"Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
Client:
Title:
Design:
MIT CC
CAD: Date:
Figure 1
[ AutoCAD Location ]
A4
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
Client:
Title:
Design: Checked:
TJ CC
CAD: Date:
TJ October 2010
Figure 2
[ AutoCAD Location ]
A4
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
LRN
LRN
Comparsion of Routes : New Baldersby Junction to Londonderry Services Londonderry Services to New Leeming Junction New Leeming Junction to Coneygarth Services Coneygarth Services to New Leeming Junction 13.3Km 4.3Km 0.7Km 0.8Km A1
Client:
Title:
Design: Checked:
MIT CC
CAD: Date:
Figure 3
A4
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
Design: Checked:
MIT CC
CAD: Date:
Figure 4
[ AutoCAD Location ]
A4
A1 Northbound
A1 Southbound
606 777
1675 1246
1563 1368
575 446
PMA
321 273
254 173
0 0
0 0
156 0
156 86
0 410
0 329
BALB BALB
374 150 242 340
374 273
242 321
524 582
0 0
403 364
86 0
LAR
155 112 156 156
A1 Northbound Diverge
311 268
1246 1675
1368 1563
236 340
Oct-10 CC JP SP
Figure 5
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
52 24
392 538
264 382
33 57
PMA
15 43
18 14
0 0
0 0
18 12
32 3
0 35
0 46
BALB BALB
8 14 11 23 6 15
6 48
33 21
0 0
18 44
6 12
LAR
16 3 30 18
A1 Northbound Diverge
45 21
538 392
382 264
25 27
Oct-10 CC JP SP
Figure 6
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
658 801
2067 1784
1827 1750
608 503
PMA
336 316
272 187
0 0
0 0
174 12
188 89
0 445
0 375
BALB BALB
385 173 248 355
380 321
250 335
557 603
0 0
421 408
92 12
LAR
171 115 186 174
A1 Northbound Diverge
356 289
1784 2067
1750 1827
261 367
Oct-10 CC JP SP
Figure 7
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
50 86
74 57
PMA
74 57
68
53
57
74
86 50
53 68
LAR 81 56
A1 Northbound Diverge
81 56
53 68
NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the New Leeming Junction (NLJ) in 2012 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00
Oct-10 CC JP SP
Figure 8
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
4 6
4 3
PMA
4 3
6 4
3 3
LAR 4 2
A1 Northbound Diverge
4 2
3 3
NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2012 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00
Oct-10 CC JP SP
Figure 9
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
54 92
78 60
PMA
78 60
71
56
60
78
92 54
56 71
LAR
85 58
A1 Northbound Diverge
85 58
56 71
NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2012 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00
Oct-10 CC JP SP
Figure 10
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
23 17
9 12
PMA
9 12
12
17 23
LAR
A1 Northbound
A1 Southbound
2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound
Oct-10 CC JP SP
Figure 11
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
26 22
23 15
PMA
23 15
15
23
22 26
LAR
A1 Northbound
A1 Southbound
2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound
Oct-10 CC JP SP
Figure 12
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
49 39
32 27
PMA
32 27
0 27
0 32
39 49
LAR
A1 Northbound
A1 Southbound
2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound
Each cell within this figure is the sum from the following figures: Existing Londonderry Truck Stop LGV Flows Existing Londonderry Truck Stop Flows
Oct-10 CC JP SP
Figure 13
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
58% 58%
42% 42%
PMA
42% 42%
100% 100%
58%
58%
100%
100%
58%
58%
58% 42%
58% 42%
LAR
58% 58%
A1 Northbound Diverge
58% 58%
42% 42%
Oct-10 CC JP SP
Figure 14
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
44 28
32 21 32 21
PMA
75 49
44
28
75
49
28
44
28 21
44 32
LAR 28 44
A1 Northbound Diverge
28 44
21 32
Arrival 49
AM Departure 49
Arrival 75
PM Departure 75 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP
Client:
Figure 15
Approved
3 F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
45 35
33 25
PMA
33 25
78 60
45
35
78
60
35
45
35 25
45 33
LAR
35 45
A1 Northbound Diverge
35 45
25 33
Arrival 60
AM Departure 60
Arrival 78
PM Departure 78 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP
Client:
Figure 16
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
89 63
64 46
PMA
64 46
153 109
89
63
153
109
63
89
63 46
89 64
LAR
63 89
A1 Northbound Diverge
63 89
46 64
Arrival 60
AM Departure Arrival 60 78
Client:
Project:
Title:
Drawing Number:
Revision:
Figure 17
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
134 62
78 48
PMA
78 48
78
48
48
78
62 134
48 78
LAR
62 134
A1 Northbound Diverge
62 134
48 78
Oct-10 CC JP SP
Figure 18
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
31 27
13 13
PMA
13 13
13
13
13
13
27 31
13 13
LAR
27 31
A1 Northbound Diverge
27 13
13 13
Oct-10 CC JP SP
Figure 19
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
165 89
91 61
PMA
91 61
91
61
61
91
89 165
61 91
LAR
89 165
A1 Northbound Diverge
89 147
61 91
Oct-10 CC JP SP
Figure 20
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
809 822
2067 1784
1827 1750
653 523
PMA
317 290
336 233
153 109
0 0
263 91
251 94
153 445
109 375
BALB BALB
448 219 337 419
443 295
250 405
557 603
0 0
379 470
97 91
LAR
175 222 249 263
A1 Northbound Diverge
423 467
1784 2067
1750 1827
312 451
Oct-10 CC JP SP
2012 Total Vehicle Base + Dev + MSA Flows without BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)
Figure 21
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
697 869
1915 1443
1850 1578
683 525
PMA
394 331
289 194
163 0
171 106
452
365
BALB BALB
274 425 404 161 305 386
397 339
565 691
472 423
106 0
LAR
178 130 171 163
A1 Northbound Diverge
349 293
1443 1915
1578 1850
267 386
OCT - 2010 CC JP SP
Figure 22
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
66 32
376 518
240 368
43 72
PMA
41 54
2 18
25 15
49 4
27
67
BALB BALB
10 43 15 29 12 19
7 62
44 31
25 56
13 15
LAR
19 4 40 25
A1 Northbound Diverge
59 29
518 376
368 240
33 34
OCT - 2010 CC JP SP
Figure 23
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
763 901
2291 1961
2090 1946
726 597
PMA
435 385
291 212
0 0
0 0
188 15
220 110
0 479
0 432
BALB BALB
419 190 317 405
404 401
284 468
609 722
0 0
497 479
119 15
LAR
197 134 211 188
A1 Northbound Diverge
408 322
1961 2291
1946 2090
300 420
OCT - 2010 CC JP SP
Figure 24
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
153 72
93 55
PMA
93 55
93
55
55
93
72 153
55 93
LAR
72 153
A1 Northbound Diverge
72 153
55 93
OCT - 2010 CC JP SP
Figure 25
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
30 26
12 13
PMA
12 13
12
13
13
12
26 30
13 12
LAR
23 30
A1 Northbound Diverge
26 30
13 12
OCT - 2010 CC JP SP
Figure 26
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
183 98
105 68
PMA
105 68
105
68
68
105
98 183
68 105
LAR
95 183
A1 Northbound Diverge
98 183
68 105
OCT - 2010 CC JP SP
Figure 27
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
932 931
2291 1961
2090 1946
785 624
PMA
430 366
355 258
153 109
0 0
277 105
283 122
153 479
109 432
BALB BALB
482 236 406 469
467 382
284 552
609 722
0 0
464 559
131 105
LAR
207 259 274 277
A1 Northbound Diverge
484 536
1961 2291
1946 2090
358 518
OCT - 2010 CC JP SP
2022 Total Vehicle Base + Dev + MSA Flows without BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)
Figure 28
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
629 801
1691 1251
1578 1383
601 469
PMA
342 291
259 178
0 0
0 0
448 85
817 88
0 348 359
0 623 372
BALB BALB
380 292 172 207 455 176 553 151 496 288 0 582 27 0 595 15
122 189
0 0
15 27
47 101
234 331
104 45
LAR
97 76 60 44 158 158
A1 Northbound Diverge
315 278
1261 1691
1383 1587
239 373
Oct-10 CC JP SP
Figure 29
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
53 24
398 546
272 338
33 57
PMA
15 43
18 14
0 0 5 13 0 7 15 0
0 0
0 0
20 12
43 3
0 19 20
0 49 8
BALB BALB
6 24 26 8 12 11 15 23 15 15 0 33 0 0 27 2
5 3
0 0
0 0
1 0
11 40
1 1
LAR
1 1 15 2 31 18
A1 Northbound Diverge
47 21
546 398
338 272
26 27
Oct-10 CC JP SP
Figure 30
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
682 825
2089 1797
1850 1721
634 526
PMA
357 334
277 192
0 0
0 0
468 97
860 91
0 367 379
0 672 380
BALB BALB
386 316 198 215 467 187 568 174 511 303 0 615 27 0 622 17
127 192
0 0
15 27
48 101
245 371
105 46
LAR
98 77 75 46 189 176
A1 Northbound Diverge
362 299
1807 2089
1721 1859
265 400
Oct-10 CC JP SP
Figure 31
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
50 86
74 57
PMA
74 57
68
53
57
74
86 50
53 68
LAR 81 56
A1 Northbound Diverge
81 56
53 68
NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the New Leeming Junction (NLJ) in 2014 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00
Oct-10 CC JP SP
Figure 32
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
4 6
4 3
PMA
4 3
6 4
3 3
LAR 4 2
A1 Northbound Diverge
4 2
3 3
NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2014 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00
Oct-10 CC JP SP
Figure 33
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
54 92
78 60
PMA
78 60
71
56
60
78
92 54
56 71
LAR
85 58
A1 Northbound Diverge
85 58
56 71
NOTES 1: Flows taken from D2B June 2008 Survey at the existing Leeming Junction 2: All traffic is assumed to use the NLJ in 2014 3: All traffic using Leeming Services to be to/from SRN 4: Peak hours surveyed are AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00
Oct-10 CC JP SP
Figure 34
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
23 17
9 12
PMA
9 12
12
17 23
LAR
A1 Northbound
A1 Southbound
2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound
Oct-10 CC JP SP
Figure 35
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
26 22
23 15
PMA
23 15
15
23
22 26
LAR
A1 Northbound
A1 Southbound
2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound
Oct-10 CC JP SP
Figure 36
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
49 39
32 27
PMA
32 27
0 27
0 32
39 49
LAR
A1 Northbound
A1 Southbound
2: Dishforth to Barton Model indicates that Northbound departures and Southbound arrivals would use the New Leeming Junction. 3: Dishforth to Barton Model indicates that Southbound departures and Northbound arrivals would use the New Baldersby Junction. 3: All traffic using Londonderry Services to be from SRN 4: Peak hours surveyed are: AM Peak 08:00 - 09:00 and PM Peak 17:00- 18:00 5: It has been assumed that all vehicles would arrive and depart within the same hour 6: Vehicles surveyed on the Northern Approach are vehicles travelling southbound 7: Vehicles surveyed on the Southern Approach are vehicles travelling Northbound
Each cell within this figure is the sum from the following figures: Existing Londonderry Truck Stop LGV Flows Existing Londonderry Truck Stop Flows
Oct-10 CC JP SP
Figure 37
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
58% 58%
42% 42%
PMA
42% 42%
100% 100%
100%
58%
58%
58% 42%
58% 42%
LAR
58% 58%
A1 Northbound Diverge
58% 58%
42% 42%
Oct-10 CC JP SP
Figure 38
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
44 28
32 21 32 21
PMA
75 49 75 44 28 49
28
44
28 21
44 32
LAR 28 44
A1 Northbound Diverge
28 44
21 32
Arrival 49
AM Departure 49
Arrival 75
PM Departure 75 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP
Client:
Figure 39
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
45 35
33 25
PMA
33 25
78 60
78 45 35
60
35
45
35 25
45 33
LAR
35 45
A1 Northbound Diverge
35 45
25 33
Arrival 60
AM Departure 60
Arrival 78
PM Departure 78 Key AM Peak PM Peak Project: Title: Drawing Number: Revision: Date Design Checked Oct-10 CC JP SP
Client:
Figure 40
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
89 63
64 46
PMA
64 46
153 109
153 89 63
109
63
89
63 46
89 64
LAR
63 89
A1 Northbound Diverge
63 89
46 64
Arrival 60
AM Departure Arrival 60 78
Client:
Project:
Title:
Drawing Number:
Revision:
Figure 41
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
135 63
79 48
PMA
79 48
79
48
48
79
63 135
48 79
LAR
63 135
A1 Northbound Diverge
63 135
48 79
Oct-10 CC JP SP
Figure 42
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
32 27
14 14
PMA
14 14
14
14
14
14
27 32
14 14
LAR
27 32
A1 Northbound Diverge
27 32
14 14
Oct-10 CC JP SP
Figure 43
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
167 90
93 62
PMA
93 62
93
62
62
93
90 167
62 93
LAR
90 167
A1 Northbound Diverge
90 167
62 93
Oct-10 CC JP SP
Figure 44
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
835 847
2089 1797
1850 1721
681 547
PMA
340 309
341 238
0 0
0 0
557 119
923 97
BALB BALB
449 316 173 278 467 170 631 220 600 367 0 615 27 0 622 17
127 192
0 0
15 27
48 101
204 435
111 93
LAR
103 186 75 46 252 265
A1 Northbound Diverge
430 497
1807 2089
1721 1859
317 486
Oct-10 CC JP SP
2014 Total Vehicle Base + Dev + MSA Flows with BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)
Figure 45
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
698 868
1915 1443
1850 1578
683 525
PMA
394 331
289 194
0 0
0 0
504 102
905 106
0 372 421
0 722 377
BALB BALB
396 268 251 231 492 208 584 161 537 325 0 604 30 0 649 17
141 213
0 0
17 30
61 110
271 367
118 50
LAR
114 90 64 55 171 163
A1 Northbound Diverge
349 308
1443 1915
1578 1850
267 427
OCT-2010 CC JP SP
Figure 46
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
65 31
376 518
240 368
43 72
PMA
20 54
23 18
0 0 7 16 1 9 18 0
0 0
0 0
28 15
55 4
0 25 26
0 63 10
BALB BALB
8 30 34 10 12 14 18 29 16 19 0 41 1 0 32 2
6 3
0 0
0 0
1 2
14 48
1 1
LAR
1 2 19 3 40 25
A1 Northbound Diverge
60 30
518 376
368 240
33 34
OCT-2010 CC JP SP
Figure 47
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
763 899
2291 1961
2090 1946
726 597
PMA
414 385
312 212
0 0
0 0
532 117
960 110
0 397 447
0 785 387
BALB BALB
404 298 285 241 504 222 602 190 553 344 0 645 31 0 681 19
147 216
0 0
17 30
62 112
285 415
119 51
LAR
115 92 83 58 211 188
A1 Northbound Diverge
409 338
1961 2291
1946 2090
300 461
OCT-2010 CC JP SP
Figure 48
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
A1 Northbound
A1 Southbound
153 72
93 55
PMA
93 55
93
55
55
93
72 153
55 93
LAR
72 153
A1 Northbound Diverge
72 153
55 93
OCT-2010 CC JP SP
Figure 49
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
30 26
12 13
PMA
12 13
12
13
13
12
26 30
13 12
LAR
26 30
A1 Northbound Diverge
26 30
13 12
OCT-2010 CC JP SP
Figure 50
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
183 98
105 68
PMA
105 68
105
68
68
105
98 183
68 105
LAR
98 183
A1 Northbound Diverge
98 183
68 105
OCT-2010 CC JP SP
Figure 51
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid Without BALB Road Network.xls
A1 Northbound
A1 Southbound
932 929
2291 1961
2090 1946
785 624
PMA
409 366
376 258
0 0
0 0
621 151
1023 122
BALB BALB
467 298 266 304 504 217 665 236 642 408 0 645 31 0 681 19
147 216
0 0
17 30
62 112
252 495
131 105
LAR
128 217 83 58 274 277
A1 Northbound Diverge
485 552
1961 2291
1946 2090
358 559
OCT-2010 CC JP SP
2022 Total Vehicle Base + Dev + MSA Flows with BALB Minus (Ex. Leeming Motel & Londonderry Truck Stop)
Figure 52
Approved
File Path: F:\PROJECTS\Development - MSA Inquiry 2010-11\Excel\ARCADY Road Networks\Hybrid With BALB Road Network.xls
This Technical Note sets out the proposed approach to be adopted in preparing a Transport Assessment (TA) in support of the proposed relocation of Exelby Services from Londonderry Village to Coneygarth, north of Leeming Bar. It is understood that the Highways Agencys Policy Team has confirmed that since Exelby Services require no signed facilities from the Strategic Road Network (SRN) its proposal can be treated as a Development Control Application and considered under Policies set out in Circular 02/2007 and the DfTs Guidance on Transport Assessment (GTA). Bedale and Leeming Bypass North Yorkshire County Council (NYCC) is proposing to construct a Bedale and Leeming Bypass (BALB) which would link to the A1(M) / New Leeming Junction. It is understood that a planning submission for the BALB will be made by NYCC in January 2010 and that construction could begin by 2012, with BALB opening to traffic in 2014. Pre-application Discussions As identified in Chapter 2 of GTA, pre-application discussions are a valuable part of the planning process. Discussions have taken place between the Operator of Exelby Services and their advisor AECOM, NYCC and their advisor Jacobs, and the HA and their advisor JMP Consultants, these discussions will continue throughout the planning process. Early discussions identified the need for this Scoping Document the following paragraphs set out the proposed Scope of the Transport Assessment. Proposals The proposed TA will consider the traffic impact of the proposed development and also illustrate the effects of relocating from the existing site (for example, a comparison in distance travelled to/from the SRN to access the existing and proposed sites, after the completion of the A1 upgrade scheme). It will also compare the impacts whether the Bedale and Leeming bypass (BALB) is implemented or not.
Page: 1 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc
Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com
The TA will include the following: A description of the proposed land uses; Details of proposed floor space; Details of the proposed facilities; Details of HGV and car parking; Details of operating hours; Details of on-site traffic management; and Proposed access and servicing arrangements.
In line with Highways Agency and NYCC policy a Travel Plan document will be developed for the site. The Travel Plan would focus on minimising single occupancy employee car trips to and from the relocated Exelby Services. The Travel Plan will provide details of measures, monitoring and mitigations. Reasons for proposed relocation The TA will set out the key reasons for the proposed relocation of Exelby Services particularly in relation to the ongoing upgrade of the A1 to motorway standard between Dishforth and Barton. The ongoing upgrade of the A1 will result in access to Londonderry village only being possible via a service road running parallel to the new motorway. This will require all vehicles travelling to and from the site to join or leave the motorway at new junctions at Baldersby and Coneygarth with consequential and significant impact on the local environment. These effects will include noise and air pollution (including particulate matter - PM10s) and additional CO2 emissions as a result of the additional fuel burned by HGVs. The additional HGV mileage and higher HGV flows on the service roads would also have a road safety and maintenance implication for NYCC. Existing Conditions As an important element of the proposals is the effect of relocating the services, the details of the existing conditions at Exelby Services will be detailed and will include the same basic information as that provided in the proposals section (see above). Need The TA will set out the Needs Case for Exelby Services in this location and the benefits of relocating the facility. A comparison will be made with other similar facilities serving the Logistics Industry along the A1, A1(M) and A66 strategic routes. Specific contract refuelling and freight services such as Exelbys should not be confused with Motorway Service Areas (MSAs) which offer a range of facilities to the travelling public and are mainly used by motorists and their passengers and must provide specific services. MSAs are usually signed from the SRN. It is anticipated that the proposed facility would not be signed from the SRN. Sequential Test The TA will include a summary of the other sites that have been considered in identifying the Coneygarth site for the proposed development. The advantages and disadvantages of these sites from a transport perspective will be summarised.
Page: 2 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc
Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com
It is understood that the design year traffic flows for the A1(M) and BALB will be provided by the Highways Agency and NYCC. The base traffic network flows for the assessment will be the same as those provided by the Highways Agency and NYCC. If the figures provided are not for the years of assessment required, the traffic flows provided will be growthed up using the DfTs National Traffic Model Forecasts (NTM) rates for the agreed assessment years for the appropriate locations.
Page: 3 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc
Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com
Peak Periods Whilst the proposed development would generate HGV traffic (and some other vehicle types) throughout the day and night, it is proposed that the morning and evening peak hours would be identified based on traffic flow data supplied by the Highways Agency and NYCC. The peak periods will be used for any junction assessments as these would represent the two busiest periods on the road network around the site. Junction Assessments Before the operational assessment of junctions is undertaken, Hambleton District Council will be consulted to determine if there are any committed developments which should be considered as part of this TA. In Scenario One, Merge / Diverge assessments will be undertaken at the proposed new Leeming Junction (in line with DMRB TD22/06 Layout of Grade Separated Junctions) to assess the impact of the development on the SRN. An assessment will be undertaken at each of the two roundabouts used to access and egress the A1(M), an assessment will be undertaken at the roundabout junction with Leases Road. The assessments will evaluate the morning and evening peak periods before and after the proposed development in the assessment years. In Scenario Two; Merge / Diverge assessments will be undertaken at the proposed new Leeming Junction (in line with DMRB TD22/06 Layout of Grade Separated Junctions) to assess the impact of the development on the SRN. An assessment will be undertaken at each of the two roundabouts used to access and egress the A1(M) which form part of the BALB, a further assessment will be undertaken at the roundabout junction with Leases Road. The assessments will evaluate the morning and evening peak periods in the assessment years. If required as a result of the operational assessments, highway schemes could be drawn up to mitigate the impact of the development traffic. Any improvements would be designed in accordance with DMRB or other standards approved by the Highways Agency and NYCC, as appropriate. Sustainable Modes of Transport In accordance with GTA, the TA will describe measures to promote sustainable modes of transport for members of staff to travel to the development. A Travel Plan Document will be produced as referred to above. The TA will address issues relating to Public Rights of Way (PROW) and matters relating to Non Motorised Users (NMU). Safety Review The TA will examine the benefits of the proposed development at this location in terms of reducing HGV driver fatigue and therefore improving safety for road users on both the local road network and SRN. Summary This document sets out the proposed scope of the Transport Assessment in support of a proposed Exelby Services at Coneygarth. This development would allow the relocation of the site from its existing site at Londonderry.
Page: 4 of 4 Doc. F8/10 Revised: April 2009 F:\PROJECTS\Dev Planning - Proposed TRSA, Leeming Bar\Word\Transport Assessment Scope 06 081209.doc
Direct Tel: 01904 694400 T +44 (0)1904 694400 F +44 (0)1904 694499 E jon.phillip@fabermaunsell.com www.fabermaunsell.com
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
1.5m wide footway Proposed footway to tie into Hansom Architects proposed layout. Dwg No. D101F
Client:
Title:
MIT CC JP
Potential Footway Provision Between the Proposed Site and the Existing Footway Network
Drawing No.
60162014-P-001
A3
cm
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
NOTES
13 Spaces
13 Spaces
8 Spaces
CAFE
Security Barriers
Yard / Bins
FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON CAR PARKING (10 Spaces)
DIESEL
Truck Wash
TANK FARM
Rev
Date
Detail
Made
Chk'd
App'd
Client:
Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass
Project:
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE
Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com Rev:
Drawing No.
60162014-P-003
F:\PROJECTS\ [ AutoCAD Location ]
A1
cm
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
Deliveries
Out
Security Barriers In
Yard / Bins
FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON Bypass Lane CAR PARKING (10 Spaces)
DIESEL
LGV FUEL DISPENSING APRON
TANK FARM
Tankers (2 Spaces)
Waiting Apron
Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass
Pedestrian Crossing
in tand ad S a l Lo norm
Ai
r/
W at er
Bypass Lane
y g Ba
Ab
Checked:
MIT JP
Date: Scale:
Swept Path of 16.5m Max Legal Articulated Vehicle Entering and Leaving Site using Leases Rd Roundabout
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE
Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
Drawing No.
ATR 01
A3
cm
Client:
Project:
Title:
Design:
CC
CAD:
CC
Tanker
PETROL / DIESEL
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
concrete finish
CAFE
Deliveries
Out
Security Barriers In
Yard / Bins
FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON Bypass Lane CAR PARKING (10 Spaces)
DIESEL
Truck Wash LGV FUEL DISPENSING APRON 2.5m tall Acoustic Screen
TANK FARM
Tankers (2 Spaces)
Waiting Apron
Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass
Pedestrian Crossing
in tand dS l Loa rma bno
Ai
r/
W at er
Bypass Lane
y g Ba
Tanker
PETROL / DIESEL
Swept Path of Abnormal Load Entering Site and Parking at the Abnormal Load Parking Space Vehicle Length 27.5 m Width 2.5m
Checked: St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
MIT JP
Date: Scale:
Drawing No.
ATR03
A3
cm
Client:
Project:
Title:
Design:
CC
CAD:
CC
by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
concrete finish
CAFE
Deliveries
Out
Security Barriers In
Yard / Bins
FORECOURT SHOP
Patio 15 Spaces 15 Spaces 2.0m tall Security Fence HGV FUEL DISPENSING APRON Bypass Lane CAR PARKING (10 Spaces)
DIESEL
Truck Wash LGV FUEL DISPENSING APRON 2.5m tall Acoustic Screen
TANK FARM
Tankers (2 Spaces)
Waiting Apron
Land Reservation for future Roadworks in Connection with Bedale, Aiskew, Leeming Bar By-Pass
Pedestrian Crossing
in tand dS l Loa rma bno
Ai
r/
W at er
Bypass Lane
y g Ba
Tanker
PETROL / DIESEL
Swept Path of Abnormal Load Leaving Abnormal Parking Space and Site Vehicle Length 27.5 m Width 2.5m
Checked: St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
MIT JP
Date: Scale:
Drawing No.
ATR 04
A3
cm
Client:
Project:
Title:
Design:
CC
CAD:
CC
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
IN
DI
CA
T IV
52
.4m
Client:
Title:
MIT CC JP
Drawing No.
ATR 05
A3
cm
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
IN
DI
CA
T IV
52
.4m
Client:
Title:
MIT CC JP
Swept Path Abnormal Load Vehicle BALB Scheme Roundabout Vehicle Length 27.5m Width 2.5m
Drawing No.
ATR 06
A3
cm
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
IN
DI
CA
T IV
52
.4m
Client:
Title:
MIT CC JP
Swept Path Abnormal Load Vehicle BALB Scheme Roundabout Vehicle Length 27.5m Width 2.5m
Drawing No.
ATR 07
A3
cm
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
INDICATIVE
Checked:
CC JP
Date: Scale:
Abnormal Vehicle Swept Path Northbound Arrival to Site Vehicle Length 27.5m, Width 2.5m
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE
Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
Drawing No.
ATR 09
A3
cm
Client:
Project:
Title:
Design:
MIT
CAD:
MIT
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
INDICATIVE
Checked:
CC JP
Date: Scale:
Abnormal Vehicle Swept Path Northbound Depature from Site Vehicle Length 27.5m, Width 2.5m
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE
Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
Drawing No.
ATR 09
A3
cm
Client:
Project:
Title:
Design:
MIT
CAD:
MIT
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
INDICATIVE
Checked:
CC JP
Date: Scale:
Abnormal Vehicle Swept Path Southbound Arrival to Site Vehicle Length 27.5m, Width 2.5m
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE
Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
Drawing No.
ATR 10
A3
cm
Client:
Project:
Title:
Design:
MIT
CAD:
MIT
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
INDICATIVE
Checked:
CC JP
Date: Scale:
Abnormal Vehicle Swept Path Southbound Departure from Site Vehicle Length 27.5m, Width 2.5m
St. Christopher House, George Cayley Drive, Clifton Moor, YORK, YO30 4XE
Approved: Tel: +44 (0) 1904 694400 Fax: +44 (0) 1904 694499 www.aecom.com
F:\PROJECTS\ [ AutoCAD Location ]
Drawing No.
ATR 11
A3
cm
Client:
Project:
Title:
Design:
MIT
CAD:
MIT
Londonderry Vehicle Flows 31/03/2009 Southbound on A1(M) Northbound on A1(M) Car/LGV HGV Car/LGV HGV 5 4 5 11 5 9 4 18 12 15 17 22 10 11 15 16 2 9 19 17 4 12 13 13 30 17 26 15 18 13 16 16 20 16 24 18 14 29 30 19 9 32 17 23 9 23 23 26 3 8 9 16 3 6 5 10 8 6 6 18 1 1 7 8 0 2 2 1 4 1 1 1 0 2 0 3 0 3 0 1 0 2 0 5 1 0 0 3 0 2 0 7 0 6 1 7 158 229 240 294
06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 00:00 01:00 02:00 03:00 04:00 05:00 Total
M6 Site DATE
15-16/09/2009 10PM-6AM 6AM-2PM 2PM-10PM 157 241 252 650 23 100 69 192 15 43 52 110 0 0 7 7
ULTIMATE
TOTAL TRANS
16-17/09/09 10PM-6AM 6AM-2PM 2PM-10PM
20 97 88
205
11 51 44
106
1 2 4
7
TOTAL TRANS
Cuckson, Christopher
From: Sent: To: Cc: Subject: Attachments: Categories: Emma Anforth [Emma.Anforth@jmp.co.uk] 24 September 2010 08:35 Allan Short; Phillip, Jon M. peter.henson@fairhurst.co.uk; Cuckson, Christopher; Jones, Simon; Paul Cawthorne; Pam Johnson; richard.jones3@jacobs.com Leeming junction geometry Geometry for BALB junctions from NYCC ARCADYs.docx Red Category
Geometry for BALB junctions to be used for purpose of MSA inquiry Table 1 Geometry for Western A1(M) Dumbbell Roundabout Measuremen t Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees) Dumbbell link 7.3 A1(M) northbound off-slip 3.7 Local access road (south) 3.65 BALB west Local access road (north) 3.35
7.3
6.75
15.10 20 80
45.90 20 80
38 20 80
16.7 20 80
27.60 20 80
30
28
30
48
23
Table 2 Geometry for Eastern A1(M) Dumbbell Roundabout Measurement A1(M) southbound offslip 3.7 6.5 45 20 58 28 BALB east Leases Road (for non BALB scenario) 3.65 6.9 13.2 20 58 34 Dumbbell link
Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees)
7.3 8 13 30 58 26
Cuckson, Christopher
Subject: Attachments: FW: Geometry for new Leeming junction - URGENT D2B-4-J-01-300-XR-001-C3 - 4 LEEMING EAST bind3.dwg; D2B-4-J-01-300-XR-002-C2 - 4 LEEMING WEST bind2.dwg; Geometry for Leeming GSJ Oct 2010.doc; New Leeming Junction with BALB for MSA Inquiry.pdf
-----Original Message----From: Emma Anforth [mailto:Emma.Anforth@jmp.co.uk] Sent: 14 October 2010 17:25 To: Phillip, Jon M.; Allan Short Cc: Jones, Simon; Pam Johnson; Jones, Richard (Northallerton); Paul Cawthorne Subject: Geometry for new Leeming junction Jon, Allan, Further to earlier comments about the previous measurements / drawing for the Leeming junction, please find attached CAD drawings and a pdf of the junction with the BALB scheme included. The measurements in the attached table have been confirmed by both designers of the scheme as being the correct measurements to accompany the drawings and hence these should be used for your junction assessments. Regards, Emma Anforth Senior Transport Planner JMP Consultants Ltd, Minerva House, East Parade, Leeds LS1 5PS [D] [T] [F] [W] 0113 2045761 0113 244 4347 0113 242 3753 http://www.jmp.co.uk
Please consider the environment before printing this email. ********************************************************************** JMP Consultants Ltd Registered office: Mercantile Chambers, 53 Bothwell Street, Glasgow, G2 6TS Registration number: SC88006 This e-mail, and any files transmitted with it, may contain confidential information and is intended only for the individual named. If you are not the named addressee you sh ould not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. If you are not the intended recipient you are notified that disclosing copying, , distributing or taking any action in reliance on the contents of this information is strictly prohibited. Warning: Although the company has taken reasonable precautions to ensure no viruses are present in this e-mail, the company cannot accept responsibility for any loss or damage arising from the use of this e-mail or attachments. You are invited to read our full email disclaimer transcript at: http://www.jmp.co.uk/email.htm ********************************************************************* *
Measurement
A1(M) Local northbound Access Road off-slip (south) 3.7 8.0 47.8 20 80 26.9 4.65 6.0 27.6 20 80 20.6
BALB west
Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees)
Measurement
BALB east
Dumbbell link
Approach road half width (m) Entry width (m) Flare length (m) Entry radius (m) Inscribed circle diameter (m) Entry angle (degrees)
Cuckson, Christopher
From: Sent: To: Cc: Subject: Attachments: Peter Henson [peter.henson@fairhurst.co.uk] 09 September 2010 14:20 Phillip, Jon M. Allan Short; Paul Cawthorne; Simon Jones; Pam Johnson RE: 79567 Motel Leeming & Exelby Services Leeming Development Flows.pdf
Jon, As discussed with Allan Short please find the development traffic flows for Leeming Bar MSA application attached. I look forward to receiving the Exelby data. Regards Peter Peter Andrew Henson Transport Planning Consultant W A Fairhurst & Partners 1 Arngrove Court, Barrack Road, Newcastle upon Tyne, NE4 6DB. Tel: 0191 2210505 Fax: 0191 2210949 Email: peter.henson@fairhurst.co.uk Website: http://www.fairhurst.co.uk -----Original Message----From: Allan Short Sent: 08 September 2010 12:32 To: Peter Henson Subject: 79567 Motel Leeming & Exelby Services
Kind Regards, Allan Short Technical Director - Transportation W A Fairhurst & Partners 1 Arngrove Court, Barrack Road, Newcastle upon Tyne, NE4 6DB Tel: 0191 221 0505 Mob: 07776 202 880 Email: allan.short@fairhurst.co.uk Website: http://www.fairhurst.co.uk
Fax:
To: Allan Short; Phillip, Jon M. Cc: Jones, Simon; Emma Anforth; 'Pam Johnson' Subject: Motel Leeming & Exelby Services Allan, Jon Following the meetings with Simon and Pam the week before last, it would seem appropriate if the two of you exchanged your respective trip generation figures direct (with copy to JMP, Simon and Pam) rather than JMP being the go -between. Regards, Paul Cawthorne Consultant JMP Consultants Ltd, Minerva House, East Parade, Leeds LS1 5PS [D] [T] [M] [F] [W] 0113 2045774 0113 244 4347 07753 583074 0113 242 3753 http://www.jmp.co.uk
Please consider the environment before printing this email. ********************************************************************** JMP Consultants Ltd Registered office: Mercantile Chambers, 53 Bothwel Street, Glasgow, G2 6TS l Registration number: SC88006 This e-mail, and any files transmitted with it, may contain confidential information and is intended only for the individual named. If you are not the named addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete this e-mail from your system. If you are not the intended recipient you are notified that disclosing, copying, distributing or taking any action in reliance on the contents of this in formation is strictly prohibited. Warning: Although the company has taken reasonable precautions to ensure no viruses are present in this e-mail, the company cannot accept responsibility for any loss or damage arising from the use of this e-mail or attachments. You are invited to read our full email disclaimer transcript at: http://www.jmp.co.uk/email.htm ********************************************************************** -------------------------------------------------------------------------This email message and accompanying data are for the sole use of the intended recipient(s) and may contain confidential information and/or copyright material. Unauthorised use, copying or disclosure of any of it is prohibited and may be unlawful. If you receiv this email ed message in error, please notify us immediately and erase all copies of this message and attachments. W A Fairhurst and Partners scans and monitors incoming and outgoing mail in accordance with its Email Policy. This email has been scanned for viruses but W A Fairhurst and Partners accept no liability for any virus which may be attached. A full list of partners is available for inspection at any of the firm's offices. ------------------------------------------------------------------------2
"This document has been prepared by Faber Maunsell Limited ("FM") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between FM and the Clie Any information provided by third parties and referred to herein has not been checked or verified by FM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of FM"
Pond waterlo
gged area
waterlo gged area waterlo gged area waterlo gged area waterlo gged area
Client:
Originator: FABER MAUNSELL 129 Victoria Road Darlington DL1 5JJ Tel: +44 (0) 1325 282 371 Fax: +44 (0) 1325 283 272 www.fabermaunsell.com Project:
d2b
NOTES
Title:
PRELIMINARY
(SEE NOTES) Crown Copyright. Reproduced, on behalf of the Highways Agency, from the Ordnance Survey Map with the permission of H.M.S.O. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence No 100018928 REV. DATE AMENDMENT DETAILS ORIG CHK'D ENG CAT II APP'D
1:2500
Original drawing size:
841 x 594 - A1
Rev:
D2B-0-W-01-000-DR-014
F:\PROJECTS\Development - MSA Inquiry 2010-11\Acad\Supplied Data\AECOM Newcastle\D2B-0-W-01-000-DR-014-P6.dwg
P6
[ AutoCAD Location ]
"This document has been prepared by AECOM Ltd ("AL") for the sole use of our Client (the "Client") and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AL and the Client. Any infor by third parties and referred to herein has not been checked or verified by AL, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AL"
29
3.65m
15
. 0m
4. 58 m
R 14
.90m
3 .3 8m
4 .6 2m
38
4 .6 2m
3 .6 5m
3 .6 3m
6.06m 35
R2 0. 00 m
00 m
3 .6
5.
5m
22
15 4.0m
6. 70 m
R2
R3 0m 5 .0
40
m 4 0. 00
7.00m 38 8.00m
m
R2
9 .9
0.0
0m
28
38
3.65m
R 17
.98m
3.70m
Client:
Project:
Title:
Design:
CC MIT JP
60162014-P-002
A2
cm
B1055900/EGHI/4744
KEY Advance Direction Traffic Sign Large Advance Direction Traffic Sign 6m Road lighting column with flat glass lantern incorporating a 50W SON-T lamp 10m Road lighting column with flat glass lantern incorporating a 150W SON-T lamp 12m Road lighting column with flat glass lantern incorporating a 150W SON-T lamp White Lining 1 LUX Lighting Contour Note: 1) Standard signing (warning, regulatory etc) not shown. 2) New/Replacement signing for HA not shown. 3) Signing and Road Lighting where no Vehicle Restraint System shall be passively safe.
Rev
Rev. Date
Purpose of revision
Drawn
Checked Approved
The land survey shown on this plan has been produced from a composite of Ordnance Survey / Topographical survey information
Client
Project
IN
Drawing status
FO RM
ROAD LIGHTING, TRAFFIC SIGN & ROAD MARKING LAYOUT CHAINAGE 2600-3350 SHEET 5 OF 7
FOR INFORMATION ONLY
DO NOT SCALE
Scale Jacobs No. Client no.
FO
Drawing number
1:1250 @ A1 B1055900
AT IO N
B1055900/EGHI/4744
This drawing is not to be used in whole or part other than for the intended purpose and project as defined on this drawing. Refer to the contract for full terms and conditions.
ON LY
Rev
Northallerton Office, Dale House, Mount View, Northallerton, North Yorkshire, DL6 2NY Tel: 01609785700 Fax: 01609 776149 www.jacobs.com