System life cycle is an organizational process of developing and maintaining systems.

It helps in establishing a system project plan, because it gives overall list of processes and sub-processes required developing a system. System development life cycle means combination of various activities. In other words we can say that various activities put together are referred as system development life cycle. In the System Analysis and Design terminology, the system development life cycle means software development life cycle. Following are the different phases of software development cycle:

System

study Feasibility study System analysis System design Coding Testing Implementation Maintenance

System study is the first stage of system development life cycle. This gives a clear picture of what actually the physical system is? In practice, the system study is done in two phases. In the first phase, the preliminary survey of the system is done which helps in identifying the scope of the system. The second phase of the system study is more detailed and in-depth study in which the identification of users requirement and the limitations and problems of the present system are studied. After completing the system study, a system proposal is prepared by the System Analyst (who studies the system) and placed before the user. The proposed system contains the findings of the present system and recommendations to overcome the limitations and problems of the present system in the light of the users requirements. To describe the system study phase more analytically, we would say that system study phase passes through the following steps:
problem identification and project initiation background analysis inference or findings

On

the basis of result of the initial study, feasibility study takes place. The feasibility study is basically the test of the proposed system in the light of its workability, meeting users requirements, effective use of resources and .of course, the cost effectiveness. The main goal of feasibility study is not to solve the problem but to achieve the scope. In the process of feasibility study, the cost and benefits are estimated with greater accuracy.

Assuming that a new system is to be developed, the next phase is system analysis. Analysis involved a detailed study of the current system, leading to specifications of a new system. Analysis is a detailed study of various operations performed by a system and their relationships within and outside the system. During analysis, data are collected on the available files, decision points and transactions handled by the present system. Interviews, on-site observation and questionnaire are the tools used for system analysis. Using the following steps it becomes easy to draw the exact boundary of the new system under consideration:
Keeping in view the problems and new requirements Workout the pros and cons including new areas of the system

All procedures, requirements must be analysed and documented in the form of detailed data flow diagrams (DFDs), data dictionary, logical data structures and miniature specifications. System Analysis also includes sub-dividing of complex process involving the entire system, identification of data store and manual processes. The main points to be discussed in system analysis are:
Specification of what the new system is to accomplish based on the user

requirements. Functional hierarchy showing the functions to be performed by the new system and their relationship with each other. Function network which are similar to function hierarchy but they highlight the those functions which are common to more than one procedure. List of attributes of the entities - these are the data items which need to be held about each entity (record)

Based

on the user requirements and the detailed analysis of a new system, the new system must be designed. This is the phase of system designing. It is a most crucial phase in the development of a system. Normally, the design proceeds in two stages :
Preliminary or general design Structure or detailed design

Preliminary

or general design: In the preliminary or general design, the features of the new system are specified. The costs of implementing these features and the benefits to be derived are estimated. If the project is still considered to be feasible, we move to the detailed design stage.

In the detailed design stage, computer oriented work begins in earnest. At this stage, the design of the system becomes more structured. Structure design is a blue print of a computer system solution to a given problem having the same components and inter-relationship among the same components as the original problem. Input, output and processing specifications are drawn up in detail. In the design stage, the programming language and the platform in which the new system will run are also decided.

After designing the new system, the whole system is required to be converted into computer understanding language. Coding the new system into computer programming language does this. It is an important stage where the defined procedure is transformed into control specifications by the help of a computer language. This is also called the programming phase in which the programmer converts the program specifications into computer instructions, which we refer as programs. The programs coordinate the data movements and control the entire process in a system. It is generally felt that the programs must be modular in nature. This helps in fast development, maintenance and future change, if required.

Before

actually implementing the new system into operations, a test run of the system is done removing all the bugs, if any. It is an important phase of a successful system. After codifying the whole programs of the system, a test plan should be developed and run on a given set of test data. The output of the test run should match the expected results.

After

having the user acceptance of the new system developed, the implementation phase begins. Implementation is the stage of a project during which theory is turned into practice. During this phase, all the programs of the system are loaded onto the user's computer. After loading the system, training of the users starts

How

to execute the package How to enter the data How to process the data (processing details) How to take out the reports After the users are trained about the computerized system, manual working has to shift from manual to computerized working

Maintenance is necessary to eliminate errors in the system during its working life and to tune the system to any variations in its working environment. It has been seen that there are always some errors found in the system that must be noted and corrected. It also means the review of the system from time to time. The review of the system is done for:
knowing the full capabilities of the system knowing the required changes or the additional requirements studying the performance

If a major change to a system is needed, a new project may have to be set up to carry out the change. The new project will then proceed through all the above life cycle phases.