Clause 5.6.1. Top Management shall review the organizations QMS, at planned intervals, to ensure its continuing suitability, adequacy and effectiveness. Clause 5.6.2. Management Review Agenda (Input) :
1. 2. 3. 4. 5. 6. 7.
Results of Audit Customer feedback Process performance and product conformity Status of corrective and preventive actions Follow up actions of previous management review Changes that could affect the QMS Recommendation for improvement
Clause 5.6.3 Out put Management Review : A = Related of Quality Management System B = Related of Quality Product to Customer Requirement. C = Related to Resource .
2
INPUT
1 2 3 4 5 6 Result of Audit Customer feedback Process performance and product conformity Status of corrective and preventive actions Follow up actions of previous management review Changes that could affect the QMS
Total (Average)
: A = Related of Quality Management System Achievement : 2.8 (Satisfy) B = Related of Quality Product to Customer Requirement Achievement : 2.3 (Fair) C = Related of Resources Achievement : 2.2 (Fair) Conclusion : Factory get Grade Satisfy for Related Management System, and Fair for Related Product & Related Resources.
5
Refer to above data we conclude that we have to improve resource in this case is human resource to produce good product.
X = Dominant factor of problem in each item input. - = No problem in each item input,
Why we choose the dominant problem ? In order to determine the effective and efficient steps for process improvement.
INPUT
Detail
Area of Audit
Top Management, QC, Prod, Eng,Whs Product, Eng, HR, Utility building, MIS, GA, Pers Laser, Matcon, QC
OUTPUT/Dominant Problem
A
1
B X X
C -
0 3
X
X 4 1
X 1 2
9
INPUT
Detail
Relevant Section
1st & 2nd, Lamp, Comp 1st & 2nd, Lamp, Comp 1st & 2nd, Lamp, Comp
Quality
Delivery
Responsiveness
2
10
INPUT
Detail
Relevant Section
1st & 2nd, Lamp, Comp
A
1 Achieve number customer complaint.
B X
C -
2
3
X
-
Ensure the equipment/ tools that used still invalid for calibration
Zero customer complaint that it cause by outgoing inspection.
QC
X
11
QC
Target
Detail
Relevant Section
A
6 Ensure the production process of subcontractor is controlled well to produce good product Issue WI for new product within 1 month after finish machine setup for each related process. Revise WI 1 month after received the technical information from Japan. Finish new or revised WI socialization to production line 2 weeks after issued. QA
B -
C X
Engineering
Engineering
Engineering
12
INPUT
Detail
Relevant Section
1st & 2nd, Lamp, Comp 1st & 2nd, Lamp, Comp Lamp, Comp
10
11
12
Zero inventory lost that caused by mishandling of production Control of decrease material lost from last semester.
13
13
Target
Detail
Relevant Section
1st, 2nd
A
14 Zero delay of export schedule which cause by PT responsibility.
B -
C X
15
Reduce number of EJO 10% for machine breakdown from last semester.
Engineering
16
Exim
17
Matcon
14
Target
Detail
Relevant Section
Matcon
A
18 Get replacement abnormal material within 2 weeks for material purchase directly by factory
B -
C X
19 Finish material complaint that supply by vendor non mother comp within 1 week & do monthly evaluation.
Purchasing
15
Target
Detail
Relevant Section
QC & Prod
A
20 Answer the customer complaint from user within 1 week and implement corrective action. Follow up the answer outgoing inspection lot out to production not over than 2 weeks. Follow up the answer of QC Patrol finding to production or engineering not over than 1 month.
B
-
C
X
21
QC
22
QC
16
Target
Detail
Relevant Section
All section,
A
23 Continue conduct SGA activity and 50% finish step PDCA Participate in 5S Patrol utility 100% for Temperature, Humidity, Lighting and another Utility. Increase effectiveness Of utility machine performance until less than 11 times stop support within a years Provide service to support available of system in ADM To be <1% down time
B -
C X X -
24 25
26
Building Mtn
27
MIS
17
Target
Detail
A
28 Performing Local Area Network Down Time less than 1% total normal work hours per month. Increase ability personnel by conduct skill training : -Basic. -7 Tool QC,PDCA With 75% pass direct evaluation. Conduct Leadership Training (for all foremen & Leader) with 100% attendance. Fulfill stationary request on time delivery to requester.
B -
C -
29
HR
30
HR
31
GA
X
18
Target
Detail
A
32 Fulfill new employee requester on time delivery to be requester 100% for operator & 95% for staff. Maintain to provide financial report to management board within 2.5 days. Maintain Quality & Environment System in Annually Schedule on Time.
-
B -
C X
33
Accounting
34
QRCC
1
3
3
3
21
1
19
Target
Detail
Relevant Section
A
1
2 3 4
5
5S
QC Patrol 9001 CPAR 14001 CPAR Subcontractor CPAR
All Section
All Section All Section All Section Sub cont 1 &2
X
1
X 1
20
Target
Detail
Relevant Section
A
1 Make system delivery questioner to customer.
Make result the preventive schedule has done for 2004 on building maintenance section Total Follow up Last Management Review
PPC
Building mtn
21
Target
Relevant Section
A
1 Change our certification body of ISO 9000 Quality Confirmation Meeting by Related Section every Friday. QRCC
B -
C -
22