E E E E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
E E E E
Remarks
17
18
18` FGD (1) Steel Structure (2) Foundation (3) Piling 19 TG House (1) TG House (2) T/G foundation (3) Equipment foundation (4) Condenser pit (5) Condensate pump pit (6) Oil dike made of concrete (6) Oil dike made of steel (7) Reinforced beam for hoist and monorail (8) Free Access floor (9) Tank foundation C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
28 / 34
B B E
B B E
E E E
E E E
E E E
E E E
C C C C C C C C C C
C C C C C C C C C C
C C C C C C C C C C
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Commissioning/ Start up
C C
Remarks
(9) Underground Oil/Water separator (10) Not Applicable 21 Lubricating Oil Tank for Turbine/Generator (1) Lubricating oil tank foundation (2) Oil dike for main lubricating oil tank made of concrete 22 Chimney (0) Piling (1) Chimney Foundation (2) Chimney (3) Inner flue & lining
C C
C C
C C
C C
C C
C C
E E E E
E E E E
E E E E
29 / 34
E E E E
E E E E
E E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E E E E E E
Remarks
(10) CCTV
23 24 25
Not Applicable Not Applicable Service Buildings (1) Building (2) Equipment foundation E E E E E E E E E E E E
26
C.W. pump House (If necessary) (1) House (2) Equipment foundation E E E E E E E E E E E E
27
27
'
28
Water Treatment Control House (1) Control House (2) Equipment foundation E E E E E E E E E E E E
29
Not Applicable
30 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
Remarks
39
E E
E E
E E
E E
E E
E E
40 41 42 43
Outdoor Equipment Foundation(Turbine Island) Gate House / Custom's House Not Applicable Not Applicable
C E
C E
C E
C E
C E
C E
44
Not Applicable
45 47
31 / 34
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E E E E E E, C Each own scope
Remarks
Others (1) Excavation, backfill and concrete works for road lighting poles (2) Flagstaff and flag & Bulletin board (3) Acid proof finish of floor and wall at battery room, etc.. (4) Mater key system and key box (5) Fire engine truck (6) Ambulance (7) Medical facility E E E, C E, B, C E E E E E E, C E, B, C E E E E E E, C E, B, C E E E
32 / 34
E E E, C E, B, C E E E
E E E, C E, B, C E E E
DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B
Description
Commissioning/ Start up
E C E
Remarks
33 / 34
Generator Transformer
MSV GMCB
Switchyard
Transmission Lines Tariff Metering LV MCC for TG & BOP LV MCC for Boiler Island Distribution Panels
Startup Transformer NRV CRV spray water line LP by-pass valve Ball injector CWP Condenser Ball strainer Vacuum pump Booster Pump Condensate to Turbine EHC Oil Unit Condenser Leak Monitor Pump Condensate Polisher Closed Cooling Water Cooler Head Tank CCW Pump to Turbine To Turbine Eqmnt Coolers
To Boiler Eqmnt Coolers
IDF
Distribution Panels
Aux. Motor
Deaerator
Oil
Coal
To boiler
Chemical Injection Fire Fighting Common Ring F/F Pump F/F Water Tank Potable Water Storage Tank Demineralized Water Pump
SH spray
Gland Condenser Each local FF Spray/Detect/Alar m Condensate Tank To turbine consumers Condensate Transfer Pump
Gen.
EDG
Desal.Sys.
To Deaerator
FO Unloading Pumps
DM Storage Tnak
Demineralizer
TV Camera
Suppression Sys.
Boiler ESP Turbine
FGD
ESP Coal Feeder Condenser Transformer Boiler Feed Water Pump Switchgear
To boiler consumers
(Electrical Equipment)
Ash disposal Fly ash
Canteen,Clinic, Welfare facilities (Sojitz/Daelim --> PTSC) LP bypass outlet piping(PTSC--> Sojitz/Daelim) Local Control Panel --> Each for own equipment(DCS will provided by Sojitz/Daelim) Yard Piping --> Main pipe rack will be provided by PTSC, each own consumper shall lead piping one meter outside of piping rack to each consumption point. All drainage piping(including waste water) shall be provided by PTSC. Security system-->PTSC Cooling water pumps, CW supply & return piping,Intake facilites for CW system & Raw water system-->PTSC WWT & all water treatment except CPP --> PTSC Air compressor system --> PTSC
Cables & Access (Boiler island and FGD, refer to SOW) Indoor Lighting(Boiler island and FGD)
Syncronization System
Conveyer
Excitation System
Gen Neutral Ground Trans Gen Neutral Ground Cubicle Gen. H2 & CO2 Sys.
Ship of coal
Unloader
Stacker
Reclaimer Outlet
UPS
Grounding Sys. (above)
Security Sys.
(Others)
Emergency DG Potable Water Sys. Service Water Sys. Waste Water Treatment Sys. Oil Water Separator Drainage Sys. Sewage Treat. Or Septic Sys. Noise Assesment Training
Chemical Fill upto COD (B,T&BOP)(PTSC and Sojitz) Consumable Fill upto COD
Boiler steel structure, roof and canopy Bunker'steel Structure Pipe Rack Foundation
(Erection Work)
CW Intake Stru.
Construc Office (incl. subcontractor)
(Control Equipment)
DCS (inc UCS,TSQ) Operator Station
CCTV
Installation (TG&BOP)
Insulation & Lagg (Erection only) (TG&BOP) Insulation & Lagg (Mat Supply) (TG&BOP) Instrumentation & Local CTRL (TG&BOP)
O&M Manual
Misc. Building TG / CNTRL Bldg Civil Design TG Foundation Civil Design Turbine Pedestal Turbine / CTRL Building BOP Buildings Turbine Island BOP Buildings Boiler Island Boiler island and FGD Foundation
Discharge civil
Ash Handling Plant Civil Coal Handling Plant Civil Ash Disposal Pond
(TG&BOP)
(B&BOP)
CW Crane
BMS
TSI
Boiler Elevator
H2 Generation system
Spares Part (2 years) Maintenance Spares (PTSC and Sojitz) Strategic/Overhaul Spares (PTSC and Sojitz)
Shore Protction
Water Intake
EHC
CO2 Bottles
Pipe Rack
Excavation & Filling (PTSC and Sojitz) Land Survey (PTSC and Sojitz) Roads (Temp & Permanent)(PTS C and Sojitz) Access Road to Site (inside)
Roads (Outside Site Boundaries)
Fencing (permanent)
Land Scaping
Coal Yard
Local Instrument
CUSTOMER
ESP Controls
Expert System
Coal Jetty
Misc Crane
EP by BWBC&GEDI
HVAC Sys.
Yard Piping?
Platform & Ladder in boiler island and FGD
Safety Shower
Data Logger
E by BWBC&GEDI
Temp. Jetty
Large Screen
TBA
Strategic/Overhaul Spares
Maintenance Spares
Coal bunker