Sunteți pe pagina 1din 39

CADE/CAODC2009AnnualDrillingConference

EvaluationofDrillingRig PerformanceCharacteristics
QuintonT.Foulston,P.Eng. PrecisionDrilling

Iwill: 1. Exploresomeoftheambiguitiesaroundthe traditionalRIGDEPTHRATING 2. Describefour(4)ALTERNATEdrillingrig performanceCHARACTERISTICS 3. Concludewithabriefsummary

Metricscommonlyreferredtowhenselectinga drillingrigintheUS&Internationalmarkets: Drawworkshorsepower Mastsize&hookload Rigdepthrating(oftenbasedonmaxdepthof depthrangeassignedbydrawworksOEM)

Metricscommonlyreferredtowhenselectinga drillingrigintheUS&Internationalmarkets: Drawworkshorsepower Mastsize&hookload Rigdepthrating(oftenbasedonmaxdepthof depthrangeassignedbydrawworksOEM) Metricscommonlyreferredtowhenselectinga drillingrigintheCanadianmarket: Rigdepthrating Mastsize&hookload
4

InordertoassignaRIGDEPTHRATING,aDrilling ContractormustmakeAMBIGUOUSassumptions aboutthefollowing: wellprofile mudweight drillstringdesign casingdesign conditionofthehole

Four(4)ALTERNATEmetrics: WhatcantherigPULL? 1. whenstuck,orwhenrunningcasing? 2. whenPOOHnearTD? HowmuchpipecantherigRACK? 3. basedonthegeometryoftheselectedpipe? 4. basedontheweightoftheselectedpipe?

Four(4)ALTERNATEmetrics: WhatcantherigPULL? 1. whenstuck,orwhenrunningcasing? 2. whenPOOHnearTD? HowmuchpipecantherigRACK? 3. basedongeometry? 4. basedonweight?

Whatthedrillingrig* canPULLisdetermined bycomparing: Mast Drillingline Drawworks

Consideration oftheMASTwhen determiningwhatthe rigcanPULL

TypicalMASTplacardas per3rdEditionofAPI4F showingthemaximum statichookloadcapacities

10

ConsiderationoftheWIREROPE whendetermining whattherigcanPULL

11

MinimumWIREROPEdesignfactors(select valuestakenfromAPIRP9B12thEdition): Rotarydrillingline Rotarydrillinglinewhensettingcasing Pullingonstuckpipe 3 2 2

Typical6X19IWRC drilllineconstruction
12

ConsiderationoftheDRAWWORKSwhen determiningwhattherigcanPULL

13

Exampleof DRAWWORKS placardmaximum hookloadcapacities

14

ConsidertheACTUALDRAWWORKS PRIMEMOVERwhendetermining whattherigcanPULL


15

Q1: Whatcantherig PULLwhenstuck, orrunningcasing?

16

Stuckpipeorcasingrunningoperations typicallyrequiretheHIGHESTHOOKLOADSof theplannedwell

17

1. WhattherigcanPULLwhenstuckorrunning casing,isthelesserof: Maststatichookload HLusing2:1SFonfastlinebreaking strength drawworksOEMmaxHLormaxSLP/HLcalc fromactualinputtorque

18

Q2:WhatcantherigPULLwhentripping? Atwhatspeed?Withwhatoverpull?

19

Trippingoperationstypically requiretheHIGHESTHOISTINGSPEEDS. TheHORSEPOWERofthedrawworksprime moverdefinestherelationshipbetween hookloadandhoistingspeed.


20

*Percentages(%)ofmaximumcapacitiesinQ1: Overpull ReducedDrilling Capacity

WireRope Mast Drawworks

33%(SF=2:1) specifiedOP specifiedOP

66%(SF=3:1) (100%lessOP) (100%lessOP)

______________________________________________________________________________________________________________________________________________________________

Whenoverpullrequirementsarespecified:

______________________________________________________________________________________________________________________________________________________________

WhenoverpullrequirementsareNOTspecified,theDrilling Contractorcanmakereductionstothemast&drawworks capacitiesbasedonthesizeofthedrillingrig:

Singles Doubles Triples

15% 85% 20% 80% 25%(upto100kip) 75%

21

*Percentages(%)ofmaximumcapacitiesinQ1: Overpull ReducedDrilling Capacity

WireRope Mast Drawworks

33%(SF=2:1) specifiedOP specifiedOP

66%(SF=3:1) (100%lessOP) (100%lessOP)

______________________________________________________________________________________________________________________________________________________________

Whenoverpullrequirementsarespecified:

______________________________________________________________________________________________________________________________________________________________

WhenoverpullrequirementsareNOTspecified,theDrilling Contractorcanmakereductionstothemast&drawworks capacitiesbasedonthesizeofthedrillingrig:

Singles Doubles Triples

15% 85% 20% 80% 25%(upto100kip) 75%

22

*Percentages(%)ofmaximumcapacitiesinQ1: Overpull ReducedDrilling Capacity

WireRope Mast Drawworks

33%(SF=2:1) specifiedOP specifiedOP

66%(SF=3:1) (100%lessOP) (100%lessOP)

______________________________________________________________________________________________________________________________________________________________

Whenoverpullrequirementsarespecified:

______________________________________________________________________________________________________________________________________________________________

WhenoverpullrequirementsareNOTspecified,theDrilling Contractorcouldmakereductionstothemast&drawworks capacities,fordrilling,basedonthesizeoftherig:

Singles Doubles Triples

15% 85% 20% 80% 25%(upto100kip) 75%

23

1. WhattherigcanPULLwhenstuckorrunning casing,isthelesserof: Maststatichookload HLusing2:1SFonfastlinebreaking strength drawworksOEMmaxHLormaxSLP/HLcalc fromactualinputtorque 2. WhattherigcanPOOHnearTDatadesired blockspeedw/anoverpullcontingency,isthe lesserof: Maststatichookloadlessanoverpull HLusing3:1SFonfastlinebreakingstrength calcHLfromactualdrwksHP&desiredblock speed,ordrawworksmaxHLlessanoverpull
24

Howmuchpipe cantherigRACK?

25

Clarificationoftermdefinitions astheyrelate tothispresentation: RACKINGCAPACITY numberofstandsthatcan bestoodonthefloorbasedonthegeometry ofthemonkeyboardandrackingfloor SETBACKCAPACITY maximumuniformweight oftubularsthatcanbesupportedbythe rackingfloor

26

Four(4)ALTERNATEmetrics: WhatcantherigPULL? 1. whenstuck,orwhenrunningcasing? 2. whenPOOHnearTD? HowmuchpipecantherigRACK? 3. basedongeometry? 4. basedonweight?

27

HowmuchpipetherigcanRACK geometricallyisgenerallybased on: Sizeoftheselectedtubulars GeometryoftheMB Footprintoftherackingfloor

28

Commondrillpipedimensions: 4 15.7#DPw/newNC405.25 ODTJ 4 16.6#DPw/newNC466.50 ODTJ 5 19.5#DPw/newNC506.625 ODTJ

29

RACKINGCAPACITIESbasedonMBgeometry: 126triplestandsw/4 DP/HWDP(3570m) 108triplestandsw/4 or5 DP/HWDP(3060m) 10triplestandsof6 collars(280m)

30

AspacebetweentheDS&ODSpipeisretainedto: Laydowndirectionaltoolswhentripping CreateclearpathforwirelinewhenloggingatTD Runlongstringofcasingwhenonamultiwellpad


m31

Gatorbacks,commonlyusedintheCanadian drillingindustrytopreventiceplugs,canlimit thenumberofstandsthatcanbeRACKED regardlessofpipesize


32

Distinctmetricsthatwouldmoreclearly definethegeometricalRACKINGcapabilityof adrillingrig: RACKINGCAPACITY(m)of4 DP/HWDP RACKINGCAPACITY(m)of4 or5 DP/HWDP RACKINGCAPACITY(m)ofCOLLARS


33

Four(4)ALTERNATEmetrics: WhatcantherigPULL? 1. whenstuck,orwhenrunningcasing? 2. whenPOOHnearTD? HowmuchpipecantherigRACK? 3. basedongeometry? 4. basedonweight?

34

Q4:Howmuchpipecantherig RACK basedonweight?

TheSETBACKCAPACITYtypicallyreflectsauniform loadingassumptionthatmaynotconsiderthe localizedloadingofHWDP.


35

Nomonkeyboard.Norackingfloor.

36

NoRACKINGorSETBACKlimitations.

37

ThispresentationencouragestheOperatorand DrillingContractortocollaborativelydetermine theloadsthatarespecifictotheplannedwell(s); andcomparetheseestimatedloadstoamore transparentsummaryofDRILLINGRIG CAPABILITIES ratherthanrelyonanambiguous rigdepthratingtoevaluatethesuitabilityofa particularrigforaparticularwellprogram. Doingsowillrefinetherigselectionprocess;and mayultimatelyreducetheCOSTtodrillthe plannedwell(s).
38

EvaluationofDrillingRig PerformanceCharacteristics
QuintonT.Foulston,P.Eng. Ph.4037164642

Thankyouforyourinterestinthispresentation. Arethereanyquestions?
39

S-ar putea să vă placă și