"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the

"Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

Proposed Development Site

Existing Truck Stop Site (to be Replaced by Proposed Development)

Client:

Title:

Exelby Services Ltd


Project:

Design:

MIT CC

CAD: Date:

MIT October 2010

Site Location Plan


Checked: Approved: JP Drawing No.
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

Scale: N.T.S Rev:

Proposed Truck Stop Coneygarth

Figure 1

F:\PROJECTS\Dev Planning - MSA Inquiry 2010-11\Acad\F\Figure 001.dwg

[ AutoCAD Location ]

A4

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

Proposed Development Site

Key 1.2km Pedestrian Isoline 5km Cycle Isoline

Client:

Title:

Exelby Services Limited


Project:

Pedestrian and Cycle Isoline

Design: Checked:

TJ CC

CAD: Date:

TJ October 2010

Approved: JP Drawing No.


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

Scale: NTS Rev:

Proposed Truck Stop Coneygarth

Figure 2

F:\PROJECTS\Dev Planning - MSA Inquiry 2010-11\Acad\F\Figure 2.dwg

[ AutoCAD Location ]

A4

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

A1 Proposed Coneygarth Truck Stop Site

New Leeming Junction

LRN

Existing Londonderry Truck Stop Site

LRN

New Baldersby Junction

Comparsion of Routes : New Baldersby Junction to Londonderry Services Londonderry Services to New Leeming Junction New Leeming Junction to Coneygarth Services Coneygarth Services to New Leeming Junction 13.3Km 4.3Km 0.7Km 0.8Km A1

Client:

Title:

Exelby Services Ltd


Project:

Comparsion of Routes to/from Existing and Proposed Sites

Design: Checked:

MIT CC

CAD: Date:

MIT October 2010

Approved: JP Drawing No.


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

Scale: N.T.S Rev:

Proposed Truck Stop Coneygarth

Figure 3

F:\PROJECTS\Dev Planning - MSA Inquiry 2010-11\Acad\F\Figure 003.dwg [ AutoCAD Location ]

A4

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

Proposed Development Site

KEY Public Bridlepaths Public Footpaths


Client: Title:

Exelby Services Ltd


Project:

Public Rights of Way (PRoW) Plan

Design: Checked:

MIT CC

CAD: Date:

MIT October 2010

Approved: JP Drawing No.


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

Scale: N.T.S Rev:

Proposed Truck Stop Coneygarth

Figure 4

F:\PROJECTS\Dev Planning - MSA Inquiry 2010-11\Acad\F\Figure 004.dwg

[ AutoCAD Location ]

A4

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

606 777

1675 1246

1563 1368

575 446

PMA

321 273

254 173

0 0

0 0

156 0

156 86

0 410

0 329

BALB BALB
374 150 242 340

374 273

242 321

524 582

0 0

403 364

86 0

LAR
155 112 156 156

A1 Northbound Diverge

311 268

1246 1675

1368 1563

236 340

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2012 JMP Hybrid Model without BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 4: LGV's includes Light Goods Vehicles and all Cars

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 LV Base Flows without BALB

Figure 5

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

52 24

392 538

264 382

33 57

PMA

15 43

18 14

0 0

0 0

18 12

32 3

0 35

0 46

BALB BALB
8 14 11 23 6 15

6 48

33 21

0 0

18 44

6 12

LAR
16 3 30 18

A1 Northbound Diverge

45 21

538 392

382 264

25 27

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2012 JMP Hybrid Model without BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 HGV Base Flows without BALB

Figure 6

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

658 801

2067 1784

1827 1750

608 503

PMA

336 316

272 187

0 0

0 0

174 12

188 89

0 445

0 375

BALB BALB
385 173 248 355

380 321

250 335

557 603

0 0

421 408

92 12

LAR
171 115 186 174

A1 Northbound Diverge

356 289

1784 2067

1750 1827

261 367

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: 2012 LGV Flows 2012 HGV Flows NOTES 1: Flows taken from 2012 JMP Hybrid Model without BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 Total Vehicle Base Flows without BALB

Figure 7

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

50 86

74 57

PMA

74 57

68

53

57

74

86 50

53 68

LAR 81 56

A1 Northbound Diverge

81 56

53 68

Leases Road A1 Northbound A1 Southbound

NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the New Leeming Junction (NLJ) in 2012 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Leeming Motel LGVs Flows

Figure 8

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

4 6

4 3

PMA

4 3

6 4

3 3

LAR 4 2

A1 Northbound Diverge

4 2

3 3

Leases Road A1 Northbound A1 Southbound

NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2012 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Leeming Motel HGVs Flows

Figure 9

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

54 92

78 60

PMA

78 60

71

56

60

78

92 54

56 71

LAR

85 58

A1 Northbound Diverge

85 58

56 71

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: Existing Leeming Motel LGV Flows Existing Leeming Motel HGV Flows

NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2012 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Leeming Motel Total Vehicle Flows

Figure 10

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

23 17

9 12

PMA

9 12

12

17 23

LAR

Leases Road A1 Northbound Diverge

NOTES 1: Flows taken from Survey undertaken in March 2009

A1 Northbound

A1 Southbound

2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Londonderry Truck Stop LGV Flows

Figure 11

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

26 22

23 15

PMA

23 15

15

23

22 26

LAR

Leases Road A1 Northbound Diverge

NOTES 1: Flows taken from Survey undertaken in March 2009

A1 Northbound

A1 Southbound

2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Londonderry Truck Stop HGV Flows

Figure 12

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

49 39

32 27

PMA

32 27

0 27

0 32

39 49

LAR

Leases Road A1 Northbound Diverge

NOTES 1: Flows taken from Survey undertaken in March 2009

A1 Northbound

A1 Southbound

2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound

Each cell within this figure is the sum from the following figures: Existing Londonderry Truck Stop LGV Flows Existing Londonderry Truck Stop Flows

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Londonderry Truck Stop Total Vehicle Flows

Figure 13

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

58% 58%

42% 42%

PMA

42% 42%

100% 100%

58%

58%

100%

100%

58%

58%

58% 42%

58% 42%

LAR

58% 58%

A1 Northbound Diverge

58% 58%

42% 42%

Leases Road A1 Northbound A1 Southbound


NOTES 1: The distribution is based on the 2009 survey at Londonderry

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Coneygarth Development Distribution

Figure 14

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

44 28

32 21 32 21

PMA

75 49

44

28

75

49

28

44

28 21

44 32

LAR 28 44

A1 Northbound Diverge

28 44

21 32

Leases Road A1 Northbound A1 Southbound


NOTES 1: The distribution is based on the current Londonderry Truck Stop from the 2009 survey 3: The development flows were taken from the AECOM TA Addendum

Arrival 49

AM Departure 49

Arrival 75

PM Departure 75 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP

Flows from AECOM TA Addendum Table 2

Client:

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Proposed Coneygarth Development LGV Flows

Figure 15

Approved

3 F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

45 35

33 25

PMA

33 25

78 60

45

35

78

60

35

45

35 25

45 33

LAR

35 45

A1 Northbound Diverge

35 45

25 33

Leases Road A1 Northbound A1 Southbound


NOTES 1: The distribution is based on the current Londonderry Truck Stop from the 2009 survey 3: The development flows were taken from the AECOM TA Addendum

Arrival 60

AM Departure 60

Arrival 78

PM Departure 78 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP

Flows from AECOM TA Addendum Table 2

Client:

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Proposed Coneygarth Development HGV Flows

Figure 16

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

89 63

64 46

PMA

64 46

153 109

89

63

153

109

63

89

63 46

89 64

LAR

63 89

A1 Northbound Diverge

63 89

46 64

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: Coneygarth Development LGV Flows Coneygarth Development HGV Flows NOTES 1: The distribution is based on the current Londonderry Truck Stop from the 2009 survey 2: The distribution is in line with the AECOM TA Addendum 3: The development flows were taken from the AECOM TA Addendum

Arrival 60

AM Departure Arrival 60 78

PM Departure 78 Key AM Peak PM Peak Date Design Checked Oct-10 CC JP SP

Client:

Project:

Title:

Drawing Number:

Revision:

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Proposed Coneygarth Development Vehicle Flows

Figure 17

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

134 62

78 48

PMA

78 48

78

48

48

78

62 134

48 78

LAR

62 134

A1 Northbound Diverge

62 134

48 78

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 Proposed Leeming MSA LGV Flows

Figure 18

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

31 27

13 13

PMA

13 13

13

13

13

13

27 31

13 13

LAR

27 31

A1 Northbound Diverge

27 13

13 13

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 Proposed Leeming MSA HGV Flows

Figure 19

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

165 89

91 61

PMA

91 61

91

61

61

91

89 165

61 91

LAR

89 165

A1 Northbound Diverge

89 147

61 91

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 Proposed Leeming MSA Total Flows

Figure 20

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

809 822

2067 1784

1827 1750

653 523

PMA

317 290

336 233

153 109

0 0

263 91

251 94

153 445

109 375

BALB BALB
448 219 337 419

443 295

250 405

557 603

0 0

379 470

97 91

LAR
175 222 249 263

A1 Northbound Diverge

423 467

1784 2067

1750 1827

312 451

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: 2012 Total Vehicle Base + Coneygarth Development - (Ex. Leeming Motel & Londonderry Truck Stop) Coneygarth Development Vehicle Flows NOTES 1: Flows taken from 2012 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3:Traffic Flows from Motel & Londonderry Excluded 4: Traffic Flows contain proposed site at Coneygarth 5: Traffic Flows include Leeming MSA Flows 6: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 7: The right turn manuourve from the LAR to the Link Road indicates that there would be a negative flow when the motel + Londonderry flow is taken away from the base flow A zero has been placed to replace the negative flow.

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2012 Total Vehicle Base + Dev + MSA Flows without BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)

Figure 21

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

697 869

1915 1443

1850 1578

683 525

PMA

394 331

289 194

163 0

171 106

452

365

BALB BALB
274 425 404 161 305 386

397 339

565 691

472 423

106 0

LAR
178 130 171 163

A1 Northbound Diverge

349 293

1443 1915

1578 1850

267 386

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 4: LGV's includes Light Goods Vehicles and all Cars

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 LV Base Flows without BALB

Figure 22

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

66 32

376 518

240 368

43 72

PMA

41 54

2 18

25 15

49 4

27

67

BALB BALB
10 43 15 29 12 19

7 62

44 31

25 56

13 15

LAR
19 4 40 25

A1 Northbound Diverge

59 29

518 376

368 240

33 34

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 HGV Base Flows without BALB

Figure 23

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

763 901

2291 1961

2090 1946

726 597

PMA

435 385

291 212

0 0

0 0

188 15

220 110

0 479

0 432

BALB BALB
419 190 317 405

404 401

284 468

609 722

0 0

497 479

119 15

LAR
197 134 211 188

A1 Northbound Diverge

408 322

1961 2291

1946 2090

300 420

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: Figure 18: 2022 LGV Flows Figure 19: 2022 HGV Flows NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Total Vehicle Base Flows without BALB

Figure 24

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

153 72

93 55

PMA

93 55

93

55

55

93

72 153

55 93

LAR

72 153

A1 Northbound Diverge

72 153

55 93

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Proposed Leeming MSA LGV Flows

Figure 25

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

30 26

12 13

PMA

12 13

12

13

13

12

26 30

13 12

LAR

23 30

A1 Northbound Diverge

26 30

13 12

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Proposed Leeming MSA HGV Flows

Figure 26

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

183 98

105 68

PMA

105 68

105

68

68

105

98 183

68 105

LAR

95 183

A1 Northbound Diverge

98 183

68 105

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Proposed Leeming MSA Total Flows

Figure 27

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

932 931

2291 1961

2090 1946

785 624

PMA

430 366

355 258

153 109

0 0

277 105

283 122

153 479

109 432

BALB BALB
482 236 406 469

467 382

284 552

609 722

0 0

464 559

131 105

LAR
207 259 274 277

A1 Northbound Diverge

484 536

1961 2291

1946 2090

358 518

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: 2022 Total Vehicle Base + Coneygarth Development - (Ex. Leeming Motel & Londonderry Truck Stop) Coneygarth Development Vehicle Flows NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3:Traffic Flows from Motel & Londonderry Excluded 4: Traffic Flows contain proposed site at Coneygarth 5: Traffic Flows include Leeming MSA Flows 6: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 7: The right turn manuourve from the LAR to the Link Road indicates that there would be a negative flow when the motel + Londonderry flow is taken away from the base flow A zero has been placed to replace the negative flow.

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT - 2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Total Vehicle Base + Dev + MSA Flows without BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)

Figure 28

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

629 801

1691 1251

1578 1383

601 469

PMA

342 291

259 178

0 0 91 330 59 187 643 98

0 0

0 0

448 85

817 88

0 348 359

0 623 372

BALB BALB
380 292 172 207 455 176 553 151 496 288 0 582 27 0 595 15

122 189

0 0

15 27

47 101

234 331

104 45

LAR
97 76 60 44 158 158

A1 Northbound Diverge

315 278

1261 1691

1383 1587

239 373

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2014 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 4: LGV's includes Light Goods Vehicles and all Cars

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 LV Base Flows with BALB

Figure 29

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

53 24

398 546

272 338

33 57

PMA

15 43

18 14

0 0 5 13 0 7 15 0

0 0

0 0

20 12

43 3

0 19 20

0 49 8

BALB BALB
6 24 26 8 12 11 15 23 15 15 0 33 0 0 27 2

5 3

0 0

0 0

1 0

11 40

1 1

LAR
1 1 15 2 31 18

A1 Northbound Diverge

47 21

546 398

338 272

26 27

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2014 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 HGV Base Flows with BALB

Figure 30

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

682 825

2089 1797

1850 1721

634 526

PMA

357 334

277 192

0 0 96 343 59 194 658 98

0 0

0 0

468 97

860 91

0 367 379

0 672 380

BALB BALB
386 316 198 215 467 187 568 174 511 303 0 615 27 0 622 17

127 192

0 0

15 27

48 101

245 371

105 46

LAR
98 77 75 46 189 176

A1 Northbound Diverge

362 299

1807 2089

1721 1859

265 400

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: 2014 LGV Flows 2014 HGV Flows NOTES 1: Flows taken from 2014 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 Total Vehicle Base Flows with BALB

Figure 31

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

50 86

74 57

PMA

74 57

68

53

57

74

86 50

53 68

LAR 81 56

A1 Northbound Diverge

81 56

53 68

Leases Road A1 Northbound A1 Southbound

NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the New Leeming Junction (NLJ) in 2014 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Leeming Motel LGVs Flows

Figure 32

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

4 6

4 3

PMA

4 3

6 4

3 3

LAR 4 2

A1 Northbound Diverge

4 2

3 3

Leases Road A1 Northbound A1 Southbound

NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2014 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Leeming Motel HGVs Flows

Figure 33

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

54 92

78 60

PMA

78 60

71

56

60

78

92 54

56 71

LAR

85 58

A1 Northbound Diverge

85 58

56 71

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: Existing Leeming Motel LGV Flows Existing Leeming Motel HGV Flows

NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2014 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Leeming Motel Total Vehicle Flows

Figure 34

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

23 17

9 12

PMA

9 12

12

17 23

LAR

Leases Road A1 Northbound Diverge

NOTES 1: Flows taken from Survey undertaken in March 2009

A1 Northbound

A1 Southbound

2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Londonderry Truck Stop LGV Flows

Figure 35

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

26 22

23 15

PMA

23 15

15

23

22 26

LAR

Leases Road A1 Northbound Diverge

NOTES 1: Flows taken from Survey undertaken in March 2009

A1 Northbound

A1 Southbound

2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Londonderry Truck Stop HGV Flows

Figure 36

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

49 39

32 27

PMA

32 27

0 27

0 32

39 49

LAR

Leases Road A1 Northbound Diverge

NOTES 1: Flows taken from Survey undertaken in March 2009

A1 Northbound

A1 Southbound

2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound

Each cell within this figure is the sum from the following figures: Existing Londonderry Truck Stop LGV Flows Existing Londonderry Truck Stop Flows

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Existing Londonderry Truck Stop Total Vehicle Flows

Figure 37

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

58% 58%

42% 42%

PMA

42% 42%

100% 100%

100% 58% 58%

100%

58%

58%

58% 42%

58% 42%

LAR

58% 58%

A1 Northbound Diverge

58% 58%

42% 42%

Leases Road A1 Northbound A1 Southbound


NOTES 1: The distribution is based on the 2009 survey at Londonderry

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Coneygarth Development Distribution

Figure 38

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

44 28

32 21 32 21

PMA

75 49 75 44 28 49

28

44

28 21

44 32

LAR 28 44

A1 Northbound Diverge

28 44

21 32

Leases Road A1 Northbound A1 Southbound


NOTES 1: The distribution is based on the current Londonderry Truck Stop from the 2009 survey 3: The development flows were taken from the AECOM TA Addendum

Arrival 49

AM Departure 49

Arrival 75

PM Departure 75 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP

Flows from AECOM TA Addendum Table 2

Client:

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Proposed Coneygarth Development LGV Flows

Figure 39

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

45 35

33 25

PMA

33 25

78 60

78 45 35

60

35

45

35 25

45 33

LAR

35 45

A1 Northbound Diverge

35 45

25 33

Leases Road A1 Northbound A1 Southbound


NOTES 1: The distribution is based on the current Londonderry Truck Stop from the 2009 survey 3: The development flows were taken from the AECOM TA Addendum

Arrival 60

AM Departure 60

Arrival 78

PM Departure 78 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP

Flows from AECOM TA Addendum Table 2

Client:

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Proposed Coneygarth Development HGV Flows

Figure 40

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

89 63

64 46

PMA

64 46

153 109

153 89 63

109

63

89

63 46

89 64

LAR

63 89

A1 Northbound Diverge

63 89

46 64

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: Coneygarth Development LGV Flows Coneygarth Development HGV Flows NOTES 1: The distribution is based on the current Londonderry Truck Stop from the 2009 survey 2: The distribution is in line with the AECOM TA Addendum 3: The development flows were taken from the AECOM TA Addendum

Arrival 60

AM Departure Arrival 60 78

PM Departure 78 Key AM Peak PM Peak Date Design Checked Oct-10 CC JP SP

Client:

Project:

Title:

Drawing Number:

Revision:

Exelby Services LTD

Proposed Truck Stop, Coneygarth

Proposed Coneygarth Development Vehicle Flows

Figure 41

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

135 63

79 48

PMA

79 48

79

48

48

79

63 135

48 79

LAR

63 135

A1 Northbound Diverge

63 135

48 79

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 Proposed Leeming MSA LGV Flows

Figure 42

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

32 27

14 14

PMA

14 14

14

14

14

14

27 32

14 14

LAR

27 32

A1 Northbound Diverge

27 32

14 14

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 Proposed Leeming MSA HGV Flows

Figure 43

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

167 90

93 62

PMA

93 62

93

62

62

93

90 167

62 93

LAR

90 167

A1 Northbound Diverge

90 167

62 93

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 Proposed Leeming MSA Total Flows

Figure 44

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

835 847

2089 1797

1850 1721

681 547

PMA

340 309

341 238

153 109 96 343 59 194 658 98

0 0

0 0

557 119

923 97

153 367 379

109 672 380

BALB BALB
449 316 173 278 467 170 631 220 600 367 0 615 27 0 622 17

127 192

0 0

15 27

48 101

204 435

111 93

LAR
103 186 75 46 252 265

A1 Northbound Diverge

430 497

1807 2089

1721 1859

317 486

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: 2014 Total Vehicle Base + Coneygarth Development - (Ex. Leeming Motel & Londonderry Truck Stop) Coneygarth Development Vehicle Flows NOTES 1: Flows taken from 2014 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3:Traffic Flows from Motel & Londonderry Excluded 4: Traffic Flows contain proposed site at Coneygarth 5: Traffic Flows include Leeming MSA Flows 6: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 7: The right turn manuourve from the LAR to the Link Road indicates that there would be a negative flow when the motel + Londonderry flow is taken away from the base flow A zero has been placed to replace the negative flow.

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

Oct-10 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2014 Total Vehicle Base + Dev + MSA Flows with BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)

Figure 45

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

698 868

1915 1443

1850 1578

683 525

PMA

394 331

289 194

0 0 100 393 68 201 722 102

0 0

0 0

504 102

905 106

0 372 421

0 722 377

BALB BALB
396 268 251 231 492 208 584 161 537 325 0 604 30 0 649 17

141 213

0 0

17 30

61 110

271 367

118 50

LAR
114 90 64 55 171 163

A1 Northbound Diverge

349 308

1443 1915

1578 1850

267 427

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 4: LGV's includes Light Goods Vehicles and all Cars

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 LV Base Flows with BALB

Figure 46

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

65 31

376 518

240 368

43 72

PMA

20 54

23 18

0 0 7 16 1 9 18 0

0 0

0 0

28 15

55 4

0 25 26

0 63 10

BALB BALB
8 30 34 10 12 14 18 29 16 19 0 41 1 0 32 2

6 3

0 0

0 0

1 2

14 48

1 1

LAR
1 2 19 3 40 25

A1 Northbound Diverge

60 30

518 376

368 240

33 34

Leases Road A1 Northbound A1 Southbound


NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 HGV Base Flows with BALB

Figure 47

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

763 899

2291 1961

2090 1946

726 597

PMA

414 385

312 212

0 0 107 409 69 210 740 102

0 0

0 0

532 117

960 110

0 397 447

0 785 387

BALB BALB
404 298 285 241 504 222 602 190 553 344 0 645 31 0 681 19

147 216

0 0

17 30

62 112

285 415

119 51

LAR
115 92 83 58 211 188

A1 Northbound Diverge

409 338

1961 2291

1946 2090

300 461

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: 2022 LGV Flows 2022 HGV Flows NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Total Vehicle Base Flows with BALB

Figure 48

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

153 72

93 55

PMA

93 55

93

55

55

93

72 153

55 93

LAR

72 153

A1 Northbound Diverge

72 153

55 93

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Proposed Leeming MSA LGV Flows

Figure 49

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

30 26

12 13

PMA

12 13

12

13

13

12

26 30

13 12

LAR

26 30

A1 Northbound Diverge

26 30

13 12

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Proposed Leeming MSA HGV Flows

Figure 50

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

183 98

105 68

PMA

105 68

105

68

68

105

98 183

68 105

LAR

98 183

A1 Northbound Diverge

98 183

68 105

Leases Road A1 Northbound A1 Southbound


NOTES 1: Traffic flows provided by Fairhurst & Partners Trip Generation for Leeming MSA

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Proposed Leeming MSA Total Flows

Figure 51

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls

A1 Northbound

A1 Southbound

Leases Road A1 Northbound Merge

932 929

2291 1961

2090 1946

785 624

PMA

409 366

376 258

153 109 107 409 69 210 740 102

0 0

0 0

621 151

1023 122

153 397 447

109 785 387

BALB BALB
467 298 266 304 504 217 665 236 642 408 0 645 31 0 681 19

147 216

0 0

17 30

62 112

252 495

131 105

LAR
128 217 83 58 274 277

A1 Northbound Diverge

485 552

1961 2291

1946 2090

358 559

Leases Road A1 Northbound A1 Southbound


Each cell within this figure is the sum from the following figures: Figure 2022 Total Vehicle Base + Coneygarth Development - (Ex. Leeming Motel & Londonderry Truck Stop) Figure Coneygarth Development Vehicle Flows NOTES 1: Flows taken from 2022 JMP Hybrid Model with BALB 2: Traffic Flows Including Committed Development & LDF sites 3:Traffic Flows from Motel & Londonderry Excluded 4: Traffic Flows contain proposed site at Coneygarth 5: Traffic Flows include Leeming MSA Flows 6: Peak hours shown are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 7: The right turn manuourve from the LAR to the Link Road indicates that there would be a negative flow when the motel + Londonderry flow is taken away from the base flow A zero has been placed to replace the negative flow.

Key AM Peak PM Peak Client: Project: Title: Drawing Number: Revision:

Date Design Checked

OCT-2010 CC JP SP

Exelby Services LTD

Proposed Truck Stop, Coneygarth

2022 Total Vehicle Base + Dev + MSA Flows with BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)

Figure 52

Approved

File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls

Scope of Transport Assessment


Project: Subject: Prepared by: Checked by: Approved by: Proposed Relocation of Exelby Services, Coneygarth Revised Scope of Transport Assessment Chris Cuckson Ken Hay Jon Phillip Date: Date: Date: 08/12/2009 08/12/2009 08/12/2009 Job No: 60042546

This Technical Note sets out the proposed approach to be adopted in preparing a Transport Assessment (TA) in support of the proposed relocation of Exelby Services from Londonderry Village to Coneygarth, north of Leeming Bar. It is understood that the Highways Agencys Policy Team has confirmed that since Exelby Services require no signed facilities from the Strategic Road Network (SRN) its proposal can be treated as a Development Control Application and considered under Policies set out in Circular 02/2007 and the DfTs Guidance on Transport Assessment (GTA). Bedale and Leeming Bypass North Yorkshire County Council (NYCC) is proposing to construct a Bedale and Leeming Bypass (BALB) which would link to the A1(M) / New Leeming Junction. It is understood that a planning submission for the BALB will be made by NYCC in January 2010 and that construction could begin by 2012, with BALB opening to traffic in 2014. Pre-application Discussions As identified in Chapter 2 of GTA, pre-application discussions are a valuable part of the planning process. Discussions have taken place between the Operator of Exelby Services and their advisor AECOM, NYCC and their advisor Jacobs, and the HA and their advisor JMP Consultants, these discussions will continue throughout the planning process. Early discussions identified the need for this Scoping Document the following paragraphs set out the proposed Scope of the Transport Assessment. Proposals The proposed TA will consider the traffic impact of the proposed development and also illustrate the effects of relocating from the existing site (for example, a comparison in distance travelled to/from the SRN to access the existing and proposed sites, after the completion of the A1 upgrade scheme). It will also compare the impacts whether the Bedale and Leeming bypass (BALB) is implemented or not.

Page: 1 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc

Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com

St Christopher House George Cayley Drive York YO30 4XE

Scope of Transport Assessment

The TA will include the following: A description of the proposed land uses; Details of proposed floor space; Details of the proposed facilities; Details of HGV and car parking; Details of operating hours; Details of on-site traffic management; and Proposed access and servicing arrangements.

In line with Highways Agency and NYCC policy a Travel Plan document will be developed for the site. The Travel Plan would focus on minimising single occupancy employee car trips to and from the relocated Exelby Services. The Travel Plan will provide details of measures, monitoring and mitigations. Reasons for proposed relocation The TA will set out the key reasons for the proposed relocation of Exelby Services particularly in relation to the ongoing upgrade of the A1 to motorway standard between Dishforth and Barton. The ongoing upgrade of the A1 will result in access to Londonderry village only being possible via a service road running parallel to the new motorway. This will require all vehicles travelling to and from the site to join or leave the motorway at new junctions at Baldersby and Coneygarth with consequential and significant impact on the local environment. These effects will include noise and air pollution (including particulate matter - PM10s) and additional CO2 emissions as a result of the additional fuel burned by HGVs. The additional HGV mileage and higher HGV flows on the service roads would also have a road safety and maintenance implication for NYCC. Existing Conditions As an important element of the proposals is the effect of relocating the services, the details of the existing conditions at Exelby Services will be detailed and will include the same basic information as that provided in the proposals section (see above). Need The TA will set out the Needs Case for Exelby Services in this location and the benefits of relocating the facility. A comparison will be made with other similar facilities serving the Logistics Industry along the A1, A1(M) and A66 strategic routes. Specific contract refuelling and freight services such as Exelbys should not be confused with Motorway Service Areas (MSAs) which offer a range of facilities to the travelling public and are mainly used by motorists and their passengers and must provide specific services. MSAs are usually signed from the SRN. It is anticipated that the proposed facility would not be signed from the SRN. Sequential Test The TA will include a summary of the other sites that have been considered in identifying the Coneygarth site for the proposed development. The advantages and disadvantages of these sites from a transport perspective will be summarised.

Page: 2 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc

Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com

St Christopher House George Cayley Drive York YO30 4XE

Scope of Transport Assessment


Trip Distribution Traffic to and from the new development will be distributed according to surveyed traffic flows at the existing site, although all development traffic will be travelling to /from the A1(M) northbound or southbound carriageways. Trip Generation Although the site would not be a destination in its own right, the TA will detail likely forecast number of trips to/from the development. As requested by the HA, the trip rates for the site will be based on data held by Exelby Services for their existing Londonderry Facility. This will best reflect the likely trip generation of the new site, because both sites will derive their custom from the A1(T)/ A1/(M). To ensure a rigorous assessment a sensitivity check will be undertaken. This will be based on data from the Exelby Services M6 (J42/Carlisle) facility. The M6 facility is an extremely successful modern site which serves over 2000 HGVs per day. The use of this site will ensure that the trip generation based on the existing Londonderry facility does not under estimate the proposed services trip generation. The number of trips associated with the existing Londonderry site will be converted into three separate trip rates based on three factors. One trip rate will be based on the size of the Londonderry site, a second trip rate will be based on the number of fuel pumps at the Londonderry site, and a third trip rate will be based on the number of lorry parking spaces on the Londonderry site. These three trip rates will then be multiplied by the appropriate size, number of pumps and number of lorry parking spaces of the proposed Exelby Services facility. This will generate three trip generation estimates for the proposed site. The average of the three trip generations will be taken and will form the predicted trip generation of the proposed site. The sensitivity check will use the same methodology described in the previous two paragraphs using the corresponding data for the M6 site. Assessment Years and Development Scenarios Following discussions with the Highways Agency and NYCC, during which it was assumed that a planning application would be submitted and registered by Hambleton District Council in 2010, it is proposed that two scenarios will be modelled as follows; In the first scenario the impact on the SRN and local road network will be assessed with the A1(M) / New Leeming Junction in place but no BALB in place. The opening year of 2012, 2014 and a design year of 2022 will be used to assess the operation of the road network, in accordance with Circular 02/2007. The second scenario will consider the impact on the SRN and local road network with the A1(M) / New Leeming Junction in place and the BALB in place. The opening year in this scenario will be 2014 (the year when the BALB is expected to open), the design year will be 2022 as requested by NYCC. This would also accord with Highways Agency policy.

It is understood that the design year traffic flows for the A1(M) and BALB will be provided by the Highways Agency and NYCC. The base traffic network flows for the assessment will be the same as those provided by the Highways Agency and NYCC. If the figures provided are not for the years of assessment required, the traffic flows provided will be growthed up using the DfTs National Traffic Model Forecasts (NTM) rates for the agreed assessment years for the appropriate locations.

Page: 3 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc

Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com

St Christopher House George Cayley Drive York YO30 4XE

Scope of Transport Assessment

Peak Periods Whilst the proposed development would generate HGV traffic (and some other vehicle types) throughout the day and night, it is proposed that the morning and evening peak hours would be identified based on traffic flow data supplied by the Highways Agency and NYCC. The peak periods will be used for any junction assessments as these would represent the two busiest periods on the road network around the site. Junction Assessments Before the operational assessment of junctions is undertaken, Hambleton District Council will be consulted to determine if there are any committed developments which should be considered as part of this TA. In Scenario One, Merge / Diverge assessments will be undertaken at the proposed new Leeming Junction (in line with DMRB TD22/06 Layout of Grade Separated Junctions) to assess the impact of the development on the SRN. An assessment will be undertaken at each of the two roundabouts used to access and egress the A1(M), an assessment will be undertaken at the roundabout junction with Leases Road. The assessments will evaluate the morning and evening peak periods before and after the proposed development in the assessment years. In Scenario Two; Merge / Diverge assessments will be undertaken at the proposed new Leeming Junction (in line with DMRB TD22/06 Layout of Grade Separated Junctions) to assess the impact of the development on the SRN. An assessment will be undertaken at each of the two roundabouts used to access and egress the A1(M) which form part of the BALB, a further assessment will be undertaken at the roundabout junction with Leases Road. The assessments will evaluate the morning and evening peak periods in the assessment years. If required as a result of the operational assessments, highway schemes could be drawn up to mitigate the impact of the development traffic. Any improvements would be designed in accordance with DMRB or other standards approved by the Highways Agency and NYCC, as appropriate. Sustainable Modes of Transport In accordance with GTA, the TA will describe measures to promote sustainable modes of transport for members of staff to travel to the development. A Travel Plan Document will be produced as referred to above. The TA will address issues relating to Public Rights of Way (PROW) and matters relating to Non Motorised Users (NMU). Safety Review The TA will examine the benefits of the proposed development at this location in terms of reducing HGV driver fatigue and therefore improving safety for road users on both the local road network and SRN. Summary This document sets out the proposed scope of the Transport Assessment in support of a proposed Exelby Services at Coneygarth. This development would allow the relocation of the site from its existing site at Londonderry.

Page: 4 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc

Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com

St Christopher House George Cayley Drive York YO30 4XE

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

1.5m wide footway Proposed footway to tie into Hansom Architects proposed layout. Dwg No. D101F

Roundabout designed by D2B

1.5m wide footway

1.5m wide footway

Key Hansom Architects Layout: D2B Design: Proposed Footway:

Proposed footway ties back into existing Industrial Estate footway

Client:

Title:

Exelby Services Ltd


Project:

Design: Checked: Approved:


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

MIT CC JP

CAD: Date: Scale:

MIT October 2010 1:500 @ A3 Rev:

Proposed Truck Stop, Coneygarth

Potential Footway Provision Between the Proposed Site and the Existing Footway Network

Drawing No.

60162014-P-001

A3

F:\PROJECTS\ [ AutoCAD Location ]

cm

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

NOTES

2.0m tall Security Fence

13 Spaces

13 Spaces

8 Spaces

2.0m tall Security Fence

Patio Yard / Bins

CAFE

STAFF PARKING (10 Spaces)

LORRY PARK (108 Spaces)


21 Spaces

Security Barriers

Yard / Bins

Truck Wash Waiting Area

FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON CAR PARKING (10 Spaces)

DIESEL
Truck Wash

TANK FARM

LGV FUEL DISPENSING APRON

2.5m tall Acoustic Screen

Rev

Date

Detail

Made

Chk'd

App'd

Client:

Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass

4 Spaces Short Vehicles

EXELBY SERVICES LTD

Project:

2.0m tall Security Fence 17 Spaces

2.5m tall Acoustic Screen


Title:

PROPOSED TRUCK STOP CONEYGARTH

2.5m tall Acoustic Screen

2.5m tall Acoustic Screen

Existing Barns to be demolished

PROPOSED INTERNAL SIGNING AND LINING


Existing Farm Buildings to be Retained EXIST. HOUSE
Design: Checked: Approved: MIT CC JP CAD: Date: Scale: MIT OCTOBER 2010 1:500 @ A1

Low Level Sign

2.4m x 215m Visibility Splay

2.4m x 215m Visibility Splay

St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE

Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com Rev:

Drawing No.

60162014-P-003
F:\PROJECTS\ [ AutoCAD Location ]

A1

cm

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
Deliveries

Out

Deliveries Pedestrian Crossing Exit Apron

LORRY PARK (108 Spaces)


21 Spaces

Security Barriers In

Yard / Bins

Truck Wash Waiting Area

FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON Bypass Lane CAR PARKING (10 Spaces)

DIESEL
LGV FUEL DISPENSING APRON

TANK FARM
Tankers (2 Spaces)

Waiting Apron 4 Spaces Short Vehicles

Waiting Apron

Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass

Pedestrian Crossing
in tand ad S a l Lo norm

Ai

r/

W at er

Bypass Lane

y g Ba

2.0m tall Security Fence 17 Spaces

2.5m tall Acoustic Screen

Ab

2.5m tall Acoustic Screen

2.5m tall Acoustic Screen

Existing Farm Buildings to be Retained EXIST. HOUSE

Low Level Sign

2.4m x 215m Visibility Splay

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Checked:

MIT JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Swept Path of 16.5m Max Legal Articulated Vehicle Entering and Leaving Site using Leases Rd Roundabout

St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE

Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

Drawing No.

ATR 01

A3

cm

Client:

Project:

Title:

Design:

CC

CAD:

CC

Tanker

PETROL / DIESEL

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
concrete finish

2.0m tall Security Fence

Patio Yard / Bins

2 Spaces Wide Loads

CAFE

STAFF PARKING (10 Spaces)

Deliveries

Out

Deliveries Pedestrian Crossing Exit Apron

LORRY PARK (108 Spaces)


21 Spaces

Security Barriers In

Yard / Bins

Truck Wash Waiting Area

FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON Bypass Lane CAR PARKING (10 Spaces)

DIESEL
Truck Wash LGV FUEL DISPENSING APRON 2.5m tall Acoustic Screen

TANK FARM
Tankers (2 Spaces)

Waiting Apron 4 Spaces Short Vehicles

Waiting Apron

Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass

Pedestrian Crossing
in tand dS l Loa rma bno

Ai

r/

W at er

Bypass Lane

y g Ba

2.0m tall Security Fence 17 Spaces

2.5m tall Acoustic Screen

Tanker

PETROL / DIESEL

2.5m tall Acoustic Screen

2.5m tall Acoustic Screen

Existing Barns to be demolished

Existing Farm Buildings to be Retained EXIST. HOUSE

Low Level Sign

2.4m x 215m Visibility Splay

2.4m x 215m Visibility Splay

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Swept Path of Abnormal Load Entering Site and Parking at the Abnormal Load Parking Space Vehicle Length 27.5 m Width 2.5m

Checked: St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

MIT JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Drawing No.

ATR03

A3

cm

Client:

Project:

Title:

Design:

CC

CAD:

CC

by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
concrete finish

2.0m tall Security Fence

Patio Yard / Bins

2 Spaces Wide Loads

CAFE

STAFF PARKING (10 Spaces)

Deliveries

Out

Deliveries Pedestrian Crossing Exit Apron

LORRY PARK (108 Spaces)


21 Spaces

Security Barriers In

Yard / Bins

Truck Wash Waiting Area

FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON Bypass Lane CAR PARKING (10 Spaces)

DIESEL
Truck Wash LGV FUEL DISPENSING APRON 2.5m tall Acoustic Screen

TANK FARM
Tankers (2 Spaces)

Waiting Apron 4 Spaces Short Vehicles

Waiting Apron

Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass

Pedestrian Crossing
in tand dS l Loa rma bno

Ai

r/

W at er

Bypass Lane

y g Ba

2.0m tall Security Fence 17 Spaces

2.5m tall Acoustic Screen

Tanker

PETROL / DIESEL

2.5m tall Acoustic Screen

2.5m tall Acoustic Screen

Existing Barns to be demolished

Existing Farm Buildings to be Retained EXIST. HOUSE

Low Level Sign

2.4m x 215m Visibility Splay

2.4m x 215m Visibility Splay

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Swept Path of Abnormal Load Leaving Abnormal Parking Space and Site Vehicle Length 27.5 m Width 2.5m

Checked: St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

MIT JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Drawing No.

ATR 04

A3

cm

Client:

Project:

Title:

Design:

CC

CAD:

CC

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

IN

DI

CA

T IV

52

.4m

Client:

Title:

Exelby Services Ltd


Project:

Design: Checked: Approved:


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

MIT CC JP

CAD: Date: Scale:

MIT October 2010 1:500 @ A3 Rev:

Proposed Truck Stop Coneygarth

Swept Path 16.5m Max Artic Vehicle BALB Scheme Roundabout

Drawing No.

ATR 05

A3

F:\PROJECTS\ [ AutoCAD Location ]

cm

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

IN

DI

CA

T IV

52

.4m

Client:

Title:

Exelby Services Ltd


Project:

Design: Checked: Approved:


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

MIT CC JP

CAD: Date: Scale:

MIT October 2010 1:500 @ A3 Rev:

Proposed Truck Stop Coneygarth

Swept Path Abnormal Load Vehicle BALB Scheme Roundabout Vehicle Length 27.5m Width 2.5m

Drawing No.

ATR 06

A3

F:\PROJECTS\ [ AutoCAD Location ]

cm

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

IN

DI

CA

T IV

52

.4m

Client:

Title:

Exelby Services Ltd


Project:

Design: Checked: Approved:


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com

MIT CC JP

CAD: Date: Scale:

MIT October 2010 1:500 @ A3 Rev:

Proposed Truck Stop Coneygarth

Swept Path Abnormal Load Vehicle BALB Scheme Roundabout Vehicle Length 27.5m Width 2.5m

Drawing No.

ATR 07

A3

F:\PROJECTS\ [ AutoCAD Location ]

cm

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

INDICATIVE

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Checked:

CC JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Abnormal Vehicle Swept Path Northbound Arrival to Site Vehicle Length 27.5m, Width 2.5m

St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE

Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

Drawing No.

ATR 09

A3

cm

Client:

Project:

Title:

Design:

MIT

CAD:

MIT

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

INDICATIVE

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Checked:

CC JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Abnormal Vehicle Swept Path Northbound Depature from Site Vehicle Length 27.5m, Width 2.5m

St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE

Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

Drawing No.

ATR 09

A3

cm

Client:

Project:

Title:

Design:

MIT

CAD:

MIT

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

INDICATIVE

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Checked:

CC JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Abnormal Vehicle Swept Path Southbound Arrival to Site Vehicle Length 27.5m, Width 2.5m

St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE

Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

Drawing No.

ATR 10

A3

cm

Client:

Project:

Title:

Design:

MIT

CAD:

MIT

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

INDICATIVE

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Checked:

CC JP

Date: Scale:

October 2010 1:1000 @ A3 Rev:

Abnormal Vehicle Swept Path Southbound Departure from Site Vehicle Length 27.5m, Width 2.5m

St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE

Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]

Drawing No.

ATR 11

A3

cm

Client:

Project:

Title:

Design:

MIT

CAD:

MIT

Londonderry Vehicle Flows 31/03/2009 Southbound on A1(M) Northbound on A1(M) Car/LGV HGV Car/LGV HGV 5 4 5 11 5 9 4 18 12 15 17 22 10 11 15 16 2 9 19 17 4 12 13 13 30 17 26 15 18 13 16 16 20 16 24 18 14 29 30 19 9 32 17 23 9 23 23 26 3 8 9 16 3 6 5 10 8 6 6 18 1 1 7 8 0 2 2 1 4 1 1 1 0 2 0 3 0 3 0 1 0 2 0 5 1 0 0 3 0 2 0 7 0 6 1 7 158 229 240 294

06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00 01:00 02:00 03:00 04:00 05:00 Total

M6 Site DATE
15-16/09/2009 10PM-6AM 6AM-2PM 2PM-10PM 157 241 252 650 23 100 69 192 15 43 52 110 0 0 7 7

DERV BP DERV ULG

ULTIMATE

TOTAL TRANS
16-17/09/09 10PM-6AM 6AM-2PM 2PM-10PM

203 252 245


700

20 97 88
205

11 51 44
106

1 2 4
7

TOTAL TRANS

Cuckson, Christopher
From: Sent: To: Cc: Subject: Attachments: Categories: Emma Anforth [Emma.Anforth@jmp.co.uk] 24 September 2010 08:35 Allan Short; Phillip, Jon M. peter.henson@fairhurst.co.uk; Cuckson, Christopher; Jones, Simon; Paul Cawthorne; Pam Johnson; richard.jones3@jacobs.com Leeming junction geometry Geometry for BALB junctions from NYCC ARCADYs.docx Red Category

Geometry for BALB junctions to be used for purpose of MSA inquiry Table 1 Geometry for Western A1(M) Dumbbell Roundabout Measuremen t Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees) Dumbbell link 7.3 A1(M) northbound off-slip 3.7 Local access road (south) 3.65 BALB west Local access road (north) 3.35

7.3

6.75

15.10 20 80

45.90 20 80

38 20 80

16.7 20 80

27.60 20 80

30

28

30

48

23

Table 2 Geometry for Eastern A1(M) Dumbbell Roundabout Measurement A1(M) southbound offslip 3.7 6.5 45 20 58 28 BALB east Leases Road (for non BALB scenario) 3.65 6.9 13.2 20 58 34 Dumbbell link

Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees)

7.3 8 13 30 58 26

3.65 5.7 15.3 20 58 36

Cuckson, Christopher
Subject: Attachments: FW: Geometry for new Leeming junction - URGENT D2B-4-J-01-300-XR-001-C3 - 4 LEEMING EAST bind3.dwg; D2B-4-J-01-300-XR-002-C2 - 4 LEEMING WEST bind2.dwg; Geometry for Leeming GSJ Oct 2010.doc; New Leeming Junction with BALB for MSA Inquiry.pdf

-----Original Message----From: Emma Anforth [mailto:Emma.Anforth@jmp.co.uk] Sent: 14 October 2010 17:25 To: Phillip, Jon M.; Allan Short Cc: Jones, Simon; Pam Johnson; Jones, Richard (Northallerton); Paul Cawthorne Subject: Geometry for new Leeming junction Jon, Allan, Further to earlier comments about the previous measurements / drawing for the Leeming junction, please find attached CAD drawings and a pdf of the junction with the BALB scheme included. The measurements in the attached table have been confirmed by both designers of the scheme as being the correct measurements to accompany the drawings and hence these should be used for your junction assessments. Regards, Emma Anforth Senior Transport Planner JMP Consultants Ltd, Minerva House, East Parade, Leeds LS1 5PS [D] [T] [F] [W] 0113 2045761 0113 244 4347 0113 242 3753 http://www.jmp.co.uk

Please consider the environment before printing this email. ********************************************************************** JMP Consultants Ltd Registered office: Mercantile Chambers, 53 Bothwell Street, Glasgow, G2 6TS Registration number: SC88006 This e-mail, and any files transmitted with it, may contain confidential information and is intended only for the individual named. If you are not the named addressee you sh ould not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. If you are not the intended recipient you are notified that disclosing copying, , distributing or taking any action in reliance on the contents of this information is strictly prohibited. Warning: Although the company has taken reasonable precautions to ensure no viruses are present in this e-mail, the company cannot accept responsibility for any loss or damage arising from the use of this e-mail or attachments. You are invited to read our full email disclaimer transcript at: http://www.jmp.co.uk/email.htm ********************************************************************* *

Geometry for BALB junctions

Geometry for Western A1(M) Dumbbell Roundabout (Drawing C2 Revision)

Measurement

Dumbbell link 7.0 8.0 20.3 20 80 35.4

A1(M) Local northbound Access Road off-slip (south) 3.7 8.0 47.8 20 80 26.9 4.65 6.0 27.6 20 80 20.6

BALB west

Local Access Road (north) 3.5 4.5 29.1 20 80 17.4

Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees)

7.3 8.0 16.7 20 80 48

Geometry for Eastern A1(M) Dumbbell Roundabout ( Drawing C3 Revision)

Measurement

A1(M) southbound offslip 3.7 6.5 20.4 25 58 24.7

Leases Link (no BALB) 4.65 6.7 15.9 20 58 29.3

BALB east

Dumbbell link

Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees)

7.3 8.0 13.0 30 58 26

3.5 6.0 9.1 35 58 17.6

Cuckson, Christopher
From: Sent: To: Cc: Subject: Attachments: Peter Henson [peter.henson@fairhurst.co.uk] 09 September 2010 14:20 Phillip, Jon M. Allan Short; Paul Cawthorne; Simon Jones; Pam Johnson RE: 79567 Motel Leeming & Exelby Services Leeming Development Flows.pdf

Jon, As discussed with Allan Short please find the development traffic flows for Leeming Bar MSA application attached. I look forward to receiving the Exelby data. Regards Peter Peter Andrew Henson Transport Planning Consultant W A Fairhurst & Partners 1 Arngrove Court, Barrack Road, Newcastle upon Tyne, NE4 6DB. Tel: 0191 2210505 Fax: 0191 2210949 Email: peter.henson@fairhurst.co.uk Website: http://www.fairhurst.co.uk -----Original Message----From: Allan Short Sent: 08 September 2010 12:32 To: Peter Henson Subject: 79567 Motel Leeming & Exelby Services

Kind Regards, Allan Short Technical Director - Transportation W A Fairhurst & Partners 1 Arngrove Court, Barrack Road, Newcastle upon Tyne, NE4 6DB Tel: 0191 221 0505 Mob: 07776 202 880 Email: allan.short@fairhurst.co.uk Website: http://www.fairhurst.co.uk

Fax:

0191 221 0949

-----Original Message----From: Paul Cawthorne [mailto:Paul.Cawthorne@jmp.co.uk] Sent: 01 September 2010 09:30


1

To: Allan Short; Phillip, Jon M. Cc: Jones, Simon; Emma Anforth; 'Pam Johnson' Subject: Motel Leeming & Exelby Services Allan, Jon Following the meetings with Simon and Pam the week before last, it would seem appropriate if the two of you exchanged your respective trip generation figures direct (with copy to JMP, Simon and Pam) rather than JMP being the go -between. Regards, Paul Cawthorne Consultant JMP Consultants Ltd, Minerva House, East Parade, Leeds LS1 5PS [D] [T] [M] [F] [W] 0113 2045774 0113 244 4347 07753 583074 0113 242 3753 http://www.jmp.co.uk

Please consider the environment before printing this email. ********************************************************************** JMP Consultants Ltd Registered office: Mercantile Chambers, 53 Bothwel Street, Glasgow, G2 6TS l Registration number: SC88006 This e-mail, and any files transmitted with it, may contain confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this in formation is strictly prohibited. Warning: Although the company has taken reasonable precautions to ensure no viruses are present in this e-mail, the company cannot accept responsibility for any loss or damage arising from the use of this e-mail or attachments. You are invited to read our full email disclaimer transcript at: http://www.jmp.co.uk/email.htm ********************************************************************** -------------------------------------------------------------------------This email message and accompanying data are for the sole use of the intended recipient(s) and may contain confidential information and/or copyright material. Unauthorised use, copying or disclosure of any of it is prohibited and may be unlawful. If you receiv this email ed message in error, please notify us immediately and erase all copies of this message and attachments. W A Fairhurst and Partners scans and monitors incoming and outgoing mail in accordance with its Email Policy. This email has been scanned for viruses but W A Fairhurst and Partners accept no liability for any virus which may be attached. A full list of partners is available for inspection at any of the firm's offices. ------------------------------------------------------------------------2

"This document has been prepared by Faber Maunsell Limited ("FM") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between FM and the Clie Any information provided by third parties and referred to herein has not been checked or verified by FM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of FM"

Pond waterlo

shallow pond waterlo gged

gged area

waterlo gged area waterlo gged area waterlo gged area waterlo gged area

area waterlo gged area 11KV issues issues overhea d line

Client:

Originator: FABER MAUNSELL 129 Victoria Road Darlington DL1 5JJ Tel: +44 (0) 1325 282 371 Fax: +44 (0) 1325 283 272 www.fabermaunsell.com Project:

Lead Consultant: FABER MAUNSELL

d2b

NOTES

Title:

PRELIMINARY
(SEE NOTES) Crown Copyright. Reproduced, on behalf of the Highways Agency, from the Ordnance Survey Map with the permission of H.M.S.O. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence No 100018928 REV. DATE AMENDMENT DETAILS ORIG CHK'D ENG CAT II APP'D

PROPOSED ROUTE GENERAL ARRANGEMENT SHEET 14 OF 27 CH 19700 TO 21350


Drawn: CRH Date: 19/03/08 Drawing No. Checked: AB Date: 05/02/09 Approved: CDLW Date: 05/02/09 Scale:

1:2500
Original drawing size:

841 x 594 - A1
Rev:

D2B-0-W-01-000-DR-014
F:\PROJECTS\Development - MSA Inquiry 2010-11\Acad\Supplied Data\AECOM Newcastle\D2B-0-W-01-000-DR-014-P6.dwg

P6
[ AutoCAD Location ]

"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"

29
3.65m

Radius = 14.87m e = 4.63m

l' Effective Flare = 11.948m


36

15

. 0m

4. 58 m

R 14

.90m

3 .3 8m

l' Effective Flare = 13.885m

4 .6 2m
38

4 .6 2m

3 .6 5m

l' Effective Flare = 14.80m

3 .6 3m

Effective Flare 23.023m

Effective Flare 23.023m

6.06m 35

R2 0. 00 m

00 m

3 .6

5.

5m

Effective Flare 13.38m


4. 58 m

22

15 4.0m
6. 70 m

R2

R3 0m 5 .0

40
m 4 0. 00

7.00m 38 8.00m
m

R2
9 .9

0.0

0m

28

Effective Flare 15.568m


R2 0. m 00

Effective Flare 19.976m 34 6.0m 8.19m


0m 0 .0 R2

38

Effective Flare 25.97m Effective Flare 47.09m

3.65m

R 17

.98m

3.70m

Client:

Project:

Title:

Design:

CC MIT JP

CAD: Date: Scale:

CC October 2010 1:1000 @ A2 Rev:

Exelby Services Ltd

Proposed Truck Stop Coneygarth

Arcady Measurements taken from D2B Design


St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com F:\PROJECTS\ [ AutoCAD Location ]

Checked: Approved: Drawing No.

60162014-P-002

A2

cm

Drawing number / Rev

B1055900/EGHI/4744
KEY Advance Direction Traffic Sign Large Advance Direction Traffic Sign 6m Road lighting column with flat glass lantern incorporating a 50W SON-T lamp 10m Road lighting column with flat glass lantern incorporating a 150W SON-T lamp 12m Road lighting column with flat glass lantern incorporating a 150W SON-T lamp White Lining 1 LUX Lighting Contour Note: 1) Standard signing (warning, regulatory etc) not shown. 2) New/Replacement signing for HA not shown. 3) Signing and Road Lighting where no Vehicle Restraint System shall be passively safe.

Rev

Rev. Date

Purpose of revision

Drawn

Checked Approved

The land survey shown on this plan has been produced from a composite of Ordnance Survey / Topographical survey information

Client

Project

A684 BEDALE, AISKEW & LEEMING BAR BYPASS


Drawing title

IN

Drawing status

FO RM

ROAD LIGHTING, TRAFFIC SIGN & ROAD MARKING LAYOUT CHAINAGE 2600-3350 SHEET 5 OF 7
FOR INFORMATION ONLY
DO NOT SCALE
Scale Jacobs No. Client no.

FO

Drawing number

1:1250 @ A1 B1055900

AT IO N

B1055900/EGHI/4744

This drawing is based on the Master Base Set M06

This drawing is not to be used in whole or part other than for the intended purpose and project as defined on this drawing. Refer to the contract for full terms and conditions.