Sunteți pe pagina 1din 8

1 (8) CN 210

Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

CN 210
DF DDF
OVP 2 PDU

TNA

1 2 3

RPM 919 715/01500 TSR 482 0211/15M Cable 4 paires 2 1

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

2 (8) CN 210
Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

CN 210
CN210installationstandard
1- InstalledinsideRBS6000 2- PoweredfromRBSbyoneConnectionCables [Pwr profile to ET-20A (Power Cable) RPM 919 715/01500] no need for redundancy cabel 3- CNConnectedtotheDF(OVP)byOneCable [RJ45>RJ45 straight TSR 482 0211/15M] with 2E1s capacity. 4- CNConnectedtoRBS6000(TNA)byOneCable [RJ45>RJ45 straight TSR 482 0211/15M] for Ethernet Configuration. 5- OVPConnectedtoDDF(Krones)bya4pair twisted cable

16

NB:
TheConnectionCable,RJ45RJ45[RPM919701/01700]willbeusedlateronfordirectE1connection
from CN210 into ETB inside RBS6000 when the 2G is swapped inside the RBS6000

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

3 (8) AMM 2P
Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

AMM 2P

DF DDF

OVP OVP

ETB

Cable 4 paires

TNA

3 1 2 3 RPM 919 715/01500 RPMR102 06/3 TSR 482 0211/15M 1

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

4 (8)
Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

16XXX 16XXX
TN2pinstallationstandard:
1- InstalledinsideRBS6000 2- PoweredfromRBSby2ConnectionCables [Pwr profile to ET-20A (Power Cable) RPM 919 715/01500] 3- NPUConnectedtotheDDFbya4xE1, User I/O,12.0m [RPMR 102 06/3] > Bypass the DF and OVP 4- NPUConnectedtoRBS6000(TNA)byOneCable [RJ45>RJ45 straight TSR 482 0211/15M] for Ethernet Configuration. 5- DF (OVP) Connected to RBS6000 by One Cable [RJ45>RJ45 straight TSR 482 0211/15M] with 2E1s capacity that will be used later for 2G swap inside RBS6000. 6- OVP Connected to DDF (Krones) by a 4 pair twisted cable.

Powerinstallationincaseno3Gplannedforsite:
1- InstalledwallmountedoronexistingTransmissionrackorinsideanewtransmissioncabinet 2- Poweredby48VDCSourceor+24VDCforTN2pwithsufficientcurrent

NB:
TheConnectioncable,SOFIXto2xRJ45[RPM919607/01900]willbeusedlateronfordirectE1connection fromTN2pintoETBinsideRBS6000whenthe2GisswappedinsidetheRBS6000

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

5 (8) AMM 6P
Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

AMM 6P
2

DF

OVP
ETB

DDF
4 3

TNA

DDF
1 2 3 4 RPM 919 714/01500 RPMR 102 06/3 TSR 482 0211/15M Cable 4 paires

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

6 (8) AMM 6P
Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

16XXX
TN6pinstallationstandard
1- InstalledinsideRBS6000 2- PoweredfromRBSby2Connection Cables [Pwr profile to ET- 20A(Power

16XXX 16XXX 16XXX 16XXX

Cable)RPM919715/01500]
3- NPUConnectedtoDDFbya4xE1,

UserI/O,12.0m[RPMR10206/3] >BypasstheDFandOVP
4- NPUConnectedtoRBS6000(TNA)

byOneCable[RJ45>RJ45straight TSR4820211/15M]forEthernet
Configuration. 5- DF(OVP)ConnectedtoRBS6000by

OneCable[RJ45>RJ45straight TSR4820211/15M]with2E1scapacity thatwillbeusedlaterfor2Gswap swapinsideRBS6000.

Powerinstallationincaseno3Gplannedforsite
1- InstalledwallmountedoronexistingTransmissionrackorinsideanewtransmissioncabinet 2- Poweredby48VDCSourceor+24VDCforTN6pwithsufficientcurrent

NB:
TheConnectioncable,SOFIXto2xRJ45[RPM919607/01900]willbeusedlateronfordirectE1connection fromTN6pintoETBinsideRBS6000whenthe2GisswappedinsidetheRBS6000

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

7 (8) AMM 20P


Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

AMM 20P
2 1

OVP

ETB

2 Cable 4 paires

TNA

DDF

New PDU

1 TFL424 02 10M , NTM 203 79/10 2 3 4 TFL424 03 10M , NTM 203 80/10 TSR 482 0211/15M RPMR 102 06/3

Prepared: Sihem Stambouli Approved: george farraj

Rev: A

8 (8) AMM 20P


Prepared
Document No.

EAL/O/B Sihem Stambouli


Approved
A 201

Checked

Date

Rev.

File

EAL/O/B George Farraj

04/04/2012

TN20pinstallationstandard
1- InstalledonexistingTransmissionrackorinsideanewtransmissioncabinet 2- Poweredby2DCcables[TFL42402,10M,NTM20379/10]forFANunitsand2DCcables[TFL42403,10M,NTM20380/10]

forPFUsfromanewPDUmoduleinstalledinsideRBS6000
3- ETU2BConnectedtotheRBS6000byaCable[RJ45>RJ45straightTSR4820211/15M]. 4- NPUconnectedtoDDF(krone)bya4xE1/DS1,UserI/O,12.0m[RPMR10206/3] 5- DF(OVP)ConnectedtoRBS6000byOneCable[RJ45>RJ45straightTSR4820211/15M]with2E1scapacity that will be used later for 2G swap inside RBS6000. 6- OVPConnectedtoDDF(krone)bya4pairtwistedcable.

Powerinstallationincaseno3Gplannedforsite
1- InstalledwallmountedoronexistingTransmissionrackorinsideanewtransmissioncabinet 2- Poweredby48VDCSourceforTN20pwithsufficientCurrent

Prepared: Sihem Stambouli Approved: george farraj

Rev: A