Sunteți pe pagina 1din 51

OVERHEAD CONSTRUCTION MANUAL

SWITCHES
Back to MAIN INDEX Go to SECTION INDEX

CONSTRUCTION

DESCRIPTION Construction code guide Switch LV SWITCH CONSTRUCTION

DWG 1175

CONSTRUCTION

DESCRIPTION EDO Switch fuse, bracket mounting, PG mains connection material EDO Switch fuse, bracket mounting, PG mains connection EDO Switch fuse, bracket mounting, LLC mains connection material EDO Switch fuse, bracket mounting, LLC mains connection

DWG 1182/6 1182/7

SWLV/3/BS SWLV/3/FS6 SWLV/3/FS8

Switch/Fuse LVABC construction Switch/Fuse LV Open Wire construction

1162 1108

SW11/S/EDO SW12/S/EDO SW19/S/EDO

1182/8 1182/9

E.D.O SWITCH CONSTRUCTION EDO Switch fuse, crossarm mounting PG mains connection material EDO Switch fuse, crossarm mounting PG mains connection material EDO Switch fuse, crossarm mounting PG mains connection 1182/1 1182/2 1182/3

SW11/S/EDO SW12/S/EDO SW19/S/EDO

SOLID LINK SWITCH CONSTRUCTION Switch solid link crossarm mounting PG mains connection material Switch solid link crossarm mounting PG mains connection 1099/1 1099/2

SW11/S/EDO SW11/1/EDO SW11/3/EDO SW12/S/EDO SW19/S/EDO SW21/1/EDO SW22/3/EDO SW33/1/EDO SW33/3/EDO

SW11/S/SLS SW11/1/SLS SW11/3/SLS SW12/S/SLS SW19/S/SLS SW22/1/SLS SW33/1/SLS SW33/3/SLS

SW11/S/EDO SW11/1/EDO SW11/3/EDO SW12/S/EDO SW19/S/EDO SW22/1/EDO SW22/3/EDO SW33/1/EDO SW33/3/EDO

EDO Switch fuse, crossarm mounting LLC mains connection material EDO Switch fuse, crossarm mounting LLC mains connection

1182/4 1182/5 SW11/S/SLS SW12/S/SLS SW19/S/SLS

Switch solid link bracket mounting PG mains connection material Switch solid link bracket mounting PG mains connection

1099/3 1099/4

A D E

ORIGINAL ISSUE 12.1.05 15.8.05


Ergon Energy Corporation Ltd

APPROVED DATE PASSED ABN 50 087 646 062 DRAWN

J. Brooks 30.06.05 A.Croft


M. Kavanagh

OVERHEAD DISTRIBUTION
SWITCHES INDEX

FILE: 5 07 1168 1

Index

Sh 1

CONSTRUCTION

DESCRIPTION AIR BREAK SWITCH CONSTRUCTION 11/22/22kV Air break switch construction material 11/22/22kV Air break switch construction drilling detail 11/22/22kV Air break switch pole top mounted construction

DWG

CONSTRUCTION SW11/3/SECT5 SW22/3/SECT5 SW33/3/SECT5 SW11/3/SECT6 SW22/3/SECT6 SW33/3/SECT6

DESCRIPTION 11/22/33kV 3 phase sectionaliser with mid pole bypass switch construction

DWG 1266/5

1279/1 1279/2 1279/3

SW11/3/ABST SW22/3/ABST SW33/3/ABST SW11/3/ABSLBT SW22/3/ABSLBT SW33/3/ABSLBT SW11/3/ABSM SW22/3/ABSM SW33/3/ABSM SW11/3/ABSLBM SW22/3/ABSLBM SW33/3/ABSLBM

11/22/22kV Air break switch with load break pole top mounted construction

1279/3 SW11/1/SECT1 SW22/1/SECT1 SW33/1/SECT1 SW11/1/SECT2 SW22/1/SECT2 SW33/1/SECT2

11/22/33kV Single phase sectionaliser with bypass switch construction material 11/22/33kV Single phase sectionaliser with bypass switch construction drilling detail 11/22/33kV Single phase sectionaliser with bypass switch construction

1121/1 1121/2 1121/3

11/22/22kV Air break switch mid pole mounted construction

1279/4

11/22/22kV Air break switch with load break mid pole mounted construction

1279/4 SW11/S/SECT1 SW12/S/SECT1 SW19/S/SECT1 SW11/S/SECT2 SW12/S/SECT2 SW19/S/SECT2

12.7/19.1kV SWER sectionaliser with bypass switch construction material 12.7/19.1kV SWER sectionaliser with bypass switch construction

1281/1 1281/2

SECTIONALISER/LINK/EDO CONSTRUCTION 11/22/33kV 3 phase sectionaliser with bypass switch construction material 11/22/33kV 3 phase sectionaliser with pole top bypass switch construction drilling detail 11/22/33kV 3 phase sectionaliser with pole top bypass switch construction 1266/1 1266/2 1266/3

SW11/3/SECT3 SW22/3/SECT3 SW33/3/SECT3 SW22/3/SECT3 SW22/3/SECT4 SW33/3/SECT4

11/22/33kV 3 phase sectionaliser with mid pole bypass switch construction drilling detail

1266/4

SW11/S/EDO SW12/S/EDO SW19/S/EDO SW11/S/SLS SW12/S/SLS SW19/S/SLS

11/12.7/19.1kV S.W.E.R. link/edo switch construction material 11/12.7/19/1kV S.W.E.R. link/edo switch construction

1458/1 1458/2

A D E

ORIGINAL ISSUE 15.07.04 15.08.05


Ergon Energy Corporation Ltd

APPROVED DATE PASSED ABN 50 087 646 062 DRAWN

J. Brooks 30.06.05 A.Croft


M. Kavanagh

OVERHEAD DISTRIBUTION
SWITCHES INDEX

FILE: 5 07 1168 2

Index

Sh 2

CONSTRUCTION

DESCRIPTION RECLOSER CONSTRUCTION 11/22/33kV 3 phase pole mounted recloser with VT (Nu-lec construction material) 11/22/33kV 3 phase pole mounted recloser with VT (Nu-lec construction material 11/22/33kV 3 phase pole mounted recloser with VT (Nu-lec) construction

DWG

CONSTRUCTION

DESCRIPTION 12.7/19.1kV SWER pole mounted oil circuit recloser drilling detail 12.7/19.1kV SWER pole mounted oil circuit Recloser HV bridging & x-arm drilling

DWG 1291/3 1291/4

1315/1 1315/2 1315/3

SW11/3/ACRT SW22/3/ACRT SW33/3/ACRT SW33/3/ACRTNE

11/22/33kV 3 phase pole mounted recloser 1315/4 with VT (Nu-lec) drilling detail 11/22/33kV 3 phase pole mounted recloser 1315/5 with VT (Nu-lec) and HV bridging 11/22/33kV 3 phase pole mounted recloser 1315/6 with VT (Nu-lec) and control cubicle & x-arm drilling

SW11/ACRT SW22/ACRT SW33/ACRT

11/22kV 3 phase pole mounted recloser with V.T. (Tavrida) construction - material 11/22kV 3 phase pole mounted recloser with V.T. (Tavrida) construction - material 11/22kV 3 phase pole mounted recloser with V.T. (Tavrida) construction 11/22kV 3 phase pole mounted recloser with V.T. (Tavrida) construction Drilling detail 11/22kV 3 phase pole mounted recloser with V.T. (Tavrida) construction H.V. bridging 11/22kV 3 phase pole mounted recloser with V.T. (Tavrida) construction Control cubicle and crossarm drilling

1429/1 1429/2 1429/3

1429/4 1429/5 1429/6

SW11/S/ACRT SW12/S/ACRT SW19/S/ACRT

12.7/19.1kV SWER pole mounted recloser with VT (Nu-lec) construction material 12.7/19.1kV SWER pole mounted recloser with VT (Nu-lec) construction 7/19.1kV SWER pole mounted recloser with VT (Nu-lec) drilling detail 12.7/19.1kV SWER pole mounted recloser with VT (Nu-lec) HV bridging & x-arm drilling 12.7/19.1kV SWER pole mounted recloser with VT (Nu-lec) LV bridging

1322/1 1322/2

1322/3 1322/4 1322/5

SW11/S/OCR SW12/S/OCR SW19/S/OCR

12.7/19.1kV SWER pole mounted oil circuit recloser construction material 12.7/19.1kV SWER pole mounted oil circuit recloser construction

1291/1 1291/2

A C D

ORIGINAL ISSUE 15.7.04 15.8.05


Ergon Energy Corporation Ltd

APPROVED DATE PASSED ABN 50 087 646 062 DRAWN

J. Brooks 30.06.05 A. Croft


M. Kavanagh

OVERHEAD DISTRIBUTION
SWITCHES INDEX

FILE: 5 07 1168 3 FILE: 5 07 1168 1

Index

ShSh 1 3

S-ar putea să vă placă și