Sunteți pe pagina 1din 6

DAILY PROGRESS REPORT

Project: Swastik City @


Narol
Unit

BOQ Qty

Achieved
today

Cum. Qty. Ach.


till date

Balance Qty to
be achieved

% Comp. for
Av. Work

Cum
Cum
Cum

1,200.00
160.00
69.60

1,200.00
160.00
70.00

100%
100%
100%

PCC
Footing / Raft / Plinth
Beam - M-20 grade
Reinforcement
Footing / Raft / Plinth
Beam
Block P-Q
Excavation
Rubble Soling
Sand Filling
RCC

Cum

70.00

70.00

100%

Cum

220.00

220.00

100%

MT

25.00

25.00

100%

Cum
Cum
Cum

1,200.00
160.00
69.60

500.00
100.00
42.00

700.00
60.00
27.60

42%
63%
60%

PCC
Footing / Raft / Plinth
Beam - M-20 grade
Reinforcement
Footing / Raft / Plinth
Beam
Block J-K
Excavation
Rubble Soling
Sand Filling
RCC
PCC

Cum

70.00

51.00

19.00

73%

Cum

220.00

67.00

153.00

30%

MT

25.00

2.00

10.00

15.00

40%

Cum
Cum
Cum

1,500.00
200.00
81.70

1,500.00
200.00
81.70

100%
100%
100%

Cum

80.00

80.00

100%

Work Description

1
2
3
4
a
b
5
a
1
2
3
4
a
b
5
a
1
2
3
4
a

Date:09/01/2012

Block N-O
Excavation
Rubble Soling
Sand Filling
RCC

Remarks

b
5
a
1
2
3
4
a
b
5
a
1
2
3
4
a
b
5
a

Footing / Raft / Plinth


Beam - M-20 grade
Reinforcement
Footing / Raft / Plinth
Beam
Block L-M
Excavation
Rubble Soling
Sand Filling
RCC
PCC
Footing / Raft / Plinth
Beam - M-20 grade
Reinforcement
Footing / Raft / Plinth
Beam
Block A-B
Excavation
Rubble Soling
Sand Filling
RCC
PCC
Footing / Raft / Plinth
Beam - M-20 grade
Reinforcement
Footing / Raft / Plinth
Beam

Cum

380.00

380.00

100%

MT

28.00

28.00

100%

Cum
Cum
Cum

1,500.00
200.00
81.70

1,500.00
190.00
78.00

10.00
3.70

100%
95%
95%

Cum

84.00

78.00

6.00

93%

Cum

380.00

MT

28.00

Cum
Cum
Cum

1,350.00
170.00
85.00

1,180.00
145.00
72.00

170.00
25.00
13.00

87%
85%
85%

Cum

80.00

66.50

13.50

83%

Cum

280.00

7.00

230.00

50.00

82%

1.00

23.00

10.00

Helper /
Misc
Labour

Bar binders

Carpenters

1.00

12.00

4.00

MT

33.00

Labour / Equipment Strength Report


Sr.
No.
1
1

Agency
Block N-O
Pravinbhai
Block P-Q
Pravinbhai
Block J-K

JCB

Tractor

70%

Retaining Wall,
Column

1
1
2

Janakbhai
Block L-M
Pravinbhai
Block A-B
Natubhai
Total
Total Man Power

61.00

28.00
29.00

10.00
22.00

6.00
10.00

Material Report
Sr.
No.
1
2
3
4
5
6
7
8

Material
Cement
Steel
Sand
Rubble
Metal
RMC - M10
Kapachi
Grit

Unit

Recd. Up to
Previous

Today
Recd.

Total Recd.

Previous
Consumption

Today's
Consumption

Total Consu.

Total
Balance

Bags
MT
Brass
Ton
Ton
Cmt
Brass
Brass

7380.00
121.00
265.00
1165.00
40.00
341.50
250.00
59.75

0.000
0.000
10.000
0.000
0.000
0.000
10.000
0.000

7380.00
121.00
275.00
1165.00
40.00
341.50
260.00
59.75

6351.00
98.00
260.00
1140.00
40.00
341.50
247.00
48.00

51.00
3.00
2.40
0.00
0.00
0.00
2.80
0.60

6402.00
101.00
262.40
1140.00
40.00
341.50
249.80
48.60

978.00
20.00
12.60
25.00
0.00
0.00
10.20
11.15

BLOCK A-B

BLOCK P-Q

BLOCK J-K