Sunteți pe pagina 1din 5

94908616.xls.

ms_office

Security Level:

No 1 3 4 7 11 16 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Notice for Local Material supplied included in the TE service:

Material list Need to provided by the subcon

Type of site SN 1 New site 2 3 Swap site 4/28/2012

Type Indoor Outdoor Indoor

4 Outdoor HUAWEI Confidential Page1of5

94908616.xls.ms_office

Security Level:

Swap site

4 Outdoor

4/28/2012

HUAWEI Confidential

Page2of5

94908616.xls.ms_office

Security Level:

Description Region 1.1: DKI Jakarta, Tanggerang, Bogor, Depok, Bekasi Engineering Site Survey & Design (BTS/NodeB or BTS/NodeB+MW) Macro BTS/NodeB: Hardware Installation, Supervision & PAT Macro BTS/NodeB: Dismantlement & Packing Macro BTS/NodeB without Antenna & Feeder: Hardware Installation, Supervision & PAT Macro BTS/NodeB Sub-system: Hardware Installation, Supervision & PAT BTS/NodeB: Antenna Mounting Installation MW PDH (0.3m/0.6m) 2: Installation and Commissioning MW PDH (0.3m/0.6m) 2: Dismantlement and Packing MW PDH 1.2m 2: Installation and Commissioning MW PDH 1.2m 2: Dismantlement and Packing MW PDH 1.2m 4: Installation and Commissioning MW PDH 1.2m 4: Dismantlement and Packing MW PDH 1.8m 2: Installation and Commissioning MW PDH 1.8m 2: Dismantlement and Packing MW PDH 1.8m 4: Installation and Commissioning MW PDH 1.8m 4: Dismantlement and Packing MW PDH 2.4/2.5m 2: Installation and Commissioning MW PDH 2.4/2.5m 2: Dismantlement and Packing MW PDH 2.4/2.5m 4: Installation and Commissioning MW PDH 2.4/2.5m 4: Dismantlement and Packing MW PDH >=3.0m 2: Installation and Commissioning MW PDH >=3.0m 2: Dismantlement and Packing MW PDH >=3.0m 4: Installation and Commissioning MW PDH >=3.0m 4: Dismantlement and Packing MW SDH 1.2m 2: Installation and Commissioning MW SDH 1.2m 2: Dismantlement and Packing MW SDH 1.2m 4: Installation and Commissioning MW SDH 1.2m 4: Dismantlement and Packing MW SDH 1.8m 2: Installation and Commissioning MW SDH 1.8m 2: Dismantlement and Packing MW SDH 1.8m 4: Installation and Commissioning MW SDH 1.8m 4: Dismantlement and Packing MW SDH 2.4/2.5m 2: Installation and Commissioning MW SDH 2.4/2.5m 2: Dismantlement and Packing MW SDH 2.4/2.5m 4: Installation and Commissioning MW SDH 2.4/2.5m 4: Dismantlement and Packing MW SDH >=3.0m 2: Installation and Commissioning MW SDH >=3.0m 2: Dismantlement and Packing MW SDH >=3.0m 4: Installation and Commissioning MW SDH >=3.0m 4: Dismantlement and Packing Transmission preparation for Project B, include E1 cable supply 1 box (@250m) /

Unit Site Site Set Set Set Set Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Hop Site /

Ceiling Price 1,110,000 4,625,000 1,575,000 3,214,000 2,540,000 350,000 3,070,000 770,000 3,250,000 875,000 4,175,000 1,004,500 4,490,000 1,750,000 5,950,000 2,175,000 5,950,000 2,175,000 7,910,000 2,560,000 6,160,000 2,880,000 8,876,000 3,475,000 3,500,000 875,000 4,375,000 1,004,500 4,790,000 1,750,000 6,250,000 2,175,000 6,250,000 2,175,000 8,434,000 2,560,000 7,414,000 2,880,000 9,100,000 3,520,000 1,175,000

Material supplied included in the TE service:

ed to provided by the subcon

List of type for Local Material need to combined in TE service Cable duct 20x40x3000mm, & Cable duct 100x50x3000mm Anaconda 1 inch with metal protector Cable duct 20x40x3000mm, & Cable duct 100x50x3000mm Anaconda 1 inch with metal protector

Unit estimated QTY PCS 1&1 Meter 10 PCS 1&1 Meter 10

4/28/2012

HUAWEI Confidential

Page3of5

94908616.xls.ms_office

Security Level:

Black Cable Ties 6 Inch Black cable ties L300 x 4.8mm Waterproof adhesive Rubber tape (Brand 3M, or Polymoth) Isolation tape black (Brand 3M)

Pack Pack PCS PCS

2 2 6 4

4/28/2012

HUAWEI Confidential

Page4of5

94908616.xls.ms_office

Security Level:

4/28/2012

HUAWEI Confidential

Page5of5

S-ar putea să vă placă și