Sunteți pe pagina 1din 4

Curriculum Vitae TARIQ HUSSAIN

MOB NO:+92-0314-9385156 +93-077-8318320


EMAIL: chandagi1983@yahoo.com tariqhussain1983@gmail.com

Personal Information:
Fathers Name: Fazal Mohammad. Languages:Urdu,Pashto,English. D.O.B:March 12,1983. Address: Distt Mardan The Katlung Village & P.O CharChure.

Career objective:
Seeking a job opportunity which offers good salary, learning and advancement opportunities.

Educational profile:
Masters in computers science from Gomal University Dera Ismail Khan Pakistan. Bachelors from University of Peshawar Pakistan. F.Sc from B.I.S.E Peshawar Pakistan. Metric from B.I.S..E Peshawar Pakistan. B.Ed from A.I.O.U Islamabad Pakistan. Certificate course in Civil as Lab Tech from N.L.C Mandra Punjab Pakistan.

Experience:
Worked for 2 years as Lab technician with Alingar Alkozai Construction Company (A.A.C.C) at Mayle Vally road(11) K.M in laghman province Alishang District Afghanistan. Worked for 1 year as Lab technicain with Aryoub Universal Construction Company in Khost province at Compeign Raod (15 Km) in Afghanistan. Worked for 6 months as Lab Technician with Shah Zaman at Jalozi camp K.P.K

Worked as lecturer of computer Science at Malakand University and Govt Degree College Khyr Abad Mardan Khyberpukhtunkhwa Pakistan.

Computer skills:
MS Office. Vb.Net SqlServer2000 Ms.Windows

Responsibities:
Complete Understanding of Construction Material Tests befor and after construction. 1) Soil Tests a) Moisture Content b) Sieve Analysis c) Plasticity Index. d) Proctor Test. e) Field Density Test(with sand cone method) f) Field Density (Core Cutter method)

g) California Bearing Ratio. h) Specific Gravity. i) j) Bulk Density Fineness Modulus.

k) All the Soil Tests including these are fully understood. 2) Aggregate tests a) Sieve Analysis. b) Flaky and Elongation Test c) Los Anglos Abrasion Test d) Sand equaling Test. e) Absorption Test f) Unit Weight

g) Crushing Value Test h) Specific Gravity

i) j)

Sodium Soundness Test And other entire Test for the aggregate Tests.

3) Cement a) Setting Time of Cement. b) Consistency of Cement. c) Compressive Strength of Cement. d) Water Absorption of Bricks. 4) Asphalt a) Marshal stability and Flow Test. b) Grade c) Bitumen Extraction Test. 5) Concrete a) Slump Test b) Compressive Strength Test c) Setting Time of Concrete d) Core Test To get the work done according to Design and Drawing. 1) Before pouring to check the Dimension of structure according to drawing. 2) To check the capabilities of form works whether it bears the required load or not. 3) During concrete to brief the subordinates to control the quality. To motivate the staff, regarding cutting and filling according to design. Full Command over office works. To deal the visiting consultants and brief them about the the current works and also to deal the high level meetings.

S-ar putea să vă placă și