Documente Academic
Documente Profesional
Documente Cultură
Establishment of The Hungarian Provincial Reconstruction Team (Pol-e-khomri) and the redeployment of Hungarian mechanised infantry company Major Janos Beseny
Table of contents
Introduction Hungarian Mechanised Infantry Company, structure, equipment, takeover-handover process Antecedents of PRT Establishment of Hungarian PRT PRT tasks Organisation, strenght CIMIC and QIP projects Baghlan province Camp Movements, convoys Questions
INTRODUCTION
2006 HDF Joint Logistic and Supply Command, Economic Bureau, chief planning officer 2006 ISAF-PRT deployment coordination group Chief Logistic officer 2005 AMIS-Darfur, EU logistic advisor as Deputy Field Support 2004-2005 HDF Joint Logistic and Supply Command, Economic Bureau, planning officer 2003-2004 MINURSO-Western Sahara, mission G4 Food and Deputy Chief Logistic Officer (DCLO) 2001-2003 MOD Economic Bureau, international relationship and planning officer 1997-2001 HDF Protocol Bureau, protocol officer 1992-1997 1. Maintancene Battalion various logistic positions 1991-1992 Vlvlgyi Fuel Base, Logistic NCO 1987-1991 Cadet
HUNGARIAN
MECHANISED INFANTRY COMPANY
COMPANY HQ
Coy Cdr
Deputy
Chief WO
G1
G2-3
G4
G6
Financial Legal
Medic Security
2 Duty officer
Inf.officer
2 Telegraphist
2 Duty NCO
Cartographer
INFANTRY PLATOON
Platoon Cdr Deputy (NCO)
Section leader
deputy ( driver.)
telegraphist
Section A
Section B
Section C
Gunner.
26 persons 7 Mercedes Benz vehicles 3 BTR-80/A APCs 1 12,7 mm GEPARD machine gun (special) 6 7,62 mm machine guns 1 40 mm grenade launcher
Supply
Maintenance
Transport
Medic
27 personels 3 Mercedes Benz CDi vehicles 4 URAL-4320 trucks 2 UNIMOG 4000 trucks 1 MERCEDES 1017 truck 4 trailers 1 IVECO ambulance car 2 special (maintenance) trucks 2 HAD- 16 generators 1 trailer a(water) 1 special truck (Signal/TVSZ 77)
STRENGTH
Ranks Permanent On ground Assimilated into PRT 14 4 23 59 100
21 3 48 64 136
TECHNICAL STRENGTH
Vehicle
Truck (5-6t)
27
7
2
9
TASKS
00.00.14.08.2006. Company under national command. Prepare inventory lists Take the stocks from Camp Warehouse, Pol-e Shark. Made the plans to redeploy the company stock and personals Maintan and made the total check of APCs and patrol cars (Currus ZRt.) Organise the redeployment and all of the movements (personals and items) from Hungary and Cabul to PEK Participate in the PRT camp handover-takeover (from Dutch to Hungarians) Take part in the prepare the Minister of Defence visit and the handover-takeover ceremony between Netherland and Hungary Organise the Mech. Inf. Company withdrawal from Cabul to home Take the unnecessary technical equipments ,stocks, personal equipments and weapons to Hungary Wind up the company after the withdrawal.
TIMETABLE OF REDEPLOYMENT
1. stage 16.08. Cordination Group 20.08. 1. Airlift 2.stage 30.08. PRT personals and the arrival of the 2. Airlift 3.stage 29.08. - 02,09. PRT personals and the arrival of the 3. Airlift 31.08. 1.Airlift to Hungary 4.stage 02.09. Mech. Inf. Coy members to Hungary
LOGISTIC TAKEOVER-HANDOVER
ANTECEDENS OF PRT
ISAF/NATO take more responsibility in Afganisthan. ISAF STAGE I establish the Nort region under German command. 2004- Netherland set up a new PRT and build camp in Pol-e Khomri (PeK). 13. 07. 2005 Hungarian Government made a deceison to take part in PRT mission under German leadership and stay at least for 2 years. 03. 02. 2006 Parliament of Netherland made a decison to leave Pol-eKhomri and hand over to Hungary. 03. 04. 2006. Dutch Government send an official notice to NATO about their withdraw from PEK and regrouping to South Afganisthan.
preparation period: 01.06.2005. 01. 02. 2006. planning period: 01. 02. 2006. 30. 06. 2006. execution period: 01. 07.2006. 30. 09. 2006.
Initial Operational Capability (IOC): 01. 10. 2006. Full Operational Capability (FOC): 01. 04. 2007.
A PRT
Designation of PRT : - Organise economic, health and local development programs in Afganisthan from national and international funds. - Take part in the development of Baghlan infrastructure. -Help the local authorities (rebuild the public administration, advisor role by POLAD). -SSR-Security Sector Reform(judicial reform, ANA and ANP training, Disarmament of Illegal Armed Groupes-DIAG-drug smuggling) -Help and guide civilian charity organisations job in Baghlan
-Finish the previous Dutch programs in Baghlan province. -Only limited independent programs.
PRT organisation chart (max. 200 pers.) Full capability from 01. 04. 2007.
Military component
HQ
43
8 3 67 2
HUMINT
9 31
Signal unit
Bomb-disposal squad
+2 dogs 8x8
Guard company
MP
Medic
34 (112)
CIMIC PROJECTS
School Chicken programs 160.000 Small hydroelectric power station (8) 160.000 Well digging(25) School tents (100) School rebuildings 89.000 30.000 55.000
Total
494.000
CIMIC
FEYZABAD
JOWZJAN
SHEBERGHAN
BADAKHSHAN
BALKH
KUNDUZ
AYBAK
TAKHAR
FARYAB
SAR-E POL
BAGHLAN
SAR-E POL
MEYMANEH
SAMANGAN
BAGHLAN
NURISTAN
KAPISA
BADGHIS BAMIAN
BAMIAN
CHARIKAR
KONAR
ASADABAD
KAPISA
LAGHMAN
KABUL
KABUL
MEHTAR LAM
VARDAK
MEYDAN SHAHR
JALALABAD LOWGAR
POL-E ALAM
NANGAHAR
GARDEZ
KHOWST
GHAZNI ACTIVITIES OF OPOSIT MILITANT FORCES (OMF) MEDIUM FARAH PAKTIKA ZABOL
QALAT
HELMAND
BAGHLAN PROVINCE
MeS KDZ
780.000 inhabitants
Baghlan
PeK
Khinjan
Road timetable: PeK - Baghlan 30 min PeK - Khinjan 75 min PeK - Kunduz 90 min PeK - MeS 3 hours PeK - Kabul 6 hours
Salang Bagram
Kabul
CAMP
Characteristics of the camp: - mobile (tents) and modern conveniences accomodations, workplaces and good circumstances of life; - quite good guard and safety system; - mostly mobile but stable water, elecricity and fuel supply system; - sewage and waste (garbage) handling system, etc. Logistic background: - rent airlift for rotation and logistic support(when occasion offers); - readiness contract for charter - rented airtransportation capacity; - Technical Agreements with another nations for airlift and logistic supply; - employ civilian or local companies for supply job (most of them inherited from Dutch PRT).
CAMP
MOVEMENTS-CONVOYS
MOVEMENTS-CONVOYS
MOVEMENTS-CONVOYS
QUESTIONS?