INPUT DATA
fc fy bw (beam width) h (beam hight) conc. Cover L(span cl.to cl) Ln(clear span) q (distriputed load) P(concentrated load) Mu+
2= continous beam d
3050
mm
a MU-
0 0
MM kg.m
CALCULATIONS
fc'= 24.9 CHECK OF DEEP BEAM ACTION Ln/d 1.00 LEVER ARM LEVER ARM [jd] (simple) LEVER ARM [jd] (continous)
1982 1672
mm mm
OK OK
DISTRIBUTION OF POSITIVE REINFORCMENT y= mm 589.5 DISTRIBUTION OF NEGATIVE REINFORCMENT As10 y1=(0.2h)= As2-
7 0
20 25
620 1860
y2=(0.6h)=
1565032 VU =1.4 V N CHECK THE ULTIMATE SHEAR FORCE N 1724873.203 Vumax= CALCULATE THE CONCRETE SHEAR STRENGTH VC 2.78 OK (3.5-2.5*Mu/Vud) 0.0036 w 1521947 Vc= N 1293655 Vc= N 646827 0.5* Vc= N DESIGN OF STIRRUPS:CHECK IF Vu<0.5VC HORUZONTAL STIRUUPS 125 Sh = Avh-min= 62.5 choose horizontal stirr. 2legs VERTICAL STIRRUPS 300 Sv = Av-min= 90 choose vertical stirr. 2legs
OK VC=.5(fc')^0.5*bw*d
SKIP THE MIN. RFT & CALC0 THE REQ. STIRR. mm mm2
7
CHECK OF S max mm mm OK OK
calculate the ultimate shear force carried by the stirrups Vs Vs= 16890194.23 Sh(mm) Sv (mm) Vs(chosen) = 150 150 10 10 Avh = Av = 157.08 157.08 mm2 mm2
1322299.44