A Heat Exchanger is a mechanical equipment in which heat is exchanged between two fluids.
Heat exchange equipment is vital to the operation of the Refinery. Its purpose is to ensure effective heat transfer as per design, functional requirements resulting in LARGE HEAT / UTILITY SAVINGS UN-INTERRUPTED OPERATION PREVENT UNSCHEDULED OUTAGES SAFETY, RELIABILITY
CONSTRUCTION BASIS
STATIONARY HEAD TYPES (A, B, C, D) SHELL TYPES (E, F, G, H, J, K) REAR HEAD TYPES (L, M, N, P, S, T, U) Example: a) A : Removable Channel & Cover E : One Pass Shell S : Floating Head with Backing Device
VARIOUS PARTS
Shell, Appurtenances (Tube Bundle) Stationary Head, Shell, Shell Cover, Channel Cover, Tube Sheet, Floating Head, Nozzles, Vents, Drains, Expansion Joints Etc. For details, please Ref: Table N-2, Fig.N-2 in TEMA Standards.
DESIGN
THERMAL DESIGN MECHANICAL DESIGN
ASME Section VIII Division 1 / TEMA R Other Sections: Section II A, B, C : Material, Welding Rod, Consumables Section V : NDT Section IX : Welder Qualifications Other Unit / Process / Licensor specific requirements
ASME Sec VIII Div 1 ( UG, UW, Mandatory, Non-mandatory appendices) ASME Sec II A Ferrous Material Specs ASME Sec II C Welding Consumables ASME Sec V NDT, specific articles
TEMA
Sec 1 : Size numbering, Type designation, Nomenclature of Heat Exchanger components. Recommended Fabrication Tolerances, Clearances. General Fabrication, Performance Information, Name Plate, Specification Sheets Etc. Installation, Operation and Maintenance. General Requirements of Shell, Tube Sheet, Covers, Baffles, Support Plates, Gaskets, Channel Cover, End Flanges Etc.
Sec 2
Sec 3
Sec 4 Sec 5
: :
Sec 6
Sec 7
Sec 8
Sec 9 Sec 10
: :
Vibration Damage Patterns, Failure Regions, Dimensionless Numbers, Natural Frequencies, Axial Tube Stress, Effective Tube Mass Damping, Acoustic Vibration, Design Considerations for Vibration Aspects. Deals with Various Thermal Relations like Fluid Temperature, Mean Metal Temperatures of Shell and Tubes. Physical Properties of Fluids viz: Density, Specific Heat, Thermal Conductivity, Viscosity, Critical Properties Etc. General Information on Dimensions, PressureTemperature Ratings, Conversion Factors Etc. Deals with Vessel Supports, Lifting Lugs, Wind and Seismic Design, Plugging of Tubes, Gaskets, Tube Sheet, Nozzles, Covers Etc.
TEMA Basis
Not to exceed Inside Diameters of 100 inches (2450 mm) Product of Nominal Dia (inches) and Design Pressure (psi) not to exceed 1,00,000 (17.5 x 106 kpa) Not to exceed Design Pressure of 3000 psi (2068 kpa)
INTENT OF THESE PARAMETERS IS TO LIMIT THE MAXIMUM WALL THICKNESS TO APPROXIMATELY 3 inches (76 mm) AND MAXIMUM STUD DIAMETER TO 4 inches (102 mm)
MATERIAL
Shell Tubes Tube Sheet Nozzle Pipes Nozzles Gaskets
Fasteners Name Plate
: : : : : :
CS / SS / Non-ferrous types CS / AS / SS / Other special types Forgings / Plates CS / AS / SS CS / AS / SS CAF, Spiral Wound, IJA, Ring Joint type : CS / AS / SS : SS
ORDERING INFORMATION
PO / PR / Datasheet / Drawings / Other relevant Specifications QAP / ITP, Stage, Final Inspections Shall be as per Heat Exchanger Specification Sheet Performance / Construction details, MOC CDD
INSTALLATION
Shell, Tube Bundle Site Checks Alignment to upstream downstream tube side / shell side piping Validation tests Passivation and Insulation
Maintenance Activities
Identify leaks Repair, rectify, plug leaks Validation tests Cleaning as per requirements Replacement of tube bundle, retubing Attend leaks from gasket joints, piping, fittings Offer statutory tests as per schedule (IBR Etc.)
Problem Areas
Performance related (CTS will monitor) Corrosion, Erosion related Leaks, reliability related Other issues (vibration Etc.)
To join tubes and tubesheet and keep the tubes structurally stable and support the skeleton assembly under design conditions.
To prevent intermixing of shell and tube sheet fluids. To take care of Longitudinal, Compressive, Mechanical and Thermal axial loads coming on tubes.
Tube to Tube sheet joints are selected based on the effective tube longitudinal, compressive stress, and loads caused by differential thermal expansion between shell and tubes. Tube to tube sheet joint loads are calculated as per Clause 7.25, section 5 of TEMA.
3. Strength Welded
DEFINITION
Expanded tube joint is the tube to tube sheet joint achieved by mechanical or explosive expansion of the tube into the tube hole in the tubesheet. Welded tube joint is a tube to tubesheet joint where the tube is welded to the tube sheet. Welded tube joint can be either strength weld or seal weld.
As per ASME Sec VIII Div 1 UW-20 Strength weld is one in which the design strength of the weld is greater than or equal to the maximum allowable axial tube strength. A strength weld shall be designed to transfer all of the longitudinal, mechanical and thermal axial loads in either direction from the tube to the tubesheet as well as provide tube joint leak tightness.
Tube sheet
Tube
As per ASME Sec VIII Div 1 UW-20 Seal weld is one which has not been designed to be a strength weld. A seal weld is used to supplement an expanded tube joint to ensure tube joint leak tightness. It is recommended to use for following cases where 1. intermixing of shell and tube side fluid causes safety hazards.
Tube
fr = test efficiency
L (test) = lowest axial load at which failure of the tube specimen occurs in lb
Fr for various joints is provided in Table A-2 of Appendix A of ASME SEC VIII DIV I.
Tube holes in Tube sheets ( RCB 7.43) Tube hole affects the mechanical strength and leak tightness of an expanded tube to tubesheet joint In general A rough tube hole provides more mechanical strength than a smooth tube hole. This is influenced by a complex relationship of modulus of elasticity, yield strength and hardness of the materials being used.
A smooth tube hole does not provide the mechanical strength that a rough tube hole does, but it can provide a pressure tight joint at a lower level of wall reduction
Contd..
Very light wall tubes requires a smoother tube hole finish than heavier wall tubes Significant longitudinal scratches can provide leak paths through an expanded tube to tubesheet joint and should therefore be removed.
Tube wall reduction Tube wall reduction depends on number of factors. Some of these are Tube hole finish (1/32 to 1/64 over the OD of tubes)
Contd..
Tube hardness and change in hardness during cold working. Tube OD Tolerance Type of expander used Type of torque control and final tube thickness control. Length of expanded joint. Compatibility of tube and tube sheet materials Groove width should be 1/8 and groove depth should be 1/32.
Not less than two inches or tubesheet thickness minus 1/8 whichever is smaller. In no case shall the expanded portion extend beyond the shell side face of the tubesheet. Expansion of tube joints to be done after carrying out required PWHT.
MOCK UP TESTS
1. DP Checks in case of welded 2. Pneumatic 3. Hydrotest 4. Pull out test
5. Determination of fr value
6. WPS / PQR / Welder competence 7. Quality of consumables
PETROKEMYA RECOMMENDATION
Conditions
Design P, Design T bar G deg C
Tube-to-tubesheet joints Use expansion with grooves. Use expansion with seal weld. Use strength weld and contact expansion ( without grooves ), Expansion shall be performed for the entire thickness of the tubesheet. Caution shall be taken not to expand tubes beyond backface of tubesheets.
> 50 -
Contd..
In any of the following conditions, TTS joints shall be seal welded as a minimum : * Where mixing of shell and tube side fluids could possibly cause problems such as explosion or contamination. * Where exchanger contains lethal substances. * Cyclic service. * H2 service where hydrogen partial pressure exceeds 6.8 bar.
Contd..
* 5-10% for CS, LAS and high alloy tube material. * 4-8% for copper alloy tube materials. Notes : * Expansion of TTS joints shall be performed after any heat treatment in which the temperature of the joint exceeds 200oC. * All strength welds shall have a minimum of two layers.
FORWARD PATH
Selection of vendors Incorporating additional inspection requirements as part of PR spec. Review/approval of QAP/ITP for each P.O. With adequate intervention points for TPI (Hold, Witness,Review) Witnessing of final Hydrotests / Review of TPI reports at vendor shop. Upgradation of existing joints during opportunity shutdown / new supplies. Supervision/ procedure compliance during retubing / repair in CES Workshop
Some Manufacturers
L & T Mumbai Godrej & Boyce Mumbai ISGEC Yamuna Nagar BHPV - Vizag
Pre-order requirements
Vendor survey Enlistment Monitoring performance Appraise purchase department Review technical bids