The Way Forward

BBMP
BMRCL

BDA

TRANSPORT DEPT

BTP COORDINATED EFFORTS

NHAI

BMTC

RAILWAYS

BWSSB

KSRTC

BESCOM

BRUHAT BENGALURU MAHANAGARA PALIKE

The Way Forward


I) Development of Signal Free Corridors
Sl. No Corridor Details Approx. Cost Project( Inclusive of land Acquisition and Corridor Improvement) Rs. In Crores 44.80 Amount required for the Year 2012-13 (Rs. In Crores) 25.00 Amount required for the Year 2013-14 (Rs. In Crores) 19.80

Dr|| Rajkumar Road ( From Okalipuram to Soap Factory) - Vivekanada College Junction and Corridor Improvements. Outer Ring Road( From Mysore Road to Central Silk Board) KEB Junction, Food World Junction, Dr. Muttu Raj Road Junction, Dollars Colony junction, Bannerughatta Road Junction and Corridor Improvements. Hosur Road (Cetral Silk Board to Vellara Junction) Grade separator at Audugodi Junction, Forum Junction, Marigowda Junction and Sarjapura Road Junction and Corridor Improvements. Old Airport Road (From Vellara Junction to Verthur Kodi Junction Via Marathahalli Kundalahalli) Grade separator at kundalahalli Junction, Suranjadas Road Junctiona and Wind Tunnel Junction and Corridor Improvements. From Mekhri Circle to Hope Farm Junction (Via Halasuru Lake Junction, Old Madras Junction, K R Puram, Whitefield Road) Grade separator at Hope Farm Junction, Hoodi Junction and HP Junction and Corridor Improvements.

190.00

116.00

74.00

100.00

72.00

28.00

135.25

96.00

39.25

147.95

117

30.95

Total

618.00

426.00

192.00

The Way Forward


II) Development of Roads under Tender SURE
Sl. No Road Stretch Approx. length in Kms
1.80 0.85 1.20 1.70 2.70

Approx. Project Cost (Rs. In Crores)


6.00 3.00 4.00 5.00 10.00

Amount required for the Year 2012-13 (Rs. In Crores)


6.00 3.00 4.00 5.00 10.00

1 2 3 4 5 6 7

St. Marks Road - from Residency Road to Shivaji Nagar Bus stand via Cubbon road Victoria road form D Souza circle to ASC Centre Museum road from Shoolay Circle to Lavellee road Brigade road from Vellara Junction to Dispensary road Richmond Road(General Thimmayya road) from Richmond Circle to Trinity circle via DSouza circle, Hosmat hospital junction & Hais road from Richmond road to Residency road Residency road ( Field Marshall Cariappa road) from Richmond Circle to M.G.road via Mayo Hall Commissariat Road - from Mayo Hall to Dsouza Circle

2.00 0.60

8.00 3.00

8.00 3.00 2.00 3.00 3.00

8
9 10 11 12

Brunton road, Primrose road, from M.G.road to Mg.Grath road/Richmond road VittalMalya Hospital Road Siddlingaiah circle to Raja Ram Mohan Roy Road Kasturba road from Hudson Circle to Siddalingaiah circle
Lalbagh Road Subbaiah Circle to Lalbagh West gate via krumbigal road Cunningham Road Queen roads to sankey road via Millers road, palace road

0.50
0.60 1.40 1.10 1.30

2.00
3.00 3.00 5.00 5.00

5.00
5.00

The Way Forward


II) Development of Roads under Tender SURE
Sl. No Road Stretch Approx. length in Kms 1.00 0.60 1.10 2.20 1.80 0.90 1.20 1.00 2.50 2.00 2.00 2.50 1.20 Approx. Project Cost (Rs. In Crores) 1.00 2.00 5.00 6.00 6.00 2.00 6.00 4.00 4.00 7.00 7.00 7.00 4.00 Amount required for the Year 2012-13 (Rs. In Crores) 1.00 2.00 5.00 6.00

13 Wood Street & Castle Street from Richmond road to Shoolay


circle 14 Church street Brigade road to St.Marks road (Pedestrianisation) 15 Modi Hospital road from Chord road to Shankarmutt

16 J.C.Road and R.V.Road from Lalbagh west gate to Hudson


circle 17 Infantry road from Rajbhavan road to Safina Plaza

6.00
2.00 6.00 4.00 4.00 7.00 7.00 7.00 4.00

18 Ali asgar road from Rajbhaven road to Cunnigham road 19 K.H.Road from Richmond circle to Lalbagh Gate 20 Raja Ram Mohan Roy Road from Hudson circle to
Richmond circle 21 Basaveshwarana Nagar Main Road(Siddiah Puranik road) from Magadi Road to Shankar Matt, via Havanur circle 22 Subedar Chatram Road from K.G.Road upto Platform road (Upto Rajivgandhi circle sheshadripuram) 23 Indiranagar 100 road from CMH road to Old Airport road

24 Indiranagar 80 road from Old Madras road to Old Airport


road 25 12th main road of Indira Nagar road - from 80 road Thippasandra to Ulsoor police station via Cambridge road

The Way Forward


II) Development of Roads under Tender SURE
Sl. No Road Stretch Approx length in Kms Approx. Project Cost (Rs. In Crores) Amount required for the Year 201213 (Rs. In Crores)

26 Roads around Ulsoor lake - Annaswamy Mudaliar road,


Kensington road, Bhaskaran road, Ulsoor road, Bazar street 27 Commercial Street and surrounding roads (Pedestrianisation)

3.50 1.10 1.60 3.70 2.00 1.00 0.90 0.90 1.50 1.30 1.70 2.70 3.00

6.00 2.00 4.00 10.00 6.00 5.00 3.00 5.00 4.00 3.00 3.00 2.00 3.00

6.00 2.00 4.00 10.00 6.00 5.00 3.00 5.00 4.00 3.00 3.00 2.00 3.00

28 20th main road Koramangala from Hosur road(Forum mall)


to 80 feet road 29 80 road Kormangala - from Ejipura main road to Sarjapura main road via sony world junction 30 Lower Agaram road from Richmond road (Hosmat junction) to Eijipura main road 31 Narasimaha raja road - from Town Hall to K.R.Market

32 Rajbhavan road from Minsk square to Basaveshwara circle 33 Nrupathunga Road from K.R. Circle to Hudson circle 34 Dr. B.R. Ambedkar Veedhi from K.R. Circle to Balekundri 35 36 37 38
circle Kumarakrupa Road from Windsor Manor Hotel to Shivananda Circle Gubbi Totadappa Road from Khoday circle to Shantala circle and upto Upparpet police station, Old Sangam road upto sheshadri road Palace road - from Myosre bank circle to Bangalore palace grounds and upto BDA junction Jayamahal road - from cantonment railway station Mehkri circle

The Way Forward


II) Development of Roads under Tender SURE
Sl.No Road Stretch Approx. length in Kms Approx. Project Cost (Rs. In Crores) Amount required for the Year 2012-13 (Rs. In Crores)

39 40

41
42 43 44 45

Bellary road - from Mehkri circle to Hebbala flyover Queens road - from M.G.road to Cantonment railway station Cresent road - from Racecourse road to Kumarakrupa road K.G.Road from Hudson Circle to Mysore Bank circle Cubbon road from Dickenson road to St Marks road th th 11 main road Jayanagar 4 block from th 30 cross to Outer ring road rd th th 33 cross road Jayanagar 4 block from 4 th main to 18 main road

3.30 2.00

3.00 4.00

3.00

4.00
1.00 4.00 7.00 5.00

0.70
1.10 1.50 2.70 1.10

1.00
4.00 7.00 5.00 2.00

2.00

Total

73.05

200.00

200.00

The Way Forward


V) Construction of Grade Separators
Sl. No Project Details Approx. Cost Project (Rs. In Crores) Amount required for the Year 201213 (Rs. In Crores) Amount required for the Year 2013-14 (Rs. In Crores)

2
3 4

Grade Seaparator at Malleshwaram Maramma Junction Underpass at Magadi Road and Basaveshwaranagar Junction th Grade Seaparator at Rajajinagar 10 Cross and West of Chord Road Road Divider at Rajajinagar Chord Road near Basaveshwara Main st Road, Manjunathnagar 1 Main th Road and Manjunathnagar 8 Main Road and Shivnagar Main Road At Shivananda Circle (Steel Fly Over)

20.00

10.00

10.00 15.00 10.00

30.00
30.00 58.00

15.00
20.00 25.00

33.00

57.00

15.00

42.00

Total

195.00

85.00

110.00

The Way Forward


VI) Construction of Multi Level Car Parking
Sl.No Location Approx. Cost (Rs. In Crores)

1 2
3

Gandhinagar- near Freedom park (Under ground car parking) Gandhinagar Multilevel car parking

56.00 15.00

4 5 6 7 8 9

a) Infront of Koaramagala Forum car parking (Surface parking) b) Infront of Hosmat hospital car parking (Surface parking) Near Vijayanagar Metro Station - Multilevel car parking Near Shivaji nagar Russel market - Multilevel car parking BBMP Head Office Automated Car Parking Infront of Yeshwanthapura Transport Office - Multilevel car parking Old Airport Road at Murgeshpalya - Multilevel car parking Near Bannappa Park Multilevel car parking Total

1.85
0.67 5.70 20.00 30.00 20.00 25.00 25.78 200.00

The Way Forward


Resurfacing of 86 roads in 8 zones Rs. 140.00 Crores Road widening of 13 roads in 5 zones Rs. 34.00 Crores. MLCP at 13 locations under 13th Finance Commission Rs. 200.00 Crores Grade separator at 5 locations Rs. 85.00 Crores. Upgradation of road under metro reach -1 (From Anil Kumble circle to Byyappanahalli junction) Rs. 64.00 Crores. Cycle track projects in Madiwala, HSR Layout, Indiranagar, Koramanagala, Malleshwaram, Mahadevapura Rs. 20.00 Crores. Traffic Engineering related works like Junction Improvement, Medians, Scientific Humps,HRPC, Busbays, On Street Parking Rs. 20.00 Crores.

The Way Forward

BANGALORE DEVELOPMENT AUTHORITY

The Way Forward


I) Development of Peripheral Ring Roads
Sl. No. Infrastructure Development Estimated Cost (Crores)

1.

Development of Peripheral Ring Road


Development of Signal free Outer Ring Road 12 Junctions

3000.00

2.

495.00

The Way Forward


Completion of Grade Separators on ORR
Sl. No.

Name of the Corridor


Kadubeesanahalli Devarabeesanahalli

1 2

3
4 5

Bellandur Junction
Hennur Junction Nagawara Junction

6 7 8 9

Bhadrappa Layout BEL Circle Kuvempu Circle FTI Circle

The Way Forward


II) Development of Signal Free Corridors
Corrid or Name of the Corridor
Total Length of Corridor in Km

Est. Cost Rs. In crore

1 2 3 4 5 6 7

Agara Lake (ORR) to Sirsi Circle via Lalbagh Fort Road City Centre to BHEL via Sirsi Circle Yeshwanthpur Industrial Area to Hebbal (NH-4 to NH-7) Cubbon Road to ORR via Kamaraj Road, Buddha Vihar Road, Hennur Road Elevated Road from Hennur Link (Anil Kumble Circle) to Mysore Road Elevated Road from Tumkur Road to BRV Grounds Road over Storm Water Drain from Mysore Road (Gali Anjaneya temple) to Rajajinagar link Road junction (near Sujatha Theatre

14.00 4.00 6.50 7.00

The Way Forward


II) Development of Signal Free Corridors
Corridor

Name of the Corridor Elevated Road from High Grounds Police Station to Hebbal Elevated Corridor from Cubbon Road to Outer Ring Road Elevated Corridor from Rajarajeshwari nagar to Jnanabharathi (Bangalore University) Road over storm water drain from KH.Road to Inner Ring Road near Sony World Junction

Total Length of Corridor

Agency BDA BDA BDA BDA BDA

Est. Cost

Cost yet to be estimated

8 9 10 11 12

2.5 Kms Elevated road between BEL circle to Goragunte Palya on Tumkur Road.

2.5 Kms

The Way Forward


Implementation of K.R. Puram Traffic Intervention Plan Restoration of Service Road on ORR

Priority Intervention at BTM Layout ORR

The Way Forward

Bangalore Traffic Police

The Way Forward


I. Traffic Regulatory and Enforcement Measures.
Estimated Agency Cost Time line Rs. in Lakhs

Sl. No

Project/task

01 Street Furniture and Road Markings a) Road Signages, Cat eyes, Reflective median markers, Other street furniture b) Thermo Plastic Marking 02 Surveillance/Monitoring and Enforcement Systems, maintenance and recurring Charges a) Maintenance, Service and shifting charges of existing surveillance and enforcement camera. b) 100 new surveillance Cameras

BTP

500.00

6 months

BTP

200.00

6 months

The Way Forward


I. Traffic Regulatory and Enforcement Measures.
Sl. Project/task No 03 State of Art Traffic Management Centre
a) Setting up of TMC Video Walls and workstations at new building b) Communication back bone, lease line and BESCOM recurring charges c) Up gradation, re-location, replacement and maintenance of existing signals, including new signals

Agency

Estimated Time line Cost


Rs. in Lakhs

BTP

1000.00

--

04 Education, Training, Publicity, Capacity Building equipments


a) b) New 300 Blackberry with printers, and other relative hardware Maintenance of Interceptors and Purchase of 500 Wheel Clamps. I.T. Infrastructure procurement and management, up gradation of servers. Miscellaneous expenditure including administration and consultancy Training, education and other expenses.

BTP

480.00

6 months

c)
d) e)

The Way Forward


I. Traffic Regulatory and Enforcement Measures.
Sl. No

Project/task
Corridors. i) J.C. Road Corridor ii) Lalbagh Road corridor iii) M.G.Road Webbs, Manipal and Adigas iv) Coffee Board, GPO and Balekundri v) 5 junctions at Koramangala IRR vi) St. John Church Road intersections vii) Krishna Floor mill, Platform and Khodeys viii) SBM-Sagar Theatre, K.G.Road Circle and Elite ix) Silk Board, 29th Main and 16th main BTM x) ASC centre, India Garage, Dsouza, and Mother Theresa, Shooley circle

Agency

05 Synchronization of Traffic Signal Lights on Important

Estimated Time line Cost Rs. in Lakhs

BTP

Nil

3 months

06 Automation Enforcement
75% compliance to Police Notices Increase in Non-contact cases Focus on suspension of Driving Licences.

BTP / Transport Dept.

Nil

6 months

The Way Forward


I. Traffic Regulatory and Enforcement Measures.
Sl. No

Project/task

Estimated Agency Cost Time line Rs. in Lakhs

07 Traffic Circulation Plans


a). 25% improvement in traffic flow and road safety in every new circulation plan b). Priority for areas like Vallara Junction ASC to India Garage corridor, Madivala, Mysore road etc. c). Traffic Circulation plans prepared and implemented in 5 areas. d). Traffic Circulation plans to be prepared and implemented in 15 areas. 08 Focus Campaigns to improve Enforcement Lane Discipline Prevention of Drunken Driving Drive against riding without helmet Drive against use of mobile phones while driving control of over speeding.

BTP Nil BBMP


6 months

BTP

Nil

2 years

The Way Forward


I. Traffic Regulatory and Enforcement Measures.
Sl. No Project/task Estimated Time line Agency Cost
(Rs. in Lakhs)

09 Safe Routes to School a). 50% improvement in traffic situation around schools b). 20% shift from private transportation mode to public transportation mode. c). 50% reduction on road accidents involving school children 10 Establishment of Zero Tolerance Area Drive against wrong parking Clearing temporary encroachments 11 Training and Capacity building for Traffic Personnel Commissioning of state of art Traffic Training Institute

BTP, Education Dept and BMTC

Nil

6 months

BTP

Nil

6 months

BTP

1200

6 months

TOTAL

3500.00

The Way Forward

BMTC
Shifting of 122 Bus stops / shelters located near intersections.

Survey of bus routes between Central Silk Board and Jayadeva flyover
Training of Drivers to stop at bus stops only Procurement of additional cranes. BRT from Hebbal to Central Silk Board.

The Way Forward

BESCOM / KPTCL
Shifting of Transformers - 79 Shifting of Electric Poles - 96 Restoration of Roads
a) b) c) d) Hosur Lashkar Road Old Airport Road Museum Road Kasturba Road

The Way Forward

BWSSB
Restoration of Roads dug up
Total 90 roads to be restored (List will be given separately)

The Way Forward

BMRCL
Asphalting of Mysore Road Between KIMCO to Nayandahalli Restoration of Cubbon Road Restoration of Magadi Road from Hunase Mara to MC Circle

The Way Forward KSRTC


Present Bus Terminals 1.Kempegowda Bus Stand at Majestic 2.Satellite Bus Stand Mysore Road Proposed Bus Terminals 1.Peenya Satellite Bus Stand 2.Byappanahalli Satellite Bus Stand Additional Requirement 1.Hosur Road Bus Terminal 2.Hebbal Bus Terminal

Private Bus Terminals Existing Kalasypalya Bus Stand Required 02 Bus Terminals 1.Byappanahalli 2.Tumkur Road (to be constructed by BBMP/BDA)

The Way Forward


Integrated Public Transport Network and System

SOUTH WESTERN RAILWAY


Commuter Rail service on existing rail lines Recommended Routes
1. City Railway station to K.R.Puram via Contonment, Bangalore east and Byappanahalli 2. CityRailway station to Chikkabanavara via Malleswaram and Yeshwanthpura. 3. Yeshwantha pura to Yelahanka via Hebbal. 4. Yeshwanthapura to Chandapura via Banasawadi 5. City Railway station to Bidadi via Nayandanahalli, University and Kengeri.

The Way Forward


Transport Department
1) Procedural Changes for Transfer of vehicles.

2)
3) 4) 5)

Automatic suspension/ cancellation of driving licence for 03 traffic violations


Issue of Annual Fitness Certificate should be linked with automation enforcement. Installation of GPS to all Taxies and new Autos. Seizure of Transport Vehicles plying without permit

6)

Ban on private bus permits till establishment of private bus terminals.

The Way Forward


Augmentation of traffic police strength
Sl. No.
1 2 3 4 5

Augmentation of Traffic Police Strength Creation of 03 new traffic police stations


Creation of additional post of DCP(North) Creation of 02 additional traffic sub-divisions Creation of separate traffic strength for TMC ACP 01, PI 02,PSI-06,HC-15,PC-60 Additional 500 Home guards

Agency

Est. Cost
(in Lakhs)

Govt. Govt. Govt. Govt. Govt.

655.00 69.73 20.98 215.84 250.00

TOTAL

1211.55

Some Urgent Issues


Sl. No.

Issues
Construction of linking roads inside Palace grounds.

Agency
DPAR/ BBMP BBMP/BMTC BDA BBMP BBMP

1 2 3 4 5 6 7 8 9

Shifting of 122 Bus shelters which are close to intersections.


Implementation of Traffic intervention plan at K.R.Puram hanging bridge. Asphalting of city roads (Filling potholes) Redesigning of K.R. Circle, Windsor Manner junction and Basaveshwara Circle. Restoration of OPH road and McGrath road. Widening of Road between Dairy Circle to Sagar Appolo Hospital Construction of Grade separator at 29th Main, BTM layout and widening of this stretch of road Widening of Mysore Road

BBMP/ BWSSB
BBMP BDA BBMP

Some Urgent Issues


Sl. No. Issues Agency

10 11 12

Completion of Road on drain near Gali Anjaneya Temple Completion of widening of Hosur-Lashkar Road. Construction of ROB at ORR, Jalahalli, Railway crossing.

BBMP BBMP BDA/South Western Railway BBMP

13 14 15

Immediate decongestion of Platform Road Junction Construction of Private bus terminal at Tumkur Road and Hosur road. Extension of IOC Flyover from Mukunda Theatre to ITC Early completion of 3 Grade separators between Marathalli and Iblur on ORR, BHEL junction and Yeshwanthpur. Expansion of Traffic Police organization. Creation of 3 additional Traffic Police Stations Creation of 2 additional Traffic Sub divisions Creation of DCP, Traffic North Division.

BBMP/ BDA
BBMP BDA / BBMP

16

17

Govt.