ATP BTS 2G (BTS 3900 (Indoor/Outdoor)
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
ATP BTS 2G
BTS 3900 (Indoor / Outdoor)
: : : : :
NTS
HUAWEI
2
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
TABLE OF CONTENTS 1. Acceptance Testing 2. Acceptance Test Procedure 2.1 Installation Checklist 2.1.1 2.1.2 2.2 Indoor installation check list Outdoor installation check list
Environment Monitoring Functional Test 2.2.1 2.2.2 2.2.3 Basic Shelter Alarms Monitoring Test Function Test for Indoor BTS Function Test for Outdoor BTS Feeder System VSWR test result Power transmitting Call Tests Handover Tests 24 Hours Stability Test Alarm query test
2.3
2.4
2.5 2.6
NTS
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
1. Acceptance Testing
1.1 Acceptance testing shall be carried out by the Contractor. The Contractor shall perform all tests required for commissioning and integration of the Equipment, Software and/or Services, as per the latest approved Schedule 3.
NTS
HUAWEI
4
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
Remarks Civil Works Check Procedure 5 6 Check that the cabinets have been securely fastened and are levelled correctly. Check that indoor cable ladder above the cabinet has been installed correctly (applicable for Indoor Equipment). Check that the DDF are grounded to the main grounding bus bar. Pass Fail N/A Remark
7 Remarks
Equipment Specific Checks Procedure 8 9 Check that all equipment internal cables are correctly installed and labelled. Check that the cabinet blanking panels have been installed. Pass Fail N/A Remark
NTS
HUAWEI
5
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
Cabinet External Cabling Check Procedure 10 11 12 13 14 15 16 Check each the equipment rack is grounded to the main grounding bus bar and labelled. Check that the Abis cables are connected to the correct position of DDF. Check that the alarm cabling has been connected from the BTS to the DDF Check that the support cabinet cables are correctly connected and labelled. Check that the feeder jumper cables are tightened all the BTS. Check that the support cabinet cabling has been cable tied to the cable ladder. Check that the indoor feeder cable labelling is correct. Check that the DC power cable is the correct size and is terminated correctly. Check the transmission cables, DC Cables and feeder jumpers are be correctly labelled Check that support equipment is installed correctly. Pass Fail N/A Remark
17 18 19
Remarks Final Checks Procedure 20 Check that all installation and packing materials have been removed from the site. Pass Fail N/A Remark
Remarks
NTS
HUAWEI
6
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
24 25 Remarks
Connectors Procedure 26 27 28 Remarks Check that all top feeder connectors are tight. Check that all top feeders to jumper connections are tight. Check that all top jumpers to antenna connections are tight. Pass Fail N/A Remark
NTS
HUAWEI
7
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
Weather sealing Procedure 29 30 31 Check all top grounding kits are weather-sealed correctly. Check all feeders to jumper connections are weather-sealed correctly. Check all jumpers to antenna connections are weather-sealed correctly. Pass Fail N/A Remark
Remarks Antenna Steelwork Procedure 32 Check that the antenna supporting steelwork is correctly installed. Check all antenna mounting clamps and brackets have been tightened. Pass Fail N/A Remark
33
Remarks Antenna Installation Check Procedure 34 35 Check that the antennas are mounted at the correct height. Check that the direction of all antennas in all sectors is correct. Pass Fail N/A Remark
Remarks
NTS
HUAWEI
8
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
M Deg
Remarks
Outdoor Site Documentation Procedure 36 37 38 Check that the antenna layout is according to the site drawing. Check that the feeder cable ladder is installed as per the site drawing. Check that the feeder gland plate is installed as per the site drawing (applicable for Indoor Equipment) Pass Fail N/A Remark
Remarks SITE:
DATE:
N/A
Remark
39
Check that the feeder cable ladder is correctly installed Check that the feeder grand plate has been correctly installed (applicable for Indoor Equipment).
40 Remarks
Feeder Grounding Procedure 41 42 Check number/location of feeder grounding kits. Check all grounding is correctly terminated Pass Fail N/A Remark
NTS
HUAWEI
9
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
43
Remarks Concluding Checks Procedure 44 Check that all installation and packing materials have been removed from the site. Pass Fail N/A Remark
Remarks Notes: For the Swap BTS, this part Outdoor Installation Checklist is not be involved.
NTS
HUAWEI
10
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
2.2 Environment Monitoring Functional Test 2.2.1 Basic Shelter Alarms Monitoring Functional Test for BTS 3900
SITE: NO Basic Shelter alarm test( only for the indoor BTS) DATE: Pass Fail Remark Audit
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Fire alarm Door Open alarm High temperature alarm Spare AC Removal alarm Genset run Genset failure Genset low fuel Phase R failure alarm Phase S failure alarm Phase T Failure alarm Arrester Failure alarm Rectifier Module alarm Rectifier High voltage alarm Rectifier Low voltage alarm OBL Failure alarm
[BSC ID No 65384] [BSC ID No 65385] [BSC ID No 65386] [BSC ID No 65387] [BSC ID No 65388] [BSC ID No 65389] [BSC ID No 65390] [BSC ID No 65391] [BSC ID No 65392] [BSC ID No 65393] [BSC ID No 65394] [BSC ID No 65395] [BSC ID No 65396] [BSC ID No 65397] [BSC ID No 65398] [BSC ID No 65399]
* Remark: Alarm test is tested end to end to verify correct operation from sensor to OMC message
NTS
HUAWEI
11
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
SITE CONFIG:
Test Description Power-On Test Fan check Board Indicators check Transmission Test Logging In to the Site Maintenance Terminal System Board Software Loading Board Software Activation Site Reset Hierarchically Cell Management State Changes Cell Performance BT Management State Change BT Test Viewing Channel State RC Attribute Management Changing RC Management State Board Operation Board Loopback Test Board Alarm Switching On an MS Calls Basic Data Services SMS test VSWR of the Antenna System DTF Test DFRU Transmit Power Pass
DATE:
Fail Remark Audit
NTS
HUAWEI
12
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
SITE CONFIG:
Test Description Pass
DATE:
Fail Remark Audit
NTS
HUAWEI
13
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
23 24 25 26 27 28 29
Door Status Alarm Water Alarm Smoke Alarm Power Supply Failure VSWR of the Antenna System DTF Test DFRU Transmit Power
NTS
HUAWEI
14
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
2.3. BTS VSWR Test & Power transmitting power 2.3.1 Feeder system VSWR test result
SITE:
V S W R a n d R et ur n L os s No. Cell Feeder VSWR
1 Cell 1 RXD12 TRX11 2 Cell 2 RXD22 TRX 21 3 Cell 3 RXD32 TRX 31
SITE CONFIG:
D AT E :
Feeder Length(m)
Audit
Notes: 1. VSWR value shall be refer to the specification manual from the supplier 2. Setting at site master for cable 7/8" (vf and cable loss shall be refer to the specification manual from supplier) 3. Setting at site master for cable 1-5/8" (vf and cable loss shall be refer to the specification manual from supplier) 4. VSWR < 1.3 5. DTF test will be carried out according to the test procedure and test result included in the test documentation.
NTS
HUAWEI
15
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
Cell 2
Cell 3
NTS
HUAWEI
16
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
2.4.2
Handover Tests
Call Test
Origin Cell
Target Cell
Pass
Fail
Remark
Audit
NTS
HUAWEI
17
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
RESULT: Remark :
Date:
Notes: The 24 hours is to be monitored from the TOC/NOC, and will be passed if BTS is in normal operation with no alarms.
RESULT: Remark :
Date:
Notes: if the site has no active alarms then write OK, no active alarms, otherwise record the alarm information in detail
NTS
HUAWEI
18
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
No. 1 2 3 4 5 6 7
DESCRIPTION
Due Date
NTS
HUAWEI
19
Name : Date :
Name : Date :
ATP BTS 2G (BTS 3900 (Indoor/Outdoor) Doc. No. : AF-CL-0168-3-140209 Ver. 1.2 04-03-09
Version
1.1
Date
14 Feb 2009
Revised by
Michael J Bullough Michael J Bullough
Revisions
Added Revision History table, typographical changes
1.2
4 Mar 2009