UNIVERSITY TECHNOLOGY MARA SHAH ALAM FACULTY OF ARCHITECTURE, PLANNING & SURVEYING CENTRE OF CONSTRUCTION STUDIES
Construction project is one of the manufacturing the large output Definition of delay in construction industries as the time over-run either beyond completion date by contract. (Sadi A. Assaf, 2006) According to (Sambasivan & Soon, 2007), 17.3% of contract project of Malaysia government were
UNIVERSITY TECHNOLOGY MARA SHAH ALAM FACULTY OF ARCHITECTURE, PLANNING & SURVEYING CENTRE OF CONSTRUCTION STUDIES
PROBLEM STATEMENT
1.
of sources. That effect to completing the project on time with indicator of efficiency.(Sadi A. Assaf, 2006) 2. Accelerated or extended the duration of completion while project delayed can cause high cost. (Aibinu & Jagboro, 2002)
UNIVERSITY TECHNOLOGY MARA SHAH ALAM FACULTY OF ARCHITECTURE, PLANNING & SURVEYING CENTRE OF CONSTRUCTION STUDIES
1.
2.
3.
UNIVERSITY TECHNOLOGY MARA SHAH ALAM FACULTY OF ARCHITECTURE, PLANNING & SURVEYING CENTRE OF CONSTRUCTION STUDIES
REFERENCE
Aibinu, A., & Jagboro, G. (2002). The effects of construction delays on project delivery in Nigerian. International Journal of Project Management 20, 593599. Sadi A. Assaf, s. A.-H. (2006). Cause of delay in large contruction site. Dahran: Elsevier. Sambasivan, M., & Soon, Y. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management 25, 517526.
UNIVERSITY TECHNOLOGY MARA SHAH ALAM FACULTY OF ARCHITECTURE, PLANNING & SURVEYING CENTRE OF CONSTRUCTION STUDIES
2. Buletin Mutiara (2012). Dasar baru MPSP, bahan binaan wajib dibuang ke
dalam
tong
roro,
Retrieved
on
June
2013
from
http://www.buletinmutiara.com/dasar-baru-mpsp-bahan-binaan-wajibdibuang-ke-dalam-tong-roro/ 3. The Star (2012). Construction waste burned despite prohibition, Retrieved on 3 June 2013 from http://thestar.com.my/news/story.asp?file=/2012/6/ 25/sarawak/11543261&sec=sarawak