Source: Siemens
Source: Siemens
3,44 1,47
600 / 620
0,75
538 / 566
42,4 % 40,1 %
43,2 %
43,6 %
40
41,1 % Supercritical unit acc. Alternative 2 255 bar 538C / 538C Subcritical unit acc. Alternative 1 166 bar 538C / 538C
30
30
40
50
60
70
80
Load %
90
100
66,0 m
PS Staudinger 5 - 550 MW el
PS Heyden 4 - 920 MW el
Heat input / furnace area [kW/m] SH heating surfaces [m] RH heating surfaces [m] Bundel surfaces [m]
Benson Boiler
Main Configuration - Single-pass / Two-pass
Source: Siemens
SH
STEAM TO TURBINE
SH
STEAM TO TURBINE
Pressure Steam Separation Types Burner Panel Load Change Cold Start Hot Start
Sub critical Drum Natural / Assisted Straight tube Base 4-5 Hours 1-2 Hours
Sub & super Critical Separator (Low loads) (Sulzer) / (Benson) Spiral Tube / Straight (MHI) Faster 2 Hours 0.5 Hours
Characteristics :
Provides Quicker response to TG load changes Supports achievement of better heat rate at lower loads Higher furnace wall pressure drop and consequent higher feed pump auxiliary power consumption Needs ultra pure quality feed water - Cannot operate under conditions of condenser leak
Boiler Load Location 100% 35% 1.) 2K 1K 2.) 7K 1K 3.) 13 K 1K 4.) 2K 3K 5.) 7K 17 K
KWU 99 152d
Page 23
BOILERS - DISCUSSED AT BBP MAJUBA 660 MW TOWER 192 bar 555 C SCHKOPAU 450 MW TOWER 262 bar 545 C VOERDE 700 MW TWO PASS 206 bar 530 C BOXBERG 900 MW TOWER 266 bar 545 C ELKRAFT 300 MW TWO PASS 250 bar 545 C 19286x19286 17846x17846 23668x15773 24086X24086 12720X14280
MAJUBA,SCHKOPAU,VOERDE : WITH VERTICAL TUBE HOPPER BOXBERG: WITH SPIRAL TUBE HOPPER ELKRAFT: WITH SPIRAL HOPPER & SPIRAL IN FRONT/REAR , HORIZONTAL IN SIDES
Furnace Arrangement
SPIRAL TYPE
VERTICAL TYPE
** Worked out based on the Alstom BOM supplied for SIPAT boiler.