SUPPLY CHAIN & BUILDING OF SHIP

Presented by:Prashant Kumar, Tamanna M.F.Tech-2nd Sem. NIFT, Gandhinagar

Contents
Terms and notations Roles in ship building Ship building process Basic differences Ship yard tour Ship design process -omitted Detailed ship design process -omitted Summary

Terms and notations


Control

Output Input Work 1

Work 2 Input

Roles in shipbuilding

Shipbuilding process
Contract

Ship Design Assembly & Painting Steel Cutting Steel Storage Pre-treatment Erection/ Launching Final Outfitting Sea Trial Delivery

Contract
Contract Ship Design Assembly & Painting Steel Cutting Steel Storage Pretreatment Erection/ Launching Final Outfitting Sea Trial Delivery

There are contract designs Activities in shipbuilding Industry

Contract

Ship design
Contract

Structural Model (Hull) Design Outfitting Design


Ship Design Assembly & Painting Steel Cutting Erection/ Launching Final Outfitting Sea Trial Delivery

Basic Design Detail Design Mfg. Design

Steel Storage Pre-treatment

Ship design

Structural Model (Hull) Design Outfitting Design

Steel storage and cutting


Contract

Two important ceremonies: Steel cutting Launching


Ship Design Assembly & Painting Steel Cutting Erection/ Launching Final Outfitting Sea Trial Delivery

steel Storage Pretreatment

Steel storage and cutting

Assembly and painting


Contract

Ship Design Assembly & Painting Steel Cutting Steel Storage Pre-treatment

Assembly steps: Manufacture Subassembly Unit assembly Paint Blocking

Erection/ Launching Final Outfitting Sea Trial Delivery

Assembly steps

Assembly and painting

Erection and launching


Contract

Incredible machines for e&l: Goliath crane Docks


Ship Design Assembly & Painting Steel Cutting Erection/ launching Final Outfiting Sea Trial Delivery

steel Storage Pretreatment

Erection and launching

Erection and launching

Final outfitting
Contract

Ship Design Assembly & Painting Steel Cutting Steel Storage Pre-treatment

Docks are the critical resource for your ship Building

Erection/ Launching Final Outfitting Sea Trial Delivery

Final outfitting

sea trial and delivery


Contract

Ship Design Assembly & Painting Steel Cutting Steel Storage Pre-treatment

A ship to be registered must be satisfactorily Inspected/surveyed by a Ship Classification Society

Erection/ Launching Final Outfitting Sea Trial Delivery

Sea trial and delivery

Shipbuilding process
Contract

Ship Design Assembly & Painting Steel Cutting Steel Storage Pre-treatment Erection/ Launching Final Outfitting Sea Trial Delivery

Basic differences
Structure and outfitting

Basic differences
Blocks for mfg. design

Basic differences
Blocks for mfg. design

Basic differences
Blocks for mfg. design

Ship yard tour