References: CLCS Document No.4330-405-PVI-P-016 I & C Device List Basic symbols for Control and Instrumentation Abbreviation
REV. 4
1.0
OVERVIEW
The purpose of this document is to explain and describe the implementation of Coordinated Master Control and Boiler Master Control used in this project.
2.0
Write-up on CLCS COORDINATED MASTER CONTROL Window Annunciators (based on customer inputs)
Control Philosophy
Unit Master Set Point comes from Load Dispatch Centre. The output of Unit Master Auto Manual Station is fed to a Ramp Generator. The Ramp Generators output Rate of Change limit is set after detecting the direction of change while checking the Boiler margins. If Boiler margin (i.e., Fuel/Air/Feedwater Controllers deviations are within limit in the intended direction of change) the Ramp Generators output is allowed to change at a preset rate. A correction is applied to the set point according to deviation of frequency through a summer. The output of the summer block is passed further on to a Ramp Generator through a Switch if CMC mode is selected. If Boiler Follow mode is selected the input to the second Ramp Generator is the Delayed Load Set Point of Turbine Controller. If the Boiler is in Manual mode, Actual Load is fed as the input to the second Ramp Generator. The above said switching function is achieved using a Switch Block. The second Ramp Generator output is ramped according to the Output rate of Change limit. The output rate of change limit is calculated according to the direction of change. The output is allowed to change according to a rate of change if direction blocking is not present in the desired direction of change. Change in any direction is allowed only if the deviation of the following controllers are within a predetermined limit. The controllers whose deviation is monitored when an increase in SP is desired are: Feed Water flow Control Air Flow Control Fuel Flow Control PA Header Pressure Control The controllers whose deviation is monitored when a decrease in SP is desired are: Feed Water flow Control Air Flow Control Fuel Flow Control The rate of change of limit is the minimum of the following: Load Rate of Change limit set by the operator The rate of change limit calculated by the Turbine Stress Evaluator(TSE) according to the margin available in the direction of change desired if TSE influence is turned on. Otherwise a safety margin of 50% is considered. The direction of change is determined by comparing the difference between the input and output of the ramp generator with a direction specific numeric with a value of +1 or 1(adjustable). When the difference cross the limit the direction of change is sensed and the corresponding margin is selected. The upper limit of the Second Ramp Generator is the minimum of the following: Unit capability DOC. No : D0T195-302-CJY-E00 NTPC REF DWG : 4330-405-PVI-P-016 REV. 4
Write-up on CLCS COORDINATED MASTER CONTROL Max Load SP set by the operator. Max Load permissible by TSE.
Unit capability is calculated according to the auxiliary equipment availability. All the auxiliary equipments mentioned in the beginning of this section are monitored continuously and unit capability due to the individual equipments are compared with the Load SP and the minimum is selected as the SP to the Unit Capability ramp generator. When any one of the equipment trips the SP to the Unit capability ramp generator comes down correspondingly. The output of the Ramp Generator is brought down by Runback action. The runback rate depends upon the equipment that tripped. Maximum load permissible by TSE is calculated by adding the Upper margin provided by TSE with Actual Load. The lower limit of the second Ramp Generator is the maximum of the following: Minimum Load SP set by the operator Minimum Load Permissible by TSE.
Minimum Load permissible by TSE is calculated by subtracting the Lower margin provided by TSE from Actual Load. The output of the second Load Ramp Generator is passed on to the Turbine Load controller as Load setpoint after delaying the output (by using a second order delay element)and subtracting a value (bias due to Throttle pressure deviation when CMC mode is selected). The same output is fed as Feed Forward signal to Boiler Master after adding a bias due to Frequency Correction (if the Frequency influence is kept ON in EHTC) when the Boiler Master is in CMC mode.
REV. 4
Write-up on CLCS COORDINATED MASTER CONTROL CJY00_1P01, CJY00_1P02, CJY00_1P03: GENLIN Block used to calculate the correction factor due to frequency deviation. CJY00_2C21: RATIO Block used as ramp generator to limit the output rate of change according to the TSE margin available. The Output High/Low limits are determined according to Unit capability , TSE margin and the Maximum/minimum limit set by the operator. CJYOO_2P01: LEADLAG Block to provide a second order delay to Unit Load SP generated. CJY00_2N58: NUMERIC Block used to determine throttle pressure deviation. The deviation of the Boiler master controller is selected and passed on according to the mode (CMC/Boiler Follow) mode selected. CJY00_2P02: GENLIN Block used to determine the influence of Throttle Pressure deviation on generated Unit Load SP. CJY00_2N51: NUMERIC Block used to pass the bias due to Throttle pressure deviation when CMC mode is selected. 4CJY00_2C22: SUMMER Block for calculating the Load SP to EHTC after taking into account the bias due to Throttle pressure deviation. CJY00_02.CALCULATOR: CALC Block used to determine the Feed forward signal to Boiler master after taking into account the frequency correction signal. CJY00_2N52: NUMERIC Block to pass on Frequency correction signal when Frequency influence is turned ON in EHTC. CJY00_3P01, P02, P03, P04, P05, CJY00_4P01, P02: CALC Blocks used to determine unit capability set point by selecting the minimum capability of the auxiliary devices as the final setpoint. CJY00_3N51 TO CJY00_3N73 & CJY00_4N51 TO CJY00_4N57: NUMERIC Blocks used to determine individual equipment capability according to availability of the equipment. If the equipment is ON then the capability of the equipment is passed on as the value of the numeric by the corresponding logic otherwise zero is passed on. CJY00_4N59 TO CJY00_4N68: NUMERIC Block for determining the individual auxiliary equipments runback rate. The rate is kept as zero until the equipments capability is more than the unit SP. Once the equipments capability comes below unit SP a predetermined runback rate is passed on. 3CJY00_04.RUNBACK: HILOAVG Block used as high selector to select the highest of the available run back rates.
CJY00_3C21: RATIO Block used as ramp generator for determining unit capability. During runback the output is ramped according to the predetermined rate of the equipment due to which the runback is initiated.
REV. 4
CJY00_4N69, CJY00_4N70: NUMERIC Blocks used by the operator to set Maximum/ Minimum Load SP.
CJY00_4P05: CALC Block used to calculate the upper and lower limit of Unit SP ramp generator.
Hand Operated A/M stations for Boiler Master: (Refer dwg. 3CJY00_06)
AutoManual stations located in UCP has the facility to take the controller individually to Manual mode and manipulate the outputs. This is redundant to the facility available in OWS. This is achieved using calculator and Logic blocks. Functional Blocks used: 3CJY00_06.UCP: CALC Block Increment and decrement command from UCP Auto Manual stations are taken as inputs and the calculated value is written back to Unit Master Auto Man Station.
3.0
Write-up on CLCS COORDINATED MASTER CONTROL The following operator interfaces based on OWS/LVS operations are available in CCR. Adjusting Boiler Demand. Selection of Transmitters Cas/Man Selection of controller.
Control Philosophy
The Set Point is either determined by the operator or depends on Boiler Load Index depending upon the mode that is selected. If fixed SP mode is selected from MMI the SP is operator determined. When the same is not selected the SP is determined based upon either Boiler Load Index or Actual MW. Selection between the two is preset. The Boiler Master can be operated in two different modes. When the Boiler Follow mode is selected the controller with a Feed Forward signal based on either Boiler Load Index or EHTC Load Set Point is selected. The selection between the two-feedforward signals is preset. When Coordinated Mode is selected the controller with Unit Load SP generated by Coordinated Master as the Feed Forward Signal is selected for control. When Manual mode is selected or when Run Back in Action the Boiler Master A/M station trips to Manual mode. When Run Back in Action signal is present Turbine Follow mode Signal is automatically selected and the Unit capability comes down to match the available capability. This signal is factored (MW to Fuel Ratio) and given as Boiler Master output to the downstream controller viz., Fuel Master and Air Master signal respectively. This will result in reduction of Steam Generation to match the available Unit Capacity. The turbine controller switches to initial pressure mode and starts controlling the Throttle pressure simultaneously. In order to provide for tracking during manual mode a switch is provided. This switches the Boiler Master demand to actual Fuel Flow (in terms of Percentage) when Fuel Master controller is not in Cas mode. With the tracking option ON, the Boiler Master Auto Manual Station Output is made to track Actual fuel flow (Percentage value) when Fuel Master is in Manual mode. When Fuel Master switches back to Cas mode a bump is avoided as Boiler Master A/M output was tracking actual Fuel Flow. Operator can select the various modes of operation (Manual mode, Turbine CLCS COORDINATED MASTER CONTROL DOC. No : D0T195-302-CJY-E00 NTPC REF DWG : 4330-405-PVI-P-016 REV. 4
Write-up on CLCS COORDINATED MASTER CONTROL Follow mode, Boiler Follow mode and Coordinated Mode) provided the enabling conditions are present and tripping conditions are not present.
Hand Operated A/M stations for Boiler Master: (Refer dwg. 3CJY00_06)
AutoManual stations located in UCP has the facility to take the controller individually to Manual mode and manipulate the outputs. This is redundant to the facility available in OWS. This is achieved using calculator and Logic blocks. Functional Blocks used: 3CJY00_06.UCP: CALC Block Increment and decrement command from UCP Auto Manual stations are taken as inputs and the calculated value is written back to Boiler Master Auto Man Station.
Write-up on CLCS COORDINATED MASTER CONTROL present. The output of Auto/Man Station is forced to a value proportionate to Unit Capability when Runback is in Action. Turbine follow Mode is selected.
The Auto Man Station is forced to CAS mode when Boiler Follow mode selection condition is
Abbreviation List:
MID OF 3 HILOAVG PID RATIO AUTOMAN SUMMER GENLIN SWITCH CALC OPLOLM OPHILM ESWMAN ESWCAS ESWAUTO ESWENBST Tag. XXXX PVFL -Median value selection -Selection of average or Operator select -Proportional +Integral +Derivative control -Ratio control -Auto/Manual station -Summing of inputs -Function Generator -Switching between inputs (S1,S2,S3,S4) -Calculator -Output Low Limit -Output High Limit -Switching externally (through logic block) to Manual mode Switching externally (through logic block) to Cascade mode -Switching externally (through logic block) to Auto mode -Enabling Mode change -Refers to the internal parameter of the tag