LISTA DE PRECIO DE MATERIALES

DESCRIPCION

UN

PZAS

SOBRE
P.U. PZAS VOLUMEN P.U. TOTAL
40%

1 ACEROS Y MALLAS
ALAMBRE RECOCIDO

KG

1000 $

15.00

6.00

15,000.00

ALAMBRON

KG

1000 $

14.20

5.60

14,000.00

ARCOS

ARMEX 15-15-3

6 $

88.00

35.20

ARMEX 15-15-4

6 $

91.00

36.00

ARMEX 15-20-4

6 $

99.00

39.60

ARMEX 15-25-4

6 $

104.00

41.60

ARMEX 15-30-4

6 $

107.80

3.13

ARMEX 15-15-4 9MM

6 $

127.50

39.20

ARMEX 15-20-4 9MM

6 $

133.63

41.20

ARMEX 15-25-4 9MM

6 $

140.40

44.00

48.00

ARMEX 15-30-4 9MM

6 $

141.50

CLAVOS 2 1/2 A 4"

KG

20.50

8.20

CLAVOS 1 1/2 A 2"

KG

22.00

17.00

ESCALERILLA 12-2

ESCALERILLA 15-2

ESTRIBOS

KG

MALLA 66-10-10
MALLA 66-66

1000 $

14.90

6.00

15,000.00

ROLLO

100 $

1,225.00

2.80

1,180.00

ROLLO

100 $

2,450.00

4.40

2,430.00

MALLA 66-44

ROLLO

100 $

3,100.00

5.74

3,230.00

MALLA 66-88

ROLLO

100 $

2,213.00

3.60

METAL DESPLEGADO 9.15 * 22

ML

100 $

391.00

352.60

TELA CRIVA 5*5

ML

100 $

67.00

26.00

VARILLA ACERO SAN LUIS R-42 # 2

333

VARILLA ACERO SAN LUIS R-42 # 2.5

217

VARILLA ACERO SAN LUIS R-42 # 3

150 $

92.33

30.40

13,850.00

VARILLA ACERO SAN LUIS R-42 # 4

84 $

164.88

66.40

13,850.00

VARILLA ACERO SAN LUIS R-42 # 5

53 $

261.32

13,850.00

VARILLA ACERO SAN LUIS R-42 # 6

37 $

374.32

13,850.00

VARILLA ACERO SAN LUIS R-42 # 7

27 $

512.96

13,850.00

VARILLA ACERO SAN LUIS R-42 # 8

21 $

659.52

13,850.00

VARILLA ACERO SAN LUIS R-42 # 10

13 $

1,065.38

13,850.00

VARILLA ACERO SAN LUIS R-42 # 12

9 $

1,538.89

13,850.00

DESCRIPCION

UN

PZAS

SOBRE
P.U. PZAS VOLUMEN P.U. TOTAL
40%

5 ADITIVOS E IMPERMEABILIZANTES
ADITECH 1

LTS

85.00

ADITECH 4

LTS

256.00

ADITECH 19

LTS

1,094.00

EMULTECH ASF 19

LTS

780.00

FRAGUARAPID 4

LTS

335.00

FRAGUARAPID 19

LTS

IMPERNIASA ACRILICO 4

LTS

325.00

IMPERNIASA ACRILICO 19

LTS

1,346.00

MEMBRACURE 19

LTS

536.00

NIASA BOND 1

LTS

136.00

NIASA BOND 4

LTS

336.00

NIASA BOND 19

LTS

1,674.00

NIASA LASTIC 19

LTS

2,015.00

RESINA B-18 1

LTS

35.00

RESINA B-18 20

LTS

648.00

DESCRIPCION

UN

PZAS

SOBRE
P.U. PZAS VOLUMEN P.U. TOTAL
40%

6 PANEL ELECTRICOS Y SONOTUBO


CARTON ASFALTICO

358.00

COLADERA D/ ALUMINIO 15*15

51.00

COLADERA D/ ALUMINIO 20*20

MANGUERA PARA JARDIN 1/2 *20 MTS

174.00

PANEL ESTRU. CONVITEC 2"

282.00

PANEL ESTRU. CONVITEC 3"

307.00

PECHOS DE PALOMA 1.22


POLIDUCTO NARANJA 1/2 100

POLIDUCTO NARANJA 3/4 100

38.00

209.50

100 $

333.00

350.00

300.00

ML

POLIDUCTO NARANJA 1/2 CORRUGADO

50 $

398.00

POLIDUCTO NEGRO CEDULA 40 100 M

297.00

LAVADERO DE GRANITO S/PILA

216.00

LAVADERO C/PILA MEDIANO

342.00

LAVADERO C/PILA GRANDE

445.00

SONOTUBO 3MTS 15 CMS

61.00

SONOTUBO 3MTS 20 CMS

81.50

SONOTUBO 3MTS 25 CMS

116.50

SONOTUBO 3MTS 30 CMS

164.50

SONOTUBO 3MTS 35 CMS

182.00

SONOTUBO 3MTS 40 CMS

207.00

SONOTUBO 3MTS 45 CMS

258.00

SONOTUBO 3MTS 50 CMS

336.50

SONOTUBO 3MTS 55 CMS

432.00

SONOTUBO CUADRADO 20 x 20

93.00

SONOTUBO CUADRADO 25 x 25

127.50

SONOTUBO CUADRADO 30 x 30

187.00

DESCRIPCION

ML

UN

PZAS

SOBRE
P.U. PZAS VOLUMEN P.U. TOTAL
40%

9 CISTERNA Y TINACOS
CISTERNA EUREKA 2800

LTS

CISTERNA EUREKA 5000

LTS

CISTERNA ROTOPLAS 2800

LTS

CISTERNA ROTOPLAS 5000

LTS

308

5,108.00

CISTERNA ROTOPLAS 10000

LTS

TINACO EUREKA 450

LTS

TINACO EUREKA 750

LTS

TINACO EUREKA 1100

LTS

TINACO EUREKA 2500

LTS

TINACO ROTOPLAS 450

LTS

964.50

TINACO ROTOPLAS 750

LTS

1,223.50

TINACO ROTOPLAS 1100

LTS

1,537.00

TAMBO VACIO 200

LTS

BOTE VACIO 200

LTS

DESCRIPCION

UN

PZAS

P.U. PZA.

10 CIMBRA
VIGA 3 1/2" -7" - 8"

2.44

VIGA 3 1/2" -7" - 10"

3.05

VIGA 3 1/2" -7" - 12"

3.66

VIGA 3 1/2" -7" - 14"

4.30

VIGA 3 1/2" -7" - 16"

4.90

VIGA 3 1/2" -7" - 18"

5.50

VIGA 3 1/2" -7" - 20"

6.10

28.91

TARIMA

21.00

DUELA 3/4" X 4"

10.21

KG

185 $

20.50

KG

148 $

20.50

Clavo de 3"

KG

124 $

20.50

Clavo de 4"

KG

92 $

20.50

TABLA DE 2DA 30 CM
TABLA DE 3ERA DE 30 CM
POLIN 3 1/2 - 3 1/2
BARROTE 1/2 DE POLIN

TABLON 1.5" - 12" - 8" DE 2DA


TABLON 1.5" - 12" - 8" DE 3ERA
ESTACAS 2" - 4" -20"

12 CLAVOS
Clavo de 2"
1|11|1||11 Clavo de 2 1/2"

LISTA DE PRECIO DE MATERIALES


DESCRIPCION

UN PZAS

SOBRE
P.U. PZAS VOLUMEN
40%

2 CEMENTOS Y POLVOS
CAL

TON

40 $

30.00

CEMENTO GRIS

TON

20 $

102.50

CEMENTO BLANCO 25

KG

40 $

86.00

CEMENTO MORTERO

TON

20 $

75.00

CEMENTO BLANCO 50

KG

20 $

4.50

COLOR AMARILLO P/ CEMENTO

KG

COLOR ROJO P/ CEMENTO

KG

COLOR NEGRO P/ CEMENTO

KG

MARMOLINA

TON

6 $

26.50

PEGAZULEJO BLANCO NIASA

PZA

50 $

65.50

YESO SUPREMO

TON

40 $

40.00

DESCRIPCION

UN PZAS

SOBRE
P.U. PZAS VOLUMEN
40%

3 MATERIAL DE ARRASTRE Y PREFABRICADO


ARENA D/ MINA P/6

M3

6 $

95.80

ARENILLA P/ VIAJE

M3

6 $

112.33

GRAVA 3/4

M3

6 $

71.80

TABICON 10*14*28 PIEZA

PZA

1000 $

2.10

TABICON 10*14-28 500 PZA

PZA

1000 $

2.50

TABICON 10*14*28 750 PIEZA

PZA

1000

TABICON 10*14*28 MILLAR

PZA

1000

TEPETATE P/VIAJE 6

M3

6 $

500.00

TUBO DE ALBAAL 6"

PZA

26.00

TUBO DE ALBAAL 8"

PZA

41.00

DESCRIPCION

UN PZAS

SOBRE
P.U. PZAS VOLUMEN
40%

4 HERRAMIENTAS
CARRETILLA ESTANDAR

710.00

CARRETILLA HONDA

770.00

CARRETILLA SUPER HONDA

810.00

CABO P/PALA

60.00

CABO P/ ZAPAPICO

66.00

CAJA 3*3

3.00

CAJA 4*4 3/4

5.00

CHALUPAS

350.00

PALA CUADRADA C/CABO

107.50

TAPA PARA CISTERNA 40 x 60

233.00

TAPA PARA CISTERNA 60 x 60

264.50

REGISTROS 1 1/4 40*60*60

112.00

SEGUETAS

11.00

ZAPAPICO CON CABO

pza

167.00

ZAPAPICO SIN CABO

101.00

DESCRIPCION

UN PZAS

SOBRE
P.U. PZAS VOLUMEN
40%

7 LAMINAS
LAMINA ACRILICA EST 1.83*1

274.00

LAMINA ACRILICA EST 2.14*1

311.70

LAMINA ACRILICA EST 2.44*1

253.00

LAMINA ACRILICA EST 2.60*1

380.00

LAMINA ACRILICA EST 3.15*1

459.00

LAMINA ACRILICA EST 3.66*1

540.00

LAMINA ACRILICA RURAL 1.25*60

120.00

LAMINA ACRILICA RURAL 1.25*1.20

147.50

LAMINA CARTON DELGADA 1.20*55

290.50

LAMINA CARTON ROJA 1.23*55

294.00

MULTITEJA COLOR ARCILLA 1.15*.85

124.50

MULTITEJA CABALLETE ESTANDAR

119.80

TEJA SAN MIGUEL .97*1.26

193.00

CABALLETE LIMATON S/MIGUEL

45.00

LAMINA CARTON GRUESA 6 1.23*55

DESCRIPCION

UN PZAS

SOBRE
P.U. PZAS VOLUMEN
40%

8 PLOMERIOA DE PVC
TUBO PVC DE NORMA 1 1/2 TRAMO

64.50

TUBO PVC DE NORMA 1 1/2 METRO

12.00

TUBO PVC DE NORMA 2" TRAMO

81.00

TUBO PVC DE NORMA 2" METRO

13.50

TUBO PVC DE NORMA 3" TRAMO

115.00

TUBO PVC DE NORMA 3" METRO

21.00

TUBO PVC DE NORMA 4" TRAMO

58.00

TUBO PVC DE NORMA 4" METRO

TUBO PVC DE NORMA 6" TRAMO

403.00

TUBO PVC DE NORMA 6" METRO

73.00

CODO 45 CEMENTAL 1 1/2

4.50

CODO 45 CEMENTAL 2"

4.00

CODO 45 CEMENTAL 3"

8.00

CODO 45 CEMENTAL 4"

15.00

CODO 45 CEMENTAL 6"

65.00

CODO 87 CEMETAL 3"

11.00

CODO 87 CEMENTAL 4"

12.00

CODO 87 CEMENTAL 6"

62.00

TEE SENCILLA CEMENTAL 1 1/2*1 1/2

4.60

TEE SENCILLA CEMENTAL 2*2"

6.00

TEE SENCILLA CEMENTAL 3*3"

10.00

TEE SENCILLA CEMENTAL 4*4"

22.00

TEE SENCILLA CEMENTAL 6*6"

71.00

YEE SENCILLA CEMENTAL 1 1/2*1 1/2

4.50

YEE SENCILLA CEMENTAL 2*2"

7.00

YEE SENCILLA CEMENTAL 3*3"

16.50

YEE SENCILLA CEMENTAL 4*4"

28.50

YEE SENCILLA CEMENTAL 4*2"

23.50

YEE SENCILLA CEMENTAL 6*6"

109.00

COPLE CEMENTAL 1 1/2"

2.80

COPLE CEMENTAL 2"

3.20

COPLE CEMENTAL 3"

7.00

COPLE CEMENTAL 4"

7.50

COPLE CEMENTAL 6"

34.50

CEMENTO PVC 500

76.00

COLADERA PVC

35.50

CESPOL BOTE DE UNA SALIDA 1 1/2"

34.00

CESPOL BOTE DE UNA SALIDA 2"

36.50

REDUCCION EXCENTRICA 2"*1/2

3.00

REDUCCION EXCENTRICA PVC 4"2"

12.50

REDUCCION EXCENTRICA PVC 6"4"

38.00

DESCRIPCION

LTS

UN PZAS

SOBRE
P.U. PZAS VOLUMEN
40%

11 VARIOS
AGUA

M3

10

HILOS

PZA

DIESEL

LTS

19

CHAFLANES

PZA

ALQUILER EQUIPO DE MEDICION

DIA

VIAJE DE PIEDRA BRAZA

M3

1000 l
l

P.U. TOTAL

1,160.00

2,050.00

3,350.00

1,500.00

3,350.00

27.00

27.00

34.00

520.00

2,700.00

1,600.00

P.U. TOTAL

1,260.00

620.00

1,120.00

1,100.00

1,150.00

2,100.00

550.00

26.00

41.00

P.U. TOTAL

P.U. TOTAL

P.U. TOTAL

P.U. TOTAL

200.00

18.00

19.00

7.00

1,200.00

1,250.00

DESCRIPCION UN
PZAS
11 VARIOS
AGUA
M3
HILOS
PZA
DIESEL
LTS
CHAFLANES PZA
ALQUILER EQUIPO
DIA DE MEDICION
VIAJE DE PIEDRA
M3BRAZA

P.U. PZAS
10
1
19
1
1
6

SOBRE VOLUMEN
P.U. 40%
TOTAL

ANALISIS DE COSTO TIPO


CONCEPTO LECHADA CEMENTO BLANCO
1.300T.de cemento +3%desp.
0.900 M3de agua +30% desp
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO LECHADA CEMENTO GRIS
1.300T.de cemento +3%desp.
0.900 M3de agua +30% desp
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO
1.500T.de cemento blanco +3%desp.
0.700 M3 de agua +30% desp
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO GRIS
1.500T.de cemento gris +3%desp.
0.700 M3 de agua +30% desp
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA DE YESO
0.810T.de yeso +3%desp.
0.900 M3 de agua +30% desp
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO POLVO DE MARMOL 1:3
0.540T. Cemento blanco +3% desp.
2.100 T.polvo marmol + 5% desp.
0.280 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO POLVO DE MARMOL 1:4
0.440T. Cemento blanco +3% desp.
2.200 T.polvo marmol + 5% desp.
0.275 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO POLVO DE MARMOL 1:5
0.380T. Cemento blanco +3% desp.
2.300 T.polvo marmol + 5% desp.
0.272 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO CAL-POLVO DE MARMOL 1:1:6
0.270T. Cemento blanco +3% desp.
0.125 T. calhidra + 3% desp.
2.100 T.polvo marmol + 5% desp.
0.280 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO CAL-POLVO DE MARMOL 1:1:8
0.220T. Cemento blanco +3% desp.
0.100 T. calhidra + 3% desp.
2.200 T.polvo marmol + 5% desp.
0.278 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO CAL-POLVO DE MARMOL 1:1:10
0.190T. Cemento blanco +3% desp.
0.085 T. calhidra + 3% desp.
2.300 T.polvo marmol + 5% desp.
0.276 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO PASTA CEMENTO BLANCO CAL-POLVO DE MARMOL 1:1:12
0.135T. Cemento blanco +3% desp.
0.075 T. calhidra + 3% desp.
2.400 T.polvo marmol + 5% desp.
0.274 M3 de agua +30% desp.
TOTAL $ /M3=

O
Un.

Cant.

Ton.

P.U
1.339 $
1.17 $
=

M3

Importe
86.00 $
200.00 $
$

115.15
234.00
349.15

O
Un.
Ton.

Cant.

P.U
Importe
1.339 $
102.50 $
137.25
1.17 $
200.00 $
234.00
=
$
371.25

Cant.

P.U
Importe
1.545 $
86.00 $
132.87
0.91 $
200.00 $
182.00
=
$
314.87

Cant.

P.U
Importe
1.545 $
102.50 $
158.36
0.91 $
200.00 $
182.00
=
$
340.36

Cant.

P.U
Importe
0.8343 $
40.00 $
33.37
1.17 $
200.00 $
234.00
=
$
267.37

Cant.

P.U
Importe
0.5562 $
86.00
47.8332
2.205 $
26.50
58.4325
0.364 $
200.00
72.8
=
179.0657

M3

O
Un.
Ton.
M3

O
Un.
Ton.
M3

O
Un.
Ton.
M3

PASTA CEMENTO BLANCO -PO


Un.
Ton.
Ton.
M3

CLASIFICACION.
Proporcion 1:3
Proporcion 1:4
Proporcion 1:5

TOTAL $=

O
Un.
Ton.
Ton.

Cant.

P.U
Importe
0.4532 $
86.00
38.9752
2.31 $
26.50
61.215
0.3575 $
200.00
71.5
=
171.6902

Cant.

P.U
Importe
0.3914 $
86.00
33.6604
2.415 $
26.50
63.9975
0.3536 $
200.00
70.72
=
168.3779

Cant.
0.2781
0.12875
2.205
0.364

P.U
Importe
$
86.00
23.9166
$
30.00
3.8625
$
26.50
58.4325
$
200.00
72.8
=
159.0116

0.2266
0.103
2.31
0.3614

P.U
Importe
$
86.00
19.4876
$
30.00
3.09
$
26.50
61.215
$
200.00
72.28
=
156.0726

0.1957
0.08755
2.415
0.3588

P.U
Importe
$
86.00
16.8302
$
30.00
2.6265
$
26.50
63.9975
$
200.00
71.76
=
155.2142

M3

O
Un.
Ton.
Ton.
M3

PASTA CEMENTO BLANC


Un.
Ton.
Ton.
Ton.
M3

O
Un.
Ton.
Ton.
Ton.

Cant.

M3

O
Un.
Ton.
Ton.
Ton.
M3

Cant.

CLASIFICACION.
Proporcion 1:1:6
Proporcion 1:1:8
Proporcion 1:1:10
Proporcion 1:1:12

O
Un.
Ton.
Ton.
Ton.
M3

Cant.
0.13905
0.07725
2.52
0.3562

P.U
Importe
$
86.00
11.9583
$
30.00
2.3175
$
26.50
66.78
$
200.00
71.24
=
152.2958

PASTA CEMENTO BLANCO -POLVO MARMOL


Cemento T
Polvo marmol T Agua m3
0.54
2.1
0.44
2.2
0.38
2.3

Costo $/m3
0.28
179.0657
0.275
171.6902
0.272
168.3779
519.1338

PASTA CEMENTO BLANCO -CAL-POLVO MARMOL


Cemento blanco T calhidra T
Polvo marmol T Agua m3
Costo $/m3
0.27
0.125
2.1
0.28
159.0116
0.22
0.1
2.2
0.278
156.0726
0.19
0.085
2.3
0.276
155.2142
0.135
0.075
2.4
0.274
152.2958
622.5942

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:3
Un. Cant.
0.250 T.de calhidra +3%desp.
Ton.
0.2575
1.000 M3 de arena + 8% desp
M3
1.08
0.270 M3 de agua +30% desp
M4
0.351
TOTAL $ /M3=

P.U
Importe
$ 30.00
7.725
$ 95.80 103.464
$ 200.00
70.2
=
181.389

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:4
Un. Cant.
0.200 T.de calhidra +3%desp.
Ton.
0.206
1.070 M3 de arena + 8% desp
M3
1.1556
0.260 M3 de agua +30% desp
M4
0.338
TOTAL $ /M3=

P.U
Importe
$ 30.00
6.18
$ 95.80 110.706
$ 200.00
67.6
=
184.486

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:5
Un. Cant.
0.170 T.de calhidra +3%desp.
Ton.
0.1751
0.130 M3 de arena + 8% desp
M3
0.1404
0.255 M3 de agua +30% desp
M4
0.3315
TOTAL $ /M3=

P.U
Importe
$ 30.00
5.253
$ 95.80 13.4503
$ 200.00
66.3
=
85.0033

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:6
Un. Cant.
0.145 T.de calhidra +3%desp.
Ton. 0.14935
1.180 M3 de arena + 8% desp
M3
1.2744
0.250 M3 de agua +30% desp
M4
0.325
TOTAL $ /M3=

P.U
Importe
$ 30.00
4.4805
$ 95.80 122.088
$ 200.00
65
=
191.568

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:7
Un. Cant.
0.125 T.de calhidra +3%desp.
Ton. 0.12875
1.220 M3 de arena + 8% desp
M3
1.3176
0.245 M3 de agua +30% desp
M4
0.3185
TOTAL $ /M3=

P.U
Importe
$ 30.00
3.8625
$ 95.80 126.226
$ 200.00
63.7
=
193.789

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:8
Un. Cant.
0.110 T.de calhidra +3%desp.
Ton.
0.1133
1.250 M3 de arena + 8% desp
M3
1.35
0.240 M3 de agua +30% desp
M4
0.312
TOTAL $ /M3=

P.U
Importe
$ 30.00
3.399
$ 95.80
129.33
$ 200.00
62.4
=
195.129

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:9
Un. Cant.
0.100 T.de calhidra +3%desp.
Ton.
0.103
1.270 M3 de arena + 8% desp
M3
1.3716
0.235 M3 de agua +30% desp
M4
0.3055

P.U
Importe
$ 30.00
3.09
$ 95.80 131.399
$ 200.00
61.1

TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CALHIDRA-ARENA1:10
Un. Cant.
0.090 T.de calhidra +3%desp.
Ton.
0.0927
1.285 M3 de arena + 8% desp
M3
1.3878
0.230 M3 de agua +30% desp
M4
0.299
TOTAL $ /M3=

195.589

P.U
Importe
$ 30.00
2.781
$ 95.80 132.951
$ 200.00
59.8
=
195.532

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA-ARENA 1:4
0.300 T. de mortero +3% desp.
1.150 m3 de arena + 8% desp.
0.290 M3 de agua +30% desp.

Un. Cant.
Ton.
0.309
m3
1.242
M3
0.377

P.U
Importe
$ 75.00
23.175
$ 95.80 118.984
$ 200.00
75.4
=
217.559

Un. Cant.
Ton.
0.2678
m3
1.3608
M3
0.3705

P.U
Importe
$ 75.00
20.085
$ 95.80 130.365
$ 200.00
74.1
=
224.55

Un. Cant.
Ton. 0.23175
m3
1.3392
M3
0.364

P.U
Importe
$ 75.00 17.3813
$ 95.80 128.295
$ 200.00
72.8
=
218.477

Un. Cant.
Ton. 0.20085
m3
1.3716
M3
0.3575

P.U
Importe
$ 75.00 15.0638
$ 95.80 131.399
$ 200.00
71.5
=
217.963

Un. Cant.
Ton.
0.1751
m3
1.3932
M3
0.351

P.U
Importe
$ 75.00 13.1325
$ 95.80 133.469
$ 200.00
70.2
=
216.801

TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA-ARENA 1:5
0.260 T. de mortero +3% desp.
1.260 m3 de arena + 8% desp.
0.285 M3 de agua +30% desp.
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA-ARENA 1:6
0.225 T. de mortero +3% desp.
1.240 m3 de arena + 8% desp.
0.280 M3 de agua +30% desp.
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA-ARENA 1:7
0.195 T. de mortero +3% desp.
1.270 m3 de arena + 8% desp.
0.275 M3 de agua +30% desp.
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA-ARENA 1:8
0.170 T. de mortero +3% desp.
1.290 m3 de arena + 8% desp.
0.270 M3 de agua +30% desp.
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO-ARENA 1:2
Un. Cant.
0.600 T. de CEMENTO +3% desp.
Ton.
0.618
1.000 m3 de arena + 8% desp.
m3
1.08
0.275 M3 de agua +30% desp.
M3
0.3575
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA 1:3
Un. Cant.
0.510 T. de CEMENTO +3% desp.
Ton.
0.5253
1.100 m3 de arena + 8% desp.
m3
1.188
0.272 M3 de agua +30% desp.
M3
0.3536
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA 1:4
Un. Cant.
0.430 T. de CEMENTO +3% desp.
Ton.
0.4429
1.120 m3 de arena + 8% desp.
m3
1.2096
0.266 M3 de agua +30% desp.
M3
0.3458
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA 1:5
Un. Cant.
0.360 T. de CEMENTO +3% desp.
Ton.
0.3708
1.150 m3 de arena + 8% desp.
m3
1.242
0.261 M3 de agua +30% desp.
M3
0.3393
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA 1:6
Un. Cant.
0.300 T. de CEMENTO +3% desp.
Ton.
0.309
1.190 m3 de arena + 8% desp.
m3
1.2852
0.257 M3 de agua +30% desp.
M3
0.3341
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA 1:7
Un. Cant.
0.250 T. de CEMENTO +3% desp.
Ton.
0.2575
1.240 m3 de arena + 8% desp.
m3
1.3392
0.252 M3 de agua +30% desp.
M3
0.3276
TOTAL $ /M3=

P.U
$ 95.80
$ 200.00
=

P.U
0
$ 95.80
$ 200.00
=

P.U
0
$ 95.80
$ 200.00
=

P.U

Importe
0
103.464
71.5
174.964

Importe
0
113.81
70.72
184.53

Importe
0
115.88
69.16
185.04

Importe

0
0
$ 95.80 118.984
$ 200.00
67.86
=
186.844

P.U

Importe
0
0
$ 95.80 123.122
$ 200.00
66.82
=
189.942

P.U

Importe

0
0
$ 95.80 128.295
$ 200.00
65.52
=
193.815

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO-ARENA 1:8
Un. Cant.
P.U
Importe
0.210 T. de CEMENTO +3% desp.
Ton.
0.2163
0
0
1.300 m3 de arena + 8% desp.
m3
1.404 $ 95.80 134.503

0.246 M3 de agua +30% desp.

M3

TOTAL $ /M3=

0.3198 $ 200.00
=

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO-ARENA CERNIDA1:2
Un. Cant.
0.630 T. de CEMENTO +3% desp.
Ton.
0.6489
1.000 m3 de arena + 35% desp.
m3
1.35
0.285 M3 de agua +30% desp.
M3
0.3705
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA CERNIDA1:3
Un. Cant.
0.540 T. de CEMENTO +3% desp.
Ton.
0.5562
1.050 m3 de arena + 35% desp.
m3
1.4175
0.280 M3 de agua +30% desp.
M3
0.364
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA CERNIDA1:4
Un. Cant.
0.440 T. de CEMENTO +3% desp.
Ton.
0.4532
1.100 m3 de arena + 35% desp.
m3
1.485
0.278 M3 de agua +30% desp.
M3
0.3614
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA CERNIDA1:5
Un. Cant.
0.380 T. de CEMENTO +3% desp.
Ton.
0.3914
1.150 m3 de arena + 35% desp.
m3
1.5525
0.275 M3 de agua +30% desp.
M3
0.3575
TOTAL $ /M3=
ANALISIS DE COSTO TIPO
CONCEPTO MESCLA CEMENTO-ARENA CERNIDA1:6
Un. Cant.
0.310 T. de CEMENTO +3% desp.
Ton.
0.3193
1.170 m3 de arena + 35% desp.
m3
1.5795
0.273 M3 de agua +30% desp.
M3
0.3549
TOTAL $ /M3=

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO CALHIDRA -ARENA 1:1:4
0.300T. Cemento +3% desp.
0.150 T. calhidra + 3% desp.
1.000 M3 de arena + 8% desp.

P.U
0
$ 95.80
$ 200.00
=

P.U

63.96
198.463

Importe
0
129.33
74.1
203.43

Importe

0
0
$ 95.80 135.797
$ 200.00
72.8
=
208.597

P.U

Importe

0
0
$ 95.80 142.263
$ 200.00
72.28
=
214.543

P.U
0
$ 95.80
$ 200.00
=

P.U

Importe
0
148.73
71.5
220.23

Importe

0
0
$ 95.80 151.316
$ 200.00
70.98
=
222.296

Un. Cant.
P.U
Importe
Ton.
0.309
0
0
Ton.
0.1545 $ 30.00
4.635
M3
1.08 $ 95.80 103.464

0.280 M3 de agua +30% desp.

M3

TOTAL $ /M3=

0.364 $ 200.00
=

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO CALHIDRA -ARENA 1:1:6
0.255T. Cemento +3% desp.
0.125 T. calhidra + 3% desp.
1.050 M3 de arena + 8% desp.
0.275 M3 de agua +30% desp.
TOTAL $ /M3=

Un. Cant.
Ton. 0.26265
Ton. 0.12875
M3
1.134
M3
0.3627

P.U

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO CALHIDRA -ARENA 1:1:8
0.215T. Cemento +3% desp.
0.100 T. calhidra + 3% desp.
1.095 M3 de arena + 8% desp.
0.278 M3 de agua +30% desp.
TOTAL $ /M3=

Un. Cant.
Ton. 0.22145
Ton.
0.103
M3
1.1826
M3
0.3614

P.U

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO CALHIDRA -ARENA 1:1:10
0.180T. Cemento +3% desp.
0.085 T. calhidra + 3% desp.
1.065 M3 de arena + 8% desp.
0.275 M3 de agua +30% desp.
TOTAL $ /M3=

Un. Cant.
Ton.
0.1854
Ton. 0.08755
M3
1.1502
M3
0.3575

P.U

ANALISIS DE COSTO TIPO


CONCEPTO MESCLA CEMENTO CALHIDRA -ARENA 1:1:12
0.150T. Cemento +3% desp.
0.075 T. calhidra + 3% desp.
1.185 M3 de arena + 8% desp.
0.273 M3 de agua +30% desp.
TOTAL $ /M3=

Un. Cant.
Ton.
0.1545
Ton. 0.07725
M3
1.2798
M3
0.3549

P.U

72.8
180.899

Importe

0
0
$ 30.00
3.8625
$ 95.80 108.637
$ 200.00
72.54
=
185.04

Importe

0
0
$ 30.00
3.09
$ 95.80 113.293
$ 200.00
72.28
=
188.663

Importe

0
0
$ 30.00
2.6265
$ 95.80 110.189
$ 200.00
71.5
=
184.316

Importe
0
0
$ 30.00
2.3175
$ 95.80 122.605
$ 200.00
70.98
=
195.902

CLASIFICACION.
Proporcion 1:3
Proporcion 1:4
Proporcion 1:5
Proporcion 1:6
Proporcion 1:7
Proporcion 1:8
Proporcion 1:9
Proporcion 1:10

MESCLAS CALHIDRA ARENA


calhidra T Arena m3 Agua m3 Costo $/m3
0.25
1
0.27
181.389
0.2
1.07
0.26 184.48648
0.17
1.13
0.255
85.00332
0.145
1.18
0.25
191.56802
0.125
1.22
0.245 193.78858
0.11
1.25
0.24
195.129
0.1
1.27
0.235 195.58928
0.09
1.285
0.23
195.53224

CLASIFICACION.
Proporcion 1:4
Proporcion 1:5
Proporcion 1:6
Proporcion 1:7
Proporcion 1:8

MESCLAS MORTERO ARENA


Mortero T Arena m3 Agua m3 Costo $/m3
0.3
1.15
0.29
217.5586
0.26
1.2
0.285
224.54964
0.225
1.24
0.28
218.47661
0.195
1.27
0.275 217.96303
0.17
1.29
0.27 216.80106

CLASIFICACION.
Proporcion 1:2
Proporcion 1:3
Proporcion 1:4
Proporcion 1:5
Proporcion 1:6
Proporcion 1:7
Proporcion 1:8

MESCLAS MORTERO ARENA


Mortero T Arena m3 Agua m3 Costo $/m3
0.6
1
0.275
174.964
0.51
1.1
0.272
184.5304
0.43
1.2
0.266
185.03968
0.36
1.15
0.261
186.8436
300
1.19
0.257 189.94216
0.25
1.24
0.252 193.81536
0.21
1.3
0.246
198.4632

CLASIFICACION.
Proporcion 1:2
Proporcion 1:3
Proporcion 1:4
Proporcion 1:5
Proporcion 1:6

MESCLAS MORTERO ARENA


Mortero T Arena m3 Agua m3 Costo $/m3
0.63
1
0.285
203.43
0.54
1.05
0.28
208.5965
0.44
1.1
0.278
214.543
0.38
1.15
0.275
220.2295
310
1.17
0.273
222.2961

CLASIFICACION.
Proporcion 1:1:4
Proporcion 1:1:6
Proporcion 1:1:8

MESCLA CEMENTO-CALHIDRA-ARENA
Cemento T calhidra T Arena m3 Agua m3
Costo $/m3
0.3
0.15
1
0.28
180.899
0.255
0.125
1.05
0.79
185.0397
0.215
0.1
1.095
0.278
188.66308

Proporcion 1:1:10
Proporcion 1:1:12

0.18

0.085

1.065

0.275

0.15

0.075

1.185

0.273

184.31566
195.90234

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 100 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.260 T. Cemento resistencia rapida +3% desp.
0.500 m3 arena + 8% desp.
0.680 M3 grava + 8% desp.
0.195 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 100 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.254 T. Cemento resistencia rapida +3% desp.
0.470 m3 arena + 8% desp.
0.700 M3 grava + 8% desp.
0.190 M3 agua +30% desp.
TOTAL $ /M2=
ANALISIS DE COSTO TIPO
CONCEPTO CONCRETADO 100 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.286 T. Cemento resistencia rapida +3% desp.
0.500 m3 arena + 8% desp.
0.680 M3 grava + 8% desp.
0.215 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 100 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA

0.280 T. Cemento resistencia rapida +3% desp.


0.470 m3 arena + 8% desp.
0.700 M3 grava + 8% desp.
0.210 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 150 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.323 T. Cemento resistencia rapida +3% desp.
0.480 m3 arena + 8% desp.
0.670 M3 grava + 8% desp.
0.210 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 150 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.308 T. Cemento resistencia rapida +3% desp.
0.450 m3 arena + 8% desp.
0.700 M3 grava + 8% desp.
0.200 M3 agua +30% desp.
TOTAL $ /M2=
ANALISIS DE COSTO TIPO
CONCEPTO CONCRETADO 150 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.354 T. Cemento resistencia rapida +3% desp.
0.480 m3 arena + 8% desp.

0.670 M3 grava + 8% desp.


0.210 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 150 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.338 T. Cemento resistencia rapida +3% desp.
0.450 m3 arena + 8% desp.
0.700 M3 grava + 8% desp.
0.220 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 200 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.355 T. Cemento resistencia rapida +3% desp.
0.470 m3 arena + 8% desp.
0.650 M3 grava + 8% desp.
0.195 M3 agua +30% desp.
TOTAL $ /M2=
TOTAL $=
ANALISIS DE COSTO TIPO
CONCEPTO CONCRETADO 200 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.337 T. Cemento resistencia rapida +3% desp.
0.440 m3 arena + 8% desp.
0.680 M3 grava + 8% desp.
0.185 M3 agua +30% desp.

TOTAL $ /M2=
ANALISIS DE COSTO TIPO
CONCEPTO CONCRETADO 200 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.391 T. Cemento resistencia rapida +3% desp.
0.470 m3 arena + 8% desp.
0.650 M3 grava + 8% desp.
0.215 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 200 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.373 T. Cemento resistencia rapida +3% desp.
0.440 m3 arena + 8% desp.
0.680 M3 grava + 8% desp.
0.205 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 250kg/cm2 AGREGADO 3/4"CEMENTO NORMAL R
0.423 T. Cemento resistencia rapida +3% desp.
0.465 m3 arena + 8% desp.
0.640 M3 grava + 8% desp.
0.190 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 250 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.400 T. Cemento resistencia rapida +3% desp.
0.435 m3 arena + 8% desp.
0.670 M3 grava + 8% desp.
0.180 M3 agua +30% desp.
TOTAL $ /M2=
ANALISIS DE COSTO TIPO
CONCEPTO CONCRETADO 250 kg/cm2 AGREGADO 3/4"CEMENTO NORMAL
0.467 T. Cemento resistencia rapida +3% desp.
0.465 m3 arena + 8% desp.
0.640 M3 grava + 8% desp.
0.210 M3 agua +30% desp.
TOTAL $ /M2=

ANALISIS DE COSTO TIPO


CONCEPTO CONCRETADO 250 kg/cm2 AGREGADO 1 1/2"CEMENTO NORMA
0.445 T. Cemento resistencia rapida +3% desp.
0.435 m3 arena + 8% desp.
0.670 M3 grava + 8% desp.
0.200 M3 agua +30% desp.
TOTAL $ /M2=

TIPO
Un. Cant.
Ton.
0.2678
Ton.
0.54
M3
0.7344
M3
0.2535

P.U

Un. Cant.
Ton. 0.26162
Ton.
0.5076
M3
0.756
M3
0.247

P.U

Un. Cant.
Ton. 0.29458
Ton.
0.54
M3
0.7344
M3
0.2795

P.U

Un.

P.U

Importe

0
0
$ 95.80
51.732
$ 71.80 52.7299
$ 200.00
50.7
=
155.162

TIPO
Importe

0
0
$ 95.80 48.6281
$ 71.80 54.2808
$ 200.00
49.4
=
152.309

CLASIFICACION
f"
Revenimient
100 kg/cm2

150kg/cm2

200kg/cm2

TIPO
Importe

0
0
$ 95.80
51.732
$ 71.80 52.7299
$ 200.00
55.9
=
160.362

TIPO
Cant.

Importe

250kg/cm2

Ton.
Ton.
M3
M3

0.2884
0
0
0.5076 $ 95.80 48.6281
0.756 $ 71.80 54.2808
0.273 $ 200.00
54.6
=
157.509

TIPO
Un. Cant.
Ton. 0.33269
Ton.
0.5184
M3
0.7236
M3
0.273

P.U

Un. Cant.
Ton. 0.31724
Ton.
0.486
M3
0.756
M3
0.26

P.U

Importe

0
0
$ 95.80 49.6627
$ 71.80 51.9545
$ 200.00
54.6
=
156.217

TIPO
Importe

0
0
$ 95.80 46.5588
$ 71.80 54.2808
$ 200.00
52
=
152.84

TIPO
Un. Cant.
P.U
Importe
Ton. 0.36462
0
0
Ton.
0.5184 $ 95.80 49.6627

M3
M3

0.7236 $ 71.80
0.273 $ 200.00
=

51.9545
54.6
156.217

TIPO
Un. Cant.
Ton. 0.34814
Ton.
0.486
M3
0.756
M3
0.286

P.U

Un. Cant.
Ton. 0.36565
Ton.
0.5076
M3
0.702
M3
0.2535

P.U

Un. Cant.
Ton. 0.34711
Ton.
0.4752
M3
0.7344
M3
0.2405

P.U

Importe

0
0
$ 95.80 46.5588
$ 71.80 54.2808
$ 200.00
57.2
=
158.04

TIPO
Importe

0
0
$ 95.80 48.6281
$ 71.80 50.4036
$ 200.00
50.7
=
149.732

TIPO
Importe

0
0
$ 95.80 45.5242
$ 71.80 52.7299
$ 200.00
48.1

146.354

TIPO
Un. Cant.
Ton. 0.40273
Ton.
0.5076
M3
0.702
M3
0.2795

P.U

Un. Cant.
Ton. 0.38419
Ton.
0.4752
M3
0.7344
M3
0.2665

P.U

Un. Cant.
Ton. 0.43569
Ton.
0.5022
M3
0.6912
M3
0.247

P.U

Importe

0
0
$ 95.80 48.6281
$ 71.80 50.4036
$ 200.00
55.9
=
154.932

TIPO
Importe

0
0
$ 95.80 45.5242
$ 71.80 52.7299
$ 200.00
53.3
=
151.554

TIPO
Importe

0
0
$ 95.80 48.1108
$ 71.80 49.6282
$ 200.00
49.4
=
147.139

TIPO
Un. Cant.
Ton.
0.412
Ton.
0.4698
M3
0.7236
M3
0.234

P.U

Un. Cant.
Ton. 0.48101
Ton.
0.5022
M3
0.6912
M3
0.273

P.U

Un. Cant.
Ton. 0.45835
Ton.
0.4698
M3
0.7236
M3
0.26

P.U

Importe

0
0
$ 95.80 45.0068
$ 71.80 51.9545
$ 200.00
46.8
=
143.761

TIPO
Importe

0
0
$ 95.80 48.1108
$ 71.80 49.6282
$ 200.00
54.6
=
152.339

TIPO
Importe

0
0
$ 95.80 45.0068
$ 71.80 51.9545
$ 200.00
52
=
148.961

CONCRETO HECHO EN OBRA

CLASIFICACION
Revenimiento
8 a 10 cm
12 a 15 cm

8 a 10 cm
12 a 15 cm

8 a 10 cm
12 a 15 cm

8 a 10 cm
12 a 15 cm

Agregado
maximo
3/4"
1 1/2"
3/4"
1 1/2"

Cemento
Ton.
0.26
0.254
0.286
0.28

3/4"
1 1/2"
3/4"
1 1/2"

0.323
0.308
0.354
0.338

0.48
0.45
0.48
0.45

3/4"
1 1/2"
3/4"
1 1/2"

0.355
0.337
0.391
0.373

0.47
0.44
0.47
0.44

3/4"
1 1/2"
3/4"
1 1/2"

0.423
0.4
0.467
0.445

0.465
0.435
0.465
0.435

Arena m3
0.5
0.47
0.5
0.47

CEMENTO
NORMAL

CEMENTO ALTA
RESISTENCIA

costo $/m3

costo $/m3

Grva m3

Agua m3

0.68
0.7
0.68
0.7

0.195
0.19
0.215
0.21

155.16192
152.30888
160.36192
157.50888

0.67
0.7
0.67
0.7

0.21
0.2
0.23
0.22

156.2172
152.8396
156.2172
158.0396

0.65
0.68
0.65
0.68

0.195
0.185
0.215
0.205

149.73168
146.35408
154.93168
151.55408

0.64
0.67
0.64
0.67

0.19
0.18
0.21
0.2

147.13892
143.76132
152.33892
148.96132

257.97
253.6
272.24
267.94

269.92
265.38
285.5
280.92

289.48
281.2
306.52
297.7

304.45
295.47
322.23
313.23

303.95
294.03
323.69
313.83

320.41
309.65
341.81
331.12

339.57
326.93
363.71
351.65

359.18
345.47
385.36
372.28

CONCEPTO
Preliminares y cimentacion.
Limpiezay trazo
Excavacion en tierra hasta de 2.0M de profundidad
Excavacion en tepetate blando hasta de 2.0M de profundidad
Traspaleo hasta2 m
Acarreo concarretilla a 20.00 m. maximo
rellenos por capas, compactadas con pison de mano
compactacion de cepas con pison de mano
Plantillas entre .07 y.10 m
Cimientos de piedra braza
Habilitado y armado de fierro e refuerzo
a) en cimentacion
b) en estructura
Habilitando y armando de alambron de 1/4 y 5/16 "
Cimbra y desimbrar , acabado no aparente.
a)en cimientos
b) en columnas rectangulares
c)en columnas circulares
d) en trabes
e)en losas
Hechura de cimbra
a)en cimientos
b) en columnas rectangulares
c)en columnas circulares
d) en trabes
e)en losas
f)cimbrar y desimbrar en sonotubo
losas reticuladas
colocacion block hasta 20x40x40cm
colocacion block hasta 35x60x60cm
entrepiso reticular celulado linea menor
entrepiso reticular celulado linea mayor
colados(no incluyendo la fabricacion del concreto)
a)en cimientos
b) en columnas y muros
c)en trbes y muros
d)en losas reticuladas
e)curado de concreto con agua en superficies horizontales
f)curado de concreto con agua
g)curado de concreto con agua en superficies verticales
muros de tabique comun o ligero no aparente
a) de 0.07m de espesor
b) de 0.14m de espesor
c) de 0.21m de espesor

Un. Gpo.
m2
m3
m3
m3
m3
m3
m2
m2
m3

2
1
1
1
1
1
1
2
5

Ton.
Ton.
Ton.

4
4
4

m2
m2
m2
m2
m2

3
3
3
3
3

m2
m2
m2
m2
m2
m

3
3
3
3
3
3

caja
caja
caja
caja

2
2
2
2

m3
m3
m3
m3
m3
m2
m2

2
2
2
2
1
1
1

m2
m2
m2

5
5
5

d)de 0.28m de espesor


e) sobre precio por cara aparente
muros de block tipo piramide
a)de 0.10 m de espesor
b) de 0.12 m de espesor
c) de 0.15 m de espesor
d) de 0.20 m de espesor
e) sobre precio por cara aparente
muro de block extruido
a) de 5x10x15 en 10 cm espesor
b) de 6x10x20 en 10 cm espesor
c) de 10x10x20 en 10 cm espesor
d) de 10x15x20 en 15 cm espesor
e) sobre precio por cara aparente
castillos y cadenas
castillo centro de block 1 (3/8") 9.5mm
castillos y cadenas 15 x 15 con 4 (3/8") 9.5mm
castillos y cadenas 15 x 20 con 4 (3/8") 9.5mm
castillos y cadenas 15 x 30 con 4 (3/8") 9.5mm
sobre cara aparente castillos y cadenas
recubrimientos
repellados de mezcla
aplanados de mezcla (rostreados)
aplanados finos de mescla
aplanados pulidos de cemento llana
confitillo sobre aplanado
recubrimiento de ceramica o mosaico veneciano incle repellado
recubrimiento cintilla 5.5 x 22 x 1.0 a 6.0 x 24 x 1.0 cm
recubrimiento fachaleta 10 x 20 x 1 a 11 x 22 x 1 cm
recubrimiento azulejo
recubrimiento tipo vitricota 6 x 20 x 18 cm
recubrimiento tipo vitricota 10 x 20 x 1.8 cm
recubrimiento mosaico 20 x 20 x 2.0 cm
boquilla incluyendo cortes a 450 materiales vereficados
sobreprecio por tendidos en fachadas
pisos
firmes de concreto para pisos espesor de 8 a 10 cm
acabado escobillado integral sobre firmes
fino no integral acabado pulido
armado con malla en pisos
pisos ceramica sin firme
pisos loseta 15 x 15 x 1.0 cm a 2 cm
pisos loseta 10 x 20 x 1.0 cm a 2 cm
pisos loseta 30 x 30 x 2.5 cm a 2.5 cm
pisos mosaico 20 x 20 x 2 cm
pisos mosaico terrazo sin junta metalica 50 x 50 x2.5 cm
zoclo mosaico 10 x 20 x 2.0 cm

m2
m2

5
5

m2
m2
m2
m2
m2

5
5
5
5
5

m2
m2
m2
m2
m2

6
6
6
6
6

m
m
m
m
m

5
5
5
5
5

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

5
5
5
5
5
6
6
6
6
6
6
5
6
3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m
m

2
5
5
4
6
6
6
6
5
6
6

zoclo loseta 10 x 15 x 30 a 40 cm
marterinados
marterinado fino sobre pisos
marterinado fino sobre columnas
marterinado fino sobre muros
marterinado fino sobre trabes y losas
azoteas
relleno de tezontle en azoteas
entortado sobre casco
enladrillado y escobillado
enladrillado aparente
chaflanes de pedaceria
varios
hechura de tarimas 50 x 100 cm
muro block vidrio 10 x 20 x 20 cm. Incluyendo refuerzo en juntas
registro de 40 x 60 cm. Con profundidad promedio 1.25 m
tapa de registro de 40 x 60 cm
impermeabilizacion de cimientos
albaales 15 cm tendido y junteo
colocacion de herreria
impermeabilizacion azotea por capa

m2

m2
m2
m2
m2

1
1
1
1

m3
m2
m2
m2

1
5
5
5
5

Pza
m2
Pza
Pza
m
m
m2
m2

3
6
5
5
2
5
5
2

rendimiento aproximado por grupo.


50 m2 / Jor
4 m3 / Jor
42m3 / Jor
18 m3 / Jor
5 m3 / Jor
7 m3 / Jor
35 m2 / Jor
14 m2 / Jor
3 m3 / Jor

COSTOS UNITARIOS DEL TRABAJO


TIPO A
TIPO B
3.87
39.96
79.93
8.88
31.97
22.84
4.57
13.84
115.29

2.68
27.53
55.07
6.12
22.03
15.73
3.15
9.58
80.58

1509.18
1603.5
1973.54

1068
1134.75
1396.62

9.5 m2/Jor
7.5 m2/Jor
6 m2/Jor
8.5 m2/Jor
9m2/Jor

36.59
46.35
57.94
40.9
38.6

25.89
32.8
41
28.94
27.33

17m2/Jor
8.5m2/Jor
4m2/Jor
10m2/Jor
10m2/Jor
15m/Jor

20.45
40.9
86.91
34.76
34.76
23.18

14.47
28.94
61.54
24.6
24.6
16.4

100 C/Jor
40 C/Jor
40 C/Jor
30 C/Jor

1.94
4.84
4.84
6.46

1.34
3.35
3.35
4.47

129.18
227.96
203.97
242.21
15.99
0.53
1.6

89.42
157.8
141.19
167.66
11.01
0.37
1.1

31.44
34.59
43.23

21.98
24.18
30.22

0.17 Ton. / Jor


0.16 Ton. /Jor
0.13Ton./Jor

1.50 m3 / Jor
0.85 m3 / Jor
0.95 m3 / Jor
.080 m3 / Jor
10 m3 / Jor
300 m2 / Jor
100 m2 / Jor
11 m2 / Jor
10 m2 / Jor
8 m2 / Jor

GPO
1
2
3
4
5
6

GPO
1
2
3
4
5
6

6 m2 / Jor
40 m2 / Jor

57.64
8.65

40.29
6.04

10 m2 / Jor
9.5 m2 / Jor
9 m2 / Jor
8.5 m2 / Jor
80 m2 / Jor

34.59
36.41
38.43
40.69
4.32

24.18
25.45
26.86
28.44
3.02

4.5 m2 / Jor
5.0 m2 / Jor
5.5 m2 / Jor
5.5 m2 / Jor
55 m2 / Jor

80.86
72.78
66.16
66.16
6.62

56.56
50.9
46.27
46.27
4.63

30 m/Jor
10 m/Jor
9.5 m/Jor
8 m/Jor
25 m/Jor

11.53
34.59
36.41
43.23
13.83

8.06
24.18
25.45
30.22
6.97

19 m2 / Jor
14 m2 / Jor
11 m2 / Jor
10 m2 / Jor
23 m2 / Jor
4 m2 / Jor
4.5 m2 / Jor
5 m2 / Jor
5.5 m2 / Jor
4.5 m2 / Jor
5 m2 / Jor
9 m2 / Jor
16 m2 / Jor
43 m2 / Jor

18.2
24.7
31.44
34.59
15.04
90.47
80.86
72.78
66.16
80.86
72.78
38.43
22.74
8.08

12.72
17.27
21.98
24.18
10.51
63.63
56.56
50.9
46.27
56.56
50.9
26.86
15.91
5.72

10 m2 / Jor
35 m2 / Jor
18 m2 / Jor
50 m2 / Jor
5 m2 / Jor
7 m2 / Jor
7 m2 / Jor
13 m2 / Jor
11 m2 / Jor
9.5 m2 / Jor
18 m2 / Jor

19.38
9.88
19.21
5.13
72.78
51.98
51.98
27.99
31.44
38.3
20.22

13.41
6.91
13.43
3.63
50.9
36.36
36.36
19.58
21.98
26.79
14.14

18 m2 / Jor

20.22

14.14

4 m2 / Jor
2 m2 / Jor
3 m2 / Jor
2 m2 / Jor

39.96
79.93
53.29
79.93

27.53
55.07
36.71
55.07

2 m3 / Jor
20 m2 / Jor
11m2 / Jor
7 m2 / Jor
24 m2 / Jor

79.93
17.29
31.44
49.41
14.41

55.85
12.09
21.98
34.54
10.07

19 Pza/ Jor
3.5 m2 / Jor
2 Pza/ Jor
6 Pza/ Jor
35 m/ Jor
26 m/ Jor
7.5 m2 / Jor
30 m2 / Jor

18.3
103.97
172.93
57.64
5.54
13.3
46.12
6.46

12.95
72.71
120.88
40.29
3.83
9.3
32.23
4.47

COMPOSICION
0.10 cabo + 1.0 Peon
0.25 oficial + 1.0 Peon
1.0 Of.Carp. + 1.0 Ay.Carp.
.5 Of.Fierr. + 1.0 Ay.Fierr.
1.0 oficial + 1.0 Peon
1.0 Of.Espec + 1.0 Peon

PARA ANALISIS DE COSTOS


OPERACIONES
1er IMPORTE FSR 2do IMPORTE F.H.M
0.1 121.8 103.86
116.04 1.25
145.05 1.03
0.25 147.2 103.86
140.66 1.25
175.825 1.03
136.95
115.4
252.35 1.25
315.4375 1.03
0.5 141.67 115.4
186.235 1.25
232.79375 1.03
147.2
103.86
251.06 1.25
313.825 1.03
160.28
103.86
264.14 1.25
330.175 1.03

F.M.
1.07
1.07
1.07
1.07
1.07
1.07

COMPOSICION
0.10 cabo + 1.0 Peon
0.25 oficial + 1.0 Peon
1.0 Of.Carp. + 1.0 Ay.Carp.
.5 Of.Fierr. + 1.0 Ay.Fierr.
1.0 oficial + 1.0 Peon
1.0 Of.Espec + 1.0 Peon

PARA PAGO DIRECTO DE AL OPERARIO


OPERACIONES
1er IMPORTE FSR 2do IMPORTE F.H.M
0.1
95
78.6
88.1 1.25
110.125 1.03
0.25 114.8
78.6
107.3 1.25
134.125 1.03
106.8
90
196.8 1.25
246 1.03
0.5 110.5
90
145.25 1.25
181.5625 1.03
114.8
78.6
193.4 1.25
241.75 1.03
125
78.6
203.6 1.25
254.5 1.03

F.M.
1.07
1.07
1.07
1.07
1.07
1.07

IMPORTE FINAL
149.40 159.86
181.10 193.78
324.90 347.64
239.78 256.56
323.24 345.87
340.08 363.89

IMPORTE FINAL
113.43 121.37
138.15 147.82
253.38 271.12
187.01 200.10
249.00 266.43
262.14 280.48

Cuadro de analisis del factor de salario paecial de personal de campo(incluyen prestaciones, factor de salari
jornada
SDB pago
prima
pago
nivel
tiempo
directo al
vacacional
semanal
semanal
trabajador
0.41%
peon
1000
6 166.666667 0.68333333
ayudante de fierrero
1000
6 166.666667 0.68333333
ayudante de carpintero
1000
6 166.666667 0.68333333
cabo
1200
6
200
0.82
velador
1000
6 166.666667 0.68333333
bodegero
1000
6 166.666667 0.68333333
oficial de carpimtero
1500
6
250
1.025
oficial de fierrero
1500
6
250
1.025
oficial de albaileria
1500
6
250
1.025
oficial especializado
1800
6
300
1.23
plomero
1500
6
250
1.025
electrico
1500
6
250
1.025
ayudante de electricista y plomero
1000
6 166.666667 0.68333333

incluyen prestaciones, factor de salario real, factir de herramienta menor,factor maestro,PRE,FSR,FHM Y FM)
aguinaldo
4.11%
6.85
6.85
6.85
8.22
6.85
6.85
10.275
10.275
10.275
12.33
10.275
10.275
6.85

SUMA
174.2
174.2
174.2
209.04
174.2
174.2
261.3
261.3
261.3
313.56
261.3
261.3
174.2

IMSS
15.99%
27.85458
27.85458
27.85458
33.425496
27.85458
27.85458
41.78187
41.78187
41.78187
50.138244
41.78187
41.78187
27.85458

ISPR
1%
1.742
1.742
1.742
2.0904
1.742
1.742
2.613
2.613
2.613
3.1356
2.613
2.613
1.742

IMSS

infonadit

1%
1.66666667
1.66666667
1.66666667
2
1.66666667
1.66666667
2.5
2.5
2.5
3
2.5
2.5
1.66666667

5%
8.33333333
8.33333333
8.33333333
10
8.33333333
8.33333333
12.5
12.5
12.5
15
12.5
12.5
8.33333333

suma de
prestaciones
39.59658
39.59658
39.59658
47.515896
39.59658
39.59658
59.39487
59.39487
59.39487
71.273844
59.39487
59.39487
39.59658

M Y FM)

FSR ACTIVIDADES DEPENDIENTES


analisis de
costo total
213.79658
213.79658
213.79658
256.555896
213.79658
213.79658
320.69487
320.69487
320.69487
384.833844
320.69487
320.69487
213.79658

segundo
total

FSR
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25
1.25

267.245725
267.245725
267.245725
320.69487
267.245725
267.245725
400.868588
400.868588
400.868588
481.042305
400.868588
400.868588
267.245725

FHM

FM

3%
8.01737175
8.01737175
8.01737175
9.6208461
8.01737175
8.01737175
12.0260576
12.0260576
12.0260576
14.4312692
12.0260576
12.0260576
8.01737175

7%
18.7072008
18.7072008
18.7072008
22.4486409
18.7072008
18.7072008
28.0608011
28.0608011
28.0608011
33.6729614
28.0608011
28.0608011
18.7072008

importe total
del analisis
de costo
293.970298
293.970298
293.970298
352.764357
293.970298
293.970298
440.955446
440.955446
440.955446
529.146536
440.955446
440.955446
293.970298

Cuadro de analisis del factor de salario paecial de personal de campo(incluyen prestaciones, factor de salario real,
prima
jornada
pago
SDB pago directo vacacional
nivel
tiempo
semanal
al trabajador
0.41%
semanal
peon
ayudante de fierrero
ayudante de carpintero
cabo
velador
bodegero
oficial de carpimtero
oficial de fierrero
oficial de albaileria
oficial especializado
plomero
electrico
ayudante de electricista y plomero

1000
1000
1000
1200
1000
1000
1500
1500
1500
1800
1500
1500
1000

6
6
6
6
6
6
6
6
6
6
6
6
6

166.6666667
166.6666667
166.6666667
200
166.6666667
166.6666667
250
250
250
300
250
250
166.6666667

0.683333333
0.683333333
0.683333333
0.82
0.683333333
0.683333333
1.025
1.025
1.025
1.23
1.025
1.025
0.683333333

estaciones, factor de salario real, factir de herramienta menor,factor maestro,PRE,FSR,FHM Y FM)


aguinaldo

IMSS

ISPR

IMSS

infonadit

15.99%

1%

1%

5%

27.855
27.855
27.855
33.425
27.855
27.855
41.782
41.782
41.782
50.138
41.782
41.782
27.855

1.742
1.742
1.742
2.09
1.742
1.742
2.613
2.613
2.613
3.136
2.613
2.613
1.742

1.6666667
1.6666667
1.6666667
2
1.6666667
1.6666667
2.5
2.5
2.5
3
2.5
2.5
1.6666667

8.333333333
8.333333333
8.333333333
10
8.333333333
8.333333333
12.5
12.5
12.5
15
12.5
12.5
8.333333333

SUMA
4.11%
6.85
6.85
6.85
8.22
6.85
6.85
10.275
10.275
10.275
12.33
10.275
10.275
6.85

174.2
174.2
174.2
209.04
174.2
174.2
261.3
261.3
261.3
313.56
261.3
261.3
174.2

suma de
prestaciones

analisis de
costo total

FHM, FM pago
FSR

39.59658
213.79658 1.25
39.59658
213.79658 1.25
39.59658
213.79658 1.25
47.515896 256.555896 1.25
39.59658
213.79658 1.25
39.59658
213.79658 1.25
59.39487
320.69487 1.25
59.39487
320.69487 1.25
59.39487
320.69487 1.25
71.273844 384.833844 1.25
59.39487
320.69487 1.25
59.39487
320.69487 1.25
39.59658
213.79658 1.25

FHM, FM pago independiente


segundo
total
267.2457
267.2457
267.2457
320.6949
267.2457
267.2457
400.8686
400.8686
400.8686
481.0423
400.8686
400.8686
267.2457

FHM

FM

3%

7%

8.0174
8.0174
8.0174
9.6208
8.0174
8.0174
12.026
12.026
12.026
14.431
12.026
12.026
8.0174

18.707
18.707
18.707
22.449
18.707
18.707
28.061
28.061
28.061
33.673
28.061
28.061
18.707

importe total del


analisis de costo
dependiente
26.7245725
26.7245725
26.7245725
32.069487
26.7245725
26.7245725
40.08685875
40.08685875
40.08685875
48.1042305
40.08685875
40.08685875
26.7245725

tabla para analisis de costos ( incluye integrado por prestaciones,FSR,FH


valor
0.1
0.25
1
0.5
1
1

nombre
cabo
oficial albaileria
oficial de carpinteria
oficial de fierrero
oficial albaileria
oficial especializado

sm salario
minimo
256.56
320.69
320.69
320.69
320.69
384.83

total

valores

25.66
80.17
320.69
160.35
320.69
384.83

1
1
1
1
1
1

nombre

sm

peon
peon
ayudante de carpintero
ayudante de fierrero
peon
peon

213.80
213.80
213.80
213.80
213.80
213.80

total
213.80
213.80
213.80
213.80
213.80
213.80

tabla para analisis de costos ( incluye in


valor
0.1
0.25
1
0.5
1
1

nombre
cabo
oficial albaileria
oficial de carpinteria
oficial de fierrero
oficial albaileria
oficial especializado

valor descripcion
1.1 cabo
0.25 oficial albaileria

sm salario
minimo
200.00
250.00
250.00
250.00
250.00
300.00
valor
1
1

1 oficial de carpinteria

0.5 oficial de fierrero


1 oficial albaileria
1 oficial especializado

1
1
1

total

valores

20
62.5
250
125
250
300

1
1
1
1
1
1

descripcion
peon
peon
ayudant
e de
carpinter
o
ayudant
e de
fierrero
peon
peon

nombre
peon
peon
ayudante de carpintero
ayudante de fierrero
peon
peon

sm

total

166.67
166.67
166.67
166.67
166.67
166.67

166.67
166.67
166.67
166.67
166.67
166.67

do por prestaciones,FSR,FHM,FM)
1er sub total
5,485.08
17,140.87
68,563.47
34,281.73
68,563.47
82,276.16

FSR
1.25
1.25
1.25
1.25
1.25
1.25

2do sub total


6,856.35
21,426.08
85,704.33
42,852.17
85,704.33
102,845.20

FHM
3%
205.69
642.78
2,571.13
1,285.56
2,571.13
3,085.36

FM
7%
479.94
1,499.83
5,999.30
2,999.65
5,999.30
7,199.16

alisis de costos ( incluye integrado por prestaciones,FSR,FHM,FM)


FHM
FM
1er sub total FSR 2do sub total
3%
186.67 1.25
233.33
7.00
229.17 1.25
286.46
8.59
416.67 1.25
520.83
15.63
291.67 1.25
364.58
10.94
416.67 1.25
520.83
15.63
466.67 1.25
583.33
17.50

7%
16.33
20.05
36.46
25.52
36.46
40.83

importe total
7,541.98
23,568.69
94,274.77
47,137.38
94,274.77
113,129.72

importe total
23.33
28.65
52.08
36.46
52.08
58.33

suma de
prestaciones
87.11
98.99
98.99
98.99
98.99
110.87

pago total de
separado
110.45
127.64
151.07
135.45
151.07
169.20

prestamo prestamo
1
2
47.52
39.60
59.39
39.60
59.39
39.60
59.39
39.60
59.39
39.60
71.27
39.60

concepto
madera de estacas
calhidra en trazo
alqiler de instruento

cimentacines
concepto
depreciacion de la pala

m2
25

un
600 kg

m2

un

cant

pu

0.04166667 $

cant

pu

importe
30.00 $

importe

1.25

CONCEPTO
Preliminares y cimentacion.
Limpiezay trazo
Excavacion en tierra hasta de 2.0M de profundidad
Excavacion en tepetate blando hasta de 2.0M de profundidad
Traspaleo hasta2 m
Acarreo concarretilla a 20.00 m. maximo
rellenos por capas, compactadas con pison de mano
compactacion de cepas con pison de mano
Plantillas entre .07 y.10 m
Cimientos de piedra braza
Habilitado y armado de fierro e refuerzo
a) en cimentacion
b) en estructura
Habilitando y armando de alambron de 1/4 y 5/16 "
Cimbra y desimbrar , acabado no aparente.
a)en cimientos
b) en columnas rectangulares
c)en columnas circulares
d) en trabes
e)en losas
Hechura de cimbra
a)en cimientos
b) en columnas rectangulares
c)en columnas circulares
d) en trabes
e)en losas
f)cimbrar y desimbrar en sonotubo
losas reticuladas
colocacion block hasta 20x40x40cm
colocacion block hasta 35x60x60cm
entrepiso reticular celulado linea menor
entrepiso reticular celulado linea mayor
colados(no incluyendo la fabricacion del concreto)
a)en cimientos
b) en columnas y muros
c)en trbes y muros
d)en losas reticuladas
e)curado de concreto con agua en superficies horizontales
f)curado de concreto con agua
g)curado de concreto con agua en superficies verticales
muros de tabique comun o ligero no aparente
a) de 0.07m de espesor
b) de 0.14m de espesor

Un. Gpo.

m2
m3
m3
m3
m3
m3
m2
m2
m3

1
1
1
1
1
1
1
2
5

Ton.
Ton.
Ton.

4
4
4

m2
m2
m2
m2
m2

3
3
3
3
3

m2
m2
m2
m2
m2
m

3
3
3
3
3
3

caja
caja
caja
caja

2
2
2
2

m3
m3
m3
m3
m3
m2
m2

2
2
2
2
1
1
1

m2
m2

5
5

c) de 0.21m de espesor
d)de 0.28m de espesor
e) sobre precio por cara aparente
muros de block tipo piramide
a)de 0.10 m de espesor
b) de 0.12 m de espesor
c) de 0.15 m de espesor
d) de 0.20 m de espesor
e) sobre precio por cara aparente
muro de block extruido
a) de 5x10x15 en 10 cm espesor
b) de 6x10x20 en 10 cm espesor
c) de 10x10x20 en 10 cm espesor
d) de 10x15x20 en 15 cm espesor
e) sobre precio por cara aparente
castillos y cadenas
castillo centro de block 1 (3/8") 9.5mm
castillos y cadenas 15 x 15 con 4 (3/8") 9.5mm
castillos y cadenas 15 x 20 con 4 (3/8") 9.5mm
castillos y cadenas 15 x 30 con 4 (3/8") 9.5mm
sobre cara aparente castillos y cadenas
recubrimientos
repellados de mezcla
aplanados de mezcla (rostreados)
aplanados finos de mescla
aplanados pulidos de cemento llana
confitillo sobre aplanado
recubrimiento de ceramica o mosaico veneciano incle repellado
recubrimiento cintilla 5.5 x 22 x 1.0 a 6.0 x 24 x 1.0 cm
recubrimiento fachaleta 10 x 20 x 1 a 11 x 22 x 1 cm
recubrimiento azulejo
recubrimiento tipo vitricota 6 x 20 x 18 cm
recubrimiento tipo vitricota 10 x 20 x 1.8 cm
recubrimiento mosaico 20 x 20 x 2.0 cm
boquilla incluyendo cortes a 450 materiales vereficados
sobreprecio por tendidos en fachadas
pisos
firmes de concreto para pisos espesor de 8 a 10 cm
acabado escobillado integral sobre firmes
fino no integral acabado pulido
armado con malla en pisos
pisos ceramica sin firme
pisos loseta 15 x 15 x 1.0 cm a 2 cm
pisos loseta 10 x 20 x 1.0 cm a 2 cm
pisos loseta 30 x 30 x 2.5 cm a 2.5 cm
pisos mosaico 20 x 20 x 2 cm
pisos mosaico terrazo sin junta metalica 50 x 50 x2.5 cm

m2
m2
m2

5
5
5

m2
m2
m2
m2
m2

5
5
5
5
5

m2
m2
m2
m2
m2

6
6
6
6
6

m
m
m
m
m

5
5
5
5
5

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

5
5
5
5
5
6
6
6
6
6
6
5
6
3

m2
m2
m2
m2
m2
m2
m2
m2
m2
m

2
5
5
4
6
6
6
6
5
6

zoclo mosaico 10 x 20 x 2.0 cm


zoclo loseta 10 x 15 x 30 a 40 cm
marterinados
marterinado fino sobre pisos
marterinado fino sobre columnas
marterinado fino sobre muros
marterinado fino sobre trabes y losas
azoteas
relleno de tezontle en azoteas
entortado sobre casco
enladrillado y escobillado
enladrillado aparente
chaflanes de pedaceria
varios
hechura de tarimas 50 x 100 cm
muro block vidrio 10 x 20 x 20 cm. Incluyendo refuerzo en juntas
registro de 40 x 60 cm. Con profundidad promedio 1.25 m
tapa de registro de 40 x 60 cm
impermeabilizacion de cimientos
albaales 15 cm tendido y junteo
colocacion de herreria
impermeabilizacion azotea por capa

m
m2

6
6

m2
m2
m2
m2

1
1
1
1

m3
m2
m2
m2

1
5
5
5
5

Pza
m2
Pza
Pza
m
m
m2
m2

3
6
5
5
2
5
5
2

rendimiento aproximado
por grupo.
50 m2 / Jor
4 m3 / Jor
42m3 / Jor
18 m3 / Jor
5 m3 / Jor
7 m3 / Jor
35 m2 / Jor
14 m2 / Jor
3 m3 / Jor

COSTOS UNITARIOS DEL


TRABAJO
TIPO A
TIPO B
3.87
39.96
79.93
8.88
31.97
22.84
4.57
13.84
115.29

2.68
27.53
55.07
6.12
22.03
15.73
3.15
9.58
80.58

1509.18
1603.5
1973.54

1068
1134.75
1396.62

9.5 m2/Jor
7.5 m2/Jor
6 m2/Jor
8.5 m2/Jor
9m2/Jor

36.59
46.35
57.94
40.9
38.6

25.89
32.8
41
28.94
27.33

17m2/Jor
8.5m2/Jor
4m2/Jor
10m2/Jor
10m2/Jor
15m/Jor

20.45
40.9
86.91
34.76
34.76
23.18

14.47
28.94
61.54
24.6
24.6
16.4

100 C/Jor
40 C/Jor
40 C/Jor
30 C/Jor

1.94
4.84
4.84
6.46

1.34
3.35
3.35
4.47

129.18
227.96
203.97
242.21
15.99
0.53
1.6

89.42
157.8
141.19
167.66
11.01
0.37
1.1

31.44
34.59

21.98
24.18

0.17 Ton. / Jor


0.16 Ton. /Jor
0.13Ton./Jor

1.50 m3 / Jor
0.85 m3 / Jor
0.95 m3 / Jor
.080 m3 / Jor
10 m3 / Jor
300 m2 / Jor
100 m2 / Jor
11 m2 / Jor
10 m2 / Jor

8 m2 / Jor
6 m2 / Jor
40 m2 / Jor

43.23
57.64
8.65

30.22
40.29
6.04

10 m2 / Jor
9.5 m2 / Jor
9 m2 / Jor
8.5 m2 / Jor
80 m2 / Jor

34.59
36.41
38.43
40.69
4.32

24.18
25.45
26.86
28.44
3.02

4.5 m2 / Jor
5.0 m2 / Jor
5.5 m2 / Jor
5.5 m2 / Jor
55 m2 / Jor

80.86
72.78
66.16
66.16
6.62

56.56
50.9
46.27
46.27
4.63

30 m/Jor
10 m/Jor
9.5 m/Jor
8 m/Jor
25 m/Jor

11.53
34.59
36.41
43.23
13.83

8.06
24.18
25.45
30.22
6.97

19 m2 / Jor
14 m2 / Jor
11 m2 / Jor
10 m2 / Jor
23 m2 / Jor
4 m2 / Jor
4.5 m2 / Jor
5 m2 / Jor
5.5 m2 / Jor
4.5 m2 / Jor
5 m2 / Jor
9 m2 / Jor
16 m2 / Jor
43 m2 / Jor

18.2
24.7
31.44
34.59
15.04
90.47
80.86
72.78
66.16
80.86
72.78
38.43
22.74
8.08

12.72
17.27
21.98
24.18
10.51
63.63
56.56
50.9
46.27
56.56
50.9
26.86
15.91
5.72

10 m2 / Jor
35 m2 / Jor
18 m2 / Jor
50 m2 / Jor
5 m2 / Jor
7 m2 / Jor
7 m2 / Jor
13 m2 / Jor
11 m2 / Jor
9.5 m2 / Jor

19.38
9.88
19.21
5.13
72.78
51.98
51.98
27.99
31.44
38.3

13.41
6.91
13.43
3.63
50.9
36.36
36.36
19.58
21.98
26.79

18 m2 / Jor
18 m2 / Jor

20.22
20.22

14.14
14.14

4 m2 / Jor
2 m2 / Jor
3 m2 / Jor
2 m2 / Jor

39.96
79.93
53.29
79.93

27.53
55.07
36.71
55.07

2 m3 / Jor
20 m2 / Jor
11m2 / Jor
7 m2 / Jor
24 m2 / Jor

79.93
17.29
31.44
49.41
14.41

55.85
12.09
21.98
34.54
10.07

19 Pza/ Jor
3.5 m2 / Jor
2 Pza/ Jor
6 Pza/ Jor
35 m/ Jor
26 m/ Jor
7.5 m2 / Jor
30 m2 / Jor

18.3
103.97
172.93
57.64
5.54
13.3
46.12
6.46

12.95
72.71
120.88
40.29
3.83
9.3
32.23
4.47

S-ar putea să vă placă și