Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.

Description

Design Criteria/ Conceptual Engineering

Engineering/ Supply Transport Detail Design

Erection/ Site Work

Commissioning/ Start up

Remarks

POWER STATION EQUIPMENT

Boiler

(1) Pressure Parts (2) Air and flue ducts (3) Safety valves (4) Blow-down tank (5) Support structure (6) Platforms (7) Enclosure side cladding (8) Insulation, Lagging (9) Soot blowers (10) Air preheated (11) Selective Catalytic Reactor (SCR) (i) NH3 Storage, distribution and control system (12) Auxiliary Steam System (Auxiliary Boiler & Accessories) (13)' SWGR for Boiler system (including MV/LV Tr) (13)" DC Distribution Panel for Boiler System (14) Fire Fighting System for Boiler Package

B B B B B B B B B B B B B B B B

B B B B B B B B B B B B B B B B

B B B B B E E E B B B B B B B B

B B B B B E E E B B B B B B B B

E E E E E E E E E E E E B B B E

B B B B B E E E B B B B B B B B

Wet-type FGD using limestone (1)Equipment (2)Aeration Basin (3)Discharge Channel (4)Instrumentation and control valve (5)Control System (PLC) B B B B B B B B B B B B B B B
1 / 34

B B B B B

E E E E E

B B B B B

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
(6) Switchgear (including MV/LV Tr) (6)'' DC Distribution Panel 3 Coal handling Equipment (1) Unloader (2) Stacker Reclaimer (2') Fire Fighting system for coal stockpile (3) Belt conveyors (3') Dust suppression & Dust extraction system (3"') Fire Fighting system for coal conveyor inside enclosure (4) Tripper conveyor (4') Fire Fighting system for tripper conveyor (5) Magnetic separator and tramp iron detectors B, E B, E B, E B, E B, E B, E B, E B, E B, E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

Design Criteria/ Conceptual Engineering


B B

Engineering/ Supply Transport Detail Design


B B B B B B

Erection/ Site Work


E E

Commissioning/ Start up
B B

Remarks

(5`) Sampler (6) Weighting scale (7) Structures (8) Rail (9) Coal handling vehicles (10) Switchgear and Motor (including MV/LV Tr) (10)' DC Distribution Panel (11) Instrumentation (12) Control System (13) CCTV 4 Coal Preparation and Burning Equipment (1) Coal Silos (1.1) Coal Silos CO2 Fire Protection System (2) Coal feeders (3) Coal pulverizes (4) Coal burners (5) Primary air fans

B, E B, E B, E B, E B, E B, E B, E B, E B, E B, E

E E E E E E E E E E

E E E E E E E E E E

E E E E E E E E E E

E E E E E E E E E E

E E E E E E E E E E

E E

E E

E E

E E

E E

E E

B B B B

B B B B

B B B B
2 / 34

B B B B

E E E E

B B B B

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(6) Structures (7) Switchgear (including MV/LV Tr) Motor (7)' DC Distribution Panel (8)Instrumentation (9)Control System (PLC)

Description

Design Criteria/ Conceptual Engineering


B B B B B B

Engineering/ Supply Transport Detail Design


B B B B B B B B B B B B B B B B B B

Erection/ Site Work


E B B B B B

Commissioning/ Start up
B B B B B B

Remarks

Light Oil Pumping and Firing Equipment ignition Equipment

(1) Light oil pumps for Boiler (1)' Valve Rack (2) Fuel oil burners (3) Strainers (4) Igniters (5) Light oil tank (6) Light oil unloading system (6.1) Fire Fighting system (6.1)' Switchgear (including MV/LV Tr) for Oil pumping equipment (6.1)' Switchgear (including MV/LV Tr) for iginition equipment (6.1)'' DC Distribution Panel 6 Air Flue Gas System (1) Forced draft fans (2) Flame Scanner Fans (3) Induced Draft fans (4) Switchgear (including MV/LV Tr) (4)' DC Distribution Panel 7 Electrostatic Precipitator (1) Electrostatic Precipitator

E E E E E E E E B B E

E E E E E E E E B B E

E E E E E E E E B B E

E E E E E E E E B B E

E E E E E E E E E E E

E E E E E E E E B B E

B B B B E

B B B B E

B B B B E

B B B B E

E E E E E

B B B B E The scope of purchase will be discussed later.

B
3 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(2) Support Steel (3)' Switchgear (including MV/LV Tr) (3)'' DC Distribution Panel (4) Instrumentation & Control Valve (5) Control System 8 Sampling Equipment Sampling Rack 9 Chemical Dosing System Chemical dosing piping from boiler area shall be provided by boiler supplier up to chemical dosing (a) Hydrazine dosing station (b) Sodium phosphate dosing station (c) Ammonium dosing station (d)' power dist board (d)'' DC Distribution Panel 10 Ash Handling System Bottom ash handling system (1) Submerged scraper conveyor (2) Clinker Crusher (3) Bottom Ash Vault (steel) (4) Water Pump for Make-up (if required) (5) Water pumps & ejectors (6) Crusher Control Panel (7) Conveyor to SCC for econ, airheater (8)Instrumentation & Control valve (9)Control System (PLC) Mill Pyrites Handling system (1) Mill Pyrites Box B, E E E
4 / 34

Description

Design Criteria/ Conceptual Engineering


B B B B B

Engineering/ Supply Transport Detail Design


B B B B B B B B B B B B B B B

Erection/ Site Work


E E E E E

Commissioning/ Start up
B B B B B

Remarks

B, C

Sampling piping from boiler area shall be provided by boiler supplier up to sampling system

B, C B, C B, C C C

C C C C C

C C C C C

C C C C C

C C C C C

C C C C C

B, E B, E B, E B, E B, E B, E B, E B, E B, E

E E E E E E E E E

E E E E E E E E E

E E E E E E E E E

E E E E E E E E E

E E E E E E E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
B, E B, E

Engineering/ Supply Transport Detail Design


E E E E E E

Erection/ Site Work


E E

Commissioning/ Start up
E E

Remarks

(2) Mill Pyrites Discharge Chute (3) Ejector & Piping Fly Ash Handling System (1) Fly Ash Silo Cyclone Bag Filter Vent Filter (2) Vacuum Blower (3) Dust conditioner (4) Discharge Chute (5) Fly Ash Silo Aeration Blower and Heater (6) Blower House Others (1) Mobile equip. for Ash handling (2) Switchgear & Motor & Control Panel (including MV/LV Tr) (2)'' DC Distribution Panel (3) Drainage (Waste water) system for AHS 10' 11 Station vacuum cleaning system for coal/particulate removal from junction houses, coal bunkers Compressed Air Plant Instrument and Station Service Air Plant (1) Compressor (2) Intercooler (3) After cooler (4) Air dryer (5) Prefilter (6) Double

B, E B, E B, E B, E B, E B, E B, E B, E B, E

E E E E E E E E E

E E E E E E E E E

E E E E E E E E E

E E E E E E E E E

E E E E E E E E E

B, E B, E B, E B, E B B, E, C

E E E E B

E E E E B

E E E E B

E E E E E

E E E E B Boiler side\requirement shall be provided by E.

E E E E E E

E E E E E E

E E E E E E
5 / 34

E E E E E E

E E E E E E

E E E E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(7) Air receiver (8) Starter (9) Instrument and control system (10) Interconnecting pipe, cable, cable tray inside of compressor (11)' Switchgear (3.3kV SWGR) (11)'' Switchgear (LV, TR)

Description

Design Criteria/ Conceptual Engineering


E E E E E E

Engineering/ Supply Transport Detail Design


E E E E E E E E E E E E E E E E E E

Erection/ Site Work


E E E E E E

Commissioning/ Start up
E E E E E E

Remarks

(11)''' DC Distribution Panel 12 13 Nitrogen Supply System Water Treatment Equipment (1) Raw Water & Demineralization Plant Desalination System Demineralised water treatment system Cation tower Degasfier Anion tower MB polisher Regeneration system Chemical dosing and neutralization system Bulk chemical storage tank Concrete tanks with lining Instrument and control valve Demineralized water tank Condensate Storage Tank Neutralization tank basin Power panel (Switchgear) (including MV/LV Tr) . DC Distribution Panel Control panel . Cable and Raceway Control System (PLC)

E E E, C, B

E E

E E

E E

E E

E E Boiler side\requirement shall be provided by E.

E E E E E E E E E E E E

E E E E E E E E E E E E

E E E E E E E E E E E E

E E E E E E E E E E E E

E E E E E E E E E E E E

E E E E E E E E E E E E

E E E E E E

E E E E E E

E E E E E E

E E E E E E

E E E E E E

E E E E E E

(2) Waste Water Treatment System Retention basin

E, C, B E E E
6 / 34

Boiler side\requirement shall be provided by E. E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
Mixing blower pH adjustment tank / treated water tank Disposal water pump NaOH pump HCI tank HCI pump Switchgear & Motor NaOH tank Local Control Panel Local Panel Instrument Sludge Thickener Clarifier Rake & Mechanical Equip. Filter Press or Dewatering Units Instrument and control valve Switchgear & Motor (including MV/LV Tr) . DC Distribution Panel . Cable and Raceway Control System (PLC)
1

Description

Design Criteria/ Conceptual Engineering


E E E E E E E E E E E E E E E E E E E E

Engineering/ Supply Transport Detail Design


E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

Erection/ Site Work


E E E E E E E E E E E E E E E E E E E E

Commissioning/ Start up
E E E E E E E E E E E E E E E E E E E E

Remarks

(3) Others Pre-retention basin E E E E E E Each sump pump and piping upto 1 m outside of each battery limit shall be provided by each own contractor. Outdoor piping upto WWT system will be provided by PTSC.

Waste water sump pump

C, B, E

13` Turbine Bypass System (1) HP (2) LP

B B, C

B B

B B
7 / 34

B B

E E

B B

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
14 Turbine (1) Turbine and accessories (Including HP Exh. & Ext. line NRV & MOV, Pre-warming & ventilation V/V,etc.) (2) Turbine Control system C C C C C C

Description

Design Criteria/ Conceptual Engineering

Engineering/ Supply Transport Detail Design

Erection/ Site Work

Commissioning/ Start up

Remarks

15

Condensate System (1) Condenser(including dump tube) (2) NA (3) Air extraction equipment (for steam side) (4) Condensate Extraction pump (5) C.W. leakage detector(including analyzer) (6) Condensate polishing Plant (CPP) & Re-generation system (7) Condenser Make-up Pump except make-up water tank (8) Condenser tube cleaning equipment (on load) (9) Condensate storage tank (10) Gland Steam Condenser & Gland Steam Exhauster (11)' Power supply system (12) Instrumentation and Control valve (13) Control System (DCS) C C C C C C C C C C C C

C C C C C E C C C C

C C C C C E C C C C

C C C C C E C C C C

C C C C C E C C C C

C C C C C E C C C C

C C C C C E C C C C

16

Feed Water Heating Equipment (1) H,P & L,P. feedwater heaters (2) Deaerator with inside storage tank (3)' Power supply system (4) Instrumentation and Control valve (5) Control System (DCS) C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

17

Boiler Feed Pump (1) Motor driven feed water pump C C C


8 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(2) Booster pump (3)' Power supply system (4) Instrumentation and Control valve (5) Control System (DCS) 18 Closed Cycle Cooling Water System (CCCW) (1) CCCW cooling water pump (2) Sea water booster pump (3) Cooling water stand pipe (4) Cooling water heat exchangers (5) CCCW cooling water make-up pump (6) Inhibitor Injection Pump (7) Instrumentation and Control valve (7)' Power supply system (3.3kV SWGR) E, C C C E, C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Description

Design Criteria/ Conceptual Engineering


C C C C

Engineering/ Supply Transport Detail Design


C C C C C C C C C C C C

Erection/ Site Work


C C C C

Commissioning/ Start up
C C C C

Remarks

(7)'' Power supply system (LV, TR)

(7)'''' DC Distribution Panel (8) Control System (DCS) 19 Generator a. Generator b. Seal oil unit c. Stator cooling water unit d. Generator auxiliary control panel e. Hydrogen gas measuring rack f. Stator cooling water measuring rack (2) Excitation equipment a. Excitation Transformer

C C

C C

C C

C C

C C

C C

C C C C C C

C C C C C C

C C C C C C

C C C C C C

C C C C C C

C C C C C C

C
9 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
b. Thyristor rectifier cubicle c. AC Bus duct and Supporting Structure d. Field circuit breaker cubicle e. DC Bus duct and Supporting Structure f. Excitation control panel 20 Isolated phase bus duct a. IPB b. VT & SA Cubicle, NGR Cubicle c. IPB support structure 21 Auxiliary Motors(Turbine Island) C C C C C C C C C C C C C C C C C C C C C C C C

Design Criteria/ Conceptual Engineering


C C C C C

Engineering/ Supply Transport Detail Design


C C C C C C C C C C C C C C C

Erection/ Site Work


C C C C C

Commissioning/ Start up
C C C C C

Remarks

22

Protection Relay Panel (1) For Generator (2) Transformer (3) MV, LV SWGR

C C C E, C E, C C E, C E, C

C C C E C C E, C E, C

C C C C C C C C

C C C C C C C C

C C C C C C C C

C C C C C C C C

22` Protection Relay Panel except swithch yard area Syncronization system 22`` Generator Circuit Breaker 22``` Pilot Wire Intercommunication System, if exist Electrical & C&I interconnection between power plant and EVN grid 23 Switchgears & Aux. Transformers Supply (1) Turbine ( MV SWGR (11kV)) (2) Turbine (LV SWGR) (3) Turbine (Aux Transformer) (4) Turbine BOP (MV SWGR (11kV)) (5) Turbine BOP (LV SWGR) (6) Turbine BOP (Aux Transformer) (7) Boiler island(MV SWGR (11kV))

C C C C C C C

C C C C C C C

C C C C C C C

C C C C C C C

C C C C C C C

C C C C C C C Boiler supplier shall provide electrical load list.

(8) Boiler island (LV SWGR)

10 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
(9) Boiler (Aux Transformer) (10) Boiler BOP (MV SWGR (11kV)) (11) Boiler BOP (LV SWGR) (12) Boiler BOP (Aux Transformer) 24 Transformers (1) Generator Transformer (2) Unit Transformer (3) Back-up Transformer 25 DC Power Supply Storage Battery and Charger (1) TG House (2) Substation C NA C NA C NA C NA C NA C NA C C N/A C C N/A C C N/A C C N/A C C N/A C C N/A

Design Criteria/ Conceptual Engineering


E E E E

Engineering/ Supply Transport Detail Design


E E E E E E E E E E E E

Erection/ Site Work


E E E E

Commissioning/ Start up
E E E E

Remarks

(3) Local SWGR Room

26

Emergency Diesel Generator Set (1) Diesel engine & generator together with its auxiliary (2) Fuel oil service tank (3) Cooling water supply up to diesel engine C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

27

Hydrogen Generation System

27' Carbon Dioxide System for generator Piping (including hanger & support,valves, fittings, insulation, lagging and paint) All piping design scope of work for Boiler area should be terminated at one(1) meter from the outermost borderline of the TG House. (1) Steam Piping a. Main steam piping

28

b. Cold reheat steam piping with non return valve c. Hot reheat steam piping

B B

B B

B B
11 / 34

B B

E E

B B

MS, CRH, HRH piping inside of TBN building shall be closely coordinated with Sojitz/Daelim consotium. Boiler supplier shall provide ISO dwg. of MS, CRH&HRH in advance for avoid interference with other piping in TBN buiding and floor opening design. The piping stress analysis and proper support design also BWBC & GEDI scope of work.

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
c'. HP Turbine bypass piping d. Auxiliary steam piping d` Soot blowing steam piping e. Extraction steam piping f. Gland steam piping g. Temporary blowout piping main / reheat steam (included silencer) h. Temporary blowout piping for gland steam (2) Condensate Piping (3) Feed Water Piping a. Deaerator outlet-final HP feedwater heater outlet

Design Criteria/ Conceptual Engineering


B C E C C B

Engineering/ Supply Transport Detail Design


B C E C C B B C E C C B B C E C C B

Erection/ Site Work


E C E C C E

Commissioning/ Start up
B C E C C B

Remarks

C C C C

C C C C

C C C C

C C C C

C C C C

C C C C

b. Final HP feedwater heater outlet FCV-boiler c. Feedwater control valve for motor driver BFP d. Attemperator spray piping for SH/RH

B C

B C

B C

B C

E C

B C

(4) Make up piping a. Make up piping to condenser and deaerator b. Make up piping to auxiliary cooling water system c. Make up piping to generator stator cooling water system d. Make up piping to boiler filing (5) Equipment Drain piping & Overflow Piping(Turbine island) a. Equipment to Drain Valve b. Drain Valve to equipment Funnel c. Embedded Piping From funnel to (Pre) Retention Basin d. Piping From funnel to (Pre) Retention Basin e. (Pre) Retention Basin to Waste Water Plant (6) Circulating Water Piping
12 / 34

C B, C C B

C B, C C B

C B, C C B

C B, C C B

C E, C C E

C B, C C B

C E, C E, C, B E, C, B E

C E, C E E E

C E, C E E E

C E, C E E E

C E, C E E E

C E, C E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
E E C C

Engineering/ Supply Transport Detail Design


E E E C, E E E E C, E E E E C, E

Erection/ Site Work


E E E C, E

Commissioning/ Start up
E E E C, E

Remarks

a. Circulating Water Piping b. R.C. Protection of CW piping under the road (7) Circulating Water Intake & Discharge Concrete Culver Canal (8) Seal Water Piping for pumps, valves and etc. (for CCCW) (9) Water Piping for Ash Handling System Plant (10) Water Piping for Air Conditioning Unit (if required) (11) CCCW Piping - Header inside T/G power house - Boiler Island branch piping (12) Sampling Piping (13) Chemical Injection Piping (14) Fuel Oil Piping a. for Boiler b. for EDG c. for aux. boiler (15) Control Air / Service Air Piping

B, E E

E E

E E

E E

E E

E E

C B B, C B, C B,C B C C E, B, C

C B B, C B, C E E E E E, B, C

C B B, C B, C E E E E E,B, C

C B B, C B, C E E E E E,B, C

C E E, C E, C E E E E E, C

C B B, C B, C E E E E E,B, C

(16) NA (17) Floor Sump Piping - Underground (Embeded) - Above ground B, E, C B, E, C B, E, C B, E, C B, E, C B, E, C B, E, C B, E, C E, C E, C B, E, C B, E, C Total system, except inside TBN island detail engineering, shall be designed by E as per local regulation.

(18) Fire Fighting Piping

E, C

E, C

E, C

E, C

E, C

E, C

(19) Potable Water Piping (Plumbing System) - Potable water distribution piping in of Turbine Island - Boiler island & other buildings C B C E, B C E
13 / 34

C E

C E

C E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
E, C

Engineering/ Supply Transport Detail Design


E, C E, C E, C

Erection/ Site Work

Commissioning/ Start up

Remarks

(20) Fuel Oil Drainage Piping

E, C

E, C

Outside of TBN island, EPC will be performed by E.

(21) Waste Drainage Piping (Embedded Piping Only)

E, C

E, C

E, C

E, C

E, C

E, C

Outside of TBN island, EPC will be performed by E.

(21') Waste Drainage Piping (Above Ground) (22) Storm water open ditch/piping including TBN island (23) NA (24) Chemical Cleaning Piping a. Chemical Cleaning Piping for Boiler b. Chemical Cleaning material for Boiler (25) Piping from Hydrogen generation plant to Turbine building (26) Pipe Support 29 Instrumentation and Control System (1) Common a. DCS b. Instrumentation cabling and piping (2) Boiler a. Boiler control system (ABC) Included in DCS

E, C E

E, C E

E, C E

E, C E

E, C E

E, C E

Outside of TBN island, EPC will be performed by E.

B B C E, C

B B C E, C

B B C E, C

B B C E, C

E E C E, C

B B C E, C

E, B, C E, B, C

C E, B, C

C E, B, C

C E, B, C

C E, C

C E, B, C

b. Burner management system (BMS) and Boiler Protection System (BPS) c. Boiler instrument d. Furnace supervisory T.V. System e. Precipitator control system f. Ash handling equipment control system g. Other instruments and detectors h. Local panels for instruments (If required)

B B B B B B

B B B B B B

B B B B B B
14 / 34

B B B B B B

E E E E E E

B B B B B B

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
I. Instrumentation piping j. Instrumentation cabling k. Flue gas emission monitoring l. UPS (3) Turbine - Generator a. Turbine control system (EHC) b. Turbine - generator supervisory instruments (TSI) c. Condenser tube Leakage detecting system d. Local control system e. Other instruments and detectors f. Local control panel g. Local junction box h. Local panels for instruments I. Instrumentation cabling and piping j. UPS for T/G control (4) Vibration Monitoring System a. Vibration Monitoring System (VMS) b. Proximitter C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Design Criteria/ Conceptual Engineering


B B B B

Engineering/ Supply Transport Detail Design


B B B B B B B B B B B B

Erection/ Site Work


E E E E

Commissioning/ Start up
B B B B

Remarks

29' CCTV 30 Cabling (1) Power Cable (2) Control Cable (3) Instrumentation Cable (4) Cable Support System (Cable rack, hanger, tray, pit,) (a) Cable Pit & Channel made of concrete including pit cover etc. (b) Cable support system inside Turbine house

E, B, C

E, B, C

E, B, C

E, B, C

E, C

E, B, C

E, B, C E, B, C E, B, C E, B, C

E, B, C E, B, C E, B, C E, B, C

E, B, C E, B, C E, B, C E, B, C

E, B, C E, B, C E, B, C E, B, C

E, C E, C E, B, C E, B, C

E, B, C E, B, C E, B, C E, B, C

E, B, C C

E, B, C C

E, B, C C
15 / 34

E, B, C C

E, B, C C

E, B, C C

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
B E E, B, C

Engineering/ Supply Transport Detail Design


B E E, B, C E E E, B, C E E E, B, C

Erection/ Site Work


E E E, B, C

Commissioning/ Start up
E E E, B, C

Remarks

(c) Cable support system in & around boiler area (d) Cable support system other than (b), (c) above & (e) below (e) Conduit wiring system, if any

31

Seawater Screening Plant (1) Stop Log (a) Dam boards (b) Guide rails (2) Bar Screens (a) Screens (b) Guide rails (c) Trash rake and control system (3) Travelling Band Screen (a) Screens (b) Guide rails (c) Spray water Pumps and piping for Screen washing (d) Level sensor and control system (4)' LV Power dist board E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

31` Electrochlorination System (1) Chlorination piping to CWP pit (2) Chlorine storage and injection system (3)' LV Power dist board (4) Instrumentation and Control valve (5) Control System 31'' Circulating Water Pump Circulating Water Pump House SWGR (MV SWGR (11kV), LV SWGR, MV/LV Tr) DC Distribution Panel E E E E E E, C E E E E E E E E E E E E E E E C E E
16 / 34

E E E E E C E E

E E E E E E E E

E E E E E C E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
31''' Debris Filter 32 Station Service Equipment (1) Crane & Hoist a. TG house Crane Rails and Stoppers Trolley cable b. C.W. Pump Gantry Crane Rails and Stopper Trolley cable c. Rail and hoist BFP d. Rail and hoist Boiler area e. Workshop Crane Rails and Stopper Trolley cable f. Rail and hoist for CWP discharge valve pit (if required) g. Rail and hoist for storage house h. Rail and hoist for Air Compressor room (2) Sump Pump (TBN Area) (3) Sump Pump(Boiler Area) (3) Elevators for Boiler (3') Elevators for Chimney (4) Workshop Equipment Machine Tools Power Panel Cable and Raceway (5) Motor Vehicle for Employer's requirement (6) Laboratory Equipment 33 Common Facilities
17 / 34

Description

Design Criteria/ Conceptual Engineering


C

Engineering/ Supply Transport Detail Design


E E E

Erection/ Site Work


E

Commissioning/ Start up
E

Remarks

C B E

C B E

C B E

C B E

C E E

C B E

E E E C B B, E E

E E E C B E E

E E E C B E E

E E E C B E E

E E E C E E E

E E E C B E E

E E E E E E

E E E E E E

E E E E E E

E E E E E E

E E E E E E

E E E E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
(1) Internal Telecommunication System (include cable) a. Telephone b. Loudspeaker system (paging system) c. Internet E E E E E E E E E E E E E E E E E E

Design Criteria/ Conceptual Engineering

Engineering/ Supply Transport Detail Design

Erection/ Site Work

Commissioning/ Start up

Remarks

d. Radio communication system

E Cables for DCS to Clock system will be provided by C, Cables between Clock system & local PLC by E&C.

(2) Clock System

(3) Electrical System for Facilities and General Usage

E, B, C

E, C

E, C

E, C

E, C

E, C

a. Lighting distribution panels after MCC Power House's switchgear b. All sockets (power outlets) to be provided in indoor for portable electrical equipment, for example, bolt heater, inspection light etc. c. All outdoor sockets together with local control boxes for outdoor use electrical equipment such as, portable oil purifier, d. Power source box for Boiler & Turbine maintenance use (indoor and outdoor) 34 Others

E, B, C

E, C

E, C

E, C

E, C

E, C

E, B, C

E, C

E, C

E, C

E, C

E, C

E, B, C E, B, C

E, C E, C

E, C E, C

E, C E, C

E, C E, C

E, C E, C

(1) Supporting Beams for Piping (Main Pipe)

a. for TG House

B,C

B,C

B, C

B, C

E, C

B, C

Piping support for main steam, cold reheat & hot reheat piping shall be designed and supplied by B and installed by E.

b. for Boiler area (2) Supporting Beams for (Other) Piping

B E,B, C

B E,B, C

B E,B, C
18 / 34

B E,B, C

E E, C

B E,B, C

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering Engineering/ Supply Transport Detail Design Erection/ Site Work Commissioning/ Start up Remarks

(3) Supporting Beams for Instrument

E,B, C

E,B, C

E,B, C

E,B, C

E, C

E,B, C

(4) Supporting Beams for Monorail & Supporting Materials

E,B, C

E,B, C

E,B, C

E,B, C

E, C

E,B, C

(5) Holding on Grating Floor (6) Concrete Ducts, Trenches and Pits (a) Boiler area (b) TG House (c) Transformer Yard (d) Outside of above (a), (b) & (c) (7) Conduits (a) Embedded (b) Above Ground (8) Earthing

E,B, C

E,B, C

E,B, C

E,B, C

E, C

E,B, C

E, B C E,B, C E

B C E,B, C E

E E E,B, C E

E E E,B, C E

E E E, C E

E E E,B, C E

E, B, C E, B, C

E, B, C E, B, C

E, B, C E, B, C

E, B, C E, B, C

E, C E, C

E, B, C E, B, C

(a) Earthing mesh (a)' Earthing grid interconnection between power plant and ENV grid (a)''Pig tail up to 1m above ground level

E, B, C E, C E, B, C

E, B, C E, C E, B, C

B, C E, C E, B, C

B, C E, C E, B, C

E, C E, C E, C

B, C E, C E, B, C

(b) Earthing Rod

E, B, C

E, B, C

E, B, C

E, B, C

E, C

E, B, C

(c) Earthing Connection above Ground Level including Connection Material (9) Not Applicable

E, B, C

E, B, C

E, B, C

E, B, C

E, C

E, B, C

(10) Ambient Air Monitoring System(if required)

E, B

E, B

E, B

E, B

E, B

E, B

(11) Spare parts

E, B, C

E, B, C

E, B, C
19 / 34

E, B, C

E, B, C

E, B, C

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(12) Special Tools (13) Consumables (H2, CO2,N2, lube oil, Chemicals power Tr, oil, etc,) for 1st filling & test commissioning (14) Site Paint (Finish & Touch up) E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C

Description

Design Criteria/ Conceptual Engineering


E, B, C E, B, C

Engineering/ Supply Transport Detail Design


E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C

Erection/ Site Work


E, B, C E, B, C

Commissioning/ Start up
E, B, C E, B, C

Remarks

(15) Thermal insulation material

B, C

B, C

E, C

E, C

E, C

E, C

35

Civil-Plant Interface

(1) T/G Pedestal (a) Template (b) Steel plate, conduit, pipe sleeve, anchor bolt, anchor frame, jacking post C C C C C C C C C C C C

(c) Bench mark

(d) Chipping and grout pad (e) Grout (f) Floor finishing (2) Power Transformers (Gene Tr, Unit Tr) (a) Hook for pulling (b) Oil catch pit (c) Fire wall (2A) Aux, transformers except above Item (2) (a) Hook for pulling (b) Oil catch pit (3) IPB Support (a) IPB support structure

C C C

C C C

C C C

C C C

C C C

C C C

C C C

C C C

C C C

C C C

C C C

C C C

C C

E E

C C

C C

C C

C C

C
20 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
C

Engineering/ Supply Transport Detail Design


C C C

Erection/ Site Work


C

Commissioning/ Start up
C

Remarks

(b) Foundation of IPB support (4) Indoor Equipment Foundation (a) Anchor bolt, sleeve, conduit (5) Outdoor Equipment Foundation (a) Anchor bolt, sleeve, conduit (6) Floor and Wall (a) Pipe and duct sleeve (b) Weather hood (c) Hook for pulling generator rotor (d) Wall and Floor penetration (7) Box out a. box out b. Grouting (8) Operating Platform (if necessary) (Steel structure and grating) (9) Floor Grating in T/G House (10) Channel base for Panels a. Box-out type b. Embedded type (11) Funnel for Equipment Drain (12) Pipe Protection Under Road (13) Handrail and Ladders for Concrete Basin, Concrete Tank Pit, and silos 36 Building Facility for Indoor & Outdoor Unless otherwise specified hereof, excavation works, backfill works, concrete works and other Civil / Architectural works which are required for the completion of Building Facilities shall be as a part of Civil contractor`s work (1) Lighting

E, C

E, C

E, C

E, C

E, C

E, C

Each own scope

E, C

E, C

E, C

E, C

E, C

E, C

Each own scope

E, C E, C C E, C

E, C E, C C E, C

E, C E, C C E, C

E, C E, C C E, C

E, C E, C C E, C

E, C E, C C E, C

Each own scope Each own scope

Each own scope

E, C E, C E, C

E, C E, C E, C

E, C E, C E, C

E, C E, C E, C

E, C E, C E, C

E, C E, C E, C

Each own scope Each own scope Each own scope

E, C E, C E, C E,C E, C

E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C

Each own scope Each own scope Each own scope Each own scope Each own scope

21 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
E E C E,B,C B B, C

Engineering/ Supply Transport Detail Design


E E C E,B,C B B, C E E C E,B,C B B, C E E C E,B,C B B, C

Erection/ Site Work

Commissioning/ Start up

Remarks

(a) Outdoor and Yard lighting including lighting pole if necessary (b) Administration Buildings lighting (c) TG House/CCB lighting (c)' Misc. Building (d) Boiler and boiler BOP Building Lighting (e) Lighting for plant equipment

E E C E,C E E, C

E E C E,B,C B B, C

(f) Yard and road lighting (g) Air Craft Warning Light for Boiler / Chimney (2) Air Conditioning (a) Air conditioning & Ventilation for TG House and central control building.

E E, B

E E, B

E E, B

E E, B

E E

E E, B

(b) Air conditioning & ventilation for Administration Buildings (c) Air conditioning & Ventilation for Misc Buildings (d) Louver

E E,B, C E,B, C

E E,B, C E,B, C

E E,B, C E,B, C

E E,B, C E,B, C

E E, C E, C

E E,B, C E,B, C

(3) Fire fighting for plant (a) Pump (b) Yard F/F System and Piping (c) Inside Building & Equipment alarm & spray (d) Fire alarm system for plant (e) Special FF alram & spray for TBN island

E E E E E C

E E E E E C

E E E E E C

E E E E E C

E E E E E C

E E E E E C

(5) Plumbing (a) Piping, valve etc. (b) Drinking water supply (c) Service water supply (d) Hot water supply E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C E, B, C
22 / 34

E, B, C E, B, C E, B, C E, B, C

E, C E, C E, C E, C

E, B, C E, B, C E, B, C E, B, C

Each own scope Each own scope Each own scope Each own scope

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(e) Sanitary fixture (f) Sewage treatment (g) Drainage system indoor (h) Drainage system outdoor (i) Booster pump for water distribution (if necessary) (6) Lightning Protection (a) Boiler and Boiler BOP (b) TG House (c) Other than (a) and (b) above (d) Chimney (7) Service water for building use E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

Description

Design Criteria/ Conceptual Engineering


E, B, C E, B, C E, B, C E E, B, C

Engineering/ Supply Transport Detail Design


E, B, C E E, B, C E E, B, C E, B, C E E, B, C E E, B, C E, B, C E E, B, C E E, B, C

Erection/ Site Work


E, C E E, C E E, C

Commissioning/ Start up
E, B, C E E, B, C E E, B, C Each own scope Each own scope

Remarks

37 38 39 40 41 42

Billing Metering facilities SCADA Equipment Interface DCS & SCADA Terminal Boards (within power plant) Protection & controls between the Power Station and the EVN SWYD Overhead line between high voltage terminal of step-up TR and Sub-station(EVN SWYD) Potable Water Treatment System Sewage Treatment System

E, C E, C E,C E, C E E

E, C C E,C E, C E E

C C C C E E

C C C C E E

C C C C E E

C C C C E E C's design role is limited supporting E C's design role is limited supporting E

SWITCHYARD CIVIL & ARCHITECTURAL WORKS Site Grading (1) Soil investigation (2) Site grading (3) Breakwaters & shore protection (if any) (4) Dredging (if any)

E, B, C E E E

E, B, C E E E

E, B, C E E E
23 / 34

E, B, C E E E

E, B, C E E E

E, B, C E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
2 C.W. System (1) Intake pond (2) Pump pit (3) Overhead Crane Rail Girder (if necessary) (4) Rail for overhead crane (5) Piling, excavation, foundation, backfill, and sand for C.W. Piping (6) Thrust block (7) Not Applicable (8) Outfall structure (9) Water intake structures (10) Inlet piping under water (11) Grating floor (removable) except operating stop for equipment operation E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

Description

Design Criteria/ Conceptual Engineering

Engineering/ Supply Transport Detail Design

Erection/ Site Work

Commissioning/ Start up

Remarks

Jetties (1) Coal Jetty (2) Not Applicable (3) Rail, Stopper and Embedded base of unloaded (Coal Jetty) (4) Mooring bitt (5) Rubber fender (6) Conveyor foundation (7) Navigation aids (8) Access way to Jetty E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

Coal Storage Yard (1) Coal storage Yard (2) Rail, Stopper and Embedded base of Stacker & Reclaimer (3) Conveyor foundation (4) Trash screen & Crusher R.C. Structure E E E E E E E E E E E E
24 / 34

E E E E

E E E E

E E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(5) Sedimentation pond (6) Crusher House (7) Transfer towers 5 Ash Disposal Yard (1) Ash disposal Yard (2) Drainage Collection System (3) Ash Runoff Basin (4) Not Applicable (5) Ash waste discharge pump foundation 6 Foundation for Tank (1) Light oil unloading pump foundation (2) Igniter supply pump foundation (3) Light oil storage tank foundation (4) Light oil service tank(day tank) foundation and dike inside EDG bld. (5) Oil dike (6) Oil catch basin (7) Oil separator (8) Pipes & piping for drainage (9) Make-up water tank foundation (10) Other small foundations 7 Ash Silo (1) Fly ash silo (2) Bottom ash vault (3) Equipment foundation E E E E E E E E E E E E E E E E E E E E E C E E E E E E,C E E E C E E E E E E,C E E E C E E E E E E,C E E E C E E E E E E,C E E E C E E E E E E,C E E E C E E E E E E,C Each own scope E E E E E E E E E E E E E E E E E E E E E E E E

Description

Design Criteria/ Conceptual Engineering


E E E

Engineering/ Supply Transport Detail Design


E E E E E E E E E

Erection/ Site Work


E E E

Commissioning/ Start up
E E E

Remarks

Switchyard

25 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
9 Pipe Rack Foundation

Description

Design Criteria/ Conceptual Engineering

Engineering/ Supply Transport Detail Design

Erection/ Site Work

Commissioning/ Start up

Remarks

(1) Pipe rack foundation (2) Piping Pit with cover (3) Concrete pipe sleeper (4) Steel pipe sleeper 9' 10 Pipe Rack Trench, Tunnel, culvert etc. (indoor & outdoor) (1) Cable & Pipe culver or tunnel with manhole (2) Cable trench with cover (3) Pipe trench with cover (4) Concrete duct (5) Cable pit with cover (6) Manhole (7) Drainage 11 Water Treatment System (1) Equipment foundation (2) Filtered water tank (3) Neutralization pond (4) Backwash waste water tank (5) Lining of tank and floor (6) Embedded piping (Process) (7) Embedded piping (Drain) 12 Waste Water Treatment System (1) Equipment foundation (2) Retention basin (3) Lining of basin and floor

E E E E E

E E E E E

E E E E E

E E E E E

E E E E E

E E E E E

E, C E, C E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C E, C E, C

E, C E, C E, C E, C E, C E, C E, C

Each own scope Each own scope Each own scope Each own scope Each own scope Each own scope Each own scope

E E E E E E E

E E E E E E E

E E E E E E E

E E E E E E E

E E E E E E E

E E E E E E E

E E E

E E E

E E E
26 / 34

E E E

E E E

E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description Design Criteria/ Conceptual Engineering
E E

Engineering/ Supply Transport Detail Design


E E E E E E

Erection/ Site Work


E E

Commissioning/ Start up
E E

Remarks

(4) Embedded piping (Process) (5) Embedded piping (Drain) 13 Coal Bunker (0) Piling (1) Steel structure (2) Foundation 14 Chlorination System (1) Equipment & pipe foundation 15 16 Conveyor Steel Structure Boiler Foundation and Structure (0) Piling (1) Boiler foundation (2) Boiler support steel structure (3) Elevator structure (4) Elevator Pit & Foundation (5) Elevator drainage embedded piping (6) Pulverizer foundation (7) PAF foundation (8) FDF foundation (9) IDF foundation (10) Blow down tank foundation (11) Flame scanner cooling air fan foundation (12) Pyrite trench with cover (13) Submerged scraper conveyor foundation (14) Water pump for make-up foundation (15) Waste water pump for dust conditioner foundation (if required)

E, B E, B E, B

E, B E, B E, B

E, B E, B E, B

E, B E, B E, B

E, B E, B E, B

E, B E, B E, B

E E

E E

E E

E E

E E

E E

B B B B B B B B B B B B B B B B

B, E E B, E E E E E E E E B, E B, E B, E B, E B, E B, C

E E E E E E E E E E E E E E E E
27 / 34

E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E E

E E E E E E E E E E E E E E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
(16) Drain gutter with cover (17) Boiler sump pit cover (17`) Boiler trenches with covers (18) panel foundation

Design Criteria/ Conceptual Engineering


B B B B

Engineering/ Supply Transport Detail Design


B, E B, E B, E B, E E E E E E E E E

Erection/ Site Work


E E E E

Commissioning/ Start up
E E E E

Remarks

17

Flue Duct Support Foundation (1) Foundation (2) Piling B B B, C B, C E E E E E E E E

18

Electrostatic Precipitator (1) Steel Structure (2) Foundation (3) Piling B B B B B B E E E E E E E E E E E E

18` FGD (1) Steel Structure (2) Foundation (3) Piling 19 TG House (1) TG House (2) T/G foundation (3) Equipment foundation (4) Condenser pit (5) Condensate pump pit (6) Oil dike made of concrete (6) Oil dike made of steel (7) Reinforced beam for hoist and monorail (8) Free Access floor (9) Tank foundation C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C
28 / 34

B B E

B B E

E E E

E E E

E E E

E E E

C C C C C C C C C C

C C C C C C C C C C

C C C C C C C C C C

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No. Description
(10) Grating floor (removable) (11) CW pipe pit (12) Not Applicable (13) Crane rail girder (14) Checkered plate floor (removable) (15) Crane rail (16) Pulling anchor for S(T)`s equipment 20 Generator Transformer and Unit Trans-former (MV switchgear power supply) and Other Aux, Transformers (1) Transformer foundation (2) Blast wall (3) Oil dike filling with gravel (4) Oil catch basin (5) Other Auxiliary Transformer Foundation (6) Not Applicable (7) Fire fighting pipe foundation (8) Pulling anchor C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C C

Design Criteria/ Conceptual Engineering


C C

Engineering/ Supply Transport Detail Design


C C C C C C

Erection/ Site Work


C C

Commissioning/ Start up
C C

Remarks

(9) Underground Oil/Water separator (10) Not Applicable 21 Lubricating Oil Tank for Turbine/Generator (1) Lubricating oil tank foundation (2) Oil dike for main lubricating oil tank made of concrete 22 Chimney (0) Piling (1) Chimney Foundation (2) Chimney (3) Inner flue & lining

C C

C C

C C

C C

C C

C C

E E E E

E E E E

E E E E
29 / 34

E E E E

E E E E

E E E E

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(4) Ladder & platform (5) Aircraft warning light (6) Lightning Protection (7) Earthing System (8) Lift structure (9) Connection between chimney & flue duct

Description

Design Criteria/ Conceptual Engineering


E E E E E E

Engineering/ Supply Transport Detail Design


E E E E E E E E E E E E E E E E E E

Erection/ Site Work


E E E E E E

Commissioning/ Start up
E E E E E E

Remarks

(10) CCTV

23 24 25

Not Applicable Not Applicable Service Buildings (1) Building (2) Equipment foundation E E E E E E E E E E E E

26

C.W. pump House (If necessary) (1) House (2) Equipment foundation E E E E E E E E E E E E

27

Workshop House (1) Workshop House (2) Equipment Foundation E E E E E E E E E E E E

27

'

Storage House (1) Storage House (2) Furniture E E E E E E E E E E E E

28

Water Treatment Control House (1) Control House (2) Equipment foundation E E E E E E E E E E E E

29

Not Applicable
30 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
30 31 32 Not Applicable Not Applicable Fire Pump House (1) House (2) Tank & Equipment foundations (3) Oil dike 33 34 35 36 Not Applicable Not Applicable Not Applicable Coal handling Control House (1) House (2) Equipment foundation 37 38 Coal Conveyor Support Foundation Not Applicable E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

Description

Design Criteria/ Conceptual Engineering

Engineering/ Supply Transport Detail Design

Erection/ Site Work

Commissioning/ Start up

Remarks

39

Chlorination System House

(1) House (2) Equipment foundation

E E

E E

E E

E E

E E

E E

40 41 42 43

Outdoor Equipment Foundation(Turbine Island) Gate House / Custom's House Not Applicable Not Applicable

C E

C E

C E

C E

C E

C E

44

Not Applicable

45 47

Storm Drainage System Road (permanent)

31 / 34

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(1) Road (2) Parking area (3) Bridge 48 49 50 51 52 53 54 55 56 Landscaping Fence Grouting and mortar finishing Not Applicable LPG Kitchen Operator Housing (if required) Potable Water Treatment System Sewage Treatment System Hydrogen generation plant Building (1) House (2) Equipment foundation 1 Others Furniture with Locker, time recorder, spare parts shelf Including central control room desks & chairs and other control rooms desks & chairs Laboratory Furniture (desks & chairs) E E E E E E C C C C C C C C C C C C E E E E E E E E E E E E E E E E E E E E E E E E

Description

Design Criteria/ Conceptual Engineering


E E E E E E, C

Engineering/ Supply Transport Detail Design


E E E E E E, C E E E E E E, C E E E E E E, C

Erection/ Site Work


E E E E E E, C

Commissioning/ Start up
E E E E E E, C Each own scope

Remarks

Others (1) Excavation, backfill and concrete works for road lighting poles (2) Flagstaff and flag & Bulletin board (3) Acid proof finish of floor and wall at battery room, etc.. (4) Mater key system and key box (5) Fire engine truck (6) Ambulance (7) Medical facility E E E, C E, B, C E E E E E E, C E, B, C E E E E E E, C E, B, C E E E
32 / 34

E E E, C E, B, C E E E

E E E, C E, B, C E E E

E E E, C E, B, C E E E Each own scope Each own scope

Long Phu 1 _ 2 x 600MW(gross) Power Project

DRAFT
2/16/2011 Activities by Owner : O Activities by PTCS :E Activities by Sojitz & Daelim Consortium : C Activities by BWBC & GEDI : B

PART 3DETAILED DIVISIONOF WORKS


Item No.
(8) Catering facility (9) Aux. Boiler Package (10) DO forwarding pump for aux. boiler & EDG

Description

Design Criteria/ Conceptual Engineering


E C C, E

Engineering/ Supply Transport Detail Design


E C E E C E E C E

Erection/ Site Work


E C E

Commissioning/ Start up
E C E

Remarks

33 / 34

Vietnum Long Phu I 2x600MW(gross) Power ProjectDivision of Scope of Works


IPB Chimney M HP by-pass valve TV Chimney FGD Silencer PAF Silencer FDF SAH CCTV in FGD Furnace TV Soot Blower Drain Pump Ignitor ESP AH To pulveriser Boiler BCP Ignitor fan Fuel oil purge Aux Boiler (1 for 2units) Spray to Turbine AUX Steam System to Boiler Fly Ash Silo Flame Scanner Cooling Fan Burner wind box BlowTank (Boiler flash tank only) AUX Steam System Steel Frame Stair & Ladder Enclosure Bottom Ash Handing Sys. Ash Hopper SCC (N.A) RH spray Each Facility Spary/Detectlarm HP Heaters Coal Bunker Coal Tripper Conveyor Dust Separator Road Tanker Belt Scale Sampler Conveyor Ship Unloader
Ash Pulverizer Seawater Deminerizer

Generator Transformer

MSV GMCB

Switchyard

Transmission Lines Tariff Metering LV MCC for TG & BOP LV MCC for Boiler Island Distribution Panels

Startup Transformer NRV CRV spray water line LP by-pass valve Ball injector CWP Condenser Ball strainer Vacuum pump Booster Pump Condensate to Turbine EHC Oil Unit Condenser Leak Monitor Pump Condensate Polisher Closed Cooling Water Cooler Head Tank CCW Pump to Turbine To Turbine Eqmnt Coolers
To Boiler Eqmnt Coolers

CEMS Power Cable

spray water line

Unit Aux. Transformer

MV/LV Switch Gear

IDF

Band Screen Bar Screen/Wash PP Chlorination system Stop Log

Distribution Panels

Aux. Steam Header

Aux. Motor

Fly Ash Handing Sys.

Lube Oil Unit

SCC Cooling Sys.(N.A)

Deaerator

Oil

Coal

Pulverizer Coal Feeder

Mill Pyrite Handling Sys.

To boiler

Chemical Injection Fire Fighting Common Ring F/F Pump F/F Water Tank Potable Water Storage Tank Demineralized Water Pump

SH spray

Fuel Oil Pumps


LDO Storage Tank

Mill Rejects System(N.A)

BFP BFPT BFPM Booster pump Hydro Coupling LP Heaters

Gland Condenser Each local FF Spray/Detect/Alar m Condensate Tank To turbine consumers Condensate Transfer Pump
Gen.

From PAF/APH Chemical Injection Sys. Sampling Equipment


Silencer

EDG

Desal.Sys.

To Deaerator

FO Unloading Pumps

DM Storage Tnak

Demineralizer

TV Camera

Suppression Sys.
Boiler ESP Turbine

Service Water Tank Raw Water Air Compressor Pretreatment Sys.

Stockpile Conveyor Crusher Reclaim Conveyor Bulldozer

FGD

ESP Coal Feeder Condenser Transformer Boiler Feed Water Pump Switchgear

To boiler consumers Dryer Receiver

To boiler consumers

(Electrical Equipment)
Ash disposal Fly ash

Canteen,Clinic, Welfare facilities (Sojitz/Daelim --> PTSC) LP bypass outlet piping(PTSC--> Sojitz/Daelim) Local Control Panel --> Each for own equipment(DCS will provided by Sojitz/Daelim) Yard Piping --> Main pipe rack will be provided by PTSC, each own consumper shall lead piping one meter outside of piping rack to each consumption point. All drainage piping(including waste water) shall be provided by PTSC. Security system-->PTSC Cooling water pumps, CW supply & return piping,Intake facilites for CW system & Raw water system-->PTSC WWT & all water treatment except CPP --> PTSC Air compressor system --> PTSC

Gen. Control & Protection Sys.


Intake

Paging, PA & Radio communication sys.

Cables & Access (TG,BOP)

Cables & Access (B&BOP)

Cables & Access (Boiler island and FGD, refer to SOW) Indoor Lighting(Boiler island and FGD)

Syncronization System

Clock Sys. (GPS)


UPS for boiler & BOP

Internal Lighting (TG&BOP) Outdoor Lighting (TG&BOP)


DC Sys. (TG&BOP)

Internal Lighting (B&BOP)


Outdoor Lighting (B&BOP) DC Sys. (B&BOP) Equipment Lighting
UPS in Boiler island and FGD

Conveyer

Overall waste water treatment sys. Effluent

Excitation System
Gen Neutral Ground Trans Gen Neutral Ground Cubicle Gen. H2 & CO2 Sys.

Aux. Relay Board Lightning & Protection ?

Outdoor Lingting (FGD and ESP) DC Sys. (FGD and ESP)

Ship of coal

Unloader

Stacker

Reclaimer Outlet

UPS
Grounding Sys. (above)

Coal Stockyard and blending Port

Grounding Sys. (below)

Data / Voice Commu. To Sys. Operating Authority

Security Sys.

Power Station Outline

(Others)
Emergency DG Potable Water Sys. Service Water Sys. Waste Water Treatment Sys. Oil Water Separator Drainage Sys. Sewage Treat. Or Septic Sys. Noise Assesment Training
Chemical Fill upto COD (B,T&BOP)(PTSC and Sojitz) Consumable Fill upto COD

Start-up & Comm.(PTSC and Sojitz) Spare Parts Special Tools

All Foundation (excluding boiler island and FGD)

Boiler steel structure, roof and canopy Bunker'steel Structure Pipe Rack Foundation

(Civil & Building work)


Site investigation (PTSC and Sojitz) Soil Investigation (PTSC and Sojitz)
Site Prep. & Shore Protection

(Erection Work)
CW Intake Stru.
Construc Office (incl. subcontractor)

(Cranes) Installation (B&BOP)


Insulation & Lagg (Erection only) (B&BOP) Insulation & Lagg (Mat Supply) (B&BOP) Instrumentation & Local CTRL (B&BOP) Cabling & Raceway (B&BOP) Construction Waste

(Control Equipment)
DCS (inc UCS,TSQ) Operator Station
CCTV

Installation (TG&BOP)
Insulation & Lagg (Erection only) (TG&BOP) Insulation & Lagg (Mat Supply) (TG&BOP) Instrumentation & Local CTRL (TG&BOP)

Cabling & Raceway (TG&BOP) Construction Waste

Turbine House EOT

EPC by Consortium Sojitz, Daelim EPC by PTSC

Boiler Elevator Structure

Thermal & Sound Insulation Works

O&M Manual

Misc. Building TG / CNTRL Bldg Civil Design TG Foundation Civil Design Turbine Pedestal Turbine / CTRL Building BOP Buildings Turbine Island BOP Buildings Boiler Island Boiler island and FGD Foundation

Discharge civil

Ash Handling Plant Civil Coal Handling Plant Civil Ash Disposal Pond

(TG&BOP)

(B&BOP)

CW Crane

BMS

TSI

BOP Controls(PTSC Protection Sys. (Boiler)

Boiler Elevator

H2 Generation system

Canteen,Clinic, Welfare Facilities

Coal & Oil

Spares Part (2 years) Maintenance Spares (PTSC and Sojitz) Strategic/Overhaul Spares (PTSC and Sojitz)

Shore Protction

Water Intake

EHC

Protection Sys. (Turbine)


Local Controller if applicable

EACH FOR OWN EQUIPMENT


Workshop & Warehouse
Lifting Equipment & Hoists(TG&BOP)

Turbine Building Elevator


Turbine Building Elevator structure

CO2 Bottles

Fuel Oil for EDG

Fuel Oil for Boiler Start-up

Pipe Rack

Excavation & Filling (PTSC and Sojitz) Land Survey (PTSC and Sojitz) Roads (Temp & Permanent)(PTS C and Sojitz) Access Road to Site (inside)
Roads (Outside Site Boundaries)

Fencing (permanent)

BFPT-EHC Sequencer(PTSC and Sojitz) Ambient Air Monitoring Station


Closed Loop Control System (PTSC and Sojitz)

DAS Performace Monitor

N2 Sealing System (w Bottle)


Laboratory (Coal/Main)

Chemical Cleaning of Boiler

Performance Test Instruments

Cable Rack (Concreate) Cable Rack (Inside TG Island) Cable Rack


(outside TG Island) Boiler steel structure, roof and canopy

Land Scaping

Coal Yard

Electrical (TG&BOP) Field Painting (TG&BOP) Commissioning (TG&BOP) Permits (TG&BOP)


Performance Test (PTSC and Sojitz) Tests required in Permits (PTSC and Sojitz)

Electrical (B&BOP) Field Painting (B&BOP) Commissioning (B&BOP) Permits (B&BOP)


Erec. & Comm. Advisors

Local Instrument

CUSTOMER

Fire Alarm CCR

Platform & Ladder

Steam Blow(MSVCRV, Aux/Grand steam)

Flush Oil for Turbine

Operator Housing Workshop House

ESP Controls

Expert System

Coal Jetty

Misc Crane

EP by BWBC&GEDI

HVAC Sys.

Yard Piping?
Platform & Ladder in boiler island and FGD

Workshop & Stores Equip

Vehicles for Boiler & Boiler BOP

Treatment & Disposal Chem. Cleaning Waste

Safety Shower

Oil unload & General Jetty

Open Loop Control System(PTSC and Sojitz)

Data Logger

E by BWBC&GEDI

Cranes and hoist in Boiler island and FGD

Thermal & Sound Insulation Works in boiler island and FGD

Limestone handling system

Gypsum handling system

Start-up & Comm. Spare Parts

Temp. Jetty

Local Control Panel

Large Screen

Auxiliary Power Supply


Open Loop Control System (FGD and ash handling)

TBA

Strategic/Overhaul Spares

Maintenance Spares

Spares Part (2 years)

Coal bunker

Closed Loop Control System in FGD and ash

Protection Sys.(Boiler) local