Mooring Equipment
Harbour Marines standard range of Mooring Equipment includes deck mounted Hawser Hooks, Chain Stoppers & Quick Release Hooks ranging in capacity from 60T to 650T. Designed for the harshest marine environments, all equipment offers quick release under load with optional load monitoring and remote release facilities.
Applications
Mooring Equipment Vessel Type
FSO, FPSO for Bow and/or Stern Mooring
Application
Secures the end link of the mooring assembly i.e. open end link, pair link, OCIMF chafe chains A & B or the eye of a mooring hawser. Secures the common link of stud link anchor chain ranging from 75 to 110mm diameter or standard OCIMF chafe chains A & B. Secures to the mooring hawser soft eye, generally installed in multiple units of double or triple hooks & often with an integral electric capstan. Hawser Load Monitoring. For joining shackles, pad eye anchorages, bollard / bitts and winch brakes.
Capacity SWL
From 200T to 350T
Hawser Hooks
FSO, FPSO Bow and/or Stem Mooring and Spread Moorings FSRU, Ship to Ship, Lightening, Offshore Terminals
Load Cells
> 50T
Safety
Safety features common to Harbour Marines mooring equipment include: Positive locking to ensure the definite locking up of the mooring unit. Safe and reliable release from zero to full load provided from either a local or remote release panel. Safe electro mechanical interlocking to ensure against an accidental or inadvertent release of the mooring.
Retrieval Winch
System Configuration
Load Monitoring is available for either single or dual leg hawsers and the system may be provided as an upgrade or replacement to an existing CALM buoy. Standard system configurations include: SPM - LMS-01: The basic Harbour Marine system is fully contained onboard the SPM itself. Load data recording is performed locally and stored for later retrieval. Audible / visible hawser tension warning lights and sirens are installed on the buoy to alert the vessel crew. SPM - LMS-02: Building on the above system a remote Base Station Monitoring system may be installed onshore with monitoring operation and diagnostics performed over UHF telemetry communi cations.
Enhancements to the above systems may also include: A Portable Operators Workstation Hand Held intrinsically safe monitors to receive loads and high load warning
Load Cells
The integral load cell measures mooring tension and is a critical component of each mooring unit, designed for the harshest marine environments. Harbour Marine load cells are manufactured in-house and have a proven history of reliability and accuracy for offshore mooring applications. The range of Load Cells for offshore applications offer: High ingress protection against water & dust to IP68. Shock release tested with the mooring units. Dual redundant gauging providing 2 load cell outputs within the single shaft. Certified for hazardous areas Zone 1 and Zone 2. Heavy duty wet pluggable electrical field connection (optional).
Instrumentation Packages
A comprehensive range of standard control room monitoring and operating packages is available. The instrumentation package generally comprises instrumentation rack cabinet containing the equipment interfaces for load monitoring, remote release and environmental sensors. The operators workstation can be installed within the instrumentation rack or alternatively supplied as a desktop workstation. Multiple workstations may be networked over Ethernet LAN.
Control
Controllers for the field equipment may be connected over analogue or digital communications. Control and status information from slave controllers, located next to each mooring unit, are typically relayed to the main control room workstation via point to point or multi drop connections over RS485 twisted pair shielded cable. Other communication options include secure radio telemetry enabling transmission of load information and alarm signals to fixed or portable remote workstations, portable intrinsically safe certified monitors or a PDA.
Communications
Software
Independent or fully integrated software applications for Load Monitoring are available with options to include Remote Release operation, Metocean monitoring or vessel positioning using GPS. Accurate monitoring, display, recording and printout of data for single and multiple mooring arrangements can be provided, linked to audible / visible tension alarm stations. Extensive analysis and editing software developed by Harbour Marine provides structured reporting of recorded data by date, time period, load magnitudes or alarm event. Integration to the vessel based DCS can be provided via industry standard protocols.
Refer to following Harbour Marine Product Data Sheets for related information: OFF - # #: Mooring Systems for FSO, FPSO, FSU SOFT - LMS - # #: Mooring Tension Monitoring Software SPM - # #: Single Point Mooring (SPM) & Monitoring SP - # #: Single Point Mooring (SPM) Monitoring Systems
Harbour & Marine Engineering Pty Ltd Trelleborg Marine Systems Virginia Park, 9 South Drive 236 - 362 East Boundary Road East Bentleigh, Victoria (Melbourne) 3165 Australia Tel: + 61 3 95 75 9999 Fax: +61 3 9 575 9900 Email: sales@harbourmarine.com www.harbourmarine.com