Sunteți pe pagina 1din 9

IGEM Standards

January 2010

Founded 1863 Royal Charter 1929 Patron: Her Majesty the Queen

CONTENTS
About IGEM Standards Placing orders About this list Scope of IGEM Standards IGEM Standards list Standard Sets Order Form 1 2 2 3 5 7 8

ABOUT IGEM STANDARDS


Since the 1960s, IGEM has published technical Standards that are now recognized as trusted industry Standards, used to assist in compliance with national legislation and official approved codes of practice and guidance. IGEM Standards relate to aspects of the Pipelines Safety Regulations; Pressure Systems Safety Regulations; Gas Safety (Management) Regulations; Gas Safety (Installation and Use) Regulations; Dangerous Substances and Explosive Atmospheres Regulations; Reporting of Injuries, Diseases and Dangerous Occurrences Regulations; Building Regulations; Health and Safety at Work etc. Act; Management of Health and Safety at Work Regulations; Pressure Equipment Regulations, Electricity at Work Regulations and so on. The Standards are drafted by expert Panels representing a cross-section of the relevant parts of the gas industry. Regulatory bodies such as HSE, Ofgem and Gas Safe RegisterTM contribute to the drafting process. The drafts are issued to the industry and other stakeholders for review and comment prior to publication and, thus, take into account the sometimes broad range of views on the content. The professional status of IGEM ensures its Standards reflect the best possible levels of safety, practice and quality within reasonable cost. In general, IGEM Standards do not overlap the scope of British Standards (BS) but they do often mirror the scope of British European Standards (BS EN) adding much more detail in many cases. There is no intent to contradict other such standards, and it is IGEMs policy to ensure this does not occur. IGEMs Standards are all available in hard copy. In addition, there are licences available for the purchase of electronic copy for use on the internal IT networks of individual companies. Standards licences can be purchased either as a complete suite or individually. Further information is available from IGEM (technical@igem.org.uk). The following SCOPE allows an at a glance view of the subject of the Standards and aspects covered. In general, the advice is set at an intermediate to high level although some books, such as IGE/GM/6, give detail on standardised installations and, hence, contain more prescription. The full list of available publications follows the SCOPE.

1 For more information on IGEM Standards, please see our website; www.igem.org.uk.

PLACING ORDERS (Subject to availability of the Standard)


An Order Form is provided on Page 7. Orders can be placed using the following methods: Phone - +44 (0) 1889 561 431 Fax - +44 (0) 1889 568 264 Email igem@yesresponse.co.uk Online www.igem.org.uk Post IGEM Standards, PO Box 2584, Uttoxeter. ST14 9AB. Payment must be received before goods can be dispatched. Dispatch of goods is normally within 2 working days of payment. The following methods of payment are accepted: credit card (MasterCard or Visa). Please give card name, number, expiry date, valid from date, 3 digit security code and address cheque sent to the above address. Please mark correspondence IGEM Standards Sales through bank transfer (overseas customers will incur a charge for this method). Please request this on the Order Form.

Accounts can be set up for large volume regular orders, under certain conditions. This list of Standards will be updated as necessary to reflect items currently available. Prices are reviewed annually (1st January) but IGEM reserves the right to change prices at other times and without notice. Discounts are available for bulk orders (6 or more) of the same title, for more details please contact IGEM (technical@igem.org.uk).

ABOUT THIS LIST


The list uses the following terms: Edition X Set of Amendments Where an edition number is stated, the previous edition is superseded i.e. is not current and is obsolete. The edition is issued with separate amendments to bring it up to date. These amendments are issued with every Standard purchased but, where this was purchased prior to issue of amendments, they are available for downloading or by email to from the IGEM website (www.igem.org.uk) technical@igem.org.uk. The edition has been reprinted to contain amendments (and enhancements if applicable). Owners of the previous version of the same edition will have to insert amendments (see above) to bring that version up to date. It is not essential to insert enhancements. Refers to a re-print with enhancements. Previous impressions remain current.

Reprint with Amendments

Nth Impression

2 For more information on IGEM Standards, please see our website; www.igem.org.uk.

SCOPE OF IGEM STANDARDS TD series


TD/1 Ed 5 TD/1 Ed 5 S1 TD/2 TD/3 Ed 4 TD/3 Ed 4 S1 TD/4 Ed 4 TD/12 Ed 2 TD/13 TD/101 Ed 2
Upstream of and including ECV
Planning/design/ construction Testing/ commissioning Operation maintenance Natural Gas LPG Other gases Other fuels Operational safety Operational management Risk and safety assessments Load/stress analysis Labelling/marking Records Corrosion and damage Alterations Connections Legal & Standards Steel pipe PE pipe Other pipe materials Electrical Pipe/meter sizing

Transmission pipelines and associated installations. MOP > 16 bar Steel pipe and components. Storage and transportation Transmission pipelines. Risk assessment for developments. Distribution pipelines. MOP 16 bar PE pipe and components. Storage and transportation Services. MOP 16 bar Stress analysis

Pressure regulating installations Management of UIP activities

GM series
GM/4 Ed 2 GM/5 Ed 3 GM/6 GM/7A GM/7B GM/8 Pt 1 GM/8 Pt 2 GM/8 Pt 3 GM/8 Pt 4 GM/8 Pt 5

Downstream of ECV except GM/4, GM/5 and GM/7 which are also upstream
Flow metering practice. MOP > 38 100 bar (I&C) Electronic gas meter volume conversion systems (D, I&C) Standard diaphragm and RD meter installations. (I&C) 3 -1 Flow > 6 m h MOP 75 mbar Electrical connections. (D, I&C) MOP 100 bar Hazardous area classification. MOP 75 bar Meter installations. (I&C) Design. MOP 38 bar Meter installations. (I&C) Location and housing. Meter installations. I&C Installation and commissioning. Meter installations. (I&C) Operation and Maintenance. Meter installations. (I&C) Notices and labels. MOP 38 bar

UP series
UP/1 Ed 2 RWA UP/1A Ed 2 RWA UP/1B Ed 2 UP/2 Ed 2 UP/3 Ed 2 UP/4 Ed 3 UP/6 Ed 2 UP/7 Ed 2 UP/9 Ed 2 UP/10 Ed 3 UP/11 UP/12

Downstream of ECV

Strength testing, tightness testing and purging MOP 16 bar (I&C) Strength testing, tightness testing and purging MOP 40 mbar (I&C) Tightness testing and purging (D). MOP 21 mbar Installation pipework MOP 5 bar (I&C) Gas fuelled spark ignition and dual fuel engines. MOP 400 bar (I&C) Commissioning of gas fired plant (I&C) Compressors. MOP 400 bar (I&C) Gas installations in framed buildings (D, I&C) Gas turbines (I&C) Gas appliances in industrial and commercial premises (I&C) Gas in educational establishments (C) Gas fired process plant (I)

D is Domestic. I is industrial. C is commercial.

3 For more information on IGEM Standards, please see our website; www.igem.org.uk.

SCOPE OF IGEM STANDARDS GL Series


All upstream except GL/8 (also downstream) and GL/9 (downstream)
Planning Design Construction Pipework Commissioning Natural Gas LPG Other gases Operational safety Operational management Risk and safety assessments Operations Maintenance Labelling/marking Records Standards Legal Electrical

GL/1 Ed 2 GL/2 Ed 2 GL/4 Ed 2 GL/5 Ed 2 GL/6 GL/8 Ed 2 GL/9

Planning distribution systems. MOP 16 bar Planning transmission MOP > 16 bar Gas system assets - risk management Managing new works, modifications and repairs Non-routine operations

Reporting and investigating incidents Responding to cessation of gas supply

G series
G/1 3rd impression G/5

Upstream and downstream


Defining the end of the Network, meter installation, etc, Gas installations in flats and other multi-dwelling buildings Definitions for the gas industry

G/4

G/6

Gas supplies to mobile dwellings

SR series
SR/4 Ed 2 SR/9 Ed 2 SR/10 Ed 2 SR/14 Ed 2 SR/15 Ed 4 SR/16 Ed 2 SR/18 Ed 2 SR/20 Ed 2 SR/22 SR/23 SR/24 SR/25 SR/26 SR/28

Most apply to upstream and downstream situations


Low pressure gas holders storing lighter than air gases Safe working practices for PRIs Dealing with escapes of gas into underground plant Fixed volume storage for lighter than air gases Integrity of safety-related systems Odorant systems for gas transmission and distribution Safe working for the integrity of pipelines and installations Dealing with reported gas escapes Purging fuel gases Venting Natural Gas Risk assessments Hazardous area classification Horizontal directional drilling and impact moling Trenchless techniques

4 For more information on IGEM Standards, please see our website; www.igem.org.uk.

IGEM STANDARDS LIST


All buyers of IGEM Standards will receive a copy of IGEM/G/1 free of charge, on request.
ITEM and EDITION TITLE (COMMUNICATION NO.) DATE STANDARD 2009 PRICE
216 55 95 142 70 142 115 136 70 FREE*

MEMBER/IA 2009 PRICE


144 36 63 94 46 94 76 90 46 FREE*

TRANSMISSION AND DISTRIBUTION


IGEM/TD/1 Ed 5 IGEM/TD/1 Ed 5 Supp 1 IGEM/TD/2 IGE/TD/3 Ed 4 IGE/TD/3 Ed 4 Supp 1 IGE/TD/4 Ed 4 IGE/TD/12 Ed 2 IGE/TD/13 IGE/TD/101 Ed 2 IGE/TD/3/12/13 and IGEM/TD/1/2 Steel pipelines for high pressure gas transmission (1735) Handling, transport and storage of steel pipe, bends and fittings (1736) Application of pipeline risk assessment to proposed developments in the vicinity of high pressure Natural Gas pipelines (1737) Steel and PE pipelines for gas distribution (1677) Handling, transport and storage of PE pipe and fittings (1682) PE and steel gas services and service pipework (1725) Pipework stress analysis for gas industry plant (1681) Pressure regulating installations for transmission and distribution systems (1672) Adoption of pipe systems by a GT management of UIP activities (1740) Set of Amendments. Download at www.igem.org.uk 2008 2008 2008 2003 2003 2007 2003 2001 2009 2008

GAS MEASUREMENT
IGE/GM/4 Ed 2 IGEM/GM/5 Ed 3 IGE/GM/6 IGEM/GM/7A IGEM/GM/7B IGE/GM/8 Part 1 IGE/GM/8 Part 2 IGE/GM/8 Part 3 IGE/GM/8 Part 4 IGE/GM/8 Part 5 Flowmetering practices. Inlet pressure exceeding 38 bar and not exceeding 100 bar (1719) Electronic gas meter volume conversion systems (1730) Specification for low pressure diaphragm and rotary displacement meter installations with badged meter capacities exceeding 6 m3/h (212 ft3/h) but not exceeding 1076 m3/h (38000 ft3/h) (1635) Electrical connections for gas metering equipment (1731) Hazardous area classification for gas metering equipment (1732) Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar Design (1706) Locations, housings and compounds (1707) Fabrication, installation, testing and commissioning (1708) Operation and maintenance (1709) Notices and labels (1710) Strength testing, tightness testing and direct purging of industrial and commercial gas installations (1716) Strength and tightness testing and direct purging of small low pressure industrial and commercial Natural Gas installations (1717) Tightness testing and direct purging of small Natural Gas installations (1714) Installation pipework on industrial and commercial premises (1729) Gas fuelled spark ignition and dual fuel engines (1720) Commissioning of gas fired plant on industrial and commercial premises (1738) Application of compressors to Natural Gas fuel systems (1741) Gas installations in timber framed and light steel framed buildings (1722) Application of Natural Gas and fuel oil systems to gas turbines and supplementary and auxiliary fired burners (1705) Installation of flued gas appliances in industrial and commercial premises (1726) Gas installations in educational establishments (1704) Application of burners and controls to gas fired process plant (1713) Set of Amendments. Download at www.igem.org.uk 2006 2008 1996 2008 2008 2005 2005 2006 2006 2005 136 87 136 95 77 142 70 87 70 70 90 58 90 63 51 94 46 58 46 46

UTILIZATION
IGE/UP/1 Ed 2 Reprint with Amds IGE/UP/1A Ed 2 Reprint with Amds IGE/UP/1B Ed 2 IGEM/UP/2 Ed 2 IGE/UP/3 Ed 2 IGEM/UP/4 Ed 3 IGEM/UP/6 Ed 2 IGE/UP/7 Ed 2 IGE/UP/9 Ed 2 IGE/UP/10 Ed 3 IGE/UP/11 IGE/UP/12 IGE/UP/1/1A/1B/6/7/10/ 12 and IGEM/UP/2 2005 2005 2006 2008 2006 2009 2009 2006 2004 2007 2004 2006 2008 95 77 77 124 87 55 87 87 87 74 70 124 FREE* 63 51 51 82 58 36 58 58 58 49 46 82 FREE*

Amds = Amendments.

Ed = Edition.

Imp = Impression.

Supp = Supplement.

Free as download only, unless stated otherwise or for amendments with its associated Standard.

5 For more information on IGEM Standards, please see our website; www.igem.org.uk.

IGEM STANDARDS LIST


All buyers of IGEM Standards will receive a copy of IGEM/G/1 free of charge, on request.
ITEM and EDITION TITLE (COMMUNICATION NO.) DATE STANDARD 2009 PRICE
77 55 55 55 55 87 FREE
*

MEMBER/IA 2009 PRICE


51 36 36 36 36 58 FREE*

GAS LEGISLATION
IGE/GL/1 Ed 2 IGE/GL/2 Ed 2 IGEM/GL/4 Ed 2 IGE/GL/5 Ed 2 IGE/GL/6 IGE/GL/8 Ed 2 IGE/GL/9 Planning of gas distribution systems of MOP not exceeding 16 bar (1718) Planning of transmission and storage systems operating at pressures exceeding 16 bar (1727) Gas system assets risk management (1743) Procedures for managing new works, modifications and repairs (1715) Non-routine operations (1631) Reporting and investigation of gas related incidents (1721) Guidance for large consumers in dealing with Natural Gas supply emergencies. Download at www.igem.org.uk Defining the end of the Network, a meter installation and installation pipework (1733). Hard copy free with any other purchased Standard, on request or download at www.igem.org.uk Definitions for the gas industry (1739). CD copy free with any other purchased Standard, or download at www.igem.org.uk Gas installations in flats and other multi-dwelling buildings (1712) Set of amendments. Download at www.igem.org.uk Gas supplies to mobile dwellings (1728) 2005 2007 2009 2005 1996 2007 2006

GENERAL
IGEM/G/1 3rd Imp IGEM/G/4 IGE/G/5 IGE/G/5 IGEM/G/6 2008 2009 2006 2006 2009 70* FREE* 115 FREE* 70 46* FREE* 76 FREE* 46

SAFETY
IGE/SR/4 Ed 2 IGE/SR/9 Ed 2 IGE/SR/10 Ed 2 IGEM/SR/14 Edition 2 IGE/SR/15 Ed 4 IGEM/SR/16 Ed 2 IGE/SR/18 Ed 2 IGE/SR/20 Ed 2 IGE/SR/22 IGE/SR/23 2nd Imp IGE/SR/24 IGE/SR/25 Reprint with Amds IGE/SR/25 IGE/SR/26 IGE/SR/28 Low pressure gasholders storing lighter-than-air gases (1624) Safe working practice for PRIs (1654) Dealing with escapes of gas into underground plant (1660) Fixed volume storage for lighter than air gases (1742) Integrity of safety-related systems in the gas industry (1711) Odorant systems for gas transmission and distribution (1734) Safe working practices to ensure the integrity of gas pipelines and associated installations (1678) Dealing with reported gas escapes (1650) Purging operations for fuel gases in transmission, distribution and storage (1625) Venting of Natural Gas (1623) Risk assessment techniques (1655) Hazardous area classification of Natural Gas installations (1665) Amendments. Download at www.igem.org.uk Horizontal directional drilling and impact moling (1662) Trenchless techniques (1680) 1996 1999 1999 2009 2005 2008 2002 1998 1999 1995 1999 2000 2005 1999 2002 105 55 55 87 95 70 55 55 77 77 70 95 FREE* 87 105 70 36 36 58 63 46 36 36 51 51 46 63 FREE* 58 70

CERTIFICATES OF STRENGTH AND TIGHTNESS TESTING AND DIRECT PURGING TO IGE/UP/1 EDITION 2 AND IGE/UP/1A EDITION 2 (shrink wrapped pads of 25 triplicate certificates)
StT/UP/1A TT/UP/1A DP/UP/1A StT/UP/1 TT/UP/1 DP/UP/1 Certificate of strength testing for IGE/UP/1A Certificate of tightness testing for IGE/UP/1A Certificate of direct purging for IGE/UP/1A Certificate of strength testing for IGE/UP/1 Certificate of tightness testing for IGE/UP/1 Certificate of direct purging for IGE/UP/1 2004 2004 2004 2004 2004 2004 16 16 16 16 16 16 10 10 10 10 10 10

BRITISH GAS PLC PUBLICATIONS


IM/28 Appliances in Commercial Garages. 1993 20 15

Amds =

Amendments.

Ed

Edition.

Imp

Impression.

Free as download only, unless stated otherwise or for amendments with its associated Standard.

6 For more information on IGEM Standards, please see our website; www.igem.org.uk.

SPECIAL OFFERS

Ordering any of the Standard Sets below saves 30% than buying the Standards individually. All buyers of IGEM Standard Sets will receive a copy of IGEM/G/1 and IGEM/G/4 free of charge. All IGEM Standard Sets include any special offers which apply on individual Standard purchases.
SET TYPE ITEM and EDITION SPECIAL SET PRICE () NONMEMBER MEMBER

TRANSMISSION SET A
IGEM/TD/1 Ed 5 and IGEM/TD/1 Ed 5 Supp 1 IGE/TD/12 Ed 2 IGE/TD/13 IGE/GL/2 Ed 2 IGE/GL/5 Ed 2

442
Saves 190

292
Saves 126

DISTRIBUTION SET B
IGE/TD/3 Ed 4 IGE/TD/4 Ed 4 IGE/TD/13 IGEM/TD/101 Ed 2 IGE/GL/1 Ed 2 IGE/GL/5 Ed 2 IGE/TD/3 Ed 4 Supp 1

484
Saves 208

319
Saves 138

GAS MEASUREMENT SET C


IGE/GM/4 Ed 2 IGEM/GM/5 Edition 3 IGE/GM/6 IGEM/GM/7A and IGEM/GM/7B IGE/GM/8 Parts 1 to 5 IGE/GL/8 Ed 2

739
Saves 318

490
Saves 210

UTILIZATION COMMERCIAL SET D


IGE/UP/1 Ed 2 RWA IGE/UP/1A Ed 2 RWA IGEM/UP/2 Ed 2 IGEM/UP/4 Ed 3 IGE/UP/10 Ed 3 IGE/UP/11 IGE/SR/15 Ed 4

413
Saves 177

273
Saves 117

UTILIZATION INDUSTRIAL SET E


IGE/UP/1 Ed 2 RWA IGE/UP/1A Ed 2 RWA IGEM/UP/2 Ed 2 IGE/UP/3 Ed 2 IGEM/UP/4 Ed 3 IGEM/UP/6 Ed 2 IGE/UP/9 Ed 2 IGE/UP/12 IGE/SR/15 Ed 4

581
Saves 250

385
Saves 166

UTILIZATION PLANT RESPONSIBILITY SET F


IGE/UP/11 IGE/GL/8 Ed 2 IGE/G/5 IGEM/G/6 IGE/SR/10 Ed 2 IGE/SR/18 Ed 2 IGE/SR/20 Ed 2 IGE/UP/7 Ed 2

415
Saves 179

274
Saves 118

7 For more information on IGEM Standards, please see our website; www.igem.org.uk.

ORDERING IGEM STANDRARDS


If you wish to order an IGEM Standard or have any other queries, please do not hesitate to contact us using the following methods. TELEPHONE: 01889 561431 FAX: 01889 568264 POST: IGEM Standards, PO Box 2584, Uttoxeter, ST14 9AB EMAIL: igem@yesresponse.co.uk ONLINE: www.igem.org.uk

ORDER FORM
Standard Quantity Standard Quantity Standard Quantity Standard
IGE/SR/24 IGE/SR/25 IGE/SR/26 IGE/SR/28 IM/28 StT/UP/1A TT/UP/1A DP/UP/1A StT/UP/1 TT/UP/1 DP/UP/1 Standard Set Standard Set Standard Set Standard Set Standard Set Standard Set

Quantity

IGEM/TD/1 Edition 5 IGEM/TD/1 Edition 5 Supp 1 IGEM/TD/2 IGE/TD/3 Edition 4 IGE/TD/3 Edition 4 Supp 1 IGE/TD/4 Edition 4 IGE/TD/12 Edition 2 IGE/TD/13 IGE/TD/101 Edition 2 IGE/GM/4 Edition 2 IGEM/GM/5 Edition 3 IGEM/GM/6 IGEM/GM/7A IGEM/GM/7B IGE/GM/8 Pt 1 IGE/GM/8 Pt 2 IGE/GM/8 Pt 3

IGE/GM/8 Pt 4 IGE/GM/8 Pt 5 IGE/UP/1 Edition 2 RWA IGE/UP/1A Edition 2 RWA IGE/UP/1B Edition 2 IGEM/UP/2 Edition 2 IGE/UP/3 Edition 2 IGEM/UP/4 Edition 3 IGE/UP/6 IGE/UP/7 Edition 2 IGE/UP/9 Edition 2 IGE/UP/10 Edition 3 IGE/UP/11 IGE/UP/12 IGEM/G/1 IGEM/G/4 IGE/G/5

IGEM/G/6 IGE/GL/1 Edition 2 IGE/GL/2 Edition 2 IGEM/GL/4 Edition 2 IGE/GL/5 Edition 2 IGE/GL/6 IGE/GL/8 Edition 2 IGE/SR/4 Edition 2 IGE/SR/9 Edition 2 IGE/SR/10 Edition 2 IGEM/SR/14 Edition 2 IGE/SR/15 Edition 4 IGEM/SR/16 Edition 2 IGE/SR/18 Edition 2 IGE/SR/20 Edition 2 IGE/SR/22 IGE/SR/23

A B C D E F

Credit Card Orders:


Expiry Date /

Type of card (Mastercard/Visa) Card Name Card Address CARD NUMBER __________ _________________ Valid/Start date / Security Number* ______ * the 3 digit security code at the back of the card

ALL Orders:

Contact Name Telephone Number Address to which INVOICE should be sent (if different from above) Address to which ordered goods should be sent (if different from above) Delivery type

Prices include postage for 2nd Class mail within the UK (IGEM charge 2.50 for 1st Class and 7.50 for Courier if requested). Special delivery services e.g. time limit guarantee deliveries, etc., are available for an extra charge. Overseas airmail is free; otherwise appropriate Courier charges will be applied. Please contact IGEM to obtain a Courier quote. Please indicate the how you wish your order to be delivered:

Free

1st Class - 2.50 (UK only)

Courier - 7.50 (UK only)

Other (Please provide details)

Member Discounts:

Member discounts apply on all Standards. To process a member discounts (IGEM Members and Industrial Affiliates) we will need your membership number or your industrial affiliate number. If no details are entered here, goods will be priced at the standard rate. Industrial Affiliate Number Membership Number Name and/or Company

Order Total
Signature: Date: 8
Please tick this box if you do not wish to be contacted by IGEM in the future