A. Gora Deputy General Director for Personnel Management SSE Chernobyl NPP, Ukraine
Commissioning
DevelopmentofestablishedChNPPcapacities:
September26,1977 December21,1978 December3, 1981 December21,1983
2
ChNPPStrategicPlanningService
It was possible to stop active release of radioactive substances from destroyed reactor only in the end of May, 1986
ChNPPStrategicPlanningService
ChNPPStrategicPlanningService
ChNPPStrategicPlanningService
New Safe Confinement Creation (NSC) In 2012 it is planned to start production of steel constructions of NSC Arch.
Foundations construction completion May, 2013. Main Arch construction assembly November, 2014. NSC Commissioning October, 2015.
ChNPPStrategicPlanningService
Chernobyl NPP Unit 3 was finally shutdown on December 15, 2000 at 13:17 according to the Decree of the President of Ukraine. Plant stopped power generation.
7 ChNPPStrategicPlanningService
Shelter Object
Unit 3
Unit 2
Unit 1
19831986
19812000
19781991
19771996
STRESS-TEST
In 2011 the Chernobyl NPP, the first among Ukrainian NPPs, performed the targeted unscheduled safety assessment of ChNPP nuclear facilities by its own forces taking into consideration the events at Fukushima 1 NPP (stress-test). The full-scale emergency trainings including personnel actions in case of accident and examination of the capabilities of emergency response units were conducted. Safety Improvement Plan for ChNPP facilities was developed: control, collection and return system for ISF-1 leakages was created; conditions enabling to connect a mobile diesel generator for ISF-1 consumers were created, tests were carried out; it is planned to conduct psychological training of personnel aimed at increasing resistance to psychological stress, development of endurance, self-control, mutual supportiveness and interaction; system of psychological selection and training of persons involved in managing the accidents with severe consequences is being developed (similar to system of operational personnel selection).
9 ChNPPStrategicPlanningService
10
ChNPPStrategicPlanningService
12
ChNPPStrategicPlanningService
13
ChNPPStrategicPlanningService
The Main Tasks of NPP Emergency Units are: Actions on preventing beyond-design-basis accidents and eliminating their consequences; Measures on personnel protection; Recommendations on population protection. A General Director is an Emergency Manager at the ChNPP industrial site.
14
ChNPPStrategicPlanningService
16
ChNPPStrategicPlanningService