MINORITY MINISTRY MULTI-SECTORAL PROJECT FOR MAMIT DISTRICT AGRICULTURE LAND DEVELOPMENT AT AIVAPUIRUAM (NEAR PHULDUNGSEI) ABSTRACT OF TERRACE

CONSTRUCTION

Sl.No. Name of Area Unit 1 R.Vawkzawnlui Watershed Ha 2 R.Uilui Watershed Ha Total=

Length Rate 250 254692.08 250 254692.08 500

Cost 63673019.19 63673019.19 127346038.4

11

MINORITY MINISTRY
MULTI-SECTORAL PROJECT FOR MAMIT DISTRICT AGRICULTURE LAND DEVELOPMENT AT AIVAPUIRUAM (NEAR PHULDUNGSEI) ESTIMATE FOR CONSTRUCTION OF BENCH TERRACE Description of items Unit Length Breadth Height Quantity Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.) 3 2 262.00 503.00 786 1006

Sl. No. 1/2.1

Rate

Amount

each Girth from 300 mm to 600 mm each Girth from 600 mm to 900 mm Clearing and Grubbing Road Land. (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) By Manual Means (i) Hec B In area of thorny jungle 3/3.30 Excavation in Hilly Areas in ordinary soil(Excavation in hilly areas in ordinary soil, by mechanical means including trimming of slopes and disposal of cut material.) (i) (ii) 2/2.3 Case-I : Disposal of cut material with all lifts and lead upto 1000 metres. a) For construction of Terrace b) For construction of Drain 4 For contour Survey and Demarcation 5 Field alignment/Contour lining by bamboo stakes including collection of bamboo stakes Add for slack lime @ 20 Qtls/Ha to reduce acidity of soil Add for Green Manuring @ 1 Qtls/Ha Total cost of 1 hecter = Quantity as per calculation sheet Cum Cum M.day M.day

1 66436.00

66436

979.6894 14.1075 5 15 20 1

167.00 163608.1 167.00 2355.953 250 1250 250 550 4500 3750 11000 4500 254692.1

6/LS 7/LS

143

MINORITY MINISTRY
MULTI-SECTORAL PROJECT FOR MAMIT DISTRICT AGRICULTURE LAND DEVELOPMENT AT AIVAPUIRUAM (NEAR PHULDUNGSEI) (Slope of the ground profile= 5%-10%) Detail Calculation for Level Bench Terrace per Hecter Data/Assumption : Formula Adopted as per Manual of Central Soil and Water Conservation Research and 1 Training Institute, Dehradun, 2006 2 Method of terracing is fully cut( Half cut and Half Fill is most desireable but impracticable) 3 Width of bench (Wb) = 6.00 m 4 Slope of riser = 1:1 5 Soil Depth for Crops after terracing = 0.85m 6 Dyke height= 20cm, width= 30cm 7 Critical Length of terrace (K) = 100m 8 Cross section for drain/outlet Bottom width = 0.3 m Top width = 1.05 m Depth = 0.38 m Cross section area = 0.2565 m2 Detail calculation : I Vertical Interval (VI) = Where, VI S Wb U Therefore VI = = = = = Vertical Interval, in m Slope of ground profile in % Width of bench (Flat strip) in m Slope of the riser taken as 7.5 X 100 - ( 6.00 7.5 X 1.00 ) 7.5 % 6.00 m 1

S X Wb 100-(SXU)

II

Width of the riser (Wr) = = Width of Terrace (Wt)=

0.49 m VI X U 0.49 m Wb+Wr+DC

III

Where, DC= width of Dyke=0.30m Therefore, Wt= IV Linear Length per Hecter (L)= = 6.79 m 10000 Wt 1473.52 m

Cross Section Area ( C )= =

VI

Volume of Cut (V)=

Wb X VI + 8 0.66 m2 LXC 979.6894 M3 7.4 Say=

DC

VII VIII

No. of outlet per Hecter= L/2K Length of Vertical disposal drain= NXHI Quantity for Drain=60X0.2656 =

8 Nos 55 m

54.29 Say= 14.1075 m3

144

MINORITY MINISTRY
MULTI-SECTORAL PROJECT FOR MAMIT DISTRICT AGRICULTURE LAND DEVELOPMENT AT AIVAPUIRUAM (NEAR PHULDUNGSEI)

Dyke 30cm width, 20cm height

Heigth of riser (Hr)

Vertical Interval (VI)

Slope 1 :1

Width of the riser (Wr) Width of the bench (Wb) Width of the terrace(Wt)

TYPICAL DRAWING OF TERRACE

223