Sunteți pe pagina 1din 8

Welipenna

Ganga

39/5
40/1
New

Kohiawala
Galamatte RB
Galamatta
Galamatta LB

42+000

No Change-4.3m
No Change 18.3
No Change 3m
Add 12m NEW

43/4
43/5
43/6
43/7
44/1
44/3
44/4
44/5
46/2
46/3
48/1
48/2
48/3
50/1

49+308

50/2

52+111

53/2

3.00

0.60

2.40

5.20

1.10
1.70
1.80
1.80
2.30

0.20
0.30
0.80
0.80
0.70

0.90
1.40
1.00
1.00
1.60

3.15
9.00
3.40
3.00
4.90

2.20

1.10

1.10

4.20

10.30
1.85

1.90
0.30

8.40
1.55

18.00
3.00

**
2.75
**
**
**
2.00
**
**
3.00

Add 40m NEW


No Change 45.8m
Replace 20m
Replace 20m
Replace 20m
Replace 6.1m
Replace 15m
Replace 6m
Replace 6m
Replace 6m
Replace 6m
Replace 4m
Replace 4m
Replace 4m
No Change 8.9m
Replace 13m
No change 3m

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

Remarks

**

2.15

New

42+550
42+814
42+826
42+978
43+069
43+678
43+758
43+795
45+650
45+730
47+048
47+400
47+865
49+068

Available WIDTH (m)

35/5

Open space(up to deck bottom)

34/2
34/3
34/4
35/4

Measured water depth

31/4

AVAILABLE HEIGHT (m)

30+750

No Change-5.2m
Increase height to 1.8m Spam 3.15m no change
No Change - 9m
No Change - 3.4m
No Change - 3m
No Change 4.8

Pdrposed Minimum Height

31/3

PROPOSED WIDTH (m)

Bridge No

Chainage

BRIDGE

Annex 1 A _B157- Mathugama- Aluthgama Road- Summary of Bridge Openings

Height to be increased to
1.8m

Additional opening allocated


to culverts

Revised further based on new


verticle alignment

4.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.15

4.80
2.50
2.00
0.80
1.60
2.40
1.20
0.00
1.00
1.50
0.95
1.10
2.00
1.60

1.90
0.90
0.80
0.30
0.40
1.50
0.30

2.90
1.60
1.20
0.50
1.20
0.90
0.90

46.00
3.00

0.20
1.50
0.25
0.20
1.00
0.70

0.80
0.00
0.70
0.90
1.00
0.90

1.30
1.60
7.00
1.60
dia.0.6
dia.0.9
6.00
2.20
dia.0.9
dia.0.9
9.00

2.15

0.90

0.30

0.60

0.60

**

1.30

0.30

1.00

3.00

Additional opening added to


50/2

Hydrology Report
Annex 1 A - Page 1

Qdes

Vmax

V Des

V Status

Q-STATUS

Qdes-Qmax

0.00

Qmax

Proposed addiotional
structure width (m)

3.15

P2/3

Nearby culvert width (m)

5.20

R2/3

Existing Bridge Width


(m)

19.97

DISCHARGE Q=CIA/360
(cumecs)

0.30

RUNOFF COEFFICIENT

108.95

A^5/3

RAINFALL INTENSITY (mm/hr)

100.00

A(m2)

RETURN PERIOD (yr.)

76.79

TIME OF CONCENTRATION
Tc=l/60v+15 (min) [ Ponrajah's
Formula]

1.5

FLOW VELOCITY (ft/sec)

0.1000

s(m/m)

SLOPE (%)

1695

WSW(m)

LENGTH OF EFFECTIVE
WATERCOURSE (m) L

2.70

TMH(m)

LENGTH OF EFFECTIVE
WATERCOURSE - ACAD UNITS

220.00

FSD(m)-WATER DEPTH

CATCHMENT AREA (ha) (A)

2.20

FB(m)

CATCHMENT AREAsqkm

31/3

BW(m)- CLEAR SPAN

Number

BRIDGE

Hydrauic Computations for bridges in B157- Mathugama- Aluthgama Road

8.35

0.50

1.300

1.800

8.350

0.0010

0.017

1.86

10.86

53.22

10.95

0.99

0.99

4.93

20.08

19.97

1.85

1.84

ok

ok

-0.101

1516.00

2.70

4145

0.0100

1.5

166.09

100.00

62.62

0.30

79.11

9.00

6.40

4.00

19.40

1.00

1.750

2.750

19.400 0.0010

0.017

1.86

33.95

355.96

22.90

1.48

1.30

8.06

82.11

79.11

2.42

2.33

ok

ok

-3.004

4703

0.1000

1.5

57.64

0.30

46.59

4.30

4.80

2.00

11.10

0.20

2.000

2.200

11.100 0.0008

0.017

1.66

22.20

175.36

15.10

1.47

1.29

6.11

47.76

46.59

2.15

2.10

ok

ok

-1.167

29.90

1.00

2.550

3.550

29.900 0.0006

0.02

1.22

76.25

1370.94

35.00

2.18

1.68

10.70

156.92 149.41

2.06

1.96

ok

ok

-7.508

45.80

1.00

3.000

4.000

45.800 0.0003

0.025

0.69

137.40 3658.57

51.80

2.65

1.92

13.90

182.41 147.55

1.33

1.07

ok

ok

-34.86

24.00

0.50

2.000

2.000

24.000 0.0003

0.017

1.02

48.00

633.97

28.00

1.71

1.43

9.22

70.05

60.69

1.46

1.26

ok

ok

-9.356

31/4
34/2
34/3
34/4
35/4
35/5

2.39
9.70

970.00

1.41

186.44 100.00

2.00

35/6
Welipenna
Gamga

39/4

59.60

5960.00

40/1

1.60

12265

0.0500

1.5

462.11 100.00

30.08

0.30

149.41

18.30

1.60

10.00

2.74

Kohiawala
Galamatte
RB

New

Galamatta

43/4

Galamatta LB

43/5

2.56

20.00

43/6

0.88

20.00

27.00
147.55

45.80

0.00

0.00

43/7

20.00

44/1

6.00

44/2
44/3

Individual Culvert
18.62

1862.00

0.83

8374

0.0100

1.5

320.26 100.00

39.12

0.30

60.69

0.00

6.00

18.00

6.00

44/4
44/5

6.00

5.00

44/6

Individual Culvert

45/1

Individual Culvert

45/2

Individual Culvert

45/3

Individual Culvert

45/4

Individual Culvert

45/5

Individual Culvert

46/1

Individual Culvert
6.00

46/2
46/3

3.49

349.00

1.46

3456

0.0100

1.5

140.98 100.00

70.43

0.30

20.48

0.00

6.00

6.00

12.00

0.50

1.500

2.000

12.000 0.0003

0.017

1.02

18.00

123.63

15.00

1.20

1.13

6.08

20.71

20.48

1.15

1.14

ok

ok

-0.227

48/1

2.79

279.00

3.20

2154

0.0100

1.5

93.52

86.49

0.30

20.11

4.00

8.00

0.00

12.00

0.50

1.500

2.000

12.000 0.0003

0.017

1.02

18.00

123.63

15.00

1.20

1.13

6.08

20.71

20.11

1.15

1.12

ok

ok

-0.6

6.00

7.00

21.90

0.50

1.600

2.100

21.900 0.0004

0.017

1.18

35.04

375.21

25.10

1.40

1.25

8.57

51.49

50.98

1.47

1.45

ok

ok

-0.51

100.00

48/2

4.00

48/3

4.00

50/1
50/2

11.00

1100.00

2.40

5296

0.0001

3.20

53/2

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

1.5

208.06 100.00

55.62

0.30

50.98

8.90
6.00
3.00

Hydrology Report
Annex 1 A - Page 2

Cross Section at U/S Paddy Field


Segment Length Ground Level
100yr Flood Level
Water Height
0.00
18.00
8.70
12.70
10.00
10.00
13.80
9.00
6.80
6.00
9.00
11.50
18.00
7.40

1.4
0.5
0.56
0.5
0.6
0.57
0.55
0.52
0.39
0.39
0.79
1.2
3.3
4.5

3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30
3.30

1.90
2.80
2.74
2.80
2.70
2.73
2.75
2.78
2.91
2.91
2.51
2.10
0.00
-1.20

Water Area
42.30
24.10
35.18
27.50
27.15
37.81
24.89
19.35
17.46
24.39
26.51
18.90

140.90
Total Area===>>>>>>
325.53
Velocity===>>
0.30
(Discharge)Q
97.66
Latest Road Design Level
Level m MSL
Chainage m

2.315
2.317
2.328
2.396
2.431
2.565
2.6
2.637
2.734
2.817
3.037
3.124
3.277
3.464
3.592
3.628
3.652
3.661
3.668
3.673
3.675
3.624
3.493
3.481
3.368
3.172

42000.000,
42003.000,
42008.078,
42020.000,
42023.933,
42035.227,
42037.653,
42040.000,
42045.653,
42050.000,
42060.000,
42063.508,
42070.000,
42080.000,
42090.000,
42094.105,
42097.994,
42100.000,
42102.105,
42104.530,
42106.812,
42120.000,
42131.680,
42132.480,
42140.000,
42153.000,

3.105

<<<===Average

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

Hydrology Report
Annex 1 A - Page 3

ADDITIONAL OPENING FOR 42+000


Cross Section at U/S Paddy Field
Segment
Ground
Embankment
Water
Length
Level
Level
Water Height
Area
0.00
1.4
3.10
1.70
38.79
18.00
0.5
3.10
2.60
22.40
8.70
0.56
3.10
2.54
32.70
12.70
0.5
3.10
2.60
25.55
10.00
0.6
3.10
2.50
25.20
10.00
0.57
3.10
2.53
35.12
13.80
0.55
3.10
2.55
23.13
9.00
0.52
3.10
2.58
18.02
6.80
0.39
3.10
2.71
16.29
6.00
0.39
3.10
2.71
22.63
9.00
0.79
3.10
2.31
24.26
11.50
1.2
3.10
1.90
15.39
18.00
3.3
3.10
-0.20
7.40
4.5
3.10
-1.40
TOTAL
140.90
Total Area===>>>>>> 299.491
Velocity===>>
0.3
Q
89.847

This calculates the 100 year Q under embankment level- rest is overflow and do not come to the proposed opening
CALCULATION FOR ADDITIONAL OPENING B157 for KOHILAWALA
Calculation of the Opening Size for Flow Path at "Kohilawala"

Cross Section Area of flow path Kohilawala (A1)


Assumed velocity(V1)
Discharge (Q1= A1xV1)
Assumed velocity at the road section after embanking (V2)
Required area at the road section(A2= Q1/V2)

299.5
0.3
89.8
1.08
83.2

m2
m/s
m3/s
m/s
m2

20 Year Flood Level

2.55

Asumed water height


Required opening width

2.15 ( No Free Board Alowed)


38.7

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

Hydrology Report
Annex 1 A - Page 3

w and do not come to the proposed opening

( No Free Board Alowed)

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

Hydrology Report
Annex 1 A - Page 3

XSS of Road for Culvert 43/5 & New Culverts ( Galamatte Bridge 43/4- RB Flood Plain)
Chainage
From
Galamatte
Flod Plain
42+550km
0
20
40
60
70
90
110
130
150
170
190
210
230
250
270
290
310
330
350
370
390
410
430
450
470
490
510
530
550
570
590
610
630
650
670
690
710

100year
Flood
Level m
Existing Level MSL
3.123
3.3
2.286
3.3
1.794
3.3
1.713
3.3
1.807
3.3
1.785
3.3
1.844
3.3
1.848
3.3
1.859
3.3
1.726
3.3
1.443
3.3
1.336
3.3
1.230
3.3
1.372
3.3
1.536
3.3
1.750
3.3
1.827
3.3
1.737
3.3
1.444
3.3
1.438
3.3
1.566
3.3
1.653
3.3
1.683
3.3
1.512
3.3
1.651
3.3
1.906
3.3
2.126
3.3
2.123
3.3
2.014
3.3
1.982
3.3
1.992
3.3
1.950
3.3
1.893
3.3
1.975
3.3
2.285
3.3
2.522
3.3
2.961
3.3

20year
Diff /Fill
Flood
Proposed Height for
Level m
Embankm 20 Year
MSL
ent Level Flood
Area
2.55
2.55
-0.573
2.55
2.55
0.264
10.2
2.55
2.55
0.756
15.93
2.55
2.55
0.837
7.9
2.55
2.55
0.743
15.08
2.55
2.55
0.765
14.71
2.55
2.55
0.706
14.08
2.55
2.55
0.702
13.93
2.55
2.55
0.691
15.15
2.55
2.55
0.824
19.31
2.55
2.55
1.107
23.21
2.55
2.55
1.214
25.34
2.55
2.55
1.320
24.98
2.55
2.55
1.178
21.92
2.55
2.55
1.014
18.14
2.55
2.55
0.800
15.23
2.55
2.55
0.723
15.36
2.55
2.55
0.813
19.19
2.55
2.55
1.106
22.18
2.55
2.55
1.112
20.96
2.55
2.55
0.984
18.81
2.55
2.55
0.897
17.64
2.55
2.55
0.867
19.05
2.55
2.55
1.038
19.37
2.55
2.55
0.899
15.43
2.55
2.55
0.644
10.68
2.55
2.55
0.424
8.51
2.55
2.55
0.427
9.63
2.55
2.55
0.536
11.04
2.55
2.55
0.568
11.26
2.55
2.55
0.558
11.58
2.55
2.55
0.600
12.57
2.55
2.55
0.657
12.32
2.55
2.55
0.575
8.4
2.55
2.55
0.265
2.93
2.55
2.55
0.028
2.55
2.55
-0.411
TOTAL=>>
522.02

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

Calculation of Culvert Opening Sizes

Q (Welipenna Southern Expressway Bridge)


Cross Section Area of flow path through culvert
Assumed velocity(V1)
Discharge (Q1= A1xV1)
Assumed velocity at the road section (V2)
Required area at the road section(A2= Q1/V2)
20 Year Flood Level
Asumed water height
Required opening width

394
522.02
0.3
156.606
1.08
145.0056

Mike11 study
m2
m/s
m3/s
m/s
m2

2.55
2.15
67.44444

Hydrology Report
Annex 1 A - Page 4

LB
Galamatte
RB

SUMMARY OF OPENING DETAILS FROM 42+000-43+069


( Galamatte Bridge Flood Plain - Welipenna River)
Culvert
Chainage
Kohilawala
42+000
42
43/4 Galamatte
42+550
42.55
43/5
42+814.609
42.814
43/6
42+826.168
42.826
43/7
42+978.780
42.978
44/1
43+069.199
43.069
44/2
43+301.628
43.301
44/3
43+678.124
43.678
44/4
43+758.856
43.758
44/5
43+795.695
43.795
44/6
43+860.556
43.86
45/1
44+035.703
44.035
45/2
44+145.834
44.145

SLLRDC LS CHAINAGE
2700
2150
1886
1874
1722
1631
1399
1022
942
905
840
665
555
Culverts on Galamatta RB Flood Plain
Galamatte LB Flood Plain

SUMMARY OF OPENINGS
Gaamatte LB- Kohilawala
Galamatte Bridge
Galamatte RB
TOTAL
Southern Expressway -Welipenna

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

40
45.8
67
152.8
150

m
m
m
m
m

Hydrology Report
Annex 1 A - Page 5

Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

Hydrology Report
Annex 1 A - Page 6