Sunteți pe pagina 1din 2

NPM Optimization Guideline Tool: NPMaster: performance analysis tool which can help us identify the root problem

M2000 &PRS: help us get the KPI and counter to identify the TopN cell Nastar: help us do the neighbor optimization and identify the coverage issues, do the interference check.

Document: From 3MS website, we can download the URFSTG documents, including OMC operation guideline, KPI monitoring and improvement guideline etc. RAN 12 UMTS reference including counter reference, alarm reference, MML reference etc.

Optimization SOP: 1. Check the KPI daily report and identify the degraded KPI 2. Identify the TopN cells and the degradation time 3. Check the alarms for topN cells, also check whether some operation or activity is done at TopN cells 4. Common troubleshooting method for TopN cell: Optimization the neighbor (Intra-freq neighbor, IRAT neighbor) Parameter tuning RF tuning Apply some algorithm 5. Common problems which lead to bad KPI or degradation Site alarm or site down Weak coverage (use Nastar to check the coverage) Pilot pollution or Missing neighbors (use Nastar to check) Other reasons (use NP Master to analysis)

Delivery document required:


2012-4-16 1 , 2

Weekly NPM activities tracker Record our weekly optimization related activities

Weekly Remain problem tracker We may find some issue which take long time to solve or need other department or RCOM to solve. This kind of issues aresite down, site alarms, external interference, other issues. We record this kind of issues and push related team to solve.

Performance analysis report Make the report and need communicate with RCOM circle team.

Optimization parameters changing record: Record the parameters

Weekly RNO meeting: Huawei HQ team and circle team will have meeting to review the RNO.

RNO weekly meeting 22-Jan.xls

2012-4-16

2 , 2

S-ar putea să vă placă și