Documente Academic
Documente Profesional
Documente Cultură
ms_office
Security Level:
No 1 3 4 7 11 16 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
94908616.xls.ms_office
Security Level:
Swap site
4 Outdoor
4/28/2012
HUAWEI Confidential
Page2of5
94908616.xls.ms_office
Security Level:
Description Region 1.1: DKI Jakarta, Tanggerang, Bogor, Depok, Bekasi Engineering Site Survey & Design (BTS/NodeB or BTS/NodeB+MW) Macro BTS/NodeB: Hardware Installation, Supervision & PAT Macro BTS/NodeB: Dismantlement & Packing Macro BTS/NodeB without Antenna & Feeder: Hardware Installation, Supervision & PAT Macro BTS/NodeB Sub-system: Hardware Installation, Supervision & PAT BTS/NodeB: Antenna Mounting Installation MW PDH (0.3m/0.6m) 2: Installation and Commissioning MW PDH (0.3m/0.6m) 2: Dismantlement and Packing MW PDH 1.2m 2: Installation and Commissioning MW PDH 1.2m 2: Dismantlement and Packing MW PDH 1.2m 4: Installation and Commissioning MW PDH 1.2m 4: Dismantlement and Packing MW PDH 1.8m 2: Installation and Commissioning MW PDH 1.8m 2: Dismantlement and Packing MW PDH 1.8m 4: Installation and Commissioning MW PDH 1.8m 4: Dismantlement and Packing MW PDH 2.4/2.5m 2: Installation and Commissioning MW PDH 2.4/2.5m 2: Dismantlement and Packing MW PDH 2.4/2.5m 4: Installation and Commissioning MW PDH 2.4/2.5m 4: Dismantlement and Packing MW PDH >=3.0m 2: Installation and Commissioning MW PDH >=3.0m 2: Dismantlement and Packing MW PDH >=3.0m 4: Installation and Commissioning MW PDH >=3.0m 4: Dismantlement and Packing MW SDH 1.2m 2: Installation and Commissioning MW SDH 1.2m 2: Dismantlement and Packing MW SDH 1.2m 4: Installation and Commissioning MW SDH 1.2m 4: Dismantlement and Packing MW SDH 1.8m 2: Installation and Commissioning MW SDH 1.8m 2: Dismantlement and Packing MW SDH 1.8m 4: Installation and Commissioning MW SDH 1.8m 4: Dismantlement and Packing MW SDH 2.4/2.5m 2: Installation and Commissioning MW SDH 2.4/2.5m 2: Dismantlement and Packing MW SDH 2.4/2.5m 4: Installation and Commissioning MW SDH 2.4/2.5m 4: Dismantlement and Packing MW SDH >=3.0m 2: Installation and Commissioning MW SDH >=3.0m 2: Dismantlement and Packing MW SDH >=3.0m 4: Installation and Commissioning MW SDH >=3.0m 4: Dismantlement and Packing Transmission preparation for Project B, include E1 cable supply 1 box (@250m) /
Unit Site Site Set Set Set Set Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Site /
Ceiling Price 1,110,000 4,625,000 1,575,000 3,214,000 2,540,000 350,000 3,070,000 770,000 3,250,000 875,000 4,175,000 1,004,500 4,490,000 1,750,000 5,950,000 2,175,000 5,950,000 2,175,000 7,910,000 2,560,000 6,160,000 2,880,000 8,876,000 3,475,000 3,500,000 875,000 4,375,000 1,004,500 4,790,000 1,750,000 6,250,000 2,175,000 6,250,000 2,175,000 8,434,000 2,560,000 7,414,000 2,880,000 9,100,000 3,520,000 1,175,000
List of type for Local Material need to combined in TE service Cable duct 20x40x3000mm, & Cable duct 100x50x3000mm Anaconda 1 inch with metal protector Cable duct 20x40x3000mm, & Cable duct 100x50x3000mm Anaconda 1 inch with metal protector
4/28/2012
HUAWEI Confidential
Page3of5
94908616.xls.ms_office
Security Level:
Black Cable Ties 6 Inch Black cable ties L300 x 4.8mm Waterproof adhesive Rubber tape (Brand 3M, or Polymoth) Isolation tape black (Brand 3M)
2 2 6 4
4/28/2012
HUAWEI Confidential
Page4of5
94908616.xls.ms_office
Security Level:
4/28/2012
HUAWEI Confidential
Page5of5