Sunteți pe pagina 1din 4

HORIZON

TM

CHUTES

G. S. PARKHE INDUSTRIAL MERIT AWARD - 2005 By MCCIA, Pune.

LINEN CHUTES
HORIZON CHUTES PVT. LTD.
Garbage Chutes - Debris Chutes - Odor Control Systems Access Doors - Fire Doors

www.horizonchutes.com

HORIZON LINEN (LAUNDRY) CHUTES


Hotels and Hospitals generate soiled linen on different floors. This used linen needs to be taken to Laundry Room, for sorting and cleaning. Thus Linen (Laundry) Chutes are planned and installed in such a way that laundry disposed from individual floors gets collected in the Laundry Room.

Schematic Layout of Linen Chute

Full Dia. Vent Weather Cowl Vent with Bird Nettting Flashing (Optional) Water Source Sanitation Unit

Fire Water Tank

Cravat Roof Slab

BIB Cock

Side Hinged Hopper

Linen Chutes can be installed in 4 Hotels, Hospitals, Bungalows. 4 buildings. Residential 4 In any duct, accessible from every floor. Advantages of Horizon Linen Chutes 4 total building Linen collection at one Facilitates single point. 4 Linen disposal with ease and safety. 4 power consumption. Reduces 4 Widely used all over the World. 4 manpower. Reduces Salient features of Horizon Linen Chutes 4 Manufactured & Installed as per BS 1703:2005, NFPA 82. 4 Weather proof Stainless Steel ON/READY construction. BUSY/ CLEANING 4 Interlocking of chute - hoppers to FAULT achieve one user at a time. Hoppers will remain locked with busy indication for PRESS TO OPEN DOOR all other floors, when one floor is HORIZON operating. CHUTES 4 Vent system to allow air movements for vacuum breaking. 4 Intake Hoppers are 90 minute fire rated as per UL Label 10B. 4 Intake Hoppers can be L-hand or R-hand side hinged. 4 end fire door D Type. Discharge 4in different sizes. Available 4 sanitation system for internal cleaning of Optional chutes.
R

Fire Sprinkler UL Listed Door Controller PVC Pipe Schedule. 40 1 Wet Riser Flat Structural Bracket

Door Frame

Intermediate Piece to Adjust Floor Height

Optional Cleaning 0 Sprinkler 120 10 LPM Discharge

Access Control Key Pad

Finish Floor Fusible Link

L Type Bracket Floor Slab

Anchor Fastener

Discharge End Fire Door

Interlocking Master Control Panel

Stand alone access control system dedicated for Linen Chute only. Access control system with 12 digit key 4 1 2 3 pad is provided near the intake hopper. 4 5 6 4 digit changeable password for each 4 intake hopper will allow usage by 7 8 9 authorized persons only. 0 # = master password is provided A with higher management for overriding any password.

1.8 TO 2 Mtr.

Line Sorting Table

Support Prop Slope

Gully Trap

CHUTE SPECIFICATIONS
Selection of Chute Diameter Type of building Residential Hotels / Hospitals Linen chute dia. 600 mm 750 mm Hopper Size Side Hung 16" x 18" 16" x 24" 21" x 21" 24" x 24"

FIRE SAFETY
Fire Protection in Linen Chutes Manufacturing and installation codes and standards. BS 1703:2005 seen along with BS 476 part 22, NFPA 82, IS 6924:2001, NBC 2005 - clause 3.4.8.3

Hopper size for std. chute Chute Diameter 600 mm Typ. Size (18) Max. Size 750 mm Typ. Size (24) Max. Size

Fire sprinkler opens at 680C to extinguish fire.

Passage to flame is not allowed.

Any bigger sizes are available with max. intake hopper size 30x 30 Mfg. as per UL Label 10 B.

Inside temp. @10000C. Fire Inside Chute

Material of Construction
4 Steel SS 304 - 1.5 to 2 mm thick. Stainless 4 Fibre, Plastic chutes are not allowed considering

fire hazard, as per BS/NFPA Codes. Floor Frames


4 weight is divided on each floor. Total chute 4 MS Galvanized structural frame fabricated from

Outside surface temp.1210C.

40 X 40 X 5 mm angles. 4 Anchor fastened with floor / beam. Sound Dampener Coating (Optional)
4 thick sound deadner coating to reduce Min. 2 mm

Hopper inside surface temp. 1210C.

Passage to flame is not allowed.

sound, if required. Intake Hoppers


4 Laundry Chute Hoppers - Side hung, left or right

hand opening.
4 chute in face with front wall. Fixed with 4 Hopper can be interlocking for One user at a time

Fire Outside Chute on Floor

Outside surface temp.@1000 C.

concept.
4 fire rated as per Underwriters Laboratory 90 minute

(UL) USA.
4 Label 10B. Std. Max. temperature rise of As per UL

Door integrity shall remain even after Hose reel test at the end of 90 min. fire test.

1210C in 30 min. (of unexposed surface) Vent


4at roof level or just above last intake Installed
NRNT2. E317138

hopper.
4 to break vacuum created by falling Designed

R 25465 Chute Frame & Fire Door Assembly. o Fire Rating 1 Hr., Temp. rise 30 Min. 250 F Max.

Switches, Industrial Control Component

Linen. 4 with weather cowl & bird screen. Provided Discharge


4 directly discharge into Laundry room on Chute shall

Requirements for Intake Hopper 4 fire rated. 90 Minute 4 for flame is Passage 4 If fire exposed

laundry sorting table.


4 90 diverted discharge at 1.8 to 2 mtr. height above
0

Laundry Room floor level.


4 end fire cut off door. Discharge

not allowed side temp. is @1000o C. then unexposed side temp. shall be 121o C. 4 Door should not fall open after Hose reel test at the end of fire test. 4 Inter-locking chute hopper controllers are also UL Listed for user safety. Fire Sprinklers Opens at 0 4 68 C. to extinguish fire. Installed 4 at top and bottom intakes and in between alternate floors. Starting from top . " IPS (BSP) female threading ready to be connected to 4 1 wet riser of fire protection system. Discharge End Fire Door 4 In case of

Linen Trolley
4 Customized fabricated trolleys available.

Discharge End Fire Door ' D ' type


4 Our "D" type discharge end fire rated door is held

horizontally against gravity by 790C. fusible link. In case of fire, fusible link melts and fire door closes the upward path of chute restricting heat transfer to upper floors.

fire in Laundry room this shall cut off fire path

at 79o C.

Provisions for Linen Chute


Duct Size
Required Minimum Duct Size for Installation

Elevation at Linen Chute Duct


Duct / Slab Opening
32 x 32 36 x 36 Dia of chute +8
As per floor to floor height.

Chute Diameter
24 (600 mm) 30 (750 mm) For other sizes

Intermediate pieces

Upper floor slab Duct wall in floor lobby to be constructed after chute erection Side Hinged Intake hopper Door

1. Front wall shall be constructed after the erection of chute. 2. Provide 1wet riser from fire protection system for total building height inside chute duct. 3. Connect fire sprinklers provided by us at top most intake, lower most intake & in between alternate floors starting from top.( Fire sprinklers are provided with 1/2 BSP female threading ready to be connected. ) 4. In case of requirement of integral cleaning system, provide predefined water connection as per our requirement.

LINEN CHUTE DUCT

Intake door

LINEN CHUTE

1200 mm

600 -700 mm

Floor slab in floor lobby

1. Provide wall tiles (min. 1.8 mtr. high ) & floor tiles. 2. Floor to have slope towards gully trap connected to drainage/basement sump. (In case of Interval cleaning system.) 3. Provide 6 Amp. MCB, earth, neutral for control panel in laundry room. 4. Lighting arrangement. 5. Provide clear min. 1.5 mtr. wide, out side opening flush door (40 mm thick) to Laundry room. 6. Chute duct slab to be closed in Laundry Room after installation of chute.

Plan at Linen Chute Duct

F
TM

Outside wall of Duct

Pipes, Cables for control panel.

Linen Chute
1 Wet riser Duct for Linen Chute (for sizes see table) Side Hinged Intake Hopper

Floor Service Lobby


AUTHORISED DEALER

HORIZON
Unit 1:

CHUTES

HORIZON CHUTES PVT. LTD.

Unit 2 : Gat No. 6B, Village Kasurdi, Shivapur - Saswad Road, Tal. Bhor, PUNE - 412 205. (Maharashtra) INDIA.

Adgraph

11/16/2, Village Nanded, Pune Sinhagad Road, PUNE - 411041. (Maharashtra) INDIA. Tel.: +91-20-24394617, 24390445. Mobile : +91-9822037079. Email : info@horizonchutes.com

In view of our constant endeavor to improve the quality of our products, We reserve the right to alter or change specifications without prior notice.

Laundry Room

Structural bracket anchor fastened

Floor slab beam

S-ar putea să vă placă și