Documente Academic
Documente Profesional
Documente Cultură
DESCRIPTION Bill No: 02 SUBSTRUCTURE Note: Please note that the works to the Water Well have been EXCLUDED due to lack of necessary details. EXCAVATION & EARTH WORKS
QTY
UNIT
SITE CLEARING Clearing of site from rubbish and vegetable matters, stumps, roots. Demolition shall be included (if any) EXCAVATION Common excavation, depth not exceeding 2.00m for Raft Foundation, Extra over breaking up rocks or any hard material as defined met with excavation of any depth. EARTH WORK SUPPORTS Earth work support system to support the Excavated surface, height not exceeding 2.00m. DEWATERING Keeping excavations free of all water including subterranean water within the site.
128.00
m2
211.00
m3
m3
Rate only
80.00
m2
1.00
item
ANTI TERMITE TREATMENT Chemical anti-termite surface treatment for Raft foundation. FILLING & COMPACTION Back filling to excavation for Raft foundations using naterials arising from excavations making level for the Ground floor slabs.
24.00
m2
140.00
m3
Carried to collection on page 04 EXCAVATION & EARTH WORKS Cont'd Disposal of surplus materials arising from excavations.
71.00
m3
CONCRETE WORKS
In-Situ Concrete PLAIN IN-SITU CONCRETE Plain in-situ concrete, designed mix Grade C15 (15N/mm) with Ordinary Portland Cement for 50mm thick blinding layer under Concrete Raft foundation. REINFORCED IN-SITU CONCRETE Reinforced Concrete, designed mix Grade C25 (25N/mm), vibrated, with Ordinary Portland Cement in Raft foundations, Foindation Beams, Columns, Lift Pit, Concrete Water Tank and the like. Pre Cast Concrete 700x700mm sized, 140mm thick Reinfroced Pre cast Concrete Cover slab for manhole including casted in steel handle
7.00
m3
87.00
m3
1.00
Nos
Form Work Plywood class 2 Formworks for sides of Concrete Raft foundations, Columns, Foindation beams, Water tank, Lift Pit and the like.
196.00
m2
Reinforcement bars of high yield steel grade 460 N / mm2 & mild steel grade 250 N / mm2 in Raft Foundation, Foundation beams, Columns, Lift Pit, Water Tank, including Staircase Starter bars, bends, tying wire, bends, hooks and spacers and the like.
13,231.00
Kg
TANKING & DAMP PROOFING Polythene damp proof membrane (500 gauge) laid on blinding layer for the soffit and edges of raft foindations. Bituminous tanking membrane hot laid for the sides and sofft of Water Tank including all necessary accessories. Water bars of approved quality applied for the lift Pit walls as per the requirement.
152.00
m2
18.00
m2
8.00
B C
TOTAL OF BILL NO. 02 - SUBSTRUCTURE (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 03 SUPERSTRUCTURE
CONCRETE WORKS REINFORCED CONCRETE In-Situ Concrete Reinforced Concrete, designed mix Grade C25 (25N/mm), vibrated, with Ordinary Portland Cement for Beams, Columns, Floor Slabs, Roof Slabs, Lift Core walls, Stair Cases, Lintols, Planters and the like in; A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof Pre Cast Concrete 1400mm dia, 140mm thick Reinfroced Pre cast Concrete Cover slab for Water Well including casted in steel handle Form Work Plywood class 2 Formworks for sides and soffits of Beams, Columns, Floor Slabs, Roof Slabs, Lift Core walls, Stair Cases, Lintols, Planters and the like in; N P Q R S Ground Level First Level Second Level Third Level Fourth Level 108.00 285.00 298.00 298.00 298.00 m2 m2 m2 m2 m2 23.00 28.00 29.00 29.00 29.00 29.00 29.00 28.00 28.00 28.00 37.00 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
1.00
Nos
Carried to collection on page 04 CONCRETE WORKS Cont'd Form Work Cont'd A Fifth Level 298.00 m2
B C D E F
Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof Reinforcement Reinforcement bars of high yield steel grade 460 N / mm2 & mild steel grade 250 N / mm2 in Beams, Columns, Floor Slabs, Roof Slabs, Lift Core walls, Stair Cases, Lintols, Planters including, bends, tying wire, bends, hooks and spacers and the like in,
m2 m2 m2 m2 m2
G H J K L M N P Q R S
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof
4,692.00 3,732.00 3,735.00 3,735.00 3,735.00 3,694.00 3,754.00 3,659.00 3,659.00 3,471.00 3,692.00
Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
TANKING & DAMP PROOFING T Bituminous Damp Proofing membrane to the sides and surface of Concrete Roof Slabs including 50mm thick Protective Mortar Screed as per the requirement. 36.00 m2
Bituminous Damp Proofing to the surface of Balconys, Toilets and Terrace areas including dressing arround and sealing to all penetrations as per the requirement.
833.00
m2
B C
TOTAL OF BILL NO. 03 - SUPERSTRUCTURE (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 04 MASONRY
Solid Block Work 100mm thick solid concrete block walls in 1:3 C/S mortar to receive 12 thk mm double coat external and 15 mm thk internal plaster in; A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 50mm thick dry wall partitioning for independent duct walls in; M N P Q R S T U V W X Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 18.00 15.00 15.00 15.00 15.00 15.00 15.00 18.00 18.00 18.00 24.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 104.00 115.00 120.00 120.00 120.00 120.00 120.00 115.00 115.00 115.00 161.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
100mm thick Hollow concrete block walls in 1:3 C/S mortar to receive 15 mm thk plaster for both sides in; A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 95.00 88.00 88.00 88.00 88.00 88.00 88.00 79.00 79.00 79.00 185.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
TOTAL OF BILL NO. 04 - MASONRY (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 05 FINISHES
Note: The cost of Bedding (Screed) has NOT been included in TILING WORK of any kind.
FINISHES TO WALLS Plastering 12mm thick double coat cement and sand (1:3) External plastering to 100mm solid block walls in, A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 15mm thick cement and sand (1:3) Internal plastering to 100mm & 50mm solid block walls in, M N P Q R S T U V W X Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 386.00 369.00 374.00 374.00 374.00 374.00 374.00 356.00 356.00 356.00 564.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 138.00 168.00 173.00 173.00 173.00 173.00 173.00 168.00 168.00 168.00 312.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
Prepare and apply one sealer coat and two full coats of PVA emulsion paint on external and internal surfaces of concrete block walls in A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof Wall Tiling 200 x 250mm Ceramic wall tiles on 15mm thick Cement/ Sand (1:3) bedding in Toilet walls up to ceiling height. M N P Q R S T U V W X Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 55.00 75.00 75.00 75.00 75.00 75.00 75.00 62.00 62.00 62.00 60.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 524.00 537.00 547.00 547.00 547.00 547.00 547.00 524.00 524.00 524.00 876.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
300 x 600mm Polished Ceramic wall tiles on 15mm thick Cement/ Sand (1:3) bedding in Kitchens. A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
FINISHES TO FLOORS Screed 40mm thick Cement/ Sand (1:3) Screed to receive the Tiling in Toilet & Balcony areas in; M N P Q R S T U V W X Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 11.00 20.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 34.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
60mm thick Cement/ Sand (1:3) Screed to receive the Tiling in areas other than Toilet & Balcony areas in; A B C D E F G H J K L Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof Floor Tiling Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout in M N Garage area in Ground Floor ( 200 x 450mm sized) Pump room & Garbage collecting room in Ground floor (300 x 300mm sized) 300 x 300mm Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Balcony and Terrace areas in; P Q R S T Ground Level First Level Second Level Third Level Fourth Level 3.00 8.00 8.00 8.00 8.00 m2 m2 m2 m2 m2 17.00 5.00 m2 m2 104.00 98.00 100.00 100.00 100.00 100.00 100.00 103.00 103.00 103.00 97.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
Carried to collection on page 21 FINISHES TO FLOORS Cont'd Floor Tiling Cont'd A B Fifth Level Sixth Level 8.00 8.00 m2 m2
C D E F
Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 200 x 200mm sized Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Toilet areas in
m2 m2 m2 m2
G H C D E F G H J K L
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 600 x 600mm sized polished Porcilain floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Areas other than Toilets, Balconys, Terraces, Bed rooms, Garage, Garbage collecting room and Pump room in;
8.00 12.00 15.00 15.00 15.00 15.00 15.00 11.00 11.00 11.00 9.00
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
M N
45.00 45.00
m2 m2
Carried to collection on page 21 FINISHES TO FLOORS Cont'd Floor Tiling Cont'd A B Second Level Third Level 47.00 47.00 m2 m2
C D E F G H J
Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 250 x 250mm sized Non-Skid Ceramic floor tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Stair cases in;
m2 m2 m2 m2 m2 m2 m2
K L M N P Q R S T U
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level 50 x 250mm sized "Nosing" Ceramic tiles to pattern and surrounds fixed to cement and sand (1:3) Bedding and applied with all joints flush pointed with Tiling Grout for Stair cases in;
7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
V W X Y
m2 m2 m2 m2
Carried to collection on page 21 FINISHES TO FLOORS Cont'd Floor Tiling Cont'd A B C Fourth Level Fifth Level Sixth Level 1.00 1.00 1.00 m2 m2 m2
D E F
Seventh Level Eighth Level Ninth Level Skirtings 100mm High Skirting to Garage, Pump room and Garbage collecting Room in Non-skid Ceramic Tiles; 100mm High Skirting for Terrace & Balcony areas in Non-skid Ceramic Tiles in;
m2 m2 m2
25.00
G H I J K L M N O P Q
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 100mm High Skirting with 600 x 600mm sized polished Porcilain floor tile for Areas other than Toilets, Balconys, Terraces, Bed rooms, Garage, Garbage collecting room and Pump room in;
9.00 29.00 29.00 29.00 29.00 29.00 29.00 37.00 37.00 37.00 50.00
m m m m m m m m m m m
R S T
m m m
Carried to collection on page 21 FINISHES TO FLOORS Cont'd Skirting Cont'd A B C D Third Level Fourth Level Fifth Level Sixth Level 68.00 68.00 68.00 68.00 m m m m
E F G H
Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 100mm High Skirting with 250x250mm sized Ceramic tiles for Stair cases in;
m m m m
J K L M N O P Q R S
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level FINISHES TO CEILING Plastering with Putty finish 12 mm thick Cement/ Sand (1:3) Puttyed Plastering to Soffit of Slabs including under sides of Stair cases finished with one sealer coat and two full coats of PVA emulsion paint in;
10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00
m m m m m m m m m m
T U V W X Y Z
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level
m2 m2 m2 m2 m2 m2 m2
Carried to collection on page 21 FINISHES TO CEILING Cont'd Plastering with Putty finish Cont'd A B C D Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level & Roof 100.00 100.00 100.00 12.00 m2 m2 m2 m2
Gypsum Board Ceiling Concealed ceiling finished with one sealer coat and two full coats of PVA emulsion paint for Toilet areas with 600 X 600mm metal frame grid and 9 mm gypsum board, beading, nails and screws etc in; E F G H J K L M N P Q Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level 8.00 12.00 15.00 15.00 15.00 15.00 15.00 11.00 11.00 11.00 97.00 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
Carried to collection on page 21 A B C D E Total from page 12 Total from page 13 Total from page 14 Total from page 15 Total from page 16
F G H J
Total from page 17 Total from page 18 Total from page 19 Total from page 20
TOTAL OF BILL NO. 05 - FINISHES (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 06 ROOF WORKS
Roof Structure
Timber roof structure in "Balau" timber inclusive of fabrication and erection together with all fixing accessories as per the drawings to comprise Ridge boards, Rafters, Wall plates, Bracings etc.
101.00
m2
Roof Covering
Supplying and fixing of LYSAGHT roofing sheets fixed onto Timber Roof Structure together with all fixing accessories. Supplying and fixing of LYSAGHT Roofing Flasing along the Ridge board as per the drawings.
Insulation
101.00
m2
7.00
Supplying and fixing of 50mm Glass wool insution with one sided Aluminium foil fixed on timber structure together with all fixing accessories.
Facia Boards
101.00
m2
25 x 225mm sized timber facia boards fixed to Timber Roof structure including Painting with Two full coats of Enamul paint as per the drawings.
Roof Plumbing
50.00
Supplying, fabrication and erection of Rain water Disposal System together with all Fittings & fixing accessories as per the drawings to comprise, F G H Half round Zincalum Rain Water Gutters Zincalum Rain Water down pipes LYSAGHT Flashing at Gable ends 17.00 170.00 32.00 m m m
TOTAL OF BILL NO. 06 - ROOF WORKS (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 07 TIMBER WORKS Timber Flooring Treated Laminated Timber Flooring fixed on Cement/ Sand (1:3) screed for Bed Room areas in; A B Ground Level First Level 25.00 36.00 m2 m2
C D E F G H J K L
Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level Timber Skirting 100mm High, Treated Laminated Hardwood Skirting fixed to Concrete Block walls for Bed Room areas in;
m2 m2 m2 m2 m2 m2 m2 m2 m2
M N P Q R S T U A B C
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level (Total Ceiling)
30.00 41.00 41.00 41.00 41.00 41.00 41.00 27.00 27.00 27.00 15.00
m m m m m m m m m m m
Carried to collection on page 25 Timber Wall Cladding Supplying & Fixing of Timber T&G Wall Panel Strip System for external walls as per the drawings in; A B C D E Ground Level First Level Second Level Third Level Fourth Level 3.00 5.00 5.00 5.00 5.00 m2 m2 m2 m2 m2
F G H J K L
Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level
m2 m2 m2 m2 m2 m2
TOTAL OF BILL NO. 07 - TIMBER WORKS (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 08 METAL WORKS & OTHER FIXTURES Supplying & Fixing of 12 mm thick Clear Tempered Glass and Stainless steel handrail system for Balconys & Terrace areas as per the drawings in; A B C D First Level Second Level Third Level Fourth Level 5.00 5.00 5.00 5.00 m m m m
E F G H J K
Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level Tenth (Terrace) Level Supplying & Fixing of Stainless Steel Handrail comprising 50mm dia Top chord, 25mm dia vertical posts, 25mm dia Intermediate rails for Stair cases as per the drawings in;
m m m m m m
L M N P Q R S A B C
Ground Level First Level Second Level Third Level Fourth Level Fifth Level Sixth Level Seventh Level Eighth Level Ninth Level 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 m m m m m m m m m
Carried to collection on page 28 METAL WORKS & OTHER FIXTURES Cont'd Supplying & Fixing of 50mm dia, 900mm length Stainless Steel Horizontal Hollow Rods as per the drawings in; D E F G H First Level Second Level Third Level Fourth Level Fifth Level 1.00 1.00 1.00 1.00 1.00 Nos Nos Nos Nos Nos
J K L M
TOTAL OF BILL NO. 08 - METAL WORKS & OTHER FIXTURES (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 09 DOORS & WINDOWS Supplying and fixing of Doors &Windows as per the drawings & schedule including all necessary ironmongery and other fixing accessories in, Ground Floor A B C D E
W1 W1A W2 W4 W5
F G H J K L M N O P Q R
W6 V1 RS D1 GD FW
1.00 3.00 1.00 2.00 1.00 1.00 3.00 3.00 1.00 1.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
S T U V W X Y Z AA AB AC AD AE AF AG AH
W1 W1A W2 W3 W4 W5 W6 W8 V1 SD1 FW
D2 D3 TD SD1 SD ( Kitchen )
2.00 1.00 2.00 1.00 2.00 2.00 1.00 1.00 4.00 1.00 1.00 1.00 4.00 4.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
2.00 1.00 2.00 1.00 3.00 2.00 1.00 4.00 1.00 1.00 1.00 4.00 4.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
O P
SD1 SD ( Kitchen )
1.00 1.00
Nos Nos
Third Floor Q R S T U V W X Y Z AA AB AC AD AE
W1 W1A W2 W3 W4 W5 W6 V1 SD1 FW D2 D3 TD SD1 SD ( Kitchen )
2.00 1.00 2.00 1.00 3.00 2.00 1.00 4.00 1.00 1.00 1.00 4.00 4.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
Fourth Floor AF AG AH AJ AK AL AM AN AP AQ AR
W1 W1A W2 W3 W4 W5 W6 V1 SD1 FW D2
2.00 1.00 2.00 1.00 3.00 2.00 1.00 4.00 1.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
Carried to collection on page 34 DOORS & WINDOWS Cont'd Fourth Floor Cont'd A B C D
D3 TD SD1 SD ( Kitchen )
Fifth Floor E F G H J K
W1 W1A W2 W3 W4 W5
L M N P Q R S T U
Sixth Floor V W X Y Z AA AB AC AD AE AF AG AH AJ AK
W1 W1A W2 W3 W4 W5 W6 V1 SD1 FW D2 D3 TD SD1 SD ( Kitchen )
2.00 1.00 2.00 1.00 3.00 2.00 1.00 4.00 1.00 1.00 1.00 4.00 4.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
Seventh Floor AL AM AN AP
W1 W1A W2 W3
Carried to collection on page 34 DOORS & WINDOWS Cont'd Seventh Floor Cont'd A B C D E F G H J K L
W4 W5 W6 W7 V1 SD3 FW D2 D3 TD SD1
2.00 3.00 1.00 1.00 3.00 1.00 1.00 1.00 3.00 3.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
SD ( Kitchen )
1.00
Nos
Eighth Floor N O P Q R S T U V W X Y Z AA AB AC
W1 W1A W2 W3 W4 W5 W6 W7 V1 SD3 FW D2 D3 TD SD1 SD ( Kitchen )
2.00 1.00 1.00 1.00 2.00 3.00 1.00 1.00 3.00 1.00 1.00 1.00 3.00 3.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
Ninth Floor AD AE AF AG AH AJ AK AL AM AN
W1 W1A W2 W3 W4 W5 W6 W7 V1 SD3
2.00 1.00 1.00 1.00 2.00 3.00 1.00 1.00 3.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
Carried to collection on page 34 DOORS & WINDOWS Cont'd Ninth Floor Cont'd A B C D E F
FW D2 D3 TD SD1 SD ( Kitchen )
Tenth Floor G H
W1 W1A
4.00 1.00
Nos Nos
J K L M N O P Q R S T U V W
1.00 1.00 2.00 1.00 1.00 1.00 2.00 2.00 1.00 1.00 2.00 2.00 1.00 1.00
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
Carried to collection on page 34 A B C D E Total from page 29 Total from page 30 Total from page 31 Total from page 32 Total from page 33
TOTAL OF BILL NO. 09 - DOORS & WINDOWS (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 13 VERTICAL TRANSPORTATION SYSTEM A
Supplying and installation of Mitshibshi, 6 person capacity lift as per the requirements.
1.00
Nos
TOTAL OF BILL NO. 10 - VERTICAL TRANSPORTATION SYSTEM (CARRIED OVER TO THE GENERAL SUMMARY) Bill No: 14 MISCELLANIOUS WORKS Paving Blocks Laying 200x100 non skid Paving Blocks at the entrance area. Kitchen Tops & Cabinets Completion of Kitchen top with all cabinets in All floors
5.00
m2
EXCLUDED
Allow for carrying out all the Civil works such as construction of ,grease trap, Pump base, RCC manholes, catch pits, interceptors, manholes, Valve pits, RCC cover slab, rain water collection tank, water tank structures, all RCC concrete structures, RSJ supporting system for water tank, concrete beddings and thrust blocks, water proofing work, etc.
1.00
item
TOTAL OF BILL NO. 14 - MISCELLANIOUS WORKS (CARRIED OVER TO THE GENERAL SUMMARY)