Sunteți pe pagina 1din 4

M.

SUBHAN FAUZI
Langkapan 01/01, Maron, Srengat, Blitar, East Java, Indonesia. Mobile E-mail Date of birth Status Date available : : : : : +62 8123 043 157 subhanfauzi@gmail.com 07-04-1975 maried, 1 son October 2010

__________________________________________________________________ SENIOR STRUCTURAL/FABRICATION Engineer. Profile:


For Ship building, Barge, Offshore & General engineering construction.

A 15-years of production engineer of various merchant ship like general cargo, dry cargo vessel, container vessel, tanker, anchor handling tug vessel, offshore facility, barge, with expertise in leading and being member of large ship yard with modern facilities of delivering on time with excellent quality in the ship building/general engineering industry. Seeking a similar role with more competitive challenge and growth where deep and consistence learning plus great team player in a fast growing environment will be utilized and advanced.

Summary of Technical Skills:



Having knowledge in welding, experienced and trained up to 3G position. Strong knowledge and experienced in steel construction fabrication process especially for ship and off shore facility. Strong analytical and experienced in structural shrinkage caused by heat affect of welding and cutting process. Experienced in erection block process on building berth. Strong knowledge in ship design, yard plan, and shop drawing with many rules (BKI, LR, ABS, GL etc.) Experienced in creating building procedure for bid documentation. Experienced in creating block transporting, handling and loading/load out procedure. Experienced in creating assembly procedure/sequence. Experienced in creating rigging/scaffolding plan. Experienced in creating erection network. Experienced in creating block division or section plan. Experienced in creating jig plan of docking ship or new ship that erected on building berth. Experienced in creating launching procedure with traditional sliding system both end launching and side launching direction. Having knowledge and experienced with Operating Systems Windows 98, Windows 2000, windows XP. Strong knowledge and experienced with AutoCAD 2000-2004 software. Having knowledge with Tribon Assembly planning & Tribon Welding planning software. Having Knowledge and experienced with Microsoft office software. Having Knowledge and experienced with specification and setting up of IBM PC hardware.

Professional Experience:

BOUSTEAD PENANG SHIPYARD Site Representative

(12/2007 12/2009)

(03/2008 02/2009) Manage and coordinate construction works of 66 blocks of 2x AHTS 67.8M at client site. Yard has agreement with client to hire workshop including tools and facilities at client yard at Miri Sarawak. Tasks involved: Prepare construction schedule. Report weekly progress to project manager/general manager. Liaise with consultant for Shop Drawing, NC Code and block 3d modelling control. Material & consumable controlling. Manage sub contractors for Man power plan.

Liaise with client for tools and facility plan. Liaise with local ABS surveyor for inspection. WPS and WQT preparation. Lifting procedure of blocks. Coordinate block transfer from site to yard (Miri to Penang), prepare the arrangement, loading procedure, lashing procedure and liaise with marine consultant & insurance for inspection and approval.

Senior Project Engineer

(12/2007 12/2009) Assist Project manager to manage all activities in building 2x AHTS 67.8m. To handling project activities involving working out various requirements with respect to facilities, utilities, equipments, manpower & monitoring overall project operations to ensure timely completion. Building method preparation to maximize flow of production to comply with yard facility. Organizing all discipline of Yard Plan from consultant and liaise with owner and classification for approval. Organizing 3D modeling & CNC coding for CNC cutting of steel for ship hull construction from consultant modeler. Conducting and facilitating NC code program from consultant to NC operator for smoothly running the code by the machine. Assist Procurement department for sub-contractor evaluation. Assist and liaise with HSE department for HSE plan (rigging, general lighting, lifting procedure evaluation, hot works and painting inside tanks). Conduct weekly meeting with all contractor for progress review and task force/recovery action plan. Assist Project Manager for progress report meeting with General Manager / Board of Director.

PT. PAL Indonesia

Chief of Engineering Production Beaureau

(01/1994 10/2007)
(12/2006 05/2007)

Lead to all production engineering activities of Merchant Ship Division to achieve optimal production output. Senior Production Engineer.
Responsible to lead and supervise production engineering activity, to ensure and maintaining a good yard production process. The responsibility also to be involved in the integration between production procedure and yard facility and perform coordination with related department, to plan and implement all yard projects in a smooth building sequence/process. Defining the implementation and integration strategy of new project to be in line with the existing project. Improving production procedure by monitoring, analyzing and evaluating the already implemented procedure. Optimizing production layouts and processes, balancing all production lines. Launching advisor for launching process with sliding system of Dry Cargo Vessel 18.500DWT-M000225, Caraka Jaya III 3250DWT General Cargo-M000190, Flat Top Barge 300FT-M000204 , FPU Barge for Unocal-M000185, with the role involved by the following task : Coordinate to related department to prepare launching environment. Making evaluation of man power planning, material & facility. Give recommendation and advising to the launching team. Supervising all tasks that involved with launching process.

(06/2001 Present)

Project involved: - Palwo Buwono, 1600 TEUs Container carrier (Project no.: M000156-157) - Palwo Buwono, 400 TEUs Container Carrier (Project no.: M000159) - Double Skin Bulk Carrier 50k DWT (Project no.: M000229,230,231,236,237) - Dry Cargo Vessel 18500 DWT (Project no.: M000225, M000226) - FPU Barge for Unocal West Seno Project Development (Project no.: M000185) - FPU Barge for EMP Kangean (Project no.: M000261)

- Wellhead Platform and Jacked for Emerada HESS Indonesia Pangkah Limited (Project no.: XAH-072) Production/Design Engineer (02/2000 06/2001)
The role involved by the following task: Design for the division project like pontoon, barge, crane gantry, and other facility. Creating assembly procedure. Creating the handling, transportation, and loading out procedure. Creating block division. Creating block margin. Creating standard line. Creating erection network. Creating jig plan on building berth. Launching team for launching process with sliding system of Floating Production UnitM00185, Palwo Buwono 400Teus-M000157 with the role involved by the following task: Creating building berth lay out for launching. Creating Launching Jig Plan and Erection Jig Plan. Creating Launching Angle plan and coordinate to Technology Division to get the launching calculation. Creating launching procedure accordance with yard standard. Conducting all calculation involved with launching by coordination with Technology Division. Project involved: Open Hatch Bulk Carrier 45000 DWT (Project no.: M000142, M000143). Flat Top Barge 300FT (Project no.: M000184, M000186, M000190) Oil Tanker 30000 DWT (Project no.: M000208)

Accuracy Control Engineer (07/1996 - 06/2000) Responsible for the accuracy of block dimension, process monitoring and analyzing from fabrication stage to erection block to get accuracy dimension result. Creating the accuracy control check sheet for fabrication stage to erection stage. Supervising and monitoring material, component, section, and block dimension check. Implementing a step by step zero margin block from cutting the margin block before loading to component zero margin in fabrication stage. Collecting and making evaluation of Accuracy control data which has been conducted for the next project. Conducting shrinkage evaluation in all production stage. Project Involved: - Open Hatch Bulk Carrier 45000 DWT (Project no.: M000140, M000141) - Oil Tanker 17.500 DWT (Project no.: M000132) - Caraka Jaya Niaga III, 3250 DWT Semi Container (Project no.: M000120, M000119) Steel fitter.
(01/1994 - 06/1996) Working as a steel fitter with responsibility in executing erection block process from loading block, adjusting block, and fitting block joint with yard standard requirement. Project involved: - Passenger vessel 500Pax (Project no.: M000121) - Dry Cargo Vessel 15000 DWT (Project no.: M000130, M000131)

Education:
DR. Soetomo University, Surabaya, Indonesia Master degree, Marketing management, 2003, GPA 3.3/4.0 Thesis: The influence of stress causes to employees performance of Merchant Ship Division PT.Pal Indonesia. Adhi Tama Institute of Technology, Surabaya, Indonesia. Bachelor degree, Ship Building Technology, 2000, GPA 2.97/4.0 Thesis: Technical review on the application of zero margin process before erection stage Ship Building Technical High School, 1993 Majoring Ship Building Steel Construction.

Highlights of Training, Seminar & Workshop:


ESQ Leadership Training, Training Center of PT.Pal, Surabaya, Indonesia, April 2006. Jotun Paint Seminar, Jotun Paint School, Surabaya, Indonesia, April 2005. First Aid Training, HSE Department of PT.Pal, Surabaya, Indonesia, October 2004 Tribon assembly planning, Technology Division of PT Pal, Surabaya, Indonesia, December 2002 Tribon weld planning, Technology Division of PT Pal, Surabaya, Indonesia, December 2002 3d AutoCAD 2000, Training Center of PT.Pal, Surabaya, Indonesia, October 2001. On the job training Training for creating shell expansion, Mould loft work shop, PT. Pal, Surabaya, Indonesia, October 1993 Training for creating shop drawing, Production drawing bureau, PT. Pal, Surabaya, September 1993. Ship hull repairing, Construction department of Repair & Maintenance Division of PT. Pal, Surabaya, Indonesia, and August 1993. Building steam boiler, Construction department of General Engineering Division of PT.Pal, Surabaya, Indonesia, July 1993. Erection work shop of Merchant Ship Division of PT. Pal, Surabaya, Indonesia, June 1993. Assembly work shop of Merchant Ship Division of PT. Pal, Surabaya, Indonesia, December 1992. Fabrication work shop of Merchant Ship Division of PT. Pal, Surabaya, Indonesia, November 1992. Training of ship construction drawing, Training Center of PT. Pal, Surabaya, Indonesia, January 1992. Training of Basic Mechanical drawing, Training Center of PT. Pal, Surabaya, Indonesia, June 1991. Training of Basic Machining process, Training Center of PT. Pal, Surabaya, Indonesia, March 1991.

Training of Sub Merged Arch Welding (Fillet&Butt joint with down hand, Horizontal and Vertical Position), Training Center of PT. Pal, Surabaya, Indonesia, Training of Oxygen Acetylene Steel Cutting, Training Center of PT. Pal, Surabaya, Training of Oxygen & Acetylene Welding process, Training Center of PT. Pal, Training of Basic Metal Processing, Training Center of PT. Pal, Surabaya, Indonesia, June 1990.
Erwin Pritanto, PhD. Project leader of PIM Project of Merchant Ship Division, PT.Pal Indonesia, mobile: +6281330204186. Ir. Bambang Harimukti Wibowo. Project Manager of Chemical Tanker 6000Dwt, Boustead Penang Shipyard, mobile: +60164370019. Iqbal Singh Maggo. Project Manager of AHTS 67.8 M, Boustead Penang Shipyard, mobile +919779017510. William Backshell. Owner representative of Sealink Sdn. Bhd. For 2xAHTS 67.8 M project. Mobile +61406998258. Surabaya, Indonesia, October 1990. Indonesia, October 1990. December 1990.

References
1. 2. 3. 4.

S-ar putea să vă placă și