Sunteți pe pagina 1din 3

ACHINT RAJPUT

rajput_achint20@yahoo.com Cell: 09528306806


OBJECTIVE

To secure a position in a progressive organization that provides opportunities to prove my excellence and efficiency.
ACADEMIC CHRONICLE Qualifying Examination Passed)/ Course B. Tech (Electrical and Electronics Engineering) Intermediate CBSE St. Marys School, Najibabad High School ICSE 2004 67.9%

Board / University Punjab Technical University

Institution Institute of Engineering and Technology, Ropar (Punjab). DAV Public School, Kotdwar

Year of Passing 2010

Percentage Obtained 72%

2006

63.4%

Contact Address: Residential:


s/o Mr. Vedprakash Arya Near Chatri wala qua, Maqbara Najibabad, Distt.- Bijnor Uttar Pradesh.

TECHNICAL PROFILE Operation and Maintenance of 25 MW Captive power plant. Basic working knowledge in AUTOCAD. Strong back ground in the principle of power system and power generation. .

Personal Data: Father : Mr. Vedprakash Arya.

Occupation : Lawyer. Born on : 20th Nov, 1987.

Marital status: Married. Nationality Language . : : Indian.

MY STRENGTHS

Active learner. Operational Experience Hindi, English Dedicated. (Can Speak, Read & Write) Ability to deal with people diplomatically.

Designation: Asst.Engineer (Project - Co-gen Power Plant) Joined on 14th July, 2010 as a Trainee Engg (14th July, 2010 to 13th Jan, 2011), Promoted as Assistant Engineer on Jan, 2011 (13th Jan, 2011-till date). Responsibility Areas: Operation and Maintenance: Knowledge of operation of 25 MW Captive power plant at USML-Barkatpur including maintenance of power transformers, 3-phase induction motors, HT line panels, Air circuit breakers, Vacuum circuit breakers.

Project Experience

132/33 KV Substation: Presently working at site of 132/33 KV UPPCL substation at village

Barkatpur.
132/11 KV Substation: Knowledge of Erection and Testing of various Electrical equipments for Substation like 132/11 KV Power Transformer, SF6 Ckt. breaker, VCB, Lighting arresters, Isolators etc. Turbo-generators: Knowledge of Erection and Testing of 3 TG Units i.e. 2x15 MW, 1X10 MW including turbine governing and protection panel erection with cable scheduling and laying. Switch Gear: Knowledge of Erection and Testing of Electrical Switch Gear and PMCCs including their cable scheduling and laying. Erection, Testing and Commissioning of 40 MW Co-gen power plant (2x15 MW TG Units and 10 MW TG Unit).

Extracurricular activities

Completed six months Industrial Training from BHEL, Haridwar on manufacturing of 250 MW Turbo generators and Stator body of 500 MW Turbo generators. Completed four weeks industrial training from BHEL, Haridwar on basics of CNC and PLC machines Attended 7 Days NSS (National Social Service) camp working with the team mates to provide general awareness among the people.

Declaration

I assure that the above furnished details are true and correct to the best of my knowledge.

Yours sincerely

Place : Najibabad Date : Achint Rajput

S-ar putea să vă placă și