Sunteți pe pagina 1din 3

POTENTIAL FAIL URE MODE AND EFFECTS ANAL YSIS (DESIGN FMEA) X System Subsystem Component Model Years(s)/Vehicle(s)

Core Team Chris Fox, Kerry Hinson 2008 XYZ Design Responsibility Dave Designer Key Date 6/27/2005 Page Prepared By FMEA Date (Orig.) Chris Fox 6/21/12 FMEA Number 05-XYZ

Action Results I t e m C L A S S

Part/ Part Number

Part Function

Failure Mode

Failure Effects

S E V

Causes/ Mechanisms of Failure

O C C

Current Design Controls

D E T

R P N

Recommended Actions

Responsibility & Target Completion Date

Actions Taken

S e v

O c c

D e t

R P N

Tool used for writing or drawing with a colored fluid, such as ink

Casing (Outer Tube)

Provides grip for writer

Casing designed too small

Won't fit in large hands comfortably, and could contribute to CTS.

Bad mating part (user's hand size) information

Print review system that includes evaluation of all mating parts, and possible clearance/interference issues by design team prior to release of print to toolmaker. Print review system that includes evaluation of all mating parts, and possible clearance/interference issues by design team prior to release of print to toolmaker.

48

Casing designed too large

Won't fit in small hands comfortably.

Bad mating part (user's hand size) information

48

Provides protection for mechanism and contents.

Ink reservoir will not actuate without binding.

Unable to move cartridge into point of operation without difficulty. Unable to move cartridge into point of operation

Internal cavity designed 2 too small

Tolerance stackup

48

Ink reservoir will not actuate, button mechanism pops off.

Internal cavity designed 2 too large

Tolerance stackup

48

Ink reservoir will not actuate, stylus larger than clearance hole.

Unable to move cartridge into point of operation

Hole designed too small. 2

Print review system that includes evaluation of all mating parts, and possible clearance/interference issues by design team prior to release of print to toolmaker.

48

Ink Reservoir

Stores ink until point of use.

Plastic material crossreacts with ink

Ink exhibits signs of contamination

Improper material selection.

Material Selection to reduce potential, and process controls

48

Leaks

Material failure - Cracks 6 or seepage.

Improper material selection.

Spray bar test, environmental testing.

48

Bent / Warped

Unable to move cartridge into point of operation

Improper material selection.

FEA to determine material suitability

48

Ink reservoir will not actuate without binding.

Unable to move cartridge into point of operation

Ink reservoir designed too large

Tolerance stackup

48

Cartridge profile incorrect

Unable to move cartridge into point of operation

Bad mating part information

Tolerance stackup

48

\\vboxsrv\conversion_tmp\scratch4506\101149285.xls.ms_office

Page 1 of 3

POTENTIAL FAIL URE MODE AND EFFECTS ANAL YSIS (DESIGN FMEA) X System Subsystem Component Model Years(s)/Vehicle(s) Core Team Chris Fox, Kerry Hinson 2008 XYZ Design Responsibility Dave Designer Key Date 6/27/2005 Page Prepared By FMEA Date (Orig.) Chris Fox 6/21/12 FMEA Number 05-XYZ

Action Results I t e m C L A S S

Part/ Part Number

Part Function

Failure Mode

Failure Effects

S E V

Causes/ Mechanisms of Failure

O C C

Current Design Controls

D E T

R P N

Recommended Actions

Responsibility & Target Completion Date

Actions Taken

S e v

O c c

D e t

R P N

Ink Stylus

Act as a cap to keep the ink from drying

Accidentally dry in the pen

Ink gums the whole thing 6 up and requires meticulous cleaning

Designed overclearance 2

Acts as a buffer between the material and the quick-drying ink inside the pen

48

Lets ink flow out of the pen at a Flow unevenly controlled rate

Flow unevenly

Designed overclearance 2

Small rotating ball made of brass, steel or tungsten carbide to disperse ink

48

Clogged / Bound ballpoint

Flow unevenly

Clogged / Bound ballpoint

Reliability testing

48

Ballpoint Oversized

Flow unevenly

Ballpoint Oversized

Pre-production validation

48

Ballpoint Undersized

Flow unevenly

Ballpoint Undersized

Pre-production validation

48

Contamination / Corrosion

Flow unevenly

Contamination / Corrosion

Reliability testing

48

Bent / Warped

Flow unevenly

Bent / Warped

Material Selection to reduce potential, and process controls

48

Ink

Viscosity too thin

Wrong ingredient(s) for application

Materials Testing

48

Viscosity too thick

Wrong ingredient(s) for application

Materials Testing

48

Ingredient: Vehicle

Acts as fluid to transport pigmentsand coloring

Wrong formulation for writing substrate

Slow to dry

Wrong ingredient(s) for application

Pre-production validation, reliability testing

48

Ingredient: Coloring

Makes writing darker and clearer.

Color Missing

Wrong ingredient(s) for application

Pre-production validation, reliability testing

48

\\vboxsrv\conversion_tmp\scratch4506\101149285.xls.ms_office

Page 2 of 3

POTENTIAL FAIL URE MODE AND EFFECTS ANAL YSIS (DESIGN FMEA) X System Subsystem Component Model Years(s)/Vehicle(s) Core Team Chris Fox, Kerry Hinson 2008 XYZ Design Responsibility Dave Designer Key Date 6/27/2005 Page Prepared By FMEA Date (Orig.) Chris Fox 6/21/12 FMEA Number 05-XYZ

Action Results I t e m C L A S S

Part/ Part Number

Part Function

Failure Mode Color Wrong

Failure Effects

S E V 6

O Causes/ Mechanisms C of Failure Current Design Controls C Wrong ingredient(s) for 2 Pre-production validation, reliability testing application

D R E P T N 4 48

Recommended Actions

Responsibility & Target Completion Date

Actions Taken

S e v

O c c

D e t

R P N

Ingredient: Additive

Stabilize and provide additional desirable characteristics.

Wrong ingredient(s) for application

Pre-production validation, reliability testing

48

Button Mechanism

Protects user and contents when not in use

Button stays in down position.

Ink leaks when not in use.

Spring failure / defective 2

Pre-production validation, reliability testing

48

Cam failure / defective

Pre-production validation, reliability testing

48

Contamination / Corrosion

Reliability testing

48

\\vboxsrv\conversion_tmp\scratch4506\101149285.xls.ms_office

Page 3 of 3

S-ar putea să vă placă și