Deployment Guide
www.huawei.com
ISSUE 1.0
GSM BSS Training Team
HUAWEI Confidential
The course tells the preparation for the deployment of HUAWEI BSC6000, and describes the deployment procedure and noteworthy issues of the following three operations: Hardware installation Software installation Commissioning, acceptance test, and cutover
HUAWEI Confidential
Page 2
Reference
Guide to HUAWEI BSC6000 Deployment
HUAWEI Confidential
Page 3
Target
At the end of the course, the students can: Get a grasp of the preparation for the deployment of BSC6000 Get a good grasp of the hardware installation process
HUAWEI Confidential
Page 4
Chapter 1 Preparation for the Deployment Chapter 2 Hardware Installation and Check Chapter 3 Software Installation and Commissioning Chapter 4 Cutover and Acceptance Test
HUAWEI Confidential
Page 5
Engineering Preparation
Software version Apply for the software version Software on
http://support.huawei.com/
Apply for the License Data preparation Have the data upgrade tool available Make off-line configuration according to the data provided by the customer Resource preparation Human resource Documents Tools and instruments
HUAWEI TECHNOLOGIES Co., Ltd.
Page 6
HUAWEI Confidential
Engineering Preparation
For the deployment, the following information and documents need be obtained: Contract information (about the product configuration) Goods information Survey Report Installation Environment Check List Customer information (Information such as order delivery information of the contract and contract number can be obtained from the EPMS system.) Engineering Document Notes According to demands, determine whether to create the Engineering Implementation Scheme Check whether the equipment room meets the installation requirements, and whether the mains power, the distribution frame, and ground cable are available. For specifics, refer to the Installation Environment Check List.
HUAWEI Confidential
Page 7
HUAWEI Confidential
Page 8
HUAWEI Confidential
Page 9
Install boards
Install signal cables Install the cabinet and other fitting parts Install the LMT computer and alarm box Check of hardware installation
HUAWEI Confidential
Page 10
HUAWEI Confidential
Page 11
Confirm the installation position of the rack Cabinet installation on cement floor Install the rack
HUAWEI Confidential
Page 12
PDF
48V1 48V2 GND PGND 48V1 48V2 RTN PGND
BSC6000 cabinet
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 13
HUAWEI Confidential
Page 14
HUAWEI Confidential
Page 15
Measure the input voltage of the BSC6000 cabinet. The voltage should
ranges between -57V and -40V. Set the power distribution switch corresponding to PDF to OFF.
HUAWEI Confidential
Page 16
Notes of installation:
Before installing internal components of the cabinet, set all power supply switches on the power distribution box of the cabinet to OFF. During installation, ensure that all rack-mounting ears are orderly and that
HUAWEI Confidential
Page 17
Install Subracks
The switch state ON means 0 and OFF means 1. The highest bit of DIP corresponds with the highest bit of the byte.
Bit 1 2 3 4 5 6 7
Meaning Subrack number control bit Subrack number control bit Subrack number control bit Subrack number control bit Subrack number control bit Odd parity check bit It is undefined, and is generally set as 0. The automatic DIP bit of the GSCU board in the central subrack is: 0, the starting of boards is highly dependent on the GBAM server, namely that the boards load from the server after starting. 1, the starting of boards is less dependent on the GBAM server, namely that the boards check the validity of the Flash file when starting, and load from the Flash file if the Flash file is valid or load from the server if the Flash file is invalid.
ON
HUAWEI Confidential
Page 18
HUAWEI Confidential
Page 19
HUAWEI Confidential
Page 20
Notes
Notes about the installation When distributing signal cables, do not destroy the jacket of the
signal cables.
If a signal cable need be pulled out, hold its connector instead of pulling the cable, so that the signal cable is not damaged. The manual describes only the installation method. To determine the actual installation positions of the cables, comply with the requirements concluded by the survey and refer to the data configuration scheme.
HUAWEI Confidential
Page 21
The minimum bending radius 25mm 40mm 45mm 25mm 35mm 25mm 25mm 25mm 40mm
Page 22
Interconnect cable between GSCU subracks Signal cable of alarm box Monitor signal cable of power distribution box Optical fiber
Correct
Incorrect
HUAWEI Confidential
MONITOR
HUAWEI Confidential
Page 23
HUAWEI Confidential
Page 24
HUAWEI Confidential
Page 25
0
GTNU GTNU
HUAWEI Confidential
Page 26
1
GTNU GTNU
2
GTNU GTNU
HUAWEI Confidential
Page 27
3
GTNU GTNU
1
GTNU GTNU
2
GTNU GTNU
HUAWEI Confidential
Page 28
HUAWEI Confidential
Page 29
HUAWEI Confidential
Page 30
situations:
The GSCU subracks to be connected are in the same cabinet. The GSCU subracks to be connected are in different
1
GSCU GSCU
cabinets.
Connecting inter-GSCU Ethernet cables in 2 subracks as shown in the right picture.
HUAWEI Confidential
Page 31
2
GSCU GSCU
1
GSCU GSCU
HUAWEI Confidential
Page 32
2
GSCU GSCU
1
GSCU GSCU
3
GSCU GSCU
HUAWEI Confidential
Page 33
1 W2
1
8 1
8 1
X2 W1 X1 W3 X3
8 1
HUAWEI Confidential
Page 34
GEPS
GSCU GSCU
GEPS
GSCU GSCU
GEPS
GSCU GSCU
CLKIN
CLKIN
HUAWEI Confidential
Page 35
HUAWEI Confidential
Page 36
2
3 4 5~8 S3 S4 S5 1~8 1~8 1~8
ON
ON ON ON ON ON ON
OFF
ON
S6
OFF ON
ON S1 OFF
S5
OFF
ON S4 OFF
ON S3 OFF
OFF
S6
1~8
ON
OFF
HUAWEI Confidential
Page 37
E1/T1(24~31)
E1/T1(24~31)
E1/T1(16~23)
E1/T1(16~23)
E1/T1(8~15)
E1/T1(8~15)
E1/T1(0~7)
E1/T1(0~7)
Active A BC D
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 38
Standby
5 5
6 6
HUAWEI Confidential
Page 39
HUAWEI
Product label
HUAWEI Confidential
Page 40
HUAWEI Confidential
Page 41
should blink.
When PDF normally works, turn the switches of the power distribution box to ON one by one and use a multimeter to check whether the output voltage of the power distribution box is in the required voltage scope (-57V~-40V).
HUAWEI Confidential
Page 42
Note: Check the boards indicator after inserting a board. Insert the next board
HUAWEI Confidential
Page 43
Assignment of Switches
SW1SW4
GEPS/GTCS
SW2SW5
GEPS/GTCS
SW3SW6
GEPS/GTCS
HUAWEI Confidential
Page 44
Do not leave cable ties or any other thing in the cabling rack (trough), at
the cabinet bottom, or around the cabinet. Do not leave cable ties or any other thing below the raised floor. After installation is complete, restore the raised floor to keep it smooth and clean.
HUAWEI Confidential
Page 45
Chapter 1 Preparation for the Deployment Chapter 2 Hardware Installation and Check Chapter 3 Software Installation and Commissioning Chapter 4 Cutover and Acceptance Test
HUAWEI Confidential
Page 46
Summary
Software installation Software structure
HUAWEI Confidential
Page 47
Software Layout
The software of BSC6000 uses a distributed structure and includes the board software and Operation & Maintenance software. The board software, which is distributed among all boards of BSC6000, includes the following types: Board version software Patch software Bios software The Operation & Maintenance software includes the following types: OMU software LMT software M2000 network management software
HUAWEI Confidential
Page 48
Software Description
Software Function Installation time Before delivery Before delivery Suse Linux Enterprise Server 9.0 It provides an operating platform for the OMU software
Windows2000 Professional(SP4)/ Windows XP Professional(SP2)
OMU software
It operates on the GBAM server and finishes the Operation & Maintenance function of the system.
It performs the maintenance function through the OMU software on the GBAM server.
At the site
LMT software
At the site
It includes the radio resource processing At the site software, resource controlling plane software, BTS management software, and configuration management software, which implement functions of different entities.
HUAWEI Confidential
Page 49
Networking Diagram
Networking scheme Use Port10 of GSCU in the basic subrack to interconnect GSCU and the GBAM server. Port10 on the active and standby GSCU in the basic subrack form
EHT 10 GSCU
GMPS
GSCU
Intranet 80.0.X.X
EHT 10
LAN Switch
Internet
LMT
M2000
HUAWEI Confidential
Page 50
HUAWEI Confidential
Page 51
HUAWEI Confidential
Page 52
HUAWEI Confidential
Page 53
Convert
Help pfbTool Uninstall
Common\SWM\Software of LMT.
Log into the BSC6000 local maintenance terminal, in the menu select BSC software > BSC software maintenance > Download software and finish downloading according to instructions of the
wizard.
Query software information in the OMU version area. Notes If the downloading fails, restart and download again.
> Download BTS software, and finish software downloading according to instructions of
the wizard. Notes BTS board software support only the file name with .bin or .hex as its suffix. Do not change the file name of BTS board software.
If on the GBAM server, a files name is the same as the downloaded file, the file on the
GBAM server will be overwritten. The system gives no prompt about the overwriting. So it is recommended to make backup of the files on the GBAM server before downloading to avoid data loss.
If the downloading state is waiting for download, wait for the response from the FTP
server.
In the downloading process, if the downloading of a file is halted the files following continues to be downloaded. If the downloading process is existed midway, the file currently being downloaded will be downloaded, but the files following will not be downloaded.
HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential
Page 56
Commissioning Process
For specific methods and procedure of
Prepare for Commissioning Load BSC software Load BTS software Verify the Abis interface Verify the Ater interface Verify the A interface
commissioning, refer to
the Commissioning Guide.
HUAWEI Confidential
Page 58
HUAWEI Confidential
Page 59
HUAWEI Confidential
Page 60
Speech service
MS calls local PSTN subscribers or The connect success rate exceeds local PSTN subscribers call MS for 50 90%. The voice is clear and has no times respectively. obvious noise.
MS calls MS for 50 times. The connect success rate exceeds 90%. The voice is clear and has no obvious noise. The faxes are correctly transmitted and received. The data rate is basically the same as the tested data rate in lab.
Data service
MS sends faxes to facsimile machines, and facsimile machines send faxes to MS. Test the GPRS or EDGE function of MS.
During operation, change over boards The changeover success rate exceeds for five times. 90%, and the service is not interrupted by the changeover.
HUAWEI Confidential
Page 61
Service Test
Service test
Dialing test of feature services
Feature services Dialing test process Use a dual-mode mobile phone to switch over from GSM network to UMTS network and from UMTS network to GSM network for 50 times respectively. Expected result The connect success rate exceeds 90%. The voice is clear and has no obvious noise.
Inter-system switchover
Location service
Make an MS initiate a call and The position of MS meets keep connection, and locate the the accuracy MS. requirement.
AMR service
MS calls PSTN subscriber and selects AMR as the speech version. Test for 50 times.
The connect success rate exceeds 90%. The voice is clear and has no obvious noise.
Page 62
HUAWEI Confidential
Chapter 1 Preparation for the Deployment Chapter 2 Hardware Installation and Check Chapter 3 Software Installation and Commissioning Chapter 4 Cutover and Acceptance Test
HUAWEI Confidential
Page 63
HUAWEI Confidential
Page 64
Cutover
Cooperate with the customer to work out the Cutover Scheme according to the demands. Confirm the responsible persons and duty division of both parties. Negotiate with the customer about how to guarantee the success of the equipment cutover and about the remedy measures in case of cutover failures. Arrange personnel to observe operation of the equipment. Noteworthy issues during cutover: Designate the responsible persons for each operation. Take the next step only after ensuring that a step is complete. Two operators are required for those important steps. Designate responsible departments and persons for each cutover step and the dialing test. If the cutover is not complete, the dialing test fails, or the success rate is lower than 80% by MM-DD XX:00, unconditionally back off the cutover.
HUAWEI Confidential
Page 65
Dec. 31 2006