Documente Academic
Documente Profesional
Documente Cultură
Meaning
Examination of the technical and engineering characteristics of a project needs to be done repeatedly when a project is made. Technical analysis seek out to decide whether the fundamentals for the successful commissioning of the project has been considered and reasonably good options have been made with respect to location, size, process etc.
Learning Objectives
This Topic will help in the following aspects Discuss the considerations that have a bearing on the choice of technology Describe the various material inputs and the utilities required on the choice for a project Factors that have bearing on the capacity decisions List the important charts and layouts that define the scope of the project
Introduction
Analysis of technical and engineering aspects is done continually when a project is being examined and formulated. The purpose of
technical analysis:
To ensure that the project is technically fesible in the sense that all the inputs required to set up the project are available To facilitate the most optimal formulation of the project in terms of technology, size, location, and so on.
Manufacturing Process/Technology
For manufacturing a product/ service, often two or more alternative technologies aer available. For Example: Steel can be made either by the Bessemer process or the open hearth process. Cement can be made either by the dry process or the wet process.
Choice of Technology
is minimized.
Technical Arrangements Satisfactory arrangements must be made to obtain the technical know
When
collaboration is sought, inter alia, the following aspects of agreement must be worked out in detail. The nature of support to be provided by the collaborations during the designing of the project, selection and procurement of equipment, installation and erection of the plant, operation and maintenance of the plant, and training of the project personnel.
Process and performance guarantees in terms of plant capacity, product quality, and consumption of raw materials and utilities.
Material Inputs
An important aspect of technical analysis is concerned with defining the materials and utilities required, specifying their properties in some detail, and setting up their supply programe. Material inputs and utilities may be classified into 4 broad categories:
Raw materials
Processed Industrial Materials and Components
1. Raw materials can be classified into four types: Agricultural Products Mineral Products Livestock and Forest Products Marine Products
Agricultural Products:
In studying agricultural products, quality must be first determined. An assessment of the quality available, currently and potentially, is required.
Mineral Products:
materials, information is required on the quantum of exploitable deposits and the properties of raw materials.
The study should provide the details of the location, size and
depth of deposits and the viability of open cast or underground mining. The composition of the ore, level of impurities, need for beneficiation, physical and chemical and other properties also must be studied.
Marine Products
Assessing the potential availability of marine products and
in feasibility study.
3.
Chemical, additives, packaging materials, paint, varnishes, oils, grease, cleaning materials etc. The requirements of such materials should be considered in the feasibility study.
4. Utilities
Power, water, steam, fuel etc come under utilities. Since the successful operations of a project depends on the availability of the utilities. The shortages or the bottlenecks should be assessed.
Product Mix
The choice of product mix is assessed by the market requirements. Variations in the size and quality is aimed at satisfying the need of the customers.
Plant Capacity
It refers to the number or volume of units that can be manufactured during a given period. It can be defined in 2 ways.
Feasible Normal Capacity (FNC) Nominal maximum Capacity NMC)
The FNC refers to the capacity attainable under the normal working
conditions. This can be established on the basis of the installed
The NMC is the capacity which is technically attainable and this often
2. Input Constraints:
In a developing country like India, there may be constraints
capacity.
3. Investment Cost When serious input constraint to not obtain, the relationship between capacity and investment cost is an important consideration. Typically,
the investment cost per unit of capacity decrease as the plant capacity
increase. This relation may be expressed as follows. C2=C1[Q2/Q1] Where C2 is the derived cost for Q2 units for Capacity, C1 is the known cost the Q1 units of capacity, and is a factor reflecting capacity cost relationship. This is usually between 0.2 and 0.9.
4. Market Conditions: The anticipated market for product/service has an important bearing on plant capacity. If the product is likely to be very strong, a plant of higher capacity is preferable. If the market is likely to be uncertain, it might be advantageous to start with a smaller capacity. If the market, starting from a small base is expected to grow rapidly, the initial capacity may be
managerial capability.
6. Government Policy: The capacity level may be influenced by the policy the government. Traditionally, the policy of the government was to disturb was to distribute the additional capacity to be created in a certain industry among several firms, regardless of economies of
adopted.
3. Labor Situation
4. Governmental Policy
5. Other factors
Climatic Conditions
The equipment required for the project may be classified into the following types:
Plant Equipment
Mechanical Equipment
Electrical Equipment Instruments Controls Internal transportation system
others
Constraints in selecting machineries and Equipment Minimum availability of power Difficulty in transporting heavy equipment to a remote location Difficulty in the initial operation of sophisticated equipment Government policies
Environmental aspects
The project should make sure that it does not harm the environment in any way. The effluents must be checked.
The important charts and layouts are as follows: General Functional Layout: Shows the relation between the equipment, buildings and civil works. The primary consideration is to facilitate smooth and economic movement of raw materials, work in progress and finished goods. Material Flow Diagram: Shows the flow of materials, utilities, intermediate products, final products, and emissions. Along with material flow diagram, quantity flow diagram can also be prepared.
transport outside the production line. Utility consumption layout: shows the consumption point of utilities i.e power, water, gas, compressed air, etc. and their requires utilities and qualities
Communication Layout: This shows how the various parts of the project will be connected with the telephone, internet, intercom, etc. Organizational layout: shows the organizational set up of the project with the information on the personnel required for various departments and their inter-
relationships.
Plant Layout: Concerned with the physical layout of the factory. It has to consider certain points: Consistency with the production Smooth flow of goods from one stage to another Proper utilization of space Scope fro expansion Minimization of production cost Safety of personnel
As a part of technical analysis, a project implementation schedule is also important. For that, the following information is needed. List of all possible activities from the project planning to the commencement of production The sequence in which various activities have to be performed.
Location
Product/Service
Selling Price
Production Cost
Thank You