AGENDA
Company Background Scope of the study Manufacturing process Value Stream map Kraljic model Risks associated with sourcing
COMPANY BACKGROUND
Sparx : Low end brand of Action shoes Outsources production to contract manufacturers Shoe Manufacturing Firm Leaps & Bounds Pvt. ltd. Based Out of Inderlok , New Delhi Start Up Expanding Manufactures different types of foot wares on contract basis
To prepare the Value stream map To study the sourcing of raw material To determine the criticality of different raw material used Investigate the parameters considered for selecting a supplier for raw materials Various risk associated with procuring raw material Risk management strategies
MANUFACTURING PROCESS
Stitching
Sole Fabrication
Production Process
Cutting and stitching the shoe Cloth as per different size & specification. Punching tack holes in the shoe upper. Grinding PUC, the material used for sole creation. Fixing the shoe upper on the die frame. Transferring grinded PUC to the machine.
Affixing the die frame to the machine. Poring molten PUC in the die. Removing the die frame from the machine. Removing shoe from the die. Checking the quality of the shoe.
Addition of accessories to the shoe (like laces). Final finishing & quality checks. Packaging the shoe. Transporting to distributors/ inventory.
View
KRALJIC MODEL
Leverage items
Cloth Die
Strategic items
PUC
Critical
Value/Cost
(1/2)
Quality of PUC:
depends upon the quality of scrap high degree of variation in quality Very critical for the overall quality and life of shoe
Number of Suppliers:
Supply demand mismatch : few suppliers in Delhi Higher inventory Suppliers from other states Not Price Competitive No economies of scale bargaining power of supplier is very high
(2/2)
Price Fluctuation:
The industry is a price taker and profits are earned by lowering cost of production Change in prices of raw material pulls the margins down Price fluctuation in PUC is high, it is perceived as a risk
On Time Delivery:
long waiting time Increase in the overall cost: to reduce the risk of stock out and production halt
VENDOR SELECTION
Factors considered while selecting a vendor :
Quality of Raw Material Final Product Price Range Past Performance of the Supplier Credit Terms Timely Delivery Size of the supplier
Sparx can buy the raw material especially PUC in bulk and pass on the same to its contract manufacturer
Better bargain through economies of scale Pricing issues and on time delivery of PUC
Vertical Integration:
Start manufacturing PUC If the company has the required resources and a sure series of order to cater to (i.e. future sources of income) risk avoidance strategy: no waiting time
Better co ordination, quality assurance, timely deliver, price risk sharing etc.
Introduction of GST