Documente Academic
Documente Profesional
Documente Cultură
by:
Tri Ratna Bajracharya
Department of Mechanical Engineering
Pulchowk Campus, Institute of Engineering
Tribhuvan University, Pulchowk, Lalitpur, Nepal
3000 4580
2000
1000 2670
1370
0
per capital energy consumption
Classification of Hydropower
Micro Hydro Power Up to 100 kW
609.057 MW
Small Hydropower 8 – 20 kW
Contribution in GDP
Agriculture
sector
40%
Non
Agriculture
Sector
60%
Renewable
Energy
0.47%
Installed capacity, kW
800
120
installations
700
Number of
100 600
80 500
60 400
300
40
200
20 100
0 0
1980 1985 1990 Year 1995 2000
Ilam
Similarly Baglung district
generates 0.89 MW and is
12 % of total MHP power 1165
generation.7471.8 0.9 Power Generation
from MHPs in MW.
Currently 0.81 MW of MHPs
are under construction and Others
detail feasibility of 0.97 MW
Baglung
capacity is already
completed.
6.6
Micro-Hydro Power for Rural Economic Development
Access to Electricity
1,000,000
Number of households
Microhydro
800,000 schemes 56220
Solar home 31330
600,000 systems 1261
3817
400,000 NEA & other
systems 697116
518816
200,000
19999 7403
0 29338
Mountain Hill Terai
Machines running in
Sikles Village without
Hauler machine with motor of 4 kW. any problems
Employment