Volume 2, Number 1 January 2000


Figure 2 Pad Through 3 PPG Stage at End of Job
Shale Stress (psi)

Can Rate Reductions Near the End of a Frac Treatment Induce Tip Screenout ?
Why/when would pump rate be reduced near the end of a fracture treatment ?
Pump rate slowdowns at the end of fracture treatments might be done for a variety of reasons. Some of these include: a) minimizing pressure on downhole equipment, b) to be pumping slow enough to open backside to generate an annular pack, c) surface rate or pressure limitations, d) possibly improved fracture conductivity/width, and e) possibly improve the near wellbore gravel packing. From a fracturing standpoint, the only time a rate slowdown is acceptable is after a tip event has occurred. If tip screenout has halted fracture propagation prior to the rate reduction, then at a minimum the first 3 positive goals (a, b, and c above) are achieved.

Pad Through 3 PPG Proppant Stages PSF1


0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000

8635 Gas 8655

8675 Silty

8695

6085

6305

20

40 60 80 Fracture Penetration(ft)

100

Stress (psi) Shale

PSF Pounds Per Square Foot 0.000

8635 Gas

1.500 3.000 4.500 6.000 9.000 psf 7.500

Why can the rate be slowed down after a tip event without detrimental effect on the frac?
When the tip event occurs, fluid loss begins to decrease as seen in Fig. 1. Why does the fluid loss decrease after the tip event because the tip screenout (TSO) halts fracture propagation and no new fracture area is being created. For moderate to high fluid loss formations, fracture area is mostly created with the pad. Then the low concentration proppant stages flow into to the fracture and travel to the Figure 1 Fluid Loss Decrease After Tip Event
Tip Event

8655

8675 Silty

10.500 12.000 13.500 15.000

8695

6085

6305

20

40 60 80 Fracture Penetration(ft)

100

5.0

10.0

15.0

20.0

perimeter of the fracture where they dehydrate. This locks the fracture area into place (Figure 2). Continued pumping above the fluid loss rate then drives net pressure up, forcing increased width. The subsequent high proppant concentration stages fill the fracture, leaving a wide proppant pack. Because fracture area is pinned, the rate at which the high concentration stages fill the fracture does not matter, provided rate is greater than leak-off rate. That is, fracture area is now fixed, and regardless of pump rate (presuming it is above fluid loss rate), the same volume of proppant is being placed over the same fracture area. Thus, average fracture conductivity, kfw, is independent of the final pump rate(s).

Net Pressure (psi)

100

200

300

400

Time (min) Injection Rate vs. Fluid Loss Rate

What happens if a tip event did not occur? Should a rate slowdown be undertaken to induce TSO?
25.0

25.0

Pump Rate

Loss Rate

15.0

15.0

A field example will be used to illustrate a possible outcome of attempting to use rate slow downs to induce a tip event. A 25,000 lb (7,400 gals) fracture treatment on a Gulf of Mexico well is pumping along, and no tip event is noticed (Fig. 3). SPE Formation Damage Symposium Lafayette Louisiana, February 23-24
Please come visit our booth in Lafayette. Wed love to visit and love to demonstrate the new automatic economic optimization/ design and production post appraisal features of StimPlan.

20.0

10.0

5.0

Tip event
5.0 10.0 Time (min) 15.0 20.0

5.0

10.0

20.0

Thank You

Frac Tips NSI Technologies, Tulsa/Houston, 1-918-496-2071 FracTips@nsitech.com www.nsitech.com Page 1 of 2

psf

Figure 3 Example Gulf of Mexico Job Conc (PPG) / Rate (bpm)

Figure 5 Simulated Results from the Job without Rate Slowdown


Stress (psi) Shale

BHP

Pounds Per Square Foot


4140 0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000 psf

Pressure (psi)

2,500

15

Surface Pres
2,000

Surface PPG

Rate
5

1,500

26

28

30

32

34

2475 3025

Shale

Gas 4200

Gas

10

4160

4180

20

40 60 Fracture Penetration(ft)

80

TIME (min)
Shale

Perforations: 6,320-6,358 MD, BHP Gages: 6,346 & 6,350 MD

Stress (psi)

Total Width (inches)


0.000 0.050 0.100 0.150

The rate is decreased several times, and at the end of the job surface pressure spikes, tripping the pumps. Note the bottomhole pressure is declining when the pumps shut down from exceeding pressure limitations. This indicates a wellbore event occurred above the pressure gauges in the hole (probably at or above the top perforation). The small drop in BHP beginning at about 32 minutes may indicate that injection rate has fallen below fluid loss rate, causing fracture width to decrease. This may have triggered bridging right at the top perforation, and forced the total screenout. However, this screenout (and the resulting surface pressure increase) is NOT applied to the formation. Thus, this has no effect on fracture width/conductivity and does not contribute to any wellbore annulus packing. The behavior of the actual stimulation was modeled as seen in Fig. 4. Note the reduced proppant concentration and width near the well. Proppant concentration is higher away Figure 4 Results from the Job with Rate Slowdown
Stress (psi) Shale

4140

Gas

4160

0.200 0.300

4180

0.350 0.400 0.450

Gas

4200

0.500

2475 3025

Shale

20

40

60

80

Fracture Penetration(ft)

from the wellbore. The annular pack is questionable because of the near wellbore pressure event above the top perforation.

What could have been done differently?


The same treatment volumes are modeled with no rate slow down (results in Fig. 5). This yields a higher proppant concentration near the perforations, and greater width near the wellbore region. Both lead to higher productivity.

Pounds Per Square Foot PSF


4140 0.000 0.500 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000

What about the annular Pack?


The annular pack could be obtained by flowing the fracture fluid back through the screen/annulus, taking surface returns on the annulus prior to the fracture closing.
psf

Gas

4160

4180 Gas

Conclusions
For this case, and probably in general, it is evident that rate slowdowns do not induce a tip event. If a tip event does not occur as designed, drastic rate slowdowns can be detrimental to the outcome of the propped fracture. The near wellbore pressure event may (or may not) indicate a good annular pack. A less damaging to the fracture method of achieving the annular pack is to take returns through the screen just at the end of the job. That is, injection rate should be maintained above fluid loss rate to insure no near well fracture closure. Just at the treatment end, injection rate is decreased and returns are taken through the screen. This combination insures that back flow into the annulus will come from the fracture, giving a good annulus proppant pack. If fracture closing is allowed prior to a flowback, some flow may come from the formation, bringing formation fines into the gravel pack!

4200 Shale

2475 3025

20

40 60 Fracture Penetration(ft)

80

Stress (psi) Shale

Total Width (inches)


0.000 0.050 0.100 0.150 0.200 0.250 0.300 4180 Gas 0.350 0.400 0.450 4200 Shale 0.500

4140

Gas

4160

2475 3025

20

40 60 Fracture Penetration(ft)

80

Frac Tips NSI Technologies, Tulsa/Houston, 1-918-496-2071 FracTips@nsitech.com www.nsitech.com Page 2 of 2

in

in

0.250

S-ar putea să vă placă și