Pine duBois, Environmentalist, Kingstons Joan of Arc regarding environmental issues Michael Kelliher, Mechanical Engineer Energy Auditor for Companies and Municipalities Michael OMeara, Mechanical Engineer Entergy
Wind Turbine
4.16. Wind Turbine Overlay District 4.16.1.0. Purpose The purpose of this by-law is to provide by special permit for the construction and operation of wind facilities and to provide standards for the placement, design, construction, monitoring, modification and removal of wind facilities that address public safety, minimize impacts on scenic, natural and historic resources of the city or town and provide adequate financial assurance for decommissioning.
http://www.kingstonmass.org/filestorage/52/Complete_Zoning_By-Laws_8-2207_Bookmarks.pdf
Fleet Audit
Action Steps
1. 2.
3. 4. 5. 6. 7.
8.
20% Reduction in Fuel Consumption Fleet Audit to be transmitted to the FinComm & Capital Planning Comm Recommendation to downsize the Fleet Revert to Bio Fuels Adopt a No Idling policy Convert the Computer System to a more restrictive Operation Care of Municipal Buildings Budget be segregated in FY2009 to reflect individual departmental appropriation for gas and diesel All departments give copies of this report
http://www.kingstonmass.org/filestorage/40/3743/Report_of_KSEFC.pdf
http://www.kingstonmass.org/filestorage/40/3743/Green_Proclamation.pdf
No Idling Policy
Silver Lake Regional High School Kingston Open Space Committee U.S. Department of Agriculture
Grow Locally