I hereby declare that work entitled Summer training project report, Submitted towards completion of vocational training after second year of B.Tech (MECHANICAL) at PDPM-IIITDM JABALPUR comprises of my original work pursued under the supervision of guides at NTPC Sipat. The results embodied in this report have not been submitted to any other Institute or University for the fulfillment of any other curriculum.
Harshit Kumar Gupta
CERTIFICATE
This is to certify that Mr. Harshit Kumar Gupta Of PDPM IIITDM JABALPUR has undergone vocational training from 21-05-2012 to 18-06-2012 at NATIONAL THERMAL POWER CORPORATION SIPAT (C.G.) in the COAL HANDLING PLANT and has made the project under my guidance.
Under the guidance of :-
Mr.M.C.Mitra Sr.Supdt.(CHP/MM)
ACKNOWLEDGEMENT
It is not possible to prepare a project report without the assistance and encouragement of other people.This one is certainly no exception On the very outset of this report, I would like to extend my sincere and heartfelt obligation towards all the personages who have helped me in this endeavor. Without there active guidance, help, cooperation and encouragement, I would not have made head way in the project. First and foremost, I would like to express my sincere gratitude to my project Guide Mr. M.C.Mitra. I was privileged to experience a sustained enthusiastic and involved interest from his side . I would also like to thank Mr. D.S.Patil, Mr. Sameer Ekka, Mr. A.K.Singh, who instead of their busy schedule, always guided me in right direction to head and also helped me in understanding Coal Handling Plant. Last but not the least, I would like to thank Mr. Pravin Patel, for the allotment in the C.H.P. Batch of Vocational Trainees. I would like to thank Employee Development Center for organizing and permitting the Vocational Training Program for us.
Thanking You,
The function of a CHP is to receive, process, store & feed the Coal bunkers consistently over the entire life of the Power plant. Coal is received from mines in the form of lumps, the sizes varying from 100mm to 350mm,BOBR meaning Bogie Open Bottom Rapid discharge unloaded in TRACK HOOPERS . (Here it comes mainly from DEEPIKA MINES )
BOBR
TRACK HOOPER
PADDLE FEEDER
Then this raw coal is scooped onto the conveyer by use of PADDLE FEEDER
CONVEYER BELT
Now this conveyer belt moves forward and carries that raw coal to CRUSHER HOUSE. In between there are equipment likes METAL DETECTORS, SUSPENDED MAGNETS which separates coal from METALS which is not desirable in the production and Non-ferrous materials like stones, shells, wood etc. are removed MANUALLY These belts are very strong and have steel cords inside. There are Normal conveyor Idlers , they are the supporting rollers for the conveyor belt on which the coal laden conveyor belt glides
|~|
CRUSHER HOUSE.
Here coal received from track hoopers is fed to VGF(Vibrating Gizzle Feeder) which allows 20(+) size coal to go to crusher and not allow 20(-) coal to go to crusher where there size is reduced to 20(-)
-Here we use Roller hammer type crusher . - And there are 4 COUPLING motors located over springs for rotating the rollers. -Then all 20(-) coal is sent either to STOCK YARD or to COAL BUNKERS via appropriate TRANSFER POINTS through CONVEYER BELT.
OPERATION OF STACKER
Luffing : This is vertical movement ,powered generally by 2 hydraulic cylinders Traveling : The stacker moves on a rail track enabling it to move around the stockyard as required. Slewing: This is rotation of the stacker around its central axis to align or place the stockpile where required. This utilizes sun and planet gear type gear box
A TYPICAL STACKER....
SUPER HEATERS
Then separated saturated steam is taken out from boiler drum through series of nozzles and fed to series of SUPER HEATERS. Firstly through DIV PANEL SH-which heats saturated steam by about 40 degree by mode of convection Then this passes through PLATEN SH-which raises temp further by next 70 degrees by mode of radiation then it goes to FINAL SH via ATTEMPRATOR which lowers the temp by spraying a fine stream of water(it is done to control the temp ) FINAL SH where remaining temp inc is picked up after which it goes to HP turbine and get expanded ** All the superheaters used are basically CLOSED HEATER
REHEATERS.
Sole purpose of reheating is to devoid wet steam from condenser which may result in EROSION OF BLADES of turbine. After steam get expanded in HP turbine(upto IP say 345 degree and 45 bar) outlet steam is passed to REHEATERS (after passing via another ATTEMPRATOR) which heats up that steam
Extra oxygen required for combustion is provided by SECONDRY AIR Initially during LIGHTING UP of boiler we first ignite coal by HFO and HLT and stop them after initialization BURNER TILT MECHANISM:
Sole purpose of turbine is to produce work by expanding steam from very high pressure to low condenser pressure. We mainly use three types of turbine here viz. 1 HP turbine, 1 IP turbine and 2 LP turbine We are using different pressure turbines for reheating purpose so that we can enhance overall efficiency of the plant (or so that we can overcome problem of wet steam) First superheated steam is allowed to expand in HPT to some IP and then send back to boiler for reheating purpose. Then this reheated steam is sent to IP turbine for expanding where after it get expanded to some lower pressure a BLEND steam is taken out and sent to FEED WATER HEATER (FWH) for heating feed water (for REGENERATION )
GENERATOR
Shaft rotated at very high RPM by TURBINE is then coupled to generator which converts rotating energy of shafts into electrical energy. During this process there is large amount of heat generation for which we require a special type of cooling system. Hydrogen gas cooling, in an oil-sealed casing, is used because it has the highest known heat transfer coefficient of any gas and for its low viscosity which reduces wind-age losses This system requires special handling during start-up, with air in the chamber first displaced by carbon dioxide before filling with hydrogen. This ensures that the highly flammable hydrogen does not mix with oxygen in the air.
During cooling of steam CW gets heated and this is send to COOLING TOWERS for getting cooled. Here hot CW is fed onto top of COOLING TOWER and allowed to fall down Also perpendicular to direction of falling air is allowed to blow which cools the water and gets out from top of the tower Also since always some of the water losts in the whole process either due to leakage or due to evaporation so we supply extra water from MAKE UP WATER PUMP
Ash collected in hoppers is grinded by grinders and mixed with water and then sent to ash slurry house by using jet pumps. Where it is collected in ASH PIT, from where it is pumped to ASH POND. Here there is also an auxiliary pump which is used for FLUSHING OFF blockages.
|~|
BA Trans. Pump
A S P H
Ash Dyke