The document outlines an offshore rig move plan in 10 steps: 1) Rig move preparation including administration, equipment inspection, and weather. 2) Preparation of the new location including surveys and jacket preparation. 3) Logistics of boats, navigation routes, and helicopters. 4) Rig move descriptions and responsibilities. 5) A rig checklist. 6) Critical lifts and operations. 7) A pre-spud inspection of safety, drilling equipment. 8) Daily move reports. 9) Rig orientation drawings. 10) Medical evacuation procedures.
The document outlines an offshore rig move plan in 10 steps: 1) Rig move preparation including administration, equipment inspection, and weather. 2) Preparation of the new location including surveys and jacket preparation. 3) Logistics of boats, navigation routes, and helicopters. 4) Rig move descriptions and responsibilities. 5) A rig checklist. 6) Critical lifts and operations. 7) A pre-spud inspection of safety, drilling equipment. 8) Daily move reports. 9) Rig orientation drawings. 10) Medical evacuation procedures.
Drepturi de autor:
Attribution Non-Commercial (BY-NC)
Formate disponibile
Descărcați ca PDF, TXT sau citiți online pe Scribd
The document outlines an offshore rig move plan in 10 steps: 1) Rig move preparation including administration, equipment inspection, and weather. 2) Preparation of the new location including surveys and jacket preparation. 3) Logistics of boats, navigation routes, and helicopters. 4) Rig move descriptions and responsibilities. 5) A rig checklist. 6) Critical lifts and operations. 7) A pre-spud inspection of safety, drilling equipment. 8) Daily move reports. 9) Rig orientation drawings. 10) Medical evacuation procedures.
Drepturi de autor:
Attribution Non-Commercial (BY-NC)
Formate disponibile
Descărcați ca PDF, TXT sau citiți online pe Scribd